SUNY 2020 Advanced Manufacturing Institute (AMI) Building

Similar documents
CLAYTON COUNTY WATER AUTHORITY. Sewer System Evaluation Surveys

REQUEST FOR PROPOSALS Professional Engineering Services for Lift Station In the Rural Municipality of Wellington

REQUEST FOR PROPOSAL RFP # TOC17-001

TEMPORARY EMPLOYMENT SERVICES, OFFICE AND CLERICAL 06-X-37778

Neighborhood Stabilization Program Frequently Asked Questions

EAST BATON ROUGE REDEVELOPMENT AUTHORITY ADMINISTRATIVE POLICY PROCUREMENT CONTRACTING AND DBE POLICY FOR FEDERALLY FUNDED PROJECTS.

MASSACHUSETTS CONVENTION CENTER AUTHORITY OWNER S PROJECT MANAGER SERVICES ADDENDUM NO. 1

Answer: No survey exists and proposer should include in their proposal.

Real Estate Commercial Advisory RFP. Information session 11/8/2017

REQUEST FOR ROPOSALS LANDLORD AND TENANT LEGAL SERVICES Issued: September 20, 2017

COUNTY OF TANEY, MISSOURI

REQUEST FOR QUALIFICATIONS

Chapter 11. Competitive Negotiation: Procedure

1. Canyon Pointe 2. Glen Willow 3. Madison. ISSUED: November 15, 2017

Request for Qualifications (RFQ) # On-Call Land Surveying Services November 21, 2018

Request for Proposals HQS Inspection Services May 21,

Charter Township of Shelby Parks & Recreation Department Request for Proposals Gene Shepherd Park Splash Pad

Questions and Answers Residential Technical Assistance Pilot Program, Request for Proposals: Multifamily Specific Resiliency Technical Assistance

REQUEST FOR RATE QUOTE. Financial Services for the Guaranteed Savings Agreement In The City of La Puente, California

ADDENDUM #1 TO BID # BID NUMBER: ISSUE DATE: Wednesday, March 21, 2018

REQUEST FOR QUALIFICATIONS FOR HOUSING ACQUISITION, RELOCATON, DEMOLITION CONSULTANT/REHABILITATION SPECIALIST WISE COUNTY, VIRGINIA

Solar Power Purchase Agreement

Questions and Answers to the RFP for Professional Property Management Bid

THE HOUSING AUTHORITY OF THE CITY OF BOULDER dba BOULDER HOUSING PARTNERS

Final proposals, as further described herein, should be addressed to:

ADDENDUM NO. 1 January 26, 2018 JOB ORDER CONTRACT FLEET AND FACILTY MANAGEMENT

Brandywine Farms Sewer Extension SEP

PERRY CITY UTAH REQUEST FOR PROPOSALS REAL ESTATE BROKER SERVICES

Scope of Work for Asset Management Plan

City of Lawrence Office of the Purchasing Agent

In Development. Consultant Selection. Consultant - Scope of Work. Design-Permitting. Planning. Construction. Closeout

Request for Proposals For Village Assessment Services

MARCH GUIDE TO BUILDING CONDITION ASSESSMENTS and RESERVE FUND STUDIES

February 22, RFQ No. 1 California WaterFix Real Estate Services ADDENDUM NO. 2

ADDENDUM #3. REQUEST FOR PROPOSAL (the RFP ) Fee Developer

The Ultimate Guide To: DC CONDO CONVERSIONS. Authored by the Washington Capital Partners Team

Central Kentucky Educational Cooperative

SPECIFICATIONS AND PROPOSAL FOR GENERAL BANKING SERVICES FOR THE TOWNSHIP OF DEERFIELD September 1, 2013 August 31, 2016

RFP # PROPOSAL DUE DATE: JUNE 11, 2014 BY 4:00PM. Susan Garcia, Director

REQUEST FOR PROPOSALS (A )

Town of Manchester, Connecticut General Services Department. Request for Qualifications

REQUEST FOR QUALIFICATIONS (RFQ ) PRE-QUALIFY TO BID ALL BHP RENOVATION CONSTRUCTION GENERAL CONTRACTOR SERVICES

Below Market Rate Program Administrator. Request for Proposals

Subject: Addendum No. 2 Request for Expressions of Interest (RFEI) for Development of Brooklyn College School of Business.

