EXHIBIT A PERMIT & GENERAL BUILDING FEES SCHEDULE

Similar documents
ORDINANCE NO (revised by Ordinance )

COUNTY OF FREDERICK INSPECTIONS DEPARTMENT FEE SCHEDULE Approved July 14, COMMERCIAL FEES Minimum Fee $ unless stated otherwise

NOW, THEREFORE, BE IT ORDAINED, by the Council of the City of Maple Heights, County of Cuyahoga, State of Ohio that:

Village of Glen Ellyn Fee & Deposit Schedule Per Village Code 4-1-4

BUILDING PERMIT FEE SCHEDULE

Department of Public Works Permit Fee Schedule

ORDINANCE NO ORDINANCE TO AMEND AN ORDINANCE CODIFIED IN THE CODE OF THE TOWNSHIP OF NUTLEY, CHAPTER 272, ENTITLED CONSTRUCTION CODES, UNIFORM

EXHIBIT A to Ordinance No PART 1

NOTICE. Valuations for determining the building permit fee shall be set by the Building Official per International Building Code Section

Permitting Fee Schedule

Chapter 3.08 FEE SCHEDULE OF VILLAGE PERMITS AND SERVICES*

City of Georgetown. Inspection Services

FEE SCHEDULE Construction Services and Permitting

FY 2018 FEE SCHEDULE (Effective )

Fee Schedule for Zoning, Building Permits, and Plan Review Services

BY-LAW NO NOW THEREFORE the Council of The City of Brandon, in open session assembled, enacts as follows:

CITY OF PALM COAST SUMMARY OF APPLICATION AND IMPACT FEES

APPENDIX A BUILDING PERMIT AND RELATED FEES

THE CITY OF WINNIPEG BY-LAW NO. 96/2012

Building Permit Fees (B) Electrical Permit Fees (C) Mechanical Permit Fees (D)

Zoning Permit. Other permits you may need: Flood Hazard Development Permit Application. Residential site Permit. Inspection: New business only.

ORDINANCE NO

10% of Building Permit in addition to the full Building Permit Fee

Appendix G Fee Schedule

City of Georgetown. Inspection Services

BUILDING PERMIT FEE ESTIMATE

9. Public (Federal, State, or local

Town of Jamestown Single/Two-family Residential. Building Permit Application Packet

CITY OF JOHNSTOWN SCHEDULE OF PERMIT FEES

Building Permit Miscellaneous Fees At time of submittal, a 15% non-refundable deposit is required.

Reynoldsburg Code of Ordinances. CHAPTER 1305 Permits and Fees

ORDINANCE NO. WHEREAS, the last update to the Chapter 6 Buildings and Building Regulations fees schedule was over a decade ago; and,

NEW BRITAIN BOROUGH SCHEDULE OF FEES (Revised April 9, 2019)

TOWN OF HAVERHILL, NH

3. COMMUNITY DEVELOPMENT Approved FY 18 19

AN ORDINANCE FOR ADOPTION OF FEES IN CONJUNCTION WITH THE FAMILY OF INTERNATIONAL BUILDING CODES FOR PEARL RIVER COUNTY

AGENDA NO: 2008/Mar/ /03/08 Department Head Date City Manager Date

What is the first step in the Architectural Committee Improvement Application process?

BUILDING & ZONING SCHEDULE OF FEES Effective March 15, 2015

City of High Point Development Fee Schedule

Administration Fees Photocopies $ Returned Checks $ Credit Card Convenience Fee $ 1.50 minimum OR 2.45%

Town of Holly Springs Residential Development Fee Worksheet. Effective July 1, 2018 June 30, 2019

SPEAR S RANCH ON SALADO CREEK ARCHITECTURAL CONTROL COMMITTEE IMPROVEMENT GUIDELINES

BOROUGH OF NORTH WALES. Fee Schedule Effective: 01/01/2018

COUNTY OF TAZEWELL DEPARTMENT OF COMMUNITY DEVELOPMENT

Home Basis Record Book

Town Code Section Department Fee Type Parking Permits (pro-rated fees)

Worcester Township Fee Schedule

MASTER FEE SCHEDULE ATTACHMENT TO CITY ORDINANCE 102. Alcoholic Beverages:

City of Sand Springs, Oklahoma Planning and Development Department Neighborhood Services Office

RESOLUTION NO

FEES AND COST DEPOSITS FOR SUBDIVISIONS, LAND DEVELOPMENTS AND DEVELOPMENT MATTERS SKETCH PLANS

Planning&Development Fee Standards

Fee Resolution

ORDINANCE NO: INTRODUCED BY: ADMINISTRATION

NEW BRITAIN BOROUGH SCHEDULE OF FEES (Revised December 15, 2017)

Village of Baxter Estates Fee Schedule

BUILDING & INSPECTIONS DIVISION 200 East Wood Street Palatine, IL Telephone (847)

Watertown City Council

Zoning Permit Application

2018 BUILDING PERMIT FEES New Commercial

Application fee (Non-refundable) $20.00 Public Passenger Vehicle Chauffeur's License

