Boiler Design Documents Appraisal Procedure

Similar documents
People's Republic of China. The Interim Regulations on the Registration and Administration of Private Non-enterprise Units

General Terms and Conditions of Sale

Town of Bristol Rhode Island

BUSINESS TERMS AND CONDITIONS FOR PURCHASE OF GOODS

UNITED NATIONS CONVENTION ON THE ASSIGNMENT OF RECEIVABLES IN INTERNATIONAL TRADE

PERMITS & PLANS APPROVALS ADVANCED MODULE INTERNET

CIRCULAR On strategic environmental assessment, environmental impact assessment, and environmental protection plans (*)

This announcement is hereby promulgated. General Administration of Customs May 28, 2018

Ordinance No. 32. on Reporting Requirements and Assignee s in Bankruptcy Budget. Chapter One. General Provisions. Chapter Two

APPRAISAL MANAGEMENT COMPANY

PROPOSED REGULATION OF THE MANUFACTURED HOUSING DIVISION OF THE DEPARTMENT OF BUSINESS AND INDUSTRY. LCB File No. R009-12

RULES AND REGULATIONS OF MARTIN COUNTY WATER AND SEWER DISTRICT NO. 1. C. Metering Individual Trailers in Mobile Home Parks

ELECTRONIC COMMERCE TRADING PARTNER AGREEMENT (Dated 10 November 2016)

Okinawa Institute of Science and Technology School Corporation Contract Management Stipulations

1. Seller means Cventus Ltd with the registered office in Nicosia, Tax Identification Number: CY T, here in after referred to as CVENTUS.

North Dakota Condo Laws. 1. "Common areas" means the entire project excepting all units therein granted or reserved.

2.4 The inspection and certification orders are processed in the order in which the documents and/or information are received.

GENERAL TERMS AND CONDITIONS OF PURCHASE

CHAPTER VIII 1 PERMIT REQUIREMENTS FOR RETAINING TANKS

Okinawa Institute of Science and Technology School Corporation Contract Management Stipulations

GENERAL TERMS AND CONDITIONS OF SALE. December 2010

* FOR OFFICE USE ONLY File Number: Profession 1504; Initial Application 1010

SAMPLE ESCROW AGREEMENT APPLICATION SOFTWARE SOURCES CODE., (hereinafter Escrow Agent ) whose main office. is located at,, and,

RĪGA STRADIŅŠ UNIVERSITY STUDENTS HOSTEL ACCOMMODATION LEASE AGREEMENT No., 20, Riga

ALLIED INTERNATIONAL SUPPORT, INC. TERMS AND CONDITIONS OF PURCHASE ORDER

the goods shall be the items and/or services stated in the purchase order by the Buyer,

ON LEASING THE LAW ON LEASING CHAPTER I GENERAL PROVISIONS. Article 1. Scope of application

Quality management system. of supplies and services

Conditions of Purchase FISCHER GmbH & Co. KG Lagertechnik + Regalsysteme, Stutensee

General Conditions on Purchasing. (Version 2010)

Republika e Kosovës Republika Kosovo-Republic of Kosovo Kuvendi - Skupština - Assembly

Information Memorandum FOR SALE FOR REMOVAL (as a total package or parts thereof)

ADDENDUM #2. September 14, 2018

Frequently Asked Questions - What Owners, Installers and Real Estate Professionals Need To Know

Land Improvement Act

IAS Revenue. By:

DISTRIBUTOR ESCROW AGREEMENT

TC-05 Terms and Conditions of Purchase (Purchase Order International Terms and Conditions Fixed Price Procurement)

TENDERER S INFORMATION CONTACT DETAILS PROPERTY DETAILS

STANDARD TERMS AND CONDITIONS FOR THE SALE OF GOODS

IV. REVIEW PROCEDURES FOR MINOR SUBDIVISIONS

INDIAN RIVER COUNTY/CITY OF VERO BEACH ALTERATIONS AND ADDITIONS Generator INFORMATION/CHECKLIST BUILDING DIVISION

hereinafter called the Lessor, and the UNITED STATES OF AMERICA, hereinafter called the Government:

GENERAL TERMS AND CONDITIONS OF SALE of the company KATOLIK GROUP SP. Z O.O. [Ltd.]

