Plan for acquisition of historical consumption data and household typology for each dwelling

Similar documents
1 April - 12 Apr and 16 Apr- 21 Apr. 30 Dec- 1 Jan and 18 Feb-31 Mar

Scottish Accommodation Occupancy Survey. Annual Report 2016

SKYDIVE ALGARVE ACCOMMODATION OPTIONS PRIMARY OPTION: Pestana Dom Joao II Resort

World Renewable Energy Congress (WRECX) Editor A. Sayigh 2008 WREC. All rights reserved. 822

SKYDIVE ALGARVE ACCOMMODATION OPTIONS PRIMARY OPTION: Pestana Dom Joao II Resort

SKYDIVE ALGARVE ACCOMMODATION OPTIONS PRIMARY OPTION: Pestana Dom Joao II Resort

Study of the energy performance of Korean apartment buildings with alternative balcony configurations

Marine Corps Resident Energy Conservation Program (RECP) MCCS Cherry Point

Monthly Indicators + 4.8% - 3.5% %

Huge 2 Bedroom Condo with Private Hot Tub - Quick Walk to the Slopes!

SFR Condo Residential Lot Sales Inventory Sales Inventory Sales Inventory. Month YTD Month Month YTD Month Month YTD Month

Monthly Indicators + 7.3% + 6.6% + 8.3% Single-Family Market Overview Condo Market Overview New Listings Pending Sales.

Information sheet A Data

Village of Glenview Appearance Commission

Monthly Indicators % % - 9.2%

657 S Belvoir South Euclid, OH Mark Khuri

Wellington Housing Accord Monitoring Report 4

Building Energy Efficiency Disclosure Act 2010 Commercial Building Disclosure Program

MLS of Greater Cincinnati - Charts for the Month: November 2017

Public Housing Utility Allowance Estimates

The Effective Analyst: From Research to Execution. Contents are subject to change. For the latest updates visit

Property Guide for Landlords

SAGRADA FAMILIA - PADILLA 3BR

DETACHED MULTI-UNIT APPROVALS

Village of Glenview Plan Commission

The University of Massachusetts Campus Master Plan. Faculty Senate April 21st

California Housing Market Update. Monthly Sales and Price Statistics November 2018

Efficient Finance and Accounting Operations: 2019 Best Practices and Updates

Released: November 2011

Monthly Indicators % % %

Monthly Indicators % + 9.7% %

Monthly Indicators % % - 3.5%

Certificate in Financial Management

California Housing Market Update. Monthly Sales and Price Statistics September 2018

Bella Luna Gorgeous 3 Bedroom 3 Bath Condo - New Owners!!

Large 3 bedroom condo in West Keystone

HOUSES IN MULTIPLE OCCUPATION Standard Guidance. Houses in Multiple Occupation Standards Guidance

Ria Hostel/ Ria Guesthouse

Overcoming Barriers to Time-of-Use Rates for Apartment Residents

Monthly Market Watch for the Prescott Quad City Area. Provided by Keller Williams Check Realty Statistics from August 2012 Prescott MLS

Graded Project OVERVIEW INSTRUCTIONS. Step 1: Create a Loan Amortization Schedule

ABSTRACT. Keywords: Adaptive behavior, Wind flow, Energy-saving, Energy consumption, Coastal areas

California Housing Market Update. Monthly Sales and Price Statistics August 2018

4791 BROADWAY. A 69 Unit Corner Mixed-Use Building Northern Manhattan

June 2008 MLS Month in Review

Certified Internal Auditor Exam Preparation. Contents are subject to change. For the latest updates visit

Monthly Market Watch for Maricopa County An overview of what is happening in the Maricopa County real estate market

Luxury 4 Bedroom Condo in River Run - 2 Minute Walk From the Gondola!

Process Plant Inspection. Contents are subject to change. For the latest updates visit Page 1 of 7

AWARD WINNING COAST AND COUNTRY PARKS

Christchurch Housing Accord Monitoring Report. For quarter ending June 2015

Village of Glenview Plan Commission

Accounts Payable: Accounting and Management Best Practices

May 2008 MLS Month in Review

Presentation of the Biowaste Management Model (5.1 model design survey) WP5 Action 5.1

July 2012 was $162,256. ($153,956). was $314,607. was $172,488. ($164,426). Kansas City Region Average Sales Price - Existing Homes

Preparing Financial Statements and the Annual Report

Accounting and Finance Policies and Procedures. Contents are subject to change. For the latest updates visit