APPLICATION FOR AN ACCESSORY APARTMENT PERMIT

Architectural Control Committee Guidelines

BUILDING SERVICES ~ FEE SCHEDULE

City of Washburn 2018 FEE SCHEDULE

EAST WHITELAND TOWNSHIP FEE SCHEDULE 2018

RESIDENTIAL / HOME OCCUPATION

Grass Lake Charter Township 373 Lakeside Drive, P.O. Box 216 Grass Lake, Michigan 49240

TOWN OF HERNDON, VIRGINIA ORDINANCE MAY 26, 2015

SOMMERSET ASSOCIATION POLICIES AND PROCEDURES INFORMATION PACKET FOR SOMMERSET ASSOCIATION HOMEOWNERS

APPENDIX A 2018 FEE SCHEDULE

1. Permit Fees for new single family dwellings, duplexes, and multifamily dwellings with eight units or less are as follows:

THE TOWN OF Angier N O R T H C A R O L I N A

Fees for construction of all buildings except single family dwellings, shall be calculated using Table 2.

2017 TOWN OF RISING SUN FEE SCHEDULE ADOPTED

Location in Code Subject Fees

ACCESSORY DWELLING UNITS

Town of Angier Rate and Fee Schedule Fiscal Year Effective July 1, 2011

Village of Kenilworth 2018 Annual Fee Schedule

TATAMY BOROUGH 2018 FEE SCHEDULE ADOPTED 1/2/18 EFFECTIVE 1/1/18

RESIDENTIAL BUILDING/GENERAL PERMIT FEE SCHEDULE

List of Principal Officials

CHAPTER 1321 Permit and Inspection Fees

SECTION 1. That Section 20-3 of Chapter 20 entitled Fees be and is hereby amended to read as follows: *Plan review fees are not refundable*

FEE SCHEDULE. Updated December 18, 2018

TEMPORARY CONSTRUCTION EASEMENT JEA SEWER SYSTEM CUSTOMER OWNED, OPERATED AND MAINTAINED

CITY OF GALION OHIO CONSOLIDATED FEE SCHEDULE

Lindon City Accessory Apartment Requirements Handbook

BUILDING PERMITS Table Total Valuation. $1.00 to $ $26.00

SCHEDULE OF PERMIT FEES. (Effective November 3, 2015)

QUARTERLY ZONING REPORT

QUARTERLY ZONING REPORT

SWYGERTS LANDING CODE. The resource for all Architectural Review Board related items.

PARISH OF ASCENSION OFFICE OF PLANNING AND DEVELOPMENT

Information Needed for a Building Permit

APPLICATION FOR DRIVEWAY PERMIT

Caroline County, Maryland Department of Planning & Codes FEE SCHEDULE Tel: Fax:

LIMERICK TOWNSHIP 646 WEST RIDGE PIKE LIMERICK, PENNSYLVANIA 19468

RESOLUTION PERMIT FEE SCHEDULE

Transcription:

EXHIBIT A PERMIT & GENERAL BUILDING FEES SCHEDULE Residential & Commercial New Construction Residential & Commercial Repairs, Alterations, Remodeling General Building Permit Fees 1% of construction value as determined by the most recent Permit Fee Schedule published by the International Code Council 1% of construction value as declared by applicant Manufactured Home Cost of water meter plus $130 Minimum Permit Fee $75 Doubling of Fees Permits shall be obtained prior to beginning work or the application fees shall be doubled. Waiver of Fees Permits and other fees may be waived for not-for-profit organizations at the discretion of the Village Board Re-inspection Fee $125 Demolition Fees Residential Shed, Garage $50 Other Structures or Buildings $50 plus $10 for each 1,000 square feet of gross floor area Plan Review Fees Third Party Review - The Building Commissioner may require that an approved third party review building plans and other construction documents. The cost of such review shall be borne by the permit applicant. Construction Value of $25,000 or more Cost to Village plus 10% of building permit fee, up to a maximum of $500 Construction Value of less than $25,000 In-House Staff Review Construction Value of $25,000 or more Construction Value of less than $25,000 Residential & Commercial New Construction Residential or Commercial Remodeling Commercial Parking Lot Lighting Commercial Permit Garage or Accessory Structure Electric Miscellaneous/Low Voltage Systems Cost to Village plus $35 20% of building permit fee up to a maximum of $1,500 $100 Electrical Permit Fees 20% of the building permit fee (includes all electrical permit fees) 20% of the building permit fee or $75 for residential and $125 for commercial work when a building permit fee is not required $35 per light pole, up to a maximum of $350 $125 minimum $40 $35 1

