Planning, Development, and Building Fees and Charges 2018

Similar documents
THE CITY OF WINNIPEG BY-LAW NO. 66/2016. A By-law of THE CITY OF WINNIPEG to impose planning, development and building fees.

COUNTY OF FREDERICK INSPECTIONS DEPARTMENT FEE SCHEDULE Approved July 14, COMMERCIAL FEES Minimum Fee $ unless stated otherwise

CITY OF BRANDON BY-LAW NO ANNUAL SCHEDULE OF FEES SCHEDULE "A"

SCHEDULE K PLANNING & BUILDING SERVICES

BUILDING DIVISION SIMPLIFIED BUILDING PERMIT FEE SCHEDULE January 01st, 2019 to December 31st, 2019

Fee Type How Determined Rate Permit Processing Charge Flat Permit or Plan Review Submittal $32.00

ORDINANCE NO ORDINANCE TO AMEND AN ORDINANCE CODIFIED IN THE CODE OF THE TOWNSHIP OF NUTLEY, CHAPTER 272, ENTITLED CONSTRUCTION CODES, UNIFORM

City of High Point Development Fee Schedule

Planning&Development Fee Standards

FY 2018 FEE SCHEDULE (Effective )

NEW BRITAIN BOROUGH SCHEDULE OF FEES (Revised December 15, 2017)

CHAPTER 1321 Permit and Inspection Fees

SCHEDULE A. Classes of Permits and Fees (Reference By-law No ) 1.) Calculation of Permit Fees (All fees are exempted from HST)

City of Wausau Building, Housing and Zoning Fee Schedule 2019

SCHEDULE A. Permit fees shall be calculated based on the formula given below, unless otherwise specified in this schedule:

Fees for construction of all buildings except single family dwellings, shall be calculated using Table 2.

THE CITY OF SPRUCE GROVE BYLAW C DEVELOPMENT FEES AND FINES BYLAW

NEW BRITAIN BOROUGH SCHEDULE OF FEES (Revised April 9, 2019)

Fee Resolution

APPENDIX A BUILDING PERMIT AND RELATED FEES

Permit fees shall be calculated based on the formula given below, unless otherwise specified in this schedule:

THE CITY OF WINNIPEG. BY-LAW No. 127/2016, as amended

City of Oregon City. Community Development Building Division Fee Schedule Effective April 1, 2016 BUILDING DIVISION

BUI L DIN G A ND E L E V A T O R F E ES

THE CITY OF WINNIPEG. BY-LAW No. 127/2016, as amended

Development Related Fee Schedule Effective May 1, Plan Reviews. Remodeling, Alterations, Additions Residential and Commercial

THE CITY OF WINNIPEG BY-LAW NO. 96/2012

Development Related Fee Schedule Effective May 1, Plan Reviews. Remodeling, Alterations, Additions Residential and Commercial

TOWN OF HERNDON, VIRGINIA ORDINANCE MAY 26, 2015

Development Related Fee Schedule Effective May 1, Plan Reviews. Remodeling, Alterations, Additions Residential and Commercial

This fee structure applies to applications submitted on or after January 1, 2018.

SECTION 1. That Section 20-3 of Chapter 20 entitled Fees be and is hereby amended to read as follows: *Plan review fees are not refundable*

BUILDING PERMITS Table Total Valuation. $1.00 to $ $26.00

Reynoldsburg Code of Ordinances. CHAPTER 1305 Permits and Fees

BUILDING & ZONING SCHEDULE OF FEES Effective March 15, 2015

Bylaw No Page 1. The Council ofthe City of Bumaby ENACTS as follows: A BYLAW to impose fees in respect ofplanning and Building matters

Class of Permits and Fees Schedule A

AGENDA NO: 2008/Mar/ /03/08 Department Head Date City Manager Date

SCHEDULE A TO BY-LAW NUMBER (Amended by By-law ) CLASSES OF PERMITS AND PERMIT FEES

SELLER DISCLOSURE STATEMENT IMPROVED PROPERTY

CITY OF CORTEZ COUNCIL RESOLUTION NO. 45, SERIES 2016

WASHINGTON SELLER S RESIDENTIAL PROPERTY DISCLOSURE STATEMENT

APPLICATION. Airport Hazard In ETJ - one- and two family dwelling $100 Airport Hazard in ETJ anything other than one- and twofamily

THE CORPORATION OF THE CITY OF MISSISSAUGA BUILDING BY-LAW 60-12

BY-LAW NO NOW THEREFORE the Council of The City of Brandon, in open session assembled, enacts as follows:

THE CORPORATION OF THE CITY OF MISSISSAUGA BUILDING BY-LAW 29-11

CONSTRUCTION PERMIT FEE SUMMARY

DEPARTMENT OF BUILDING AND SAFETY

ZONING & BUILDING PERMIT AND SUBDIVISION & LAND DEVELOPMENT PLAN MASTER FEE SCHEDULE PER RESOLUTION No

THE BOARD OF COUNTY COMMISSIONERS

LANE COUNTY BUILDING & ELECTRICAL PROGRAMS PERMIT FEE GUIDE

Fee Schedule Last Updated: November 21, 2017

EXHIBIT A to Ordinance No PART 1

The City of Daytona Beach Fee Schedule

CITY OF JOHNSTOWN SCHEDULE OF PERMIT FEES

1. Permit Fees for new single family dwellings, duplexes, and multifamily dwellings with eight units or less are as follows:

BUILDING PERMIT INSTRUCTIONS CONTRACTOR

Commissioners to enact, amend, and enforce technical construction and building codes; and,

Building Division Fee Schedule January 2018

Lawrence Township. Mercer County, New Jersey. Working with our Planning and Zoning Boards & A Guide to our Permit Process

Violet Township requires Zoning and Plans Examination and Building Permits for all new construction.

TENANT IMPROVEMENT APPLICATION Page 1 of 4

CONSOLIDATED PLANNING AND DEVELOPMENT APPLICATION FEES REGULATION

Permitting Fee Schedule

2017 TOWN OF RISING SUN FEE SCHEDULE ADOPTED

Project Address. Name of Project/business name. Owner of Property Phone . Emergency contact phone number. Parcel Number

DESCRIPTION FEE UNIT MINIMUM BLDG FEE¹ New Building or Addition All occupancy classifications except

APPENDIX A 2018 FEE SCHEDULE

Department of Public Works Permit Fee Schedule

UPPER SAUCON TOWNSHIP DEPARTMENT OF COMMUNITY DEVELOPMENT COMPREHENSIVE FEE SCHEDULE (Per Resolution )

Revised April 3/18 Sheet Effective April 3/18 B/L 6108

MIDDLESEX TOWNSHIP SCHEDULE OF FEES

RESIDENTIAL BUILDING/GENERAL PERMIT FEE SCHEDULE

SCOPE All fees associated with and referenced in the 2016 Building Code of the City and County of Denver ( Code ) are as set forth in this policy.