Village of Glenview Plan Commission

California Housing Market Update. Monthly Sales and Price Statistics October 2018

Financial Analysis Workshop. Contents are subject to change. For the latest updates visit

Published in Spring 1986 Issue The Real Estate Appraiser & Analyst Society of Real Estate Appraisers 1

THE OUTLOOK FOR HOUSING IN ILLINOIS

Aalborg Universitet. CLIMA proceedings of the 12th REHVA World Congress volume 6 Heiselberg, Per Kvols. Publication date: 2016

Springbrook Estates Sewer Improvement Area Informational Meeting Presented By Allen County Sanitary Engineering Department August 28, 2013

Rightmove House Price Index

STEVE CARDINALE Park Hyatt Office PO Drawer 2820 Beaver Creek, CO

Provided by Keller Williams Realty Professional Partners Statistics from September 2010 MLS

RENTAL AGREEMENT IMPORTANT INFORMATION. Expenses on the tenant s charge

Contents: Notes: Application:

Released: August 2011

Improving the energy efficiency of our buildings

Monthly Indicators % % %

Puerto Rico Housing Finance Authority Housing Stimulus Programs

Rightmove House Price Index

STAY ON THE FRENCH RIVIERA

ELECTRICAL LOAD CHARACTERISTICS OF SUPERINSULATED MULTIFAMILY HOUSING: A CASE STUDY

California Housing Market Update. Monthly Sales and Price Statistics May 2018

Contents: Notes: Application:

England Occupancy Survey May 2017 SUMMARY OF RESULTS

45 Court Street New Haven, CT 06511

REALTOR MEMBERSHIP APPLICATION

UNITED KINGDOM OCCUPANCY SURVEY. Serviced Accommodation Summary Report April the research solution

California Housing Market Update. Monthly Sales and Price Statistics December 2018

the Fuchsbau Blockhouse 1

CONTINUUM Multigenerational and Mixed-Income Community Living

UNITED KINGDOM OCCUPANCY SURVEY. Serviced Accommodation Summary Report March the research solution

This Month in Real Estate

Certified Crisis Management Professional. Contents are subject to change. For the latest updates visit

Rightmove House Price Index

Rightmove House Price Index

Village of Glenview Plan Commission

Village of Glenview Appearance Commission

Daylight availability in courtyards of urban dwellings in Athens

While a project is typically acquired on a specific date

Queens Rental Market Report November 2017 mns.com

Queens Rental Market Report February 2018 mns.com

Procurement Method. Preparatio n of TORs/invi tation

TABLE OF CONTENTS ASKING PRICE $27,500,000 EXECUTIVE SUMMARY THE NEIGHBORHOOD FINANCIAL OVERVIEW PROPERTY PHOTOS DUE DILIGENCE

Evolving Resident Demographics. Marketing to the Millennial & Baby Boomer Generations

Transcription:

MED Programme Priority-Objective 2-2: Promotion and renewable energy and improvement of energy efficiency Contract n. IS-MED10-029 Plan for acquisition of historical consumption data and household typology for each dwelling Greek pilot project: Energy Refurbishment of Students residences in DUTH Komotini Campus Intelligent energy management systems at local and regional level Setting an experimentation plan for multi-energy smart metering in LIH in the Med area October 2013 Authors: - Centre of Renewable Energy Sources and Saving (CRES) - Democritus University of Thrace (DUTH) Project co-financé par le Fonds Européen de Développement Régional - FEDER

CONTENTS 1.0 INTRODUCTION... 3 2.0 OVERVIEW OF PILOT PROJECT... 4 2.1 GENERAL INFORMATION - GEOMETRY...4 2.2 SOCIO-ECONOMIC CHARACTERISTICS...5 2.3 BUILDING SYSTEMS INFORMATION...6 2.4 TYPOLOGIES - ENERGY USES......6 2.4.1 One-person student flats........7 2.4.2 Two-persons student flats......8 2.4.3 Communal / circulation areas......8 3.0 ACQUISITION OF HISTORICAL CONSUMPTION DATA...10 3.1 TYPE OF DATA SOUGHT......10 3.2 TYPE OF HISTORICAL DATA METERED / MONITORED...10 3.3 PROCESSING OF AVAILABLE HISTORICAL DATA...14 APPENDIX 1 HISTORICAL PPC MONTHLY ELECTRICITY RECORDS FOR DUTH CAMPUS (2010-2012)...17 APPENDIX 2 HISTORICAL FUEL OIL REGISTERS FOR 7 BUILDINGS ON SITE (2008-2012)....30 Project co-financé par le Fonds Européen de Développement Régional - FEDER