DEVELOPER SELECTION PROCESS

Questions from Tampa Machinery:

City of O Fallon Project Management

NYS HOME Local Program

ADDENDUM #2. September 14, 2018

ADDENDUM NUMBER FIVE

Housing Commission Report

TOWN OF MANSFIELD RULES AND REGULATIONS FOR THE EXTENSION OF PUBLIC SEWERS

RFP # Request for Proposals Canyon Pointe Parking Lot Replacement

County Tax Sale PLEASE MARK YOUR ENVELOPE "SEALED BID # RETURN ONE (1) ORIGINAL AND THREE (3) COPIES TO:

INFORMATION FOR VENDORS DOING BUSINESS WITH THE CITY OF CORAL SPRINGS, FLORIDA FINANCIAL SERVICES DEPT

Town of North Castle New York REQUEST FOR PROPOSALS REAL ESTATE BROKER SERVICES

CITY OF GROVER BEACH COMMUNITY DEVELOPMENT DEPARTMENT Tentative Map Checklist

EDGERTON CITY HALL PLANNING COMMISSION MEETING REGULAR SESSION March 12, 2019

REQUEST FOR PROPOSAL FOR ENGINEERING DESIGN SERVICES. Channel Reconstruction at Short Hills Garden Apartments Site Millburn, New Jersey

REQUEST FOR PROPOSALS

Effingham County Health Department Environmental Health Division. Business Hours

MINUTES OF MEETING SIX MILE CREEK COMMUNITY DEVELOPMENT DISTRICT

REVISED REQUEST FOR REDEVELOPMENT PROPOSALS (RFP) 62 nd STREET INDUSTRIAL PARK IN THE UPPER LAWRENCEVILLE NEIGHBORHOOD OF THE CITY OF PITTSBURGH

TOWN OF LEWISTON PLANNING BOARD APPLICATION

REQUEST FOR PROPOSAL FOR STATION EQUIPMENT AND UPGRADES

Onsite Wastewater Treatment System Remediation Project

1. Question: In regards to the facilities are they all Monday thru Friday cleaning? Any facilities Saturday and or Sunday cleaning?

EASTERN WEST VIRGINIA COMMUNITY & TECHNICAL COLLEGE REGULATION No. AR- 7.10

NYS HOME Local Program Small Rental Development Initiative (SRDI) Application Technical Assistance Webinar Questions and Answers

Chapter 5. Competitive Sealed Bidding: Procedure

PORT OF TACOMA REQUEST FOR PROPOSALS No Conservation Easement Holder for Upper Clear Creek Mitigation Bank

Attachment 2 Civil Engineering

NYS HOME Local Program

Chapter 9. Competitive Sealed Bidding: Evaluating Bids

Allegheny County Sanitary Authority REQUEST FOR QUALIFICATIONS. for

REQUEST FOR PROPOSALS RFP # September 16, 2011 Proposals Due on October 5, 4:00 pm

Request For Proposal RFP # Capital Lease Financing for Enterprise Software. City of Greenville, Texas. October 13, 2010

The Lawrenceville Community Land Trust: A Scattered Site, Single- Family, For- Sale Housing Development Lawrenceville Corporation

REQUEST FOR PROPOSAL 2017 ASPHALT PAVING SERVICES

Missouri Housing Development Commission

This Addendum incorporates the following items: 1. Pre Proposal Summary along with the sign-in sheet (attached).

REAL ESTATE BROKER SERVICES : DUPLEXES Request For Proposal # October 30, 2018

SITE PLAN REVIEW ADMINISTRATIVE REVIEW. Please Note: Once submitted to the County, all application materials become a matter of public record.

Community Dev. Coord./Deputy City Recorder

VILLAGE OF MUNDELEIN NORTH LAKE STREET FAÇADE IMPROVEMENT PROGRAM ARCHITECTURAL DESIGN SERVICES

Preliminary Plat Application & Submittal Checklist

Springbrook Estates Sewer Improvement Area Informational Meeting Presented By Allen County Sanitary Engineering Department August 28, 2013

APPLICATION PACKET SINGLE FAMILY CLUSTER HOUSING OPTION REVIEW

Housing and Community Development

PART ONE - GENERAL INFORMATION

PROPOSAL CONTENT AND FORMAT

PROCUREMENT DEPARTMENT 2 MONTGOMERY STREET, 3 rd FLOOR JERSEY CITY, NJ ADDENDUM # 4, Revised TO PROSPECTIVE RESPONDENTS TO RFQ# 31224

Special Use Permit Application to Allow Short Term Rental

CITY OF LAREDO Environmental Services Department

Request for Proposals (RFP) for. The construction of a new pole barn addition for the AuSable Township Department of Public Works

STATE OF MINNESOTA OFFICE OF THE STATE AUDITOR

We look forward to working with you to build on our collaboration and enhance our partnership on behalf of all Minnesotans.