Administration Fees Photocopies $ Returned Checks $ Credit Card Convenience Fee $ 1.50 minimum OR 2.45%

List of Principal Officials

Appendix G Fee Schedule

FEE SCHEDULE SAFETY CODE PERMIT FEES EFFECTIVE JANUARY 1, 2018 PART 1 - DEFINITIONS

PLANNING AND DEVELOPMENT DIVISION OF BUILDING AND INFRASTRUCTURE HAMILTON COUNTY, OHIO SCHEDULE OF FEES JANUARY, 2014, EDITION

Building Permit Fees (B) Electrical Permit Fees (C) Mechanical Permit Fees (D)

Community Development Department Fee Schedule

LANE COUNTY BUILDING & ELECTRICAL PROGRAMS PERMIT FEE GUIDE

TENANT DESIGN MANUAL UPDATED MAY 2016

RESOLUTION NO BUILDING, ZONING, AND SEWAGE ENFORCEMENT FEE SCHEDULE

TOWN OF HAVERHILL, NH

County of Kane CHAPTER 6, BUILDINGS AND BUILDING REGULATIONS, OF THE KANE COUNTY CODE

RESIDENTIAL / HOME OCCUPATION

Fees and charges. Consenting and property information fees and charges. Effective from 1 July 2018

TOWN OF WOODWAY FEE SCHEDULE EFFECTIVE JANUARY 8, 2019

Community Development Fees (as of March 2015)

Chapter 101, CONSTRUCTION CODES, UNIFORM [HISTORY: Adopted by the Mayor and Council of the Borough of Laurel Springs as indicated in article

a. Test well for the purpose of community water supply or any other investigatory purpose per Ordinance 124 b. Monitoring Well

Springfield Township Bucks County SCHEDULE OF FEES AND CHARGES RESOLUTION #

Amendment to the City s Master Schedule of Fees, Charges & Application Fees

Chapter 3.08 FEE SCHEDULE OF VILLAGE PERMITS AND SERVICES*

SCHEDULE OF BUILDING PERMIT FEES

City of Winnipeg 2018 Fees and Charges Schedule

Rules and Regulations. for. Building Control Fees. Revised January 2, 2018

Ordinance 991 CHAPTER 91 RENTAL HOUSING CODE

NEBRASKA REAL ESTATE COMMISSION SELLER PROPERTY CONDITION DISCLOSURE STATEMENT Residential Real Property

Transcription:

CITY OF WINNIPEG Planning, Development, and Building Fees and Charges 2018 The City of Winnipeg Planning, Property and Development Department January 1, 2018 All Fees are Payable at the Time of Application

TABLE OF CONTENTS 1. HOUSING... 3 1.1. BUILDING PERMITS... 3 1.1.1. New Construction and Additions... 3 1.1.2. Renovations and Alterations... 3 1.1.3. Accessory Structures... 4 1.1.4. Other Fees... 4 1.2. ELECTRICAL PERMITS... 5 1.3. PLUMBING PERMITS... 6 2. COMMERCIAL... 7 2.1. BUILDING PERMITS... 7 2.1.1. New Construction and Additions... 7 2.1.2. Staged Building Permit Fees... 8 2.1.3. Interior/Exterior Alterations and Other... 9 2.1.4. Special Events... 10 2.1.5. Alternative Solutions and Electrical Code Deviations... 11 2.1.6. Fire Paramedic Services... 12 2.1.7. Other Fees... 12 2.2. ELECTRICAL PERMITS... 13 2.3. PLUMBING PERMITS... 16 2.4. MECHANICAL PERMITS... 17 2.5. OCCUPANCY PERMITS... 18 2.6. BUILDING PERMITS FOR SIGNS, AWNINGS, AND CANOPIES... 20 2.7. TESTING LIFE SAFETY SYSTEMS FOR THE PURPOSES OF OCCUPANCY... 20 3. ZONING... 21 3.1. DEVELOPMENT PERMITS... 21 3.2. VARIANCES AND CONDITIONAL USES... 22 3.3. OTHER FEES... 23 4. PLANNING AND LAND DEVELOPMENT... 24 4.1. GENERAL PLANNING... 24 4.2. LAND DEVELOPMENT APPLICATIONS... 25 4.3. AGREEMENTS... 26 4.4. OTHER FEES... 26 4.5. WATERWAYS / FLOOD FRINGE... 27 4.6. IMPACT FEES... 27 5. ENCROACHMENTS... 28 6. DEMOLITION PERMITS... 29 7. INSPECTIONS AND LICENSING... 30 7.1. COMMERCIAL AND HOUSING INSPECTIONS... 30 7.2. CONTRACTOR AND INSTALLER LICENCE FEES... 31 8. DOCUMENTS, RECORDS AND INFORMATION... 32 9. REFUNDS, DISCOUNTS AND FEES FOR NON COMPLIANCE... 34 9.1. REFUNDS... 34 9.2. DISCOUNTS AND REBATES... 35 9.3. FEES FOR NON COMPLIANCE... 36 10. GENERAL ADMINISTRATION... 37 2

1. HOUSING 1.1. BUILDING PERMITS 1.1.1. New Construction and Additions Base Fee - New or Addition to single-family dwellings, two-family dwellings, detached secondary suites, and multi-unit dwellings + Area Fee -single-family and two-family dwellings or detached secondary suites for the construction of, or addition to, housing below, at or above grade level -multi-unit residential dwellings, including row housing; new and additions Additional fee to establish secondary suite or duplex at the time of new construction; including detached secondary suites Declared value of $1000 or less - construction which cannot be described in terms of area, as determined by the designated employee (base fee) Each additional $1000 or portion thereof in declared value - construction which cannot be described in terms of area, as determined by the designated employee (in addition to base fee) $206 $4.15/m² $8.30/m² $309 $155 $10.20 Note: Development Permit fees apply (see page 21). Area calculations include the total floor area of all floors including finished space, unfinished basements, attached garages, sunrooms, covered porches and covered decks. 1.1.2. Renovations and Alterations Renovations affecting each floor of previously established habitable floor space including $155/floor basement development Flood Proofing permit (includes electrical, plumbing and foundation repair): Non-structural $155 Establishment of any additional units or suites in an existing building. $620 -includes secondary suites or conversion to a duplex or triplex -this fee is in addition to the per floor renovation fee if a building permit is required. Establishment of a detached secondary suite in an existing accessory building (e.g. garage) Reducing the number of units in a multi-unit dwelling. -including secondary suites, duplexes, converted residential dwellings, etc. -this fee is in addition to the per floor renovation fee if a building permit is required. Removal of a dwelling unit / suite in a house with previously established 2 or more units, including those within a Division II building compliant with By-law 4304. $411 $129 $129 Notes: Development Permit fees may apply (see page 21). Alterations of stairs connecting two floors are only allocated to a single floor. Alterations on roofs, trusses, and dormers are treated as part of the single floor immediately below. Alterations to covered porches/decks, and attached garages are treated as part of the floor. Renovations to two or more suites of a multi-unit dwelling would be treated as floors per unit (e.g. renovation to a single floor but involving 2 suites would be considered to be two floors.) Housing includes: o Single-family and two-family dwellings, and o Multi-unit dwellings (including row housing) not requiring an Occupancy Permit. 3 HOUSING