1.0 INTRODUCTION The pilot project in Greece involves the energy refurbishment of the 5 Students residences buildings of the Democritus University of Thrace (DUTH) campus of Komotini. This report presents the process that was followed in order to obtain historical data for the pilot buildings, in relation to their characteristics (technical, social, economic aspects), energy uses, occupants energy behaviour and historical energy consumption data. It also presents the actual consumption data obtained for the last 3-5 years. Sources of data acquisition To obtain data on the characteristics of the pilot buildings / student rooms and on the patterns of energy behaviour / consumption, information was collected from a number of sources: Architectural and building services design drawings On-site visits to the pilot buildings and on-site energy audits by CRES Discussions and walkarounds with the buildings manager and technical personnel responsible for the buildings maintenance and operation Discussions with the Technical Services department of DUTH Questionnaire survey (printed and e-mail), given to building residents (students), including general profile questions and more specific energy and comfort related questions (data collection for WP5 and WP6) Records of the electricity supplier (Publlic Power Corporation), of the Technical Services department of DUTH and of the Student residences building manager Having processed the information obtained from these sources, in the sections that follow an overview is given of the pilot buildings characteristics and historical consumption data. Project co-financé par le Fonds Européen de Développement Régional - FEDER

2.0 OVERVIEW OF PILOT PROJECT 2.1 General information - Geometry The pilot project includes the energy refurbishment of the 5 existing DUTH Students residences buildings (buildings S1, S2, S3, S4, S5) in the campus of Komotini. The buildings were constructed in 1985-1988. The site plan below illustrates the location of the 5 pilot buildings within the wider DUTH University campus. DUTH University campus Student residences City of KOMOTINI The total floor area of the 5 pilot buildings is 12,863m 2 accommodation for a total of 700 students. and they provide The 5 pilot building blocks are 2-3 storey and they contain in total 630 student flats: 560 one-person and 70 two-person flats. Each flat includes its own bathroom, and there are communal kitchens on each floor as well as other communal areas and circulation areas (corridors). The table below summarises the buildings accommodation breakdown: Building name Floor area 1-person flats 2-persons flats Total No of flats Total No of occupants (m 2 ) S1 3.055 114 30 144 174 S2 3.359 115 40 155 195 S3 1.464 78 78 78 S4 2.759 138 138 138 S5 2.226 115 115 115 Total 12.863 560 70 630 700 Project co-financé par le Fonds Européen de Développement Régional - FEDER

The site plan below shows the layout of the five pilot buildings on the site. Building S1 Building S3 Building S4 Building S2 Building S5 2.2 Socio-economic characteristics The Student residences are public buildings owned and managed by the Democritus University of Thrace. The buildings follow in principle the model of low-income social housing buildings since they are occupied by students that have been selected according to social and financial criteria. Students pay no contribution to their energy bills, as these are paid directly by the University. The selection of residents for the Student halls is reviewed on an annual basis. Students can reside in the buildings between 1 and 6 years; typically they stay for 3-4 years. Project co-financé par le Fonds Européen de Développement Régional - FEDER

2.3 Building systems information Space heating and domestic hot water in the buildings are provided using a centralized oil boiler for each building, controlled on a central timer. The oil boiler for each building is located in a ground floor boiler room. There are radiators in all student flats as well as throughout the communal areas. There are no further automations/controls, and no cooling provision, except for a limited number of split units for few office areas). DHW is generated through the same oil boiler for each building as used for space heating. Lighting is provided mostly by incandescent light bulbs in student rooms, and by fluorescent light bulbs in communal areas. The type of energy consuming systems present in the different types of spaces in the buildings are further described in the following section. 2.4 Typologies Energy uses There are two typologies of student rooms in the buildings: one-person flats and twoperson flats. Their breakdown across the five buildings is shown on the table of section 2.1. Apart from these two types of spaces, there are also large communal areas (e.g. communal kitchens and lounges on each floor) and circulation areas in each building. Due to the nature of student residence buildings (including shared kitchens and communal areas), for the energy analysis that was undertaken, each pilot building was treated as a building block and the student flats were not treated as individual dwellings. This is in line with the Greek national energy methodology, treating student residence buildings not as stand-alone dwellings but as non-domestic multiresidential buildings, due to their typical functions and energy uses, including a significant percentage of communal spaces. Therefore for the purposes of ELIH-MED, there are 5 pilot building blocks on site and it is essential to be able assess each building s overall energy consumption at a whole building level (including student flats as well as communal areas). Below is a summary description of the types of spaces found in the buildings: Project co-financé par le Fonds Européen de Développement Régional - FEDER

