UCSD Revelle College Apartments

Similar documents
UCB - STILES RESIDENCE HALL CITY DESIGN REVIEW COMMITTEE PACKAGE

2075 BROADWAY LOFTS DOWNTOWN ARAPAHOE SQUARE DESIGN DEVELOPMENT REVIEW SUBMISSION OCTOBER 8, 2015

erie street hotel WEST ERIE STREET CHICAGO, IL PROJECT DATA SITE AREA BUILDING AREA (FAR) LEVELS HEIGHT GUESTROOM COUNT

Davis Live Project Narrative

EAGLE AVENUE FAMILY HOUSING 2437 Eagle Avenue, Alameda. Corner of Eagle Avenue and Everett Street

Contemporary villas Panoramic view 3 minutes from Bonita Beach

ESLA 5116 is a prime quality residential complex consisting of three luxurious buildings.

The demolition required for the project came before the Landmark Preservation Commission (LPC) on November 3, 2016, where no action was taken.

T A white metal skin and roof coating was chosen for maximum heat reflectance with blue tinted glazing.

Potential Building 6-Storey (Allowable) 50' Shoulder ALEXANDER STREET. Evelyne Saller Centre Main Entrance. Rodan Lodge Entry Porch

MEMORANDUM. C3A District Shoreland Overlay District 32,055 square feet / 0.74 acres. West Calhoun, adjacent to Cedar-Isles-Dean

2 OSBORN Medical Office Building LPA

900 BURRARD STREET CD-1 GUIDELINES (BY-LAW NO. 6421) (CD-1 NO. 229) CONTENTS. 1 Application and Intent... 1

CYCLE HOUSE. Seattle, Washington 2500 sf. 18 bicycles. Two people. One house.

OCEAN AVIATION Design Strategies. Gabreski (FOK) Airport Westhampton Beach, New York

TO MEMBERS OF THE COMMITTEE ON GROUNDS AND BUILDINGS: ACTION ITEM

The Cannery Marketplace Narrative. Purpose: Site Design Approach: Cannery Commerce District 10/18/2017

8 Delanson Circle Wellesley, MA PROJECT NARRATIVE

DESIGN, ACCESS & PLANNING STATEMENT

COMMUNICATION URBAN DESIGN REVIEW BOARD CITY OF DES MOINES, IOWA NOVEMBER 1, 2016, 2016 MEETING

Advisory Design Panel Report For the Meeting of February 27, 2019

Bethesda Downtown Design Advisory Panel Submission Form

DRAFT FOR DISCUSSION PURPOSES ONLY. Port Credit Local Area Plan Built Form Guidelines and Standards DRAFT For Discussion Purposes

MEMORANDUM. DATE: August 31, Honorable Mayor and City Councilmembers Patrick Klaers, City Administrator. Matthew Bachler, Associate Planner

Pico Branch Library at Virginia Ave Park

148,000 sq ft. Net area of Grade A Office Accommodation

ONE FLOOR REMAINING! FULL FLOOR AVAILABILITY 10,316 RSF

LAKE JONATHON FLATS NARRATIVE June 7, 2016 BACKGROUND AND PROJECT OBJECTIVES

Architectural Inventory Form

KENECT DENVER 2136 LAWRENCE OPTIONAL CONCEPT REVIEW ARAPAHOE SQUARE DESIGN ADVISORY BOARD FEBRUARY 20, 2018

Memo to the Planning Commission HEARING DATE: JUNE 30, 2016

DAYLIGHTING DESIGN. Strategies for Achieving Quality Daylighting. Spring 2014 College of Architecture, Texas Tech University 1

4.0 PROJECT DESCRIPTION

Architectural Review Board Report

Accessory Coach House

Rénovation. municipal

THE OPPORTUNITY BACKGROUND HIGH ST MONTREAL ST ROYAL FREMANTLE GOLF CLUB STEVENS ST CARRINGTON ST HOPE ST YALGOO AVE NANNIE AVE WATKINS ST SOUTH ST

320 Maple Mixed Use PDR Narrative Fort Collins, CO Project # 1525

510 MAIN STREET WINNIPEG CITY HALL Green Blankstein Russell and Associates (Bernard Brown and David Thordarson, principal designers),

2018 APPLICATION FOR URBAN DESIGN REVIEW BOARD City of Des Moines, Iowa

12th Avenue Arts 29,058 SF (0.67 acres) 149,501 SF Seattle, WA Midrise, Mixed-Use Residential

RIDGEDALE A VENUE E AST H ANOVER, NEW J ERSEY

Kassner Goodspeed Architects Ltd.