HOUSING 1.1.3. Accessory Structures Detached Garages and other large structures Base Fee -Construction of detached garage $104 -Construction of other accessory structure greater than 10m 2 $104 + Area Fee - Construction of detached garage or accessory structure greater than 25m² in $2.10/m 2 area Structural alterations or repairs to existing accessory structures $104 Decks (uncovered) Single-level, simple deck $104 Multi-level or complex deck $155 Other Accessory Structures In-ground swimming pools $155 Accessory structures (multi-owner detached garages) for multi-family buildings $8.30/m² Radio or communication tower: Single-family & two-family dwellings $104 Above ground swimming pools, hot tubs, spa tubs $104 All other exterior projects requiring a building permit $78 Note: Development Permit fees apply (see page 21). 1.1.4. Other Fees Installation of solar photovoltaic systems with the submission of plans under an engineer s $78 seal Installation of solid fuel burning appliance $104 Additional fee for multiple plan reviews on a single project: percentage of original permit fee 25% Notes: Development Permit fees may apply (see page 21). Deck complexity is determined based on foundation designs. Multiple foundations, multiple foundation types or single foundations with multiple, stacked structural loads would be considered complex. HOUSING 4

HOUSING 1.2. ELECTRICAL PERMITS New / Additions Single-family dwellings, Two-family dwellings, Multi-unit dwellings, creation of additional, self-contained dwelling units such as a secondary suite Base Fee - New construction of single-family dwellings, two-family dwellings, multi-unit $78 dwellings and additions - up to 400 Amp service size + Area Fee - for all floors $1.01/m 2 Voice, Data, Video (VDV) for structures with 2 or more units -Work undertaken as part of the new construction electrical permit (no base fee applies) -Work undertaken by a separate contractor and/or separate permit (no base fee applies) (Assumes inspections are completed at the time of other inspections. Additional inspection fees immediately apply if work requires VDV only inspections for the initial inspection or due to defects.) Renovations / Interior Alterations Single-family dwellings, Two-family dwellings, Multi-unit dwellings $0 $20.25/unit A floor for the purposes of the calculation below is determined by fixtures, switches, outlets, and other electrical elements located on that floor. A project on one floor that passes through another floor to a panel in the basement is considered to be a single floor. That is, a panel only affects the determination of the number of affected floors when the permit involves expansion or replacement of the panel. Base Fee (includes 1 affected floor) $78 Each additional floor affected $78 Electrical permit as part of a flood-prevention related building permit $0 Voice, Data, Video (VDV) for structures with 2 or more units (no base fee applies) (no $78/unit multi-floor additional fee applies) Additional or Add-on fees Fees are in addition to new construction fees, or in the case of an existing building, in addition to the base fee and /or other fees assessed Extra fee (in addition to base or per floor fee) for greater than 200 Amp service (initial installation or upgrade) Extra fee (in addition to base or per floor fee) for each additional panel board (at time of new construction or later) Extra fee (in addition to base or per floor fee) to install or remove renewable energy systems (e.g. solar photovoltaic systems, wind systems, etc.) (at time of new construction or later) Extra fee (in addition to base or per floor fee) to install or remove a generator (at time of new construction or later) Fee for interview/test if required to establish competency of homeowner to engage in work for a homeowner permit Installation of fire alarm system: Single-family dwellings, two-family dwellings (no base fee applies unless other wiring is involved) Removal of fire alarm system: Single-family, two-family dwellings (no base fee applies unless other wiring is involved) $62 $52 $181 $181 $30.70 $104 $78 5 HOUSING

HOUSING Exterior Electrical Permits (exterior must be separate permits from interior work; no base fee applies) Air-conditioners: installation, construction, renovation or alteration $62 Outdoor, unenclosed swimming pools or hot tubs: installation, construction, renovation or $62 alteration Open decks, gazebos, patios, landscape lighting: installation, construction, renovation or $62 alteration All other exterior electrical work (excluding exterior plugs installed as part of new construction $62 or clearly those part of an interior project) Open decks, detached garages, gazebos, patios, landscape lighting: installation, construction, $62 renovation or alteration 1.3. PLUMBING PERMITS New Construction / Additions Minimum fee: (applied to each suite / dwelling unit) $78 Cost per drain $25.60 Renovations/Interior Alterations Minimum fee: $78 Plumbing renovations or repairs each drain outlet impacted $25.60 Plumbing permit as part of a flood-prevention related building permit $0 HOUSING 6

2. COMMERCIAL 2.1. BUILDING PERMITS 2.1.1. New Construction and Additions Construction of new buildings, or additions where the area being developed can be clearly determined Finished Base Building Only Base Fee $825 $720 + Area Fee Group A Assembly Occupancy (Open-air structures) Group A Assembly Occupancy (All others) $15.50/m 2 $11.75/m 2 $18.50/m 2 $14.00/m 2 + Area Fee Group B Care, Treatment or Detention Occupancy $24.50/m 2 $18.50/m 2 + Area Fee Group C Residential Occupancy $13.90/m 2 $10.10/m 2 + Area Fee Group D Business & Personal Services Occupancy $15.50/m 2 $11.75/m 2 + Area Fee Group E - Mercantile Occupancy $13.50/m 2 $10.10/m 2 + Area Fee Group F1 - Industrial Occupancy Group F2 - Industrial Occupancy Group F3 - Industrial Occupancy $15.50/m 2 $10.40/m 2 $8.30/m 2 $11.75/m 2 $7.80/m 2 $7.00/m 2 + Area Fee - Any other structure defined in the Building By-law that can be measured in terms of area $8.30/m 2 $6.20/m 2 Temporary open-air structures other than stages and bleachers covered or uncovered (in addition to tent and occupancy fees if applicable) Minimum Fee $206 Area Fee $15.50/m 2 Note: Area calculations include the total floor area of all floors including below grade floors. 7 COMMERCIAL BUILDING PERMITS

COMMERCIAL BUILDING PERMITS Other Projects Residential Balcony Enclosures (no base fee) $411 Base Fee - Declared value for new construction which cannot be described in terms of $411 area, including base building only + Value Fee - Each $1000 or portion thereof in declared value for new construction which cannot be described in terms of area, including base building only (in addition to base fee) Spray Booth install new, alteration or removal (includes fees for electrical and mechanical permits) Base Fee - first booth + Base Fee - each additional booth $10.20 per $1000 of declared value $930 $520 + Area Fee $10.40/m 2 Alterations to existing booths Base fee only Removal of existing booths (no base fee) (includes electrical and mechanical permits) $360 2.1.2. Staged Building Permit Fees Permit fees for each stage of construction % of Total Permit Fee Payable Surcharge (as a % of the total permit fee) Site Preparation, Excavation, Piling, Interior Demolition 20% 2.5% Foundation Only 35% 5% Structural Framing 65% 2.5% Customized Stage Superstructure or Final Building Permit Determined by the Designated Employee Balance of building permit fees 5% Not Applicable Notes: Partial permit fees are expressed as a percentage of the total building permit fee less any stage percentage previously paid. Note that an additional staged permit premium will also be applied and is calculated and applied independent of this percentage. Interior Demolition can be included along with a staged permit for a building addition only. COMMERCIAL BUILDING PERMITS 8