2.4.1 One-person student flats There are 560 one-person flats across the five buildings, as shown in the accommodation breakdown (section 2.1). Each one-person flat has a floor area of approx.15m 2 (small variations occur). The rooms are occupied throughout the year, except for the summer holiday period between 15/07 and 31/08. Typical energy uses Typical photo and plan of a one-person student flat Space heating: The rooms are heated through radiators, fed by a central oil boiler in each building. There is no individual heating control per room, as the heating for each building is controlled centrally through a timer. Due to the heating system either not being on for long during the day or not operating properly in all rooms, auxiliary heating is commonly used by most students, through electrical heating devices (electric radiators or electric fan heaters). Domestic hot water: DHW is provided in the rooms, generated through the same central oil boiler in each building as used for space heating. It is stored in each building s boiler room in storage cylinders and distributed throughout the building via distribution pipework. Space ventilation / cooling: There is no cooling provided. All rooms are naturally ventilated through openable windows. In addition some students use portable electric ventilation fans in hot days. Lighting: Each student flat typically includes 3 conventional incandescent light bulbs 75W each providing general lighting in the room, the entrance and the bathroom, and 2 linear fluorescent luminaires with lamps 36W each, over the study desk. Lighting is controlled manually (on/off switches). Cooking: Typically cooked meals are not prepared in the rooms as these don t have kitchens and there is a student restaurant on campus. However some students use some personal electric appliances in their rooms for preparing quick meals, e.g. mini electric oven hobs / kitchenettes, coffee makers, toasters, kettles. Appliances: Electric appliances typically used by students in their rooms include TVs, PCs, laptops, hi-fi systems, small fridges, hairdryers. Project co-financé par le Fonds Européen de Développement Régional - FEDER

2.4.2 Two-persons student flats There are 70 two-persons flats, found only in buildings S1 and S2, as shown in the accommodation breakdown (section 2.1). Each two-persons flat has a floor area of approx.20m 2 (small variations occur). The rooms are occupied throughout the year, except for the summer holiday period between 15/07 and 31/08. Typical energy uses Typical photo and plan of a two-persons student flat The energy uses occurring in the two-persons flats are the same as described above in section 2.4.1 for the one-person flats. 2.4.3 Communal / circulation areas There are communal kitchens and lounges on each floor, typically one every 15 rooms, or 2-3 per floor, by perimeter areas. Circulation corridors and stairwells run throughout the buildings, with corridors being in their majority internal. There is a limited number of office / administration rooms at the ground floor of each building, and a student cantine, at the ground floor of building S1. Typical photo and plan of a communal area Project co-financé par le Fonds Européen de Développement Régional - FEDER

Typical photo and plan of a circulation corridor Typical energy uses Space heating: All communal and circulation areas are heated through radiators fed by the central oil boiler in each building. There is no separate heating control for the different communal spaces of the building, as the heating for each building is controlled centrally through a timer. Domestic hot water: DHW is provided to communal kitchens on each floor (however it was observed that these are very rarely used). DHW is generated by the same central oil boiler in each building as used for space heating. Space ventilation / cooling: There is no cooling provided, apart from a limited number of rooms (office / administration rooms) where some split units are used. All communal and perimeter circulation spaces are naturally ventilated through openable windows. A large percentage of the circulation corridors is internal. Lighting: Lighting of circulation corridors and communal areas, in its majority includes linear fluorescent luminaires (of different wattage) as well as some circular fluorescent luminaires in stairwells. There is also some security lighting. All communal/circulation areas lighting is controlled centrally by a timer. Cooking: In the communal kitchens there are electric kitchen hobs, however it was observed that these are very rarely used, as there is a student restaurant on campus. There is a student cantine (in building S1) where some electrical appliances are used to serve drinks and snacks, e.g. toaster, kettle, fridges. Appliances: There are no electrical appliances in circulation areas and lounges. In a limited number of office / administration rooms at the ground floor of each building there are some PCs and in the student cantine (in building S1) there is a TV and radio. Project co-financé par le Fonds Européen de Développement Régional - FEDER