Indian Institute of Technology Bombay

MODEL INTERNATIONAL FORM No. 4 REQUEST FOR THE RECORDAL OF A CHANGE IN OWNERSHIP

Q16 - Engineering Directed Standard Tool/Perishable Tool Inspection Requirements

ARCHITECTURAL MODIFICATION GUIDELINES

Landlord Guide to Housing Choice Voucher Program

QUALITY REQUIREMENTS SELLER QUALITY REQUIREMENTS

Quality Clause Q16. Engineering Directed Standard Tool/Perishable Tool Inspection Requirements

TECHNICAL BID. T 4449 (E-Tender I.D. No. ) Subject: Supply of EFW Coal Discharge Pipes for Coal Mill -3, 4 & 5 at GSECL Ukai TPS.

FUNDS TRANSFER AGENCY AGREEMENT

Report Topical Peer Review 2017 Ageing Management Technical Specification for the National Assessment Reports -

EXHIBIT J BILL OF SALE

The General Terms of Sale of Metal Process Sp. z o.o.

1. Introduction and reading guide Purpose of the inspection The inspection period Requirements for the inspection...

LAND (AMENDMENT) ACT (NO. 2) 1991

Direction for General Regulation Concerning Jointly Owned Properties. Chapter One Definitions and General Provisions

LAW OF THE RUSSIAN FEDERATION ON MORTGAGE (PLEDGE OF REAL ESTATE) NO. 102-FZ OF JULY 16, 1998

CARRDAN TERMS AND CONDITIONS

Application for a Building/Zoning Permit

Cartersville Code of Ordinances Historic Preservation Commission

PLANNING DEPARTMENT Application for a Type 2 Use through the Board of Adjustment & Appeals

CITY OF KEEGO HARBOR 2025 Beechmont, Keego Harbor Michigan (248) ORDINANCE NO. 417

PLANNING DEPARTMENT Application for a Nonconforming Use Modification

Title 32: PROFESSIONS AND OCCUPATIONS

114 Vaughan Road Condominium Final Report

Map Filing Law. 46: Effective date This act shall take effect January first, one thousand nine hundred and fiftyfour.

Selecting your contractor Construction contracts Construction liens Lien documents Payments to contractors

CHAPTER 16 ELECTRICAL CODE PAGE NO.

WEB Mission Statement Quality of life depends on access to safe sustainable water. EQUAL OPPORTUNITY PROVIDER

GREEN CORRIDOR PROPERTY ASSESSMENT CLEAN ENERGY (PACE) DISTRICT PROGRAM GUIDELINES. November 17, Version 1.2

CHAPTER SHORT SUBDIVISIONS

Terms & Conditions. Cleveland, OH Toledo, OH Pharr, TX. Universal Metal Products, Inc Lakeland Boulevard Cleveland, OH

BUILDING CODE SERVICES PERMIT SUBMITTAL REQUIREMENTS (2017 Florida Building Code in Effect)

COLLEGE OF ENGINEERING JAGTIAL Nachupally (Kondagattu), Kodimial (M), Jagtial Dist , Telangana (India)

PURCHASE AGREEMENT No

10. Land and Property Tax in China 1. The categories of tax concerning land and property in China

ORDINANCE NO

LIQUIDATION CONTRACT

GENERAL TERMS AND CONDITIONS OF SALE

Standard conditions of Eesti Energia AS gas contract for household consumer Valid from 19 April 2018

T E M P O R A R Y U S E A N D O C C U P A N C Y P E R M I T P R O C E D U R E

NELA USA Terms and Conditions of Sale

GUEST BOAT SLIP LEASE

GENERAL BUSINESS CONDITIONS TOP TISK obaly s.r.o.

PRIVATE PROVIDER PROGRAM General Information Rev

Terms and conditions of sale for new motor vehicles

AWI QUALITY CERTIFICATION CORPORATION AWI-NON-QCP PROJECT INSPECTION SERVICES

VERENIGING GOLFKARTON CONDITIONS OF SALE. Lodged with the Clerk to the Court of First Instance, Haarlem on 21 April 2000

Residential Energy Credits

GENERAL TERMS OF ORDER for works performed on the ground

CITY OF SURREY. Surrey Waterworks Cross Connection Control By-law, 2007, No

ON-SITE SEWAGE FACILITY PERMIT APPLICATION

KRS 324A A.150 Definitions for KRS 324A.150 to 324A.164. Effective: June 25, 2013