COMMERCIAL 2.1.3. Interior/Exterior Alterations and Other Fees for Work that is evaluated based on Floor Area Alterations where an area calculation is used would include projects that affect an entire tenant space or entire floor level of a tenant space. (e.g. a tenant fit-up, a complete interior demolition or a change of use of a defined occupancy/tenant space) Base Fee $309 + Area Fee Group A Assembly Occupancy (Open-air structures) Group A Assembly Occupancy (All others) $6.20/m 2 $7.80/m 2 + Area Fee Group B Care, Treatment or Detention Occupancy $9.90/m 2 + Area Fee Group C Residential Occupancy $5.40/m 2 + Area Fee Group D Business & Personal Services Occupancy $6.20/m 2 + Area Fee Group E- Mercantile Occupancy $5.40/m 2 + Area Fee Group F1- Industrial Occupancy Group F2- Industrial Occupancy Group F3- Industrial Occupancy $6.20/m 2 $4.70/m 2 $4.15/m 2 + Area Fee - Any other structure defined in the Building By-law that can be measured in terms of area $3.35/m 2 Fees for Work that is evaluated based on Declared Value of Construction Alterations where an area calculation is not used would include small projects within a larger tenant floor area; landlord alterations or alterations to a base building only; projects that are mostly exterior alterations, etc. Note that declared value of construction is defined in the Winnipeg Building By-law. Interior/Exterior Alteration Permits Minimum Fee: $309 Declared value of construction Each $1000 or portion thereof (based on complete $10.20 project cost/value) Other Commercial Building Permit Fees (Unless indicated, no minimum/base fee applies if a separate permit) Adding one or more additional suites or units to an existing, compliant multi-unit dwelling including a converted residential dwelling or rooming house. The fee is in addition to the area or declared value of construction fee if renovations require a building permit. Reducing one or more suites or units in an existing multi-unit dwelling. No base fee applies if no work requiring a building permit is involved. If the work requires a building permit, regular fees would apply and this fee would not. 9 $411 $129 COMMERCIAL BUILDING PERMITS

COMMERCIAL BUILDING PERMITS Temporary Buildings Temporary Building Fee calculated as a new commercial building under section 2.1.1. (including the base fee) Same as applicable building permit + Maintenance Fee per month (in addition to Temporary Building Fee) payable annually $67 Nonpayment resulting in an inspection (in addition to monthly fee) $206 Miscellaneous Structures Outdoor swimming pool - above ground or below ground $309 Satellite dish or antennae; radio or communication tower $258 Storage tanks removal of one tank (includes Fire Prevention Inspections no longer $155 being charged) Storage tanks installation of one tank (includes Fire Prevention Inspections) $360 Storage tanks for each additional tank, same site $52 2.1.4. Special Events Tents/Bleachers/Stages (Tents with 1000 or more occupants and/or electrical and mechanical systems are considered temporary buildings subject to Temporary Building fees.) (All fees for outdoor structures include occupancy and inspection fees) Tents greater than 84m 2 in area $206 Each additional tent greater than 84m 2 on the same site $15.50 Stages between 0.6 and 1.5 meters in height and less than 84m 2 in area All other stages $104 $520 Bleachers with less than 300 design occupant load All other bleachers $104 $520 Request for a permit within 3 days or less Double Fees Occupancy Indoor special event occupancy permit: greater than 60 occupants and greater than the established occupant load for the space (maximum permit fee of $600) $.10/m 2 Development (Charged on all outdoor and indoor special events.) Temporary event or a temporary use $25.60 COMMERCIAL BUILDING PERMITS 10

COMMERCIAL 2.1.5. Alternative Solutions and Electrical Code Deviations Alternative Solutions Fees Pre Application Stage Application Stage Post Permit Issuance Classification New Building Existing Building Minor $206 $104 Major $520 $309 Minor $360 $258 Major $775 $520 Minor $520 $411 Major $1030 $1030 Minor Major Example Descriptions Sprinkler systems used in lieu of basement fire separation in a house conversion Roll-out counter in lieu of flip-top Barrier-free washroom size variation in existing building Shared washroom with other tenant space Mezzanine exceeds % limit Provide window or additional measures Building area exceeds classification Alternative measures are provided such as additional fire compartments Window sprinkler protection School addition requires total building to be non-combustible construction Existing wood frame roof Racking mezzanine in large stores and warehouses Fire protection consultant (fire or time based egress modeling) Other types by Architect or P. Eng Other types by Architect or P. Eng with detailed reports Electrical Requests for Code Deviation Fees Pre Application or During Electrical Plan Examination Review Post Electrical Plan Examination Review Classification Standard Complex Standard Complex New Building or Structure $155 $309 $360 $620 Existing Building or Structure $104 $206 $309 $520 Resubmission of Alternative Solutions or Electrical Requests for Code Deviations Resubmission Fee 50% of original fee Note: Classification of an alternative solution or electrical deviation will occur during processing. 11 COMMERCIAL BUILDING PERMITS

COMMERCIAL 2.1.6. Fire Paramedic Services Fire Prevention Plan Examiner Review Fee per hour of inspection reasonably required as part of a plan review by the Fire Paramedic Service Fee per hour for re-examination of plans due to revisions, alternate solutions or Fire Protection Reports Application that requires Fire Paramedic Service to establish an occupant load (base fee) Fee per hour or portion thereof for plan examination or inspections required to establish occupant load (in addition to base fee) $106/hr $106/hr $309 $155/hr 2.1.7. Other Fees Building Code Plan or Revised Plan Review Pre-application meeting or alternative solutions meeting: meeting/ discussion/ $206 presentation by applicant concerning Building Code compliance (base fee) Per City employee in attendance - each hour (in addition to base fee) $155 Charge for cancellation or postponement within 24 hours /missed preliminary plan $206 review meeting Multiple Plan Reviews on a single project by one or more disciplines Base $1030 plus $155/hour per discipline to maximum of 10% of building permit fee Fee for re-examination an additional fee where Base $1030 plus a) A permit has been issued or review of submitted plans has been completed $155/hour to and; maximum of 25% b) New plans are submitted, or additional or revised detail, information or of building permit specifications for the previous plans are provided; and fee c) The designated employee determines that the re-examination of the new plans or modification of the original plans made necessary by the additional details, information, or specifications will require time and resources consistent with a full plan examination. Conforming Construction Agreements with Caveat on Title (includes legal $4110 processing fees) COMMERCIAL BUILDING PERMITS 12