3.0 ACQUISITION OF HISTORICAL CONSUMPTION DATA 3.1 Type of data sought As analysed above, the nature of student residence buildings is such that large communal and circulation areas are included (in this project these spaces are both heated and lit), therefore for energy purposes each building s consumption is assessed at whole building level, as student rooms are not stand-alone dwellings. In order to assess the energy consumption of the existing buildings, prior to implementing the planned energy saving interventions, historical energy consumption data was sought by the Technical Services department of DUTH, as well as by the Student residences building manager. Specifically, in line with the agreed ELIH-MED methodology, the University was asked to provide as a minimum, monthly fuel and electricity bills for the Student residences buildings, for the last 3 years (2010, 2011, 2012). 3.2 Type of historical data metered / monitored The situation with regards to historical metering / monitoring of consumption data in the pilot buildings is summarised as follows: Electricity There is no electricity meter (or sub-meters) for each of the pilot buildings, neither there is a meter for the 5 Student residences buildings as a total. As a result, there is no historic data available for the electricity delivered specifically to the 5 pilot Student residence buildings. There is a single electricity meter for the whole of the University campus, including over 15 buildings of different uses (e.g. teaching buildings, student residences, amphitheatre, administrative buildings, restaurant etc.). The corresponding monthly electricity meter reading records for the period 01/2010 until 12/2012 were available by the Public Power Corporation, on the basis of which the monthly electricity bills were issued to DUTH for the entire campus. As these historical monthly bills were not available, the corresponding consumption and costs have been calculated (see section 3.3) using the information available from the monthly PPC registers and PPC information on energy charges for the past three years. However, these calculated monthly and annual consumptions correspond to the electricity consumption for the whole University campus (including over 15 buildings of different types and usage patterns) and it would be very difficult to estimate consumption just for the five pilot buildings. Project co-financé par le Fonds Européen de Développement Régional - FEDER

A sample electricity bill for the DUTH campus is in the format below. Consumption period Total consumption (kwh) Total cost Meter readings Project co-financé par le Fonds Européen de Développement Régional - FEDER

A sample PPC meter readings register for the DUTH campus is in the format below. The full set of monthly records for the years 2010, 2011, 2012 is included in Appendix 1. Date of reading Meter reading Date of reading Meter reading Project co-financé par le Fonds Européen de Développement Régional - FEDER

Heat Space heating and DHW in the pilot buildings is generated through a central oil boiler in each building. There is no heat metering on the centralised space heating and hot water system for each building. The consumption of fuel oil, is monitored through recording the quantity of oil purchased in total, for the 5 pilot buildings plus 2 nearby buildings on campus (restaurant, amphitheatre). Both the quantities (in litres) and corresponding costs (Euros) are recorded and these records were available for years 2008-2012. Therefore there is no historic data available for the fuel oil (heat) delivered specifically to the 5 pilot Student residence buildings. However, from the data that is available for the total oil fuel purchased for the 7 buildings, and using an approximate calculation (described in section 3.3) an estimate has been made of the monthly and annual heat consumption of each of the pilot buildings for the years 2008-2012. A sample fuel oil register sheet is in the format below. The full set of registers for the years 2008-2012 is included in Appendix 2. Quantity (lt) Cost ( ) Date Project co-financé par le Fonds Européen de Développement Régional - FEDER