INTERNATIONAL MARKETING CONTRACT

Certificate of Occupancy Application

WINDWARDS HOMEOWNERS ASSOCIATION ARCHITECTURAL GUIDELINES

TEMPORARY USE AND OCCUPANCIES PERMIT PROCEDURE

Transcription:

oiler Design Documents Appraisal Procedure Contents Chapter 1 Chapter 2 Chapter 3 Chapter 4 Chapter 5 Appendix 1 Appendix 2 Appendix 3 Appendix 4 General Provision Contents of Appraisal Appraisal Procedure Responsibilities and Supervision Administration Supplementary Provisions oiler Design Documents Submitted by Applicants Application Form of oiler Design Documents Appraisal Report of oiler Design Documents Appraisal List of Documents with Stamp Passed for Appraisal 1

Chapter 1 General Provision Article 1 According to the Regulations on Safety Supervision of Special Equipment (hereinafter referred to as the Regulations ) and the oiler Design Documents Appraisal Administration Regulation, design documents of boilers that will be used within the territory of the P. R. China and within the scope stipulated in the Regulations shall be appraised. Article 2 The Procedure is applicable to design documents appraisal of boilers which are fabricated by manufacturers outside the territory of the P. R. China and will be used inside the territory of the P. R. China and within the scope stipulated in the Regulations. Article 3 The China Special Equipment Inspection and Research Center (hereinafter referred to as the CSEI ) has been authorized by General Administration of Quality Supervision Inspection and Quarantine of the P. R. China (hereinafter referred to as the AQSIQ ) to appraise design documents of boilers fabricated by manufacturers outside the territory of the P. R. China. Article 4 Design Documents Appraisal defined in the Procedure refers to review and assess whether the safety performance of boiler appointed for appraisal meet the requirements of Chinese safety technical standards and codes. Generally, it does not include manufacture process, operation performance, economic performance, environmental performance etc. Article 5 Any boiler manufacturers applying for design document appraisal (hereinafter referred to as Applicant ) must hold Manufacture License of Special Equipment (oilers) (hereinafter referred to as Manufacture License ) with corresponding levels. Manufacturers, who are applying for Manufacture License, can apply for oiler Design Documents Appraisal if their Manufacture License application have been accepted and within the term of validity. Article 6 The technical requirements for oiler Design Documents Appraisal are based on the Chinese safety technical regulations, national standards and trade standards such as the Technical Supervision Regulation for Safety of Steam oilers, the Technical Safety Supervision Regulation for Hot Water oilers, the Technical Safety Supervision Regulation for Organic Fluid Heaters, etc. Manufacturers outside the territory of the P. R. China, who have difficulties to completely carry out the above-mentioned Chinese boiler safety technical regulations and standards in short time, are allowed to adopt the technical codes and standards, which are conventional and complete in system and are used by most countries, after having been approved by the ureau of Safety Supervision of Special Equipment of AQSIQ of the P. R. China (hereinafter referred to as the SESA ). However, in this case, they must meet the requirement as stipulated from Article 45 to 50 of the Requirements for oiler and Pressure Vessel Manufacture Licensing simultaneously. 2

Chapter 2 The Contents of Appraisal Article 7 The scope of Appraisal for oiler Design Documents shall include boiler proper s safety performance of materials, structures, strength of pressure parts and safety appurtenances, etc. Article 8 For the boiler design which is first applying for appraisal, the Applicant shall submit design documents according to the requirements of Appendix 1. For the design documents which have passed appraisal, the Applicants shall submit the changed design documents only. Article 9 If the structure of boiler parts and spares is a standard model described in relevant codes and standards of boiler, the detailed drawings and concerned calculations of these boiler parts and spares do not need to be submitted, but concerned code and standard and adopted structure must be described clearly in the related drawings and design documents. Article 10 According to the different structures, the appraisal institution may ask the Applicant to submit other relevant technical documents and data needed for appraisal. Article 11 The main contents of oiler Design Documents Appraisal 1. To verify whether the level classification of the boiler in design documents submitted is in conformity with the level classification of Applicant s Manufacture License. To verify whether boiler design documents meet the requirements of Appendix 1 of the Procedure. To verify whether it has been approved by SESA, in cases that the Applicant adopts foreign technical codes and standards. 2. To verify whether the units of data and parameters for boiler design documents and design drawings are SI system, or whether the units of parameters have been converted into SI system. To verify whether the views of boiler drawings can exactly and completely describe the shape, composition, dimensions and main welding seams. To verify whether the written description can express clearly the main technical characteristics, parameters and the standards, codes or/and technical requirements for the boiler design, manufacturing, inspection, installation and acceptance. To verify whether there are clear identifications on design modification or change in drawings. 3. To verify whether the boiler pressure components (including staying components) are made of killed-steels, whether the designations of the steels are listed in foreign boiler steel standards or are conventional boiler steels. To verify whether the metallic materials used for pressure components meet the applied ranges and requirements of relevant regulations, codes and standards. To verify whether the hydraulic test, items and proportion of NDT, the heat treatment, etc. meet the applied ranges and requirements of relevant regulations, codes and standards. 4. To verify whether the boiler structures are in complete accordance with the Chinese safety technical regulations for boilers. 5. To verify whether strength calculations of pressure parts is standardized and the results 3