COMMERCIAL 2.2. ELECTRICAL PERMITS Base Fee $104 + Installation Fees Low voltage service or distribution board/enclosed switch/motor control center/cste/splitter -First item less than 400 Amps -Each additional like item less than 400 Amps -First item 400-1000 Amps -Each additional like item 400-1000 Amps -First item over 1000 Amps -Each additional like item over 1000 Amps High voltage equipment (Over 750 V) -Each service including metering and grounding -Distribution, each unit or cell of protective or switching equipment -Each motor or transformer: 500 hp/kva or less -Each motor or transformer: 501 hp/kva to 1000 hp/kva -Each motor or transformer: over 1000 hp/kva Motorized valves, transformers, motors, controllers, capacitors and similar equipment not listed elsewhere in this schedule -1 kva/kw/hp/kvar/amps or less, each -Over 1 to 25 kva/kw/hp/kvar/amps, each -Over 25 to 100 kva/kw/hp/kvar/amps, each -Over 100 kva/kw/hp/kvar/amps, each Life and Health Safety Equipment Devices -Control panel or annunciator, each -Transponders -Detectors and alarms, each (includes smoke, heat, CO, methane, etc. detectors and alarms, signals, pull stations, nurse call system devices, sprinkler & standpipe switches, miscellaneous monitoring & supervisory points) Emergency Lighting and Exit Signs -Battery banks, each -Remote emergency lighting heads, per outlet -Combination emergency lighting/exit sign units, each -Exit signs, each Voice, Data, Video (VDV) & Intrusion Alarm Systems -Fibre optic cable (any length) -Voice, Data, Video & Intrusion Alarm systems: associated devices, each (data outlets, CCTV outlets, etc.) -Data rack or control panel including all components installed, each -Amplifiers, each -Extra low voltage controllers/cabinets, each VDV Audit Program -Annual fee (includes registration information, review of applicant s training and operational procedures and audit inspections) -Permit fee per installation per address -Fee for non-compliance during an audit -Fee for suspension from the program 13 $107 $81 $197 $118 $249 $139 $296 $155 $206 $258 $370 $10.90 $20.30 $78 $155 $68 $30.70 $5.40 $10.90 $1.77 $11.90 $1.77 $30.70 $1.77 $57 $10.40 $1.77 $3600 $30.70 $309 $5140 COMMERCIAL ELECTRICAL PERMITS

COMMERCIAL ELECTRICAL PERMITS Empty Raceways -60 m or less -Over 60 m to 300 m -Over 300 m Receptacles, wall switches, luminaires, electric door strikes, H/C door operators, card readers, request to exit devices, thermostats, I/O devices and similar equipment -15 Amp, each -Over 15 Amp, each Electric heating and/or cooking appliances -2 kw or less, each -Over 2 kw to 5 kw, each -Over 5 kw to 15 kw, each -Over 15 kw, each Fuel burning equipment -Each domestic package unit or unit heater -Each industrial/commercial type package $33.75 $68 $131 $1.77 $2.65 $8.40 $13.25 $20.30 $33.75 $20.30 $58 Door hold-open devices, each $5.40 Electromagnetic locks, each $10.40 Fire pump electrical connection and associated equipment, each $210 Fuel dispensers and similar equipment, each $29.70 Generator driven by prime mover & associated equipment, each $235 Hotels and motels: per bedroom unit : new construction or additions to existing structures $61 Light standards, each $15.75 Machine/HVAC control panels, each $67 Multiple-family dwelling: first three dwelling units $505 Multiple-family dwelling: electrical permit for each additional dwelling unit $128 Relay cabinets, lighting contactors, dimming control panels and similar enclosures, each $30.70 Solar photovoltaic panels, each $5.20 Spray booths - install new, alteration or removal (fee incorporated in spray booth $0 building permit) (Electrical permit still required) Reduction of electrical permit fees: where equipment is connected to existing wiring that has been previously inspected under another electrical permit, the per item fee imposed is one half (½) the fee that would otherwise be applicable Fee to be calculated Note: Applicable to new buildings and additions only. Applies to all electrical equipment and devices contained within the dwelling units except for life safety & health equipment. Fees for life safety & health equipment and for electrical equipment installed in areas outside of dwelling or bedroom units are assessed on per device costs. COMMERCIAL ELECTRICAL PERMITS 14

COMMERCIAL ELECTRICAL PERMITS Signs (electrical permit fee) First free standing sign $103 Each additional free standing sign installed at the same time $61 First non-free standing sign installed $103 Each additional non-free standing sign installed at the same time $16.75 Temporary installations Supplied from a permanent electrical system $103 Supplied from a temporary electrical service $171 Annual permits Base Fee $104 + Building Fee - 1-5 buildings $520 + Building Fee - 6-10 buildings $1030 + Building Fee - 11+ buildings $1545 Defect Re-Inspections Re-inspections of defects where defects are identified during a requested inspection and re-inspection is required to confirm their correction/ each hour or portion thereof/per visit $129 Meeting/discussion concerning Electrical Code compliance Base Fee $206 + Staff Fee - each City employee in attendance, each hour $155 Charge for meeting cancellation within 24 hours $206 Applicable to All Electrical Permits Certificate of Electrical Inspection Acceptance $33.75 15 COMMERCIAL ELECTRICAL PERMITS

COMMERCIAL 2.3. PLUMBING PERMITS Type of Installation Base Fee Applies to all commercial plumbing permits except for items indicated with an asterisk (*) when they are the only item included on the permit. *Underground Rough-in only (separate permit for work up to the lowest below grade floor level); outlet and fixture fees also apply New Multiple-family dwelling: each additional dwelling unit (in addition to base fee) $155 $258 $104/suite Outlet and/or fixture each (except for dwelling units in new multi-family dwellings) $30.70 Backwater valve $52 *Domestic potable water backflow prevention device with test cocks, first device $193 *Domestic potable water backflow prevention device with test cocks, each additional $26 device Interceptor, sump, catch basin, pit, each $52 Minor repairs to drainage or venting systems (renewal of each fixture trap or drain, etc.) $15.50 Renewal of stacks only new work proposed (one or more) (in addition to base fee) $670 Potable water service pipe only -Water service pipe ¾ to 2 in diameter $52 -Water service pipe over 2 in diameter $83 -Renewal of potable water supply to existing fixtures (hot, cold or recirculation potable - No Charge water piping) Re-piping only of existing water supply to fixtures -For each dwelling unit, or -For each floor or portion thereof Applicable to All Plumbing Permits $165 $463 Certificate of Plumbing Inspection Acceptance $33.75 COMMERCIAL PLUMBING PERMITS 16

COMMERCIAL 2.4. MECHANICAL PERMITS M1 Mechanical Permit Base Fee $258 + Area Fee - floor area impacted $0.35/m 2 + Area Fee - Rough in HVAC only (eligible for entire base building only) $0.20/m 2 + Area Fee - Base building HVAC extension for tenant fit-up $0.25/m 2 + Area Fee - Unconditioned floor area mechanical air system in F2 or F3 occupancies only (no heating, no cooling, and no air distribution system) Repair or alteration of an existing mechanical system which cannot be described in terms of area (no base fee) Spray Booth - install new, alteration or removal (fee incorporated in spray booth building permit) (M1 permit still required) M2 Mechanical Permit $0.10/m 2 Base Fee $258 Plus fee for floor area impacted $0.25/m 2 Fire Pump /Standpipe (no base fee or fees for each additional floor) $520 First backflow prevention device with test cocks (no base fee if only item) $193 Each additional backflow prevention device with test cocks $26 Spray Booth - install new, alteration or removal (fee incorporated in spray booth building permit) (M2 permit still required) $0 M3 Mechanical Permit $258 $0 Fire Suppression -New -Repair/Minor modification Special Ventilation Systems Commercial Kitchen Exhaust, Dust Collector, etc. -New system (base fee) -New system additional connection (e.g. additional kitchen exhaust hoods, dust collection inlet), each connection -Repair or alteration to existing system Spray Booth install new or alteration (fee incorporated in spray booth building permit) (M3 permit still required) $258 $104 $411 $206 $309 $0 Applicable to All Mechanical Permits Certificate of Mechanical Inspection Acceptance $33.75 17 COMMERCIAL MECHANICAL PERMITS