Table of Contents E.3 Light and Glare - Glare

KING RICHARD DEVELOPMENT

U P L A N D S W A L K S U P P O R T I V E H O U S I N G

Architectural Narrative Columbia & Hawthorn responds to its unique location as a gateway to Little Italy and the Bay in several ways. 1. The visual ch

Long Range Development Plan (LRDP) Mission Bay Community Workshop #2

Guide to the Morley Baer Photographs,

LAKE JONATHAN FLATS 1 1/14/2017

Central Piers 4, 5 & 6

Renovating older apartment buildings A multi-disciplinary international project. Architectural design & construction

WASHINGTON, DC. Maxwell MacKenzie

Ann Arbor Downtown Zoning Evaluation

5.1 Site Planning & Building Form

Kieran Boughan. San Francisco Architect RESIDENTIAL

Wilson Bridge Corridor Zoning. Department of Planning & Building

SAN FRANCISCO FIRE DEPARTMENT FIRE STATION 5 CIVIC DESIGN REVIEW PHASE II APRIL 20TH, Building Design & Construction

Rawlinson House, Lewisham, London SE13 5EL

Passive Cooling Measures for Multi-Unit Residential Buildings

Apartment Building in Brogården, Alingsås SE

DAYLIGHTING DESIGN. Strategies for Achieving Quality Daylighting. Spring 2014 College of Architecture, Texas Tech University 1

LANCASTER AVENUE WARREN STREET N. 33RD STREET N. 34TH STREET FILBERT STREET SITE PLAN ACC-DREXEL UNIVERSITY LANCASTER TOWER HALL CALHOUN HALL

BUILDING SPECIFICATIONS

Urban Design Brief (Richmond) Corp. 1631, 1635, 1639, 1643 and 1649 Richmond Street City of London

;

MEMORANDUM. I1 District Industrial Living Overlay District 110,703 square feet / 2.54 acres

CADA Board of Directors MAY 18, 2018 Board Meeting AGENDA ITEM 5 SITE 21 DEVELOPMENT PROPOSAL (SW CORNER OF 14 TH AND N STREETS)

SCHEDULE B. Comprehensive Mixed Use Sign and Awning Package Replacing Section VI.P.3 of the Redevelopment Plan As amended January 22, 2013

FRAMELESS GLAZING WITH 2" CLEAR GLASS STAINLESS STEEL AWNING & SIGNAGE NATURAL STONE PLASTER COLOR 1

INDEX PACKAGE SUMMARY...39

CREATIVE OFFICE/SHOWROOM SPACE DTLA LEASE OPPORTUNITY Adjacent to Fashion District & Arts District

Request Subdivision Variance (4.4 (b) of the Subdivision Regulations) Staff Recommendation Approval. Staff Planner Jonathan Sanders

307 Sherbourne Street - Zoning Amendment Application - Preliminary Report

[BUILDING STATISTICS PART I]

multi-residential apartments

600 W. St. Germain Street, St. Cloud, MN

ReNOVATION à la carte Program

Community Affairs and Planning Committee Paul Allore, MCIP, RPP Director of Planning and Development Services

Design Review Board (DRB) Staff Report. Exterior Building Renovation. 400 Monroe Ave. Memphis, TN Hwy. 64 Memphis, TN 38123

A Model for Extreme Climate Responsive Design

Appendix J - Planned Unit Development (PUD)

MEMORANDUM. B4S-2 Downtown Service District DP Downtown Parking Overlay District 42,390 square feet / 0.97 acres. DMNA; adjacent to North Loop

Southall Gas Works: Design Statement by URBED with Capita Symonds, WYG, Lovejoys, Jestico and Whiles and RPSDesign Statement. Typologies.