3.3 Processing of available historical data After all available data was obtained by the DUTH Technical Services and the Student residences building manager, the data was processed in order to tabulate the historical monthly / annual consumption figures for heat and electricity. The methodology followed can be summarised as follows: Electricity From the PPC monthly meter reading records, using the difference between consecutive readings, the monthly and annual consumption in kwh and corresponding costs have been calculated for years 2010, 2011, 2012, shown on the table below. As already mentioned, these figures do not refer to the 5 pilot buildings specifically, but to the whole University campus including over 15 buildings. HISTORICAL ELECTRICITY CONSUMPTION FOR WHOLE UNIVERSITY CAMPUS Year 2010 2011 2012 Billing date Consumption period Monthly electricity consumption Monthly electricity cost Annual electricity consumption Annual electricity cost kwh EUR kwh EUR 18/01/10 Jan/2010 272,000 42,479 3,742,000 568,164 18/02/10 Feb/2010 466,000 64,766 18/03/10 Mar/2010 360,000 52,977 18/04/10 Apr/2010 264,000 41,571 18/05/10 May/2010 248,000 38,993 18/06/10 Jun/2010 282,000 46,057 18/07/10 Jul/2010 324,000 49,988 18/08/10 Aug/2010 236,000 39,890 18/09/10 Sep/2010 308,000 46,398 18/10/10 Oct/2010 260,000 40,430 18/11/10 Nov/2010 304,000 45,528 29/12/10 Dec/2010 418,000 59,086 01/02/11 Jan/2011 428,000 51,443 3,604,000 436,663 01/03/11 Feb/2011 402,000 45,977 01/04/11 Mar/2011 402,000 48,740 01/05/11 Apr/2011 220,000 28,843 01/06/11 May/2011 244,000 27,817 01/07/11 Jun/2011 266,000 33,738 01/08/11 Jul/2011 236,000 29,303 01/09/11 Aug/2011 152,000 19,203 01/10/11 Sep/2011 234,000 30,056 01/11/11 Oct/2011 302,000 36,462 01/12/11 Nov/2011 394,000 45,612 01/01/12 Dec/2011 324,000 39,468 01/02/12 Jan/2012 430,000 52,938 3,440,000 470,387 01/04/12 Feb/2012-Mar/2012 876,000 114,490 01/05/12 Apr/2012 242,000 34,082 01/06/12 May/2012 262,000 34,913 01/07/12 Jun/2012 236,000 35,974 01/08/12 Jul/2012 186,000 29,868 01/09/12 Aug/2012 150,000 22,533 01/10/12 Sep/2012 200,000 26,857 01/11/12 Oct/2012 228,000 30,809 01/12/12 Nov/2012 308,000 42,441 01/01/13 Dec/2012 322,000 45,481 Project co-financé par le Fonds Européen de Développement Régional - FEDER

Heat From the available data on the total oil fuel purchased for the 5 pilot buildings plus 2 nearby buildings on campus (restaurant, amphitheatre), an approximate calculation has been made in order to estimate the monthly and annual heat consumption of each of the pilot buildings for the years 2008-2012. The calculation can be summarised as follows: The total annual quantity (lt) of purchased oil to serve the 7 buildings, was proportioned to each building, based on a combination of the following factors: - The known installed heating system capacity (kcal/h) for each of the 7 buildings - The estimated operation time of the heating system during the year, for each of the buildings depending on their use (and based on information given by the buildings' manager) After obtaining the total annual quantity (lt) of estimated oil consumption for each of the buildings, this was further proportioned down to monthly consumption, using available heating degree-days information for each month of the heating season for the climate of Komotini. Finally, the monthly quantity of oil (lt) consumed for each building was converted into kwh of delivered thermal energy, based on the net calorific value of oil as per the Greek energy regulations. The results of the above calculation are presented in the table that follows. Project co-financé par le Fonds Européen de Développement Régional - FEDER