COMMERCIAL 2.5. OCCUPANCY PERMITS Occupancy Permit Associated with a Building Permit Base Fee -Final Occupancy Permit -1 st Interim Occupancy Permit or denial of request -2 nd and subsequent Interim Occupancy Permit or denials of request + Area Fee -Final Occupancy Permit -1 st Interim Occupancy Permit or denial of request per discipline -2 nd Interim Occupancy Permit or denial of request per discipline -3 rd and subsequent Interim Occupancy Permit or denials of request per discipline Maximum (per permit or denial) -Final Occupancy Permit -1 st Interim Occupancy Permit or denial of request -2 nd and subsequent Interim Occupancy Permit or denials of request Discounts for tenant spaces where the only defects are related to the base building -1 st Interim Occupancy Permit or denial of request -2 nd and subsequent Interim Occupancy Permit or denials of request $206 $206 $206 $0.10/m 2 $0.05/m 2 $0.10/m 2 $0.20/m 2 $620 $825 $1235 50% 50% Occupy-only Occupancy Permit Fees Base Fee $206 + Area Fee -Final Occupancy Permit -1 st Interim Occupancy Permit or denial of request per discipline -2 nd Interim Occupancy Permit or denial of request per discipline -3 rd and subsequent Interim Occupancy Permit or denials of request per discipline Maximum Occupy-only fee (per permit or denial) $620 $0.10/m 2 $0.05/m 2 $0.10/m 2 $0.20/m 2 Note: When a per discipline rate is indicated, the following are identified as a discipline: 1. Building, structural, fire prevention; 2. Electrical; 3 Mechanical (M1, M2, M3) Refunds and Discounts For building permits applied for after June 1, 2016, a full refund of the Final Occupancy fee will be granted if there is a complete submission of all required documents (ie: no incomplete certificates) at the time of the first request for an occupancy permit and there are no defects at inspections (ie: no re-inspections required). This refund does not apply to individual dwelling units, special events or occupy-only permits and only applies if occupancy is required as part of a related building permit. COMMERCIAL OCCUPANCY PERMITS A fifty percent fee discount will be granted for interim occupancy permits per tenancy space when the only reason for the interim occupancy permit is defects in the base building. 18

COMMERCIAL OCCUPANCY PERMITS Occupancy Inspection Requests Request for occupancy inspections in fewer than 3 days from date of request where request can be facilitated. Double all associated occupancy fees Other Occupancy Permit Fees Indoor special events occupancy permit: greater than 60 occupants and greater than $.10/m 2 the established occupant load for the space (no base - maximum permit fee: $600) Temporary building occupancy permit for each 12-month period or portion thereof in $.25/m 2 addition to the base fee (to a maximum permit fee of $400) Base Fee - Application to establish an occupant load includes first hour of plan $309 examination or inspections + Hourly Fee - Each hour or portion thereof of plan examination or inspections $155/hr required to establish occupant load Replacement: occupancy permit certificate or occupant load placard (each) $52 Update and provide a copy of an issued occupancy permit (change of $83 ownership/change of operating name) Condominium display suite $360 Fees for Non-Compliance Occupancy prior to obtaining occupancy permit (occupy only - no building permit required) each month or part thereof subsequent to violation notice Occupancy prior to obtaining an occupancy permit when a construction-related permit is required or after a denial (e.g. new construction, additions, alterations or change of use) each month or part thereof subsequent to violation notice Fee for non-compliance for occupying with an Expired Interim occupancy permit each month Base Fee Area Fee Max $309 $.51/m 2 $1030 each time $411 $.51/m 2 $2060 each time $206 $.25/m 2 $2060 each time 19 COMMERCIAL OCCUPANCY PERMITS

COMMERCIAL 2.6. BUILDING PERMITS FOR SIGNS, AWNINGS, AND CANOPIES For Review of the Sign Support Structure (For signs that do not require engineer seals, the lower fee applies.) Applications where plans do not include engineer seals at the time of application Applications where plans include engineer seals at the time of application Freestanding sign 2.44m or less in height $258 $155 Freestanding sign over 2.44m in height but under 7.6m in $411 $258 height Freestanding sign over 7.6m in height N/A $411 Mansard roof, projecting or other structural signs $258 $155 Any other sign type $206 $104 Awning / canopy or similar types of structure or equipment $258 $155 Second and each subsequent additional sign involving the $104 $78 same type, same category, applied for in a single application Single sign face replacement $52 $52 2.7. TESTING LIFE SAFETY SYSTEMS FOR THE PURPOSES OF OCCUPANCY Fees for Life, fire, safety and health systems testing Test Re-Test Regular normal office hours $5140 $2580 Regular fully or in part outside office hours % time inside office hours x $5140 + % time outside office hours x 1.5 x $5140 % time inside office hours x $2570 + % time outside office hours x 1.5 x $2570 Complex or unusually large projects (as determined by the City) normal office hours $7710 $3090 Complex or unusually large projects (as determined by the City) fully or in part outside office hours % time inside office hours x $7710 + % time outside office hours x 1.5 x $7710 % time inside office hours x $3090 + % time outside office hours x 1.5 x $3090 Note: When tests occur fully or in part outside of regular business hours, the fee will be multiplied by 1.5 times in proportion to the percentage of the time spent outside of business hours. COMMERCIAL 20

3. ZONING 3.1. DEVELOPMENT PERMITS Housing-related Development Permits Base Fee - Single-family and Two-family dwellings $130 + New Dwelling Fee -180m² total floor area or less -more than 180m² of total floor area $33.75 $78 + Addition Fee for additions to an existing principal building $33.75 New accessory building/structure (no base fee applies) $25.60 Addition to accessory building (no base fee applies) $25.60 Housing change of use $25.60 Installation of solar photovoltaic systems (no base fee applies) $25.60 Commercial-related Development Permits New site development or new construction $620 Additions or exterior alterations to existing buildings or existing site redevelopment $309 New construction of, or an addition to, an accessory building $309 Temporary event or a temporary use $25.60 Commercial change of use $155 Erection of tents including tents considered to be a temporary building $25.60 Signs Free standing, mansard, projecting, or other structural supported signs $78 All Digital Signs $160 Awning or canopy with or without signs $78 All other types of signs $49 Sign face replacement $30.70 To place or locate a mobile advertising sign for a month or less $68 To place or locate a mobile advertising sign for a period of up to three calendar months $165 Other Fees Home-based business development permit (Fee applies to both Minor and Major $155 categories. Major home-based businesses incur an additional conditional use fee) Frozen Waterways Permit Application $104 Fee for re-examination ½ the fee of e.g. Review of re-submitted plans the initial development permit Note: For commercial permits that include multiple development types, only one development permit fee is charged. The fee selected will be the highest development permit fee as applicable to the scope of the permit work. 21 ZONING