meet the requirements of relevant safety technical codes and standards. 6. To verify whether the quantity, specification, category, parameter, type and installation location of safety appurtenances, instruments and safeguard devices (such as safeguard of over-temperature, over-pressure, ignition and flame failure, etc.) meet the requirements of relevant safety technical codes and standards. 7. To verify whether the calculation of relief capacity of safety valves meets the requirements of relevant safety technical codes and standards. 8. To verify whether design of the boiler furnace and flue pass of the boiler proper is in accordance with the requirements of relevant safety technical codes and standards. 9. To verify whether the boiler water circulation calculation, thermal calculation and calculation for the temperature of the walls of superheater and reheater tubes have been done based on relevant stipulations. Chapter 3 Appraisal Procedure Article 12 efore fabrication of boilers which will be exported to the P. R. China, Manufacture License holder outside the territory of the P. R. China can download from CSEI s website (www.csei.org) or directly ask the International Division of CSEI for the Application Form of oiler Design Documents Appraisal and relevant documents (See Appendix 2 for the form and filling out requirements of the Appraisal Application Form of oiler Design Documents ). On design appraisal fee rates and payment way, please directly ask the International Division of CSEI. Article 13 the Application Form of oiler Design Documents Appraisal shall be filled out in Chinese or English in triplicate, and mail to CSEI together with the following documents: 1. The copy of the Applicant s Manufacture License (or the copy of the application form for manufacture license which has been accepted by SESA); 2. For boilers,which are first applying for appraisal, design documents stipulated in Appendix 1 should be submitted; For boiler which have passed appraisal, only the changed documents need to be submitted. The category A of design documents in the Appendix 1 should be submitted for two copies, the category is one copy only. 3. Other necessary complementary documents. Article 14 Manufacturers outside territory of the P. R. China, who have difficulties to completely carry out Chinese oiler safety technical regulations and codes, shall also submit the copy of approval documents issued by SESA for its adopting technical codes and standards other than Chines. Article 15 The Applicant outside the territory of the P. R. China can invite also the design appraisers to conduct design appraisal at the manufacturer s location if there are difficulties to supply all the design documents to CSEI. In this case, in addition to the appraisal fees, the Applicant shall bear costs for the airfare, board and lodging, accident insurance and communication of the appraisers arising from the design appraisal. Article 16 After receipt of manufacturer s boiler design documents and Application Form of oiler Design Documents Appraisal, the CSEI will check application documents, appoint the 4

serial No. of appraisal item and collect fees for appraisal according to regulations. The CSEI will endorse on the application form and return one copy to the Applicant, submit one copy to SESA, and keep one copy by CSEI. Article 17 The CSEI shall complete the appraisal within 15 working days (30 working days for separated boilers), and issue to the Applicant the Report of oiler Design Document Appraisal (see Appendix 3) and give one of the following appraisal conclusions: 1. To modify design The parts of the design, which are in unconformity with requirements of relevant safety technical codes and regulations, should be modified. Appraiser shall point out the parts need to be modified by Applicant and re-appraise the modified documents according to the procedures of this Chapter. 2. Pass the appraisal (agree to register) The design conforms to requirements of relevant safety technical regulations and codes, and manufacturer can proceed with manufacture according to the design. 3. Not pass the appraisal (refuse to register) The design, which has big safety problems, seriously violates relevant safety technical regulations and codes, is completely denied, and the appraiser shall state the reasons meanwhile. Article 18 After the design documents pass the appraisal, CSEI shall stamp on the main design documents with Special Stamp for Pass of the Appraisal for Special Equipment Design Document (see picture 1). Name of the appraisal institution Responsible Person of the Appraisal Institution Special Stamp for Pass of the Appraisal for Special Equipment Design Document CSEI Report No Responsible Person Date 45mm Name of the Special Stamp No. Of the Appraisal Report 70mm Date Picture 1: Special Stamp for Pass of the Appraisal for Special Equipment Design Document For design of assembly boilers, the Special Stamp shall be stamped on the boiler proper drawings and the summary for data of the pressure parts strength calculation. For design of separated boilers, the Special Stamp shall be stamped on the boiler proper drawings or general drawings, the drawings of main pressure parts including drums, water cooled walls, economizers, superheaters, reheaters and attemperators, etc., and the summary for data of the pressure parts strength calculation. Special Stamp for Pass of the Appraisal for Special Equipment Design Document shall be stamped at the upper or right side of the caption column of the design drawings. The CSEI shall file and register the above mentioned stamped documents (see Appendix 4). Article 19 If the Applicant want to use the design documents which are provided by other 5