Architectural Inventory Form

Memo to the Planning Commission HEARING DATE: JULY 6, 2017

Draft University of Kentucky College Town Study Update

th Avenue NW Early Design Guidance Meeting - SDCI # EDG Meeting

150 North Riverside Street Chicago IL

201 College Avenue. Zoning Compliance. City of Ithaca, New York Date:

Weißenhofsiedlung. eine Fallstudie der Sonne, Wind, und Licht. boodan, bui, makhalik, so, xia

WHEREAS, after consideration of the evidence presented at the public hearing on October 30, 2008, the Prince George's County Planning Board finds:

Beverly Hills Pilots Retreat St Marys Isles of Scilly. Type: Type: House. Location: St. Marys. Price: 375,000. Bedrooms:

Roger Williams University USGBC Student Group Completed a sustainable design workshop as a prerequisite to the LEED Green Associate Exam.

A Treasure Trove of Nature

Elementary Teachers Foundation of Ontario

Planning Commission June 25, Lincoln Boulevard

measures of apartment buildings

A N I K A E N C L A V E

Figure 1. The chart showing how the effort and cost of the design changes are affected as the project progresses (Anon.) Simulation tools are a key co

Transcription:

UCSD Revelle College Apartments Regents Committee on Grounds and Buildings Preliminary Review of Design November 18, 2008

Project Information In-fill project of 510 student beds Six students per apartment suite 2 double bedrooms and 2 single bedrooms per apartment Common Areas to include: Conference/meeting space Laundry Mail Services Outdoor program areas 153,891 gross square feet/109,658 assignable square feet Sustainable design/leed Silver

2004 LRDP AND 1989 UCSD MASTER PLAN Site

Proposed Site Location Natural Science Building Blake Argo N. Torrey Pines Road Scholars Drive Site Boundary Galbraith Hall Scholars Drive

Site Photos Looking North

Site Photos Looking Northeast

Site Photos Looking Southeast

Site Photos Looking South

Revelle/Muir Colleges Neighborhood Planning Study Illustrative Plan

TRANSPARENCY EXISTING REVELLE COLLEGE BUILDING CONTEXT

MODULAR ELEMENTS EXISTING REVELLE COLLEGE BUILDING CONTEXT

Unit based scheme Unit based scheme, horiz + vert Aperture based scheme SKETCHES

WEST ELEVATION ELEVATIONS

SOUTH ELEVATION, SOUTH TOWER ELEVATIONS

EAST ELVATION ELEVATIONS

NORTH ELEVATION, NORTH TOWER ELEVATIONS

Aerial view looking to northwest

Aerial view looking to the southwest

Student Residential Meeting Room Extensive green roof Terrace with planters Laundry Ground Floor Plan Typical Upper Floor Roof Plan at West Bar CURRENT PLANS

18-2 17-0 Double 191 Bathroom 113 Single 100 Single 100 55-9 Stor Commons 343 Double 183 9-5 11-0 11-0 4-8 19-9 23-0 40-9 11-7 8-01 8-10 11-7 Double 185 Single 102 Single 102 Double 185 Bathroom 121 Stor Commons 305 10-1 21-9 31-11 North / South Tower Unit West Bar Unit CURRENT PLANS

Looking northeast from Torrey Pines Road

Looking southeast from Torrey Pines Road

View from Revelle Plaza

View from Revelle Commons to Revelle Housing

Looking west from Revelle Commons

Enhanced landscaping and bioswale

Structure Concrete (Colton type II, type III) Cladding: -Cement plaster -Fiber cement board (Colors in keeping with the Revelle palette) Railings: - Fiberglass grating -- -Painted / natural metals PROPOSED MATERIALS