ZONING 3.2. VARIANCES AND CONDITIONAL USES Single or Two-family dwellings Other Residential & Accessory Structures New/Additions Commercial Temporary Use and/or Density $1545 $1545 $1545 A-Variance (first) $104 $155 $570 A-Variance (each additional) $52 $104 $206 B-Variance (first) $360 $620 $1235 B-Variance (each additional) $104 $206 $309 C-Variance (first) N/A $620 $2060 C-Variance (each additional) N/A $206 $520 D-Variance (first) N/A $620 $2060 D-Variance (each additional) N/A $206 $520 Conditional Uses Single or Two-family dwellings Other Residential & Commercial General Conditional Use $620 $2,580 Attached secondary suite $258 N/A Detached secondary suite $620 N/A Home Based Business Major $620 $620 Fees for Non-Compliance Single or Two-family dwellings Other Residential & Accessory Structures New/Additions Commercial A-Variance (first) $155 $309 $825 A-Variance (each additional) $78 $206 $309 B-Variance (first) $570 $930 $2580 B-Variance (each additional) $155 $309 $463 C-Variance (first) N/A $930 $4110 C-Variance (each additional) N/A $309 $775 D-Variance (first) N/A $930 $4110 D-Variance (each additional) N/A $309 $775 Conditional Uses -General Conditional Use -Attached Secondary Suite -Detached Secondary Suite -Home Based Business-Major $930 N/A N/A $930 $930 $620 $1030 $930 $5140 N/A N/A $930 Note: Variances are categorized as follows: o A-Variance: A minor tolerance of a zoning rule for residential and/or commercial applications. o B-Variance: A zoning variance reviewed and approved or denied by the director. o C-Variance: A zoning variance reviewed by the director, approved or denied by the Board of Adjustment. o D-Variance: A zoning variance reviewed by the director, approved or denied by the Community Committee in conjunction with another Development Application. ZONING 22

ZONING 3.3. OTHER FEES Zoning Letters Verification of existing zoning for a specific property $52 Verification of existing or proposed use single and two family dwellings $133 Verification of existing or proposed use all other $206 Zoning or land use history $535 Any other information $206 Zoning memorandum single and two family dwellings $52 Zoning memorandum all other $206 Lot of record search in addition to direct Manitoba Land Title search costs $258 Miscellaneous Fees Mobile home - development application approval $309 Mobile home inspection - first hour $155 Mobile home inspection - each additional hour $104 Draft Application fee (can be applied to application fee if applicant proceeds with $520 formal application) Zoning Inspection Fee 1 st hour $155 Zoning Inspection Fee each additional hour $104 Winnipeg Building Commission: application fee $1575 Spatial Separation / Party Wall agreement with Caveat on Title (includes legal $4110 + LTO Fees processing fees) Development application for variation or removal of building restriction caveat $620 + LTO Fees (includes legal costs) Communication facility proposal review $1,225 Communication facility proposal review for exempted installations $520 Request to demolish a single-family or two-family dwelling in a residential area $520 without a building permit to replace the demolished residence Advertising of public hearings Newspaper advertising charges Manitoba Land Titles Office (LTO) Fees (The Property Registry) As billed by The Property Registry Delivery of issued permits and plans by courier (optional service) $10.20 23 ZONING

4. PLANNING AND LAND DEVELOPMENT 4.1. GENERAL PLANNING Plan Reviews Site Plan Review for Plan Approval Director - $206 Committee - $360 Second and each subsequent review $206 Master Plan in EI Zoning Districts Second and each subsequent review $1175 $885 Parking Management Plan review $258 Alternative equivalent compliance approval $258 Design Reviews New building or new addition $411 Signs $155 All other development applications $258 Downtown Development Applications Urban Design Review New building or new addition Second and each subsequent review $765 $457 Signs $186 All other development applications $288 Appeal of a decision $775 Historical Buildings and Resources Review Heritage Permits -Rehabilitation or new addition -Second and each subsequent review -Signs -All other development applications $765 $457 $186 $288 Owner - initiated nomination $258 Removal from or modification of list $2580 Expedited review $2580 Appeal of a decision $775 Street/Building Names and Addresses PLANNING AND LAND DEVELOPMENT Addition of one street name to Street Name Reserve List *Fee exempt for $164 applications recognizing individuals Fee for each additional street name to add to Street Name Reserve List $28.60 Honourary Street name application $164 Honourary Street name topper (each) $218 Advertising street name change Newspaper advertising charges Public street name change $900 + LTO Fees Privately-owned street name designation $411 + LTO Fees Street address confirmation by letter $72 Street address change $206 Request for a building name $73 24

PLANNING AND LAND DEVELOPMENT City Plans Amendment to OurWinnipeg: Application Fee $29,770 OurWinnipeg: Advertising fee Newspaper advertising charges Complete Communities Amendment: Application Fee $29,770 Complete Communities: Advertising fee Newspaper advertising charges New Secondary Plan (Precinct Plan, Area Master Plan, etc.) $35,920 Amendment to Secondary Plan: Application Fee $11,300 Secondary Plan: Advertising fee Newspaper advertising charges 4.2. LAND DEVELOPMENT APPLICATIONS Land Development Administration Fee $2,200 per Acre Plan of Subdivision (DAS) (subdivide property and create new rights-of-way; public hearing required for subdivision approval) Base fee $6,630 + Per Acre fee (to a maximum of $20,000) $411 per Acre Rezoning (DAZ) (rezoning of land or zoning text amendment) Base fee $11,550 + Per Acre fee (to a maximum of $50,000) $411 per Acre Zoning text amendment $350 Plan of Subdivision and Rezoning (DASZ) (approval of plan of subdivision and rezoning of the land contained in the subdivision) Base fee $12,710 + Per Acre fee (to a maximum of $50,000) $411 per Acre Short Form Plan of Subdivision (DASSF) (subdivide property but will not create new rights-of-way; public hearing not required) Base fee $3,550 + Per Acre fee (to a maximum of $15,000) $411 per Acre Plan of Survey (PS) (development application for the approval of a plan of survey) Base fee $3,550 + Per Acre fee (to a maximum of $15,000) $411 per Acre 25 PLANNING AND LAND DEVELOPMENT

PLANNING AND LAND DEVELOPMENT Other Fees Consent Application (CA) fee: each consent, for approval to convey $3,090 CONDO fee: application for the approval of a condominium plan $4,110 Zoning agreement amendments $1,855 DAO fee (application for a street, lane or walkway opening) $1,135 + LTO Fees DAC fee (application for a street, lane or walkway closing) $2,060 + LTO Fees DAOC fee (application for a street, lane or walkway opening and closing) $2,060 + LTO Fees DAASP fee (for the approval of an air space plan) $540 Extension Fees Extension fees - for an extension of the time period approved by Council for enactment of a by-law under a DAS/DAZ/DASZ file Extension fees - for an extension of the time period approved by Council for a by-law coming into force under a DAS/DAZ/DASZ file Extension fees - administrative re-approval of a plan of subdivision under DASSF Extension fees - for an extension of the time period for the Standing Policy Committee to complete a DASSF application Extension fees - for time extension of the one year limitation for registration of plan of subdivision at the LTO (re-approval of mylars) $740 $565 $376 $740 $376 Mylar Signing Fees DAS/DASZ/DASSF/DAPS/DAASP Mylar signing fees - for each lot within plan $64 DAS/DASZ/DASSF/DAPS/DAASP Mylar signing fees - minimum lot/parcel fee $174 for each plan Condo plan mylar signing fee - each plan $64 Condo plan mylar signing fee - minimum fee for each condominium complex $174 4.3. AGREEMENTS Subdivision agreement $345 Servicing agreement $1,200 Development agreement $1,720 Zoning agreement $345 Subdivision/Servicing/Development agreement amendment $740 PLANNING AND LAND DEVELOPMENT 4.4. OTHER FEES Subdivision park plan review $350 Subdivision land equivalencies $350 Consent to assign servicing or development agreement $740 Certificate of consent $174 Certified copy of a certificate of consent $64 Manitoba Land Titles Office (LTO) Fees (The Property Registry) As billed by The Property Registry 26