company and the documents have been appraised and passed appraisal, the original applicant s information (such as the caption column) shall be retained, and stamp of the documents supplier should be affixed, whereas no re-appraisal is required, but above-mentioned design documents should be registered in the CSEI before fabrication. The copy of contract on supplying document, a copy of the related Report of oiler Design Documents Appraisal and documents required in the Appendix 1 should be submitted for registration. Article 20 For any Change to the boiler design documents, which have passed appraisal, the Applicant can not change the original boiler type and numbers of the design drawings. Under following situations, the changed parts of design documents shall be re-appraised as per the Procedure: 1. Any change of design documents to boiler pressure parts and components, main supporting parts, and suspending parts. 2. To substitute high strength material with low strength material. 3. To substitute thick material with thin material (except for heat piping of boilers with rated steam pressure no more than 1.6MPa). 4. The nominal outer diameter of the substituted steel pipes and tubes are different from the original. 5. When applied safety technical codes and standards are modified or revised, the design documents shall make corresponding changes. The Applicant should apply to CSEI for name change registration with name change certification while changing the applicant name (including the supplier s name for supplying design documents) on boiler design documents. Article 21 The Applicant should apply to CSEI for re-appraisal for any design documents change on the article 20 of this Procedure, otherwise design documents would be appraised as a first applying for appraisal. Article 22 The International Division of CSEI is responsible for Appraisal Acceptance. The oiler Division of CSEI is responsible for Implementation and Registration of Appraisal. Chapter 4 Responsibilities and Supervision Administration Article 23 CSEI should keep objective and impartial position when conducting the appraisal, and issue the appraisal conclusion without delay. The CSEI should take good care of the technical documents submitted by the Applicant and keep its secret of any concerned information. Article 24 For any dispute between the CSEI and Applicant, or if Applicant finds some members of CSEI violate the rule or have any dereliction of duty during the appraisal, Applicant have right to appeal to AQSIQ or other related departments. Article 25 When applicant violates the Regulation, the CSEI shall report to AQSIQ and impose administrative penalty on the violation according to Regulations on Safety Supervision of Special Equipment and relevant stipulations. Article 26 The CSEI should report the affairs of boiler design documents appraisal for Applicants outside the territory of the P. R. China to AQSIQ every six months, and publish 6

on its website. Chapter 5 Supplementary Provisions Article 27 The Procedure is also applicable to single-handed boiler parts design. Article 28 The CSEI is responsible for the interpretation of the Procedure. Article 29 The Procedure will become effective as January 1, 2005. Note: The item modification or modify and change in the Procedure are defined as following: Modification (modify) refers to the required actions proposed by appraisers, and should be done by Applicants for the purpose of meeting the relevant Chinese technical codes and regulations. Change refer to self-initiated action made by Applicants to design documents. 7