CONCRETE COLTON TYPE II CONCRETE COLTON TYPE III STRUCTURE MATERIAL PALETTE

CEMENT PLASTER CEMENT BOARD FIBER REINFORCED CONCRETE PRECAST CONCRETE CLADDING MATERIAL PALETTE

KALWALL POLYCARBONATE WITH NANOGEL GLASS BRICK CLADDING MATERIAL PALETTE

ALUMINUM WITH KYNAR FINISH WINDOW FRAMES MATERIAL PALETTE

FIBERGLASS GRATING RAILING MATERIAL PALETTE

WEST FACING UNITS: EFFECTS OF ANGLE ON INSOLATION LEVEL ENVIRONMENTAL ANALYSIS

WEST FACING UNITS: INCIDENT SOLAR RADIATION, MARCH- SEPT. ENVIRONMENTAL ANALYSIS

WEST FACING UNITS: DAYLIGHT PENETRATION: JUNE 21, 2PM ENVIRONMENTAL ANALYSIS

SOUTH FACADE: SEASONAL EFFECTIVENESS OF EXTERNAL SHADING DEVICES ENVIRONMENTAL ANALYSIS

WEST FACING UNITS: INCIDENT SOLAR RADIATION ENVIRONMENTAL ANALYSIS

Sustainability Features Passive solar building orientation and shading devices to take advantage of and control solar gain Natural ventilation and cross ventilation in each apartment High performance exterior envelope Daylighting optimization Energy efficient building systems Water conservation w/low use plumbing fixtures High albedo materials/finishes to reduce heat island effect on roofs Rooftop photovoltaics infrastructure Recycled and sustainable building materials Bioswale landscape for storm water drainage and filtration Drought tolerant landscape materials

Discussion

Slides following are not currently in presentation

UC San Diego Revelle College Apartments Silver = 33-38 points Current Target Points - Silver 35 Gold = 39-51 points Additional Target Points Needed - Gold 4 as a minimum Sustainable Strategy Options for Consideration # of LEED Points Cost Premium Payback Period SS 5.2: Site Development, Maximize Open Space 1 $0 n/a SS 6.2: Storm Water Design, Quality Control 1 $0 n/a EA 2: On-Site Renewable Energy 1 $0 n/a EQ 2: Increased Ventilation 1 $75,000 n/a EQ 7.1: Thermal Comfort, Design 1 in EQ 2 n/a EQ 8.1: Daylight & Views, Daylight 75% of Spaces 1 $0 n/a EQ 8.2: Daylight & Views, Views for 90% of Spaces 1 $0 n/a Option Totals 7

NPS Vision FUTURE REVELLE APARTMENTS REVELLE HOUSING QUAD REVELLE COMMONS DINING TERRACE

PROJECT SITE

SOUTH ELEVATION, NORTH TOWER ELEVATIONS

NORTH ELEVATION, SOUTH TOWER ELEVATIONS

EAST ELEVATION ELEVATIONS

Section A Enlargement

Section B Enlargement

PRELIMINARY SHADING DEVICES SKETCHES

PRELIMINARY SHADING DEVICES SKETCHES

MATERIALITY BUILDING CONTEXT

View with landscaping View to northeast from Torrey Pines Road

EMBERS OF THE COMMITTEE ON GROUNDS AND BUILDINGS or the Meeting of November 18, 2008 BACKGROUND INFORMATION FOR PRELIMINARY REVIEW OF DESIGN REVELLE COLLEGE APARTMENTS SAN DIEGO CAMPUS The Revelle College Apartments infill project will be located on approximately 2.5 acres located within the Revelle College Neighborhood at the south-west portion of the UCSD main campus. The project complies with the 1989 UCSD Master Plan and the 2004 Long Range Development Plan. The design of the project is in conformance with the vision guidelines articulated in the 2006 Revelle and Muir Colleges Neighborhood Planning Study. The project will provide 85 four-bedroom apartments which will accommodate 510 undergraduate students, and 2 threebedroom staff units. Resident apartment suites consist of six students accommodated in two single bedrooms and two double bedrooms. The project design consists of a single building composed of a C shape with a north, west and south wing (10, 5 and 8 stories respectively). In addition to the apartments, the project will provide a conference room, laundry area, mail area and maintenance and custodial spaces. Complementary outdoor spaces would be developed to accommodate a variety of activities for the residents. The project is scheduled to be completed for fall 2011 occupancy. The project will achieve USGBC LEED Silver rating. The proposed Revelle College Apartment project would encompass total of approximately 109,658 assignable square feet (asf) and 153,891 gross square feet (ogsf) of building space. Total project costs are $69,461,000 at CCCI 5425 The construction cost is $316.17 per ogsf.