PLANNING AND LAND DEVELOPMENT 4.5. WATERWAYS / FLOOD FRINGE Base fee -Deck -Detached Garage -Single- or two- family dwelling addition -Single- or two- family dwelling -Multi-family dwelling -Commercial -Commercial Accessory Structure + Area Fee -Deck -Detached Garage -Single family dwelling -Multi-family dwelling to a maximum of 8 stories above grade -Commercial to a maximum of 8 stories above grade Waterway Permit: for value of work which cannot be described in terms of area up to $5,000 and/or base fee for over $5,000 Waterway Permit: for each additional $1,000 between $5000.01 and $500,000.00 (in addition to base fee) Waterway Permit: for each additional $1,000 between $500,000.01 -to- $1,000,000.00 (in addition to base fee) Waterway Permit: for each additional $1,000 over $1,000,000.00 (in addition to base fee) Discount for all Waterway Permits where a maintained public street or the Primary Line of Defense is intervening between the proposed development and the waterway, as determined by the Waterways Authority. $78 $155 $309 $1030 $2060 $2060 $520 $1.01/m 2 $2.10/m 2 $4.15/m 2 $8.30/m 2 $8.30/m 2 $206 $4.90 $3.45 $3.25 Renewal of Waterway Permit $104 Waterway record search $52 Flood Fringe Agreements / waiver caveated on title $2060 Fees for Non Compliance Work not involving a Contractor Work performed by a Contractor Work without a Waterway Permit Equivalent to the permit fee or $411.00 whichever is greater. Equivalent to the permit fee or $1030.00 whichever is greater Maximum Fee for Non-Compliance $4,110 $20,530 50% Notes: Includes the floor area of all levels, unfinished basements/attached garages. Compound projects, including multiple components will pay one base fee equal to the greatest of the applicable base fee(s), plus the individual unit rates for all components of the project. 4.6. IMPACT FEES New Residential development in New and Emerging Communities (OurWinnipeg) $57.47/m 2 Administration Fee for refunds $100 Application Fee for Director review $100 Appeal Fee $250 27 PLANNING AND LAND DEVELOPMENT

5. ENCROACHMENTS Encroachments: Approved by the Public Service (Simple Encroachments such as parts of buildings, fences, seasonal patios etc.) Initial Encroachment Approval Fees Single-family and two-family dwellings and accessory structures $129 All other property types $206 Seasonal patios $206 Annual Encroachment Licence Fees Single-family and two-family dwellings, Multi-unit residential dwellings subject to part 9 of $78 the building code: First 5m² or less of occupied space Single-family and two-family dwellings, Multi-unit residential dwellings subject to part 9 of $42 the building code: Each additional 5m² or portion thereof All other types of encroachments: First 5m² or less of space occupied $104 All other types of encroachments: Each additional 5m² or portion thereof $62 Sign Encroachments Initial Approval Fees Sign encroachment $155 Annual Licence Fees Annual Administration fee $52 Rate per square meter (first year rate to be charged pro-rated) $12.40 All other Encroachment Types including those of a non-standard or commercial nature Initial Approval Fees (Includes legal processing fees) Requiring Council approval with simple legal agreements $2,060 Requiring approval of a designated employee with simple legal agreements $1,550 Requiring Council approval with complex legal agreements $4,630 Requiring approval of a designated employee with complex legal agreements $3,810 Annual Licence Fees Annual Administration fee $386 Encroachment licence annual rate $25.60/m 2 Other Encroachment Fees Encroachment Discharge fee (all encroachment types except seasonal patios) $104 Annual encroachment licence late payment fee $15.50 ENCROACHMENTS 28

6. DEMOLITION PERMITS Housing Single and Two-Family, Triplexes, Rooming Houses Demolish/remove $360 If part of new home project with building permit application $206 Demolish/remove garage, porch, lean-to or similar structure or other accessory $104 structures (without demolition of the dwelling) If part of new project with building permit application $52 Fee for non-compliance for incomplete demolitions beyond the term of the demolition $206 permit. Fee per week Property tax clearance $23.50 Commercial Base fee -simple demolition (No basement or deep foundation, slab on grade, no piles, single $258 storey maximum 3 meter wall height.) -all other demolition $520 + Area Fee: of all floor area(s) $0.35/m 2 Fee for non-compliance for incomplete demolitions beyond the term of the demolition $1,030 permit. Fee per week Discount when demolition permit is accompanied by a concurrent building permit 20% Property tax clearance $23.50 Note: Fees for non-compliance for demolition without a permit are in the Fees for Non-compliance section (see page 36). 29 DEMOLITION PERMITS

7. INSPECTIONS AND LICENSING 7.1. COMMERCIAL AND HOUSING INSPECTIONS Excess Commercial and Housing Inspections Inspection cannot be performed (in addition to the fees listed, each site visit also consumes one of the inspections included in the permit fee) -Work not ready for inspection when inspection arranged -Incorrect/Insufficient information provided -No address on site, building, or suite -Inspector unable to gain access -Inspection cancelled same day -Unsafe work site Extra Inspections-Commercial (applied in cases where a re-inspection of a defect is required, Fire Prevention inspections and any other additional inspections.) -1 st -2 nd -3 rd and subsequent Extra inspections-housing -1 st -2 nd -3 rd and subsequent $155 ea. $155 ea. $155 ea. $155 ea. $155 ea. $411 ea. $129 $258 $360 $104 $206 $309 Base Fee - Inspections conducted outside office hours four hours or less per inspector $463 + Hourly Fee - Inspections conducted outside office hours per inspector $155/hr Inspection to identify non-compliance $155/hr Failure to either call for an inspection or to notify the City that work has been initiated within a 6 month period after the permit has been issued. Housing - Failure to call for a re-inspection of a defect or to obtain an extension from the City within 1 month of a defect being identified Commercial - Failure to call for a re-inspection of a defect or to obtain an extension from the City within seven (7) working days of a defect being identified Failure to close a permit or obtain a formal extension from the City within 3 years of permit being issued $52 $155 $155 $206 Note: Permits for new single-family and two-family dwellings, detached secondary suites and additions, the number of inspections included in a project would be 7 (3 for building, 2 for plumbing, and 2 for electrical if applicable to the construction project). Since most of the required inspection points can be combined to include more than one permit, the inspections can be transferred between permits on these projects. However, for many interior renovation projects or accessory structure (external to the house) projects which might include more than one permit (e.g. a garage with a building and electrical permit), the inspections would not be transferable because each electrical or plumbing contractor will typically call for inspections independently. There are two inspections in total per flood proofing permit package. INSPECTIONS AND LICENSING 30