Year 2008 2009 2010 2011 2012 Consumption period Building S1 Monthly heat consumption Monthly heat cost Building S2 Monthly heat consumption Monthly heat cost Building S3 Monthly heat consumption Monthly heat cost Monthly heat consumption Building S4 Monthly heat cost Monthly consum kwh EUR kwh EUR kwh EUR kwh EUR kwh Ιαν/2008 91.457 6.193 92.053 6.233 85.502 5.790 91.457 6.193 89.07 Φεβ/2008 73.792 4.997 74.272 5.029 68.987 4.671 73.792 4.997 71.87 Μαρ/2008 65.071 4.406 65.495 4.435 60.834 4.119 65.071 4.406 63.37 Απρ/2008 32.871 2.226 33.085 2.240 30.731 2.081 32.871 2.226 32.01 Οκτ/2008 19.454 1.317 19.581 1.326 18.187 1.232 19.454 1.317 18.94 Νοε/2008 48.300 3.271 48.615 3.292 45.155 3.058 48.300 3.271 47.04 Δεκ/2008 76.252 5.163 76.748 5.197 71.286 4.827 76.252 5.163 74.26 Total 407.197 27.572 409.849 27.752 380.682 25.777 407.197 27.572 396.5 Ιαν/2009 91.310 4.589 91.904 4.619 85.364 4.290 91.310 4.589 88.93 Φεβ/2009 73.673 3.703 74.152 3.727 68.875 3.462 73.673 3.703 71.75 Μαρ/2009 64.966 3.265 65.389 3.286 60.736 3.053 64.966 3.265 63.27 Απρ/2009 32.818 1.649 33.032 1.660 30.681 1.542 32.818 1.649 31.96 Οκτ/2009 19.423 976 19.549 983 18.158 913 19.423 976 18.91 Νοε/2009 48.222 2.424 48.536 2.439 45.082 2.266 48.222 2.424 46.96 Δεκ/2009 76.128 3.826 76.624 3.851 71.171 3.577 76.128 3.826 74.14 Total 406.540 20.433 409.187 20.566 380.067 19.102 406.540 20.433 395.9 Ιαν/2010 84.735 6.088 85.286 6.127 79.217 5.691 84.735 6.088 82.52 Φεβ/2010 68.368 4.912 68.813 4.944 63.916 4.592 68.368 4.912 66.58 Μαρ/2010 60.288 4.331 60.681 4.360 56.362 4.049 60.288 4.331 58.71 Απρ/2010 30.455 2.188 30.653 2.202 28.472 2.046 30.455 2.188 29.66 Οκτ/2010 18.024 1.295 18.142 1.303 16.851 1.211 18.024 1.295 17.55 Νοε/2010 44.750 3.215 45.041 3.236 41.836 3.006 44.750 3.215 43.58 Δεκ/2010 70.647 5.076 71.107 5.109 66.046 4.745 70.647 5.076 68.80 Total 377.266 27.104 379.723 27.281 352.700 25.339 377.266 27.104 367.4 Ιαν/2011 86.378 8.082 86.941 8.135 80.754 7.556 86.378 8.082 84.12 Φεβ/2011 69.694 6.521 70.148 6.563 65.156 6.096 69.694 6.521 67.87 Μαρ/2011 61.457 5.750 61.858 5.788 57.456 5.376 61.457 5.750 59.85 Απρ/2011 31.046 2.905 31.248 2.924 29.024 2.716 31.046 2.905 30.23 Οκτ/2011 18.374 1.719 18.494 1.730 17.177 1.607 18.374 1.719 17.89 Νοε/2011 45.618 4.268 45.915 4.296 42.647 3.990 45.618 4.268 44.43 Δεκ/2011 72.017 6.738 72.486 6.782 67.328 6.300 72.017 6.738 70.14 Total 384.584 35.984 387.089 36.218 359.542 33.641 384.584 35.984 374.5 Ιαν/2012 55.074 6.690 55.432 6.734 51.488 6.254 55.074 6.690 53.63 Φεβ/2012 44.436 5.398 44.725 5.433 41.543 5.046 44.436 5.398 43.27 Μαρ/2012 39.185 4.760 39.440 4.791 36.633 4.450 39.185 4.760 38.16 Απρ/2012 19.794 2.405 19.923 2.420 18.505 2.248 19.794 2.405 19.27 Οκτ/2012 11.715 1.423 11.791 1.432 10.952 1.330 11.715 1.423 11.41 Νοε/2012 29.085 3.533 29.275 3.556 27.192 3.303 29.085 3.533 28.32 Δεκ/2012 45.917 5.578 46.216 5.614 42.927 5.215 45.917 5.578 44.72 Total 245.207 29.787 246.803 29.981 229.240 27.847 245.207 29.787 238.8 Project co-financé par le Fonds Européen de Développement Régional - FEDER

APPENDIX 1 HISTORICAL PPC MONTHLY ELECTRICITY RECORDS FOR DUTH CAMPUS (2010-2012) Project co-financé par le Fonds Européen de Développement Régional - FEDER

APPENDIX 2 HISTORICAL FUEL OIL REGISTERS FOR 7 BUILDINGS ON SITE (2008-2012) (5 PILOT BUILDINGS + RESTAURANT + AMPHITHEATRE) Project co-financé par le Fonds Européen de Développement Régional - FEDER

Project co-financé par le Fonds Européen de Développement Régional - FEDER

Project co-financé par le Fonds Européen de Développement Régional - FEDER

Project co-financé par le Fonds Européen de Développement Régional - FEDER

Project co-financé par le Fonds Européen de Développement Régional - FEDER

Project co-financé par le Fonds Européen de Développement Régional - FEDER

Project co-financé par le Fonds Européen de Développement Régional - FEDER

Project co-financé par le Fonds Européen de Développement Régional - FEDER

Project co-financé par le Fonds Européen de Développement Régional - FEDER

Project co-financé par le Fonds Européen de Développement Régional - FEDER