EXHIBIT A PERMIT & GENERAL BUILDING FEES SCHEDULE Residential Permit $75 minimum Service (temporary, $40 up to 100 amps, plus $30/each add l 100 amps upgrade or new) Pool Electric $40 Re-inspection Fee $125 Miscellaneous Permit Fees Note: If the proposed work includes a combination of permits, the fee will be the cost of the combined permit fees or one percent (1%) of the work to be performed, whichever is less. Basketball Court $40 plus zoning certificate fee Deck Driveway New Resurfacing Extension Fence Garbage Enclosure Gazebo Patio Shed Swimming Pool Above-ground $65 plus zoning certificate fee $65 $40 $40 $30 plus zoning certificate fee $65 plus zoning certificate fee $40 plus zoning certificate fee $40 plus zoning certificate fee $65 plus zoning certificate fee $40 plus zoning certificate fee In-ground 20% of cost of construction plus zoning certificate fee Antenna Structures (Private $40 plus zoning certificate fee Residence) Antenna Structures $50 plus zoning certificate fee (Commercial or Industrial) Construction Water $150 Roof (Re-Shingle) $40 Roof (Tear-Off, Re-Roof) $40 Siding, Soffit, Facia $40 Windows $40 Gutters $40 Mailbox Monument $55 Garage Door, Patio Door $40 Concrete-Sidewalk or Porch New Replacement $65 $40 Miscellaneous Residential $75 Building Permit Miscellaneous Commercial $125 Building Permit Mechanical Permit Fees 2

EXHIBIT A PERMIT & GENERAL BUILDING FEES SCHEDULE Residential & Commercial 20% of the building permit fee New Construction Residential or Commercial 20% of the building permit fee or $75 for residential and Remodeling $125 for commercial work when a building permit fee is not required Residential Permit $75 minimum Commercial Permit Commercial Boiler, Water Heater or Pressure Vessel (Per Unit) Commercial Furnace or $65 Heater (Per Unit ) Residential Central Air $40 Conditioning Residential Furnace $40 Residential Water Heater, $40 Boiler Re-inspection Fee $125 Residential & Commercial New Construction Residential or Commercial Remodeling $125 minimum $65 Plumbing 20% of the building permit fee 20% of the building permit fee or $75 for residential and $125 for commercial work when a building permit fee is not required Lawn Sprinkling System Residential - $40 Non-Residential - $55 Commercial Permit $125 minimum Sewer Clean-Out $40 Water Heater, Boiler $40 Residential Permit $75 minimum Re-inspection Fee $125 Contractor/Sub-Contractor Licenses Contractors Sub-Contractors Health Inspection General (excl. Restaurants) Restaurants $150 $150 Health Inspections $125 (annual) $225 (annual) Re-Inspection $125 Elevator Inspection Fees Elevator Annual Inspection $55 plus service contractor fee Elevator New with Plan $55 plus service contractor fee Review Elevator Re-inspection Fee $55 plus service contractor fee Property Maintenance Fees 3

EXHIBIT A PERMIT & GENERAL BUILDING FEES SCHEDULE Property Maintenance Out- $60, plus cost to Village Sourcing (i.e. grass cutting; board-up) Existing Structure Inspections (ESI) Commercial $150 up to10,000 sq.ft. $150 + 1% per sq.ft. of total gross floor area >10,000 sq.ft. (incl. initial inspection only and one re-inspection) Re-Inspection for $125 -up to10,000 sq.ft. Commercial $125 +$.005 >10,000 sq.ft. Residential $75 (incl. initial inspection and one re-inspection) Multi Family Annual $35 /dwelling unit up to a maximum of $420 (incl. initial inspection and one re-inspection) Re-inspection for $125 Residential Re-inspect for Multi Family $100/dwelling unit up to a maximum of $1,000 Annual Construction Value $0 to $2,000 $2,001 to $25,000 Over $25,000 Current Price Schedule 5/8 x ¾ T10 1 T10 1-1/2 T10 2 T10 2 T/F Compound 3 T/F Compound 4 T/F Compound 6 T/F Compound New Construction Water Usage Sewer Connection Up to 2 inch water service > 2 inch water service Residential Cash Bonds (for concrete work when homeowner serves as contractor) $ 125 $ 250 $ 500 Meters $ 242.91 $ 286.60 $ 378.13 $ 532.51 $1,439.00 $1,929.00 $2,664.40 $4,316.40 Water/Sewer Fees $150 $ 400 $1,000 Water Connection Up to 2 inch water service > 2 inch water service $ 400 $1,000 Sign Permit refer to Planning & Zoning Fees Schedule 4

GENERAL BUILDING & PERMIT FEE SCHEDULE EXHIBIT B Approved March 2, 2015 VILLAGE OF MATTESON PERMIT FEE SCHEDULE GENERAL FIRE PERMIT FEES FIRE PREVENTION FEES Minimum permit fee $ 100 Re-inspection $ 100 Second Re-Inspection $ 200 Third Re-Inspection $ 300 Fourth Re-Inspection $ 400 Fifth or more Re-Inspection $ 500 per inspection General review of Building plans $ 100 Smoke detection system review by staff $ 250 Fire sprinkler review by staff $ 300 Fire sprinkler review by third party cost of review plus $ 250 Fire smoke detection review by third party - cost of review plus $ 100 Residential Existing Structure Inspection $ 50 Commercial Existing Structure Inspection $ 100 FIRE DEVELOPMENT FEE A Fire Development Fee shall be assessed for all newly developed properties within the Village boundaries as outlined below: Residential Fire Protection Fee $ 349.00 per home Commercial Fire Protection Fee $1,850.00 per acre 1 Acre = 43,560 square feet 1 square foot = 0.0000229568411 acre