Appendix 1 oiler Design Documents Submitted by Applicants No Name of Documents Category Remark 1 List for submitted documents Description 2 Design specification for the boiler Documents 3 of Design Installation and operation instruction for the boiler 4 General drawing for the boiler A Two copies should be submitted 5 oiler proper drawing A Two copies should be submitted 6 Drawings for assembly unit (drum, superheater economizer, etc.) A Two copies should be submitted 7 Drawings of main pressure parts A Two copies should be submitted 8 Drawings of main part for supporting and suspending 9 Design Drawings for the piping system A Two copies should be submitted 10 Drawing Drawing for medium flowing 11 Arrangement drawing for safety appurtenances or instruments A Two copies should be submitted 12 Drawings of main system for supporting and suspending 13 Thermal expansion system drawings A Only for separated boilers. Two copies should be submitted 14 System drawing of thermal insulation A Two copies should be submitted 15 Strength calculation sheets of pressure parts or summary of calculations A Two copies should be submitted 16 Relieving capacity calculation sheet of safety valve or summary of calculations A Two copies should be submitted 17 Set value of all safetyguard devices 18 Strength calculation sheets or summary for main parts of supporting and suspending 19 Water circulation calculation sheet (including The organic heat boilers should resistance of water and/or steam flow) or calculate flow resistance of summary of calculations (except shell type mediums boiler in nature circulation) 20 21 22 23 24 Design Documents Thermal calculation sheet or summary of For the boilers with rated steam calculations pressure of 3.8MPa and above For the boilers with rated steam Superheater tube wall temperature calculation pressure of 3.8MPa and above sheet or summary of calculation and organic fluid boiler with rated power more than 7MW Draft resistance calculation sheet or summary of For the boilers with rated steam calculations pressure of 3.8MPa and above Thermal expansion values calculation sheet or For the boilers with rated steam summary of calculations pressure of 3.8MPa and above Reheater tube wall temperature calculation sheet For the boilers with rated steam or summary of calculations pressure of 9.8MPa and above Note: 1. The documents of category A should be appraised, the documents of category are only for supply of date and not for appraisal. 2. The category A of design documents in the Appendix 1 should be submitted for two copies, one will be returned to Applicant, the other one should be kept by CSEI for registration. The category is one copy only. 8

Appendix 2 Application Form of oiler Design Documents Appraisal Name of Applicant Address of Applicant Tel. No. e-mail No. Manufacturer License No. Date of Expiration of Manufacturer License Name of the oiler Fax No. Responsible Person for Design Documents Classification of the Level for Manufacturer Licensing Appraisal Attribution General Situation of the oiler Design Date First Applying for Appraisal Design Change Sort of oiler Steam oiler Hot Water oiler Organic Fluid oiler Others Type of oiler General Drawing No. Rated Outlet Pressure Rated Output(t/h) or Rated Power (MW) MPa Rated Outlet Temperature Mode of Structure Type of Fuel Mode of Combustion Comments of the Last Appraisal and Modification by Applicant Note: 1. To indicate the non-conforming parts and the items needed to be modified by the appraiser in the last appraisal. 2. The modified contents made by Applicant. 3. If this design documents are first applying for appraisal, please type Null here. Change for Design Documents Last Design Appraisal Institution Serial No. of Appraisal Item of Last Appraisal Note: 1. The reasons and contents changed. 2. Other description. If this form is not enough to filling out, please attach sheets with title Description of Design Change Signature of Technical Responsible Person of the Applicant: Signature of Acceptance Person : Note: Fill in this application form in triplicate. One will be returned to applicant, one should be sent to the SESA, and one should be kept by CSEI 9

Appendix 3 Name of Applicant Address of Applicant Manufacture License No. Appraisal Attribution Name of oiler Sort of oiler Type of oiler Report of oiler Design Documents Appraisal Report No.: XXXXXX-GK XX First Applying for Appraisal Design Change General Situations of the oiler Steam oiler Organic Fluid Heaters Classification of the Level for Manufacturer Licensing Serial No. of Appraisal Item Hot Water oiler Others General Drawing No. Rated Outlet Pressure MPa Rated Outlet Temperature Rated Output(t/h) or Rated Power (MW) Type of Fuel Conclusion: Name of Structure Mode of Combustion Require modifications Pass the Appraisal Not Pass the Appraisal (Approval for Registration) (Disapproval for Registration) Note: The Appraisal Conclusion: 1 Require design modifications The boiler designs have following problems: ( the attached sheets can be added if there are many contents) Please modify the above problems, and then send the modified design documents to our office to be re-appraised. 2 Pass the Appraisal The boiler designs (or repair and alteration program) conform to the requirements, and can be put for fabrication. 3 Not Pass the Appraisal The boiler designs have big safety problems, seriously violates relevant safety technical regulations and codes, the situation is as follows: (the attached sheets can be added if there are many contents) In view of the above problems, the designs do not be pass the appraisal. Appraiser: ( Stamp of the Appraisal Institution) Team Leader of Appraisal: Approver: Note: Fill in this form in duplicate. One will be returned to applicant, one should be send to the SESA, and one other should be kept by CSEI. 10

Appendix 4 List of Documents with Stamp Passed for Appraisal Name of Applicant Report No.: XXXXXX-GK XX Address of Applicant No. Name of oiler Name of Stamped Document Document Number Appraiser Serial No. of Appraisal Item Design Documents Team Leader Approver Approval Date Remark Appraisal Institution Stamp: Note: Fill in this form in duplicate. One will be returned to applicant, another should be kept by CSEI. 11