ROXBURY COMMUNITY CENTER

RFP REQUEST FOR PROPOSAL. for TAX CREDIT ADVISOR SERVICES. for BOULDER HOUSING PARTNERS. March 6, 2012 Requested Return: March 15, 2010

A Septic-to-Sanitary Sewer System Conversion Packet

Transcription:

SUNY 2020 Advanced Manufacturing Institute (AMI) Building Addendum #1 Revised budget for construction project Notes from pre-proposal site visit held Tuesday, May 19, 2015 Responses to written questions received by May 20, 2015 deadline Additional scope of work Revised budget for construction project Our revised budget for this construction project will be $10,600,000. This excludes DASNY fees, construction management, geotechnical, and access road construction. Notes from Pre-proposal Site Visit Held Tuesday, May 19, 2015: In attendance at Pre-proposal Site Visit Tuesday, May 19, 2015: Name Email Phone# Dwight Wethey dwethey@cscos.com (315)703-4419 Chris Jahn cjahn@swbr.com (585)232-8300 Jerry Young youngj@erdmananthony.com (518)783-1205 Randy Collin/CSArch rcollins@csarchpc.com (518)463-8068 Aaron Schwartz aaron@plananyc.com (646)209-9821 David Whitford dave@aesnortheast.com (518)561-1598 Carl Schoder carl@sraengineers.com (518)761-0417 Tenee Casaccio tenee@jmzarchitects.com (518)793-0786 Jared Heinl jheinl@beardsley.com (518)483-1585 Steve Boisvert sboisvert@bergmannpc.com (518)862-0325 Question: Would it be possible to provide your best estimate of what the Minority and Women-Owned Business participation requirements or goals will be prior to proposals being submitted? Answer: Approximately 30% (probably 15% women/15% minority). This will need to be confirmed Question: Will your estimate of 30% Minority and Women-Owned Business participation be included in the design stage or just construction? 1

Answer: Probably not much of an opportunity to incorporate this in the design stage but would like to encourage it. Respondents are encourage to stipulate what portion of their fees are estimated to be M/WBE participation. Question: Will the project be subject to public bidding in accordance with Wick s Law? Answer: Wick s Law is not applicable. Single prime allowed. Question: Will LEEDS certification be required? Answer: Due to nature of the building, LEEDS certification will hot have to be met; however, a minimum of 26 points towards LEEDS certification will be required. Question: Will DASNY s fees come out of the budget for this project? Answer: Yes, approximately $175,000, but this will be confirmed once final funding approval is received. Question: Does the budget for the construction project include furnishings? Answer: Yes; however, it does not include approximately $800,000 for specialized equipment. Not looking for any frills on this building we need quality. Question: Any idea what the $800,000 equipment will be and the utilities it may require? Answer: One thing may be a small machine shop. Need to think about making industrial utilities available for the design of the first floor. Should be all set as far as electrical utilities. Will need to consider new PRV station for natural gas. Question: Are you expecting a pre-engineered building or conventional? Answer: Leaning toward conventional. Question: How much of the space is dedicated to manufacturing training/education? What kind of stuff is going on in the building in regards to noise and vibration? Answer: Approximately half will be used in manufacturing training/education. Definitely need flexibility. Question: Clarify the fee structure? Answer: It will be based on a percentage of construction budget, excluding geotechnical, construction management, and DASNY participation. Question: How much additional site work around the building? Will additional parking be needed? Answer: Additional site work is unknown at this time. Additional parking will probably not be needed. Question: Are there utilities already serving that area? Answer: 150 (+/-) available north for gas main, and sanitary waste line leaving the property Power available on the entry approximately 150 away Water only a 12 inch main going to the main academic building, will need to tie into this 12 inch main. The main is located approximately 600 from construction site. Water is received from the town water tower. Static pressure is 22-24 pounds the distribution system supply pumps and fire pumps will need to be looked at to make sure there is adequate flow. 2

Question: Do you have a current site survey? Answer: No Question: If a variance is needed for the height of the building who would that be filed with? Answer: At this time, we do not know. As per DASNY, there should be no other agency review. Question: Are you expecting industry, traditional student, and corporate training? Answer: Yes all of the above. Question: Will there be a municipal or SEQR review? Answer: DASNY will want to review the project and will be the permitting agency. Question: The RFP states that design and bid ready documents are to be completed by November 1, 2015, is there any flexibility? Answer: Yes. Depends on how long it will take the state to provide us with the approval of the funds. Would like to break ground by April 2016. Question: Where is the access road? Answer: Near where the two storage containers are. We would like to build the access road this summer. The cost of the access road would come out of the construction budget. Question: Are soil boring tests coming out of this budget? Answer: Yes Question: Do you want to include industry in the programming and planning in the building? Answer: Yes. We do have partners (includes Clarkson University, SUNY Plattsburgh, and local manufacturers). Question: Will your current Industrial Tech/Engineering program be moved to the new building? Answer: Yes. This department currently takes up 7,500 square feet. Question: Will this be a DASNY contract or standard AIA contract? Answer: Yes, AIA contract. Question: Will the college hire a construction manager to oversee the day-to-day activities of the contractors? Answer: Not certain. Question: Should the existing parking lot be paved as part of the project? Answer: Yes. Question: Is there a retention basin? Answer: Yes, north side of site. Question: How deep is the bedrock? Answer: Found at 18 where we dug. Appears to be limestone. 3

Question: In the evaluation criteria, where does cost rank? Answer: Cost will be a consideration; however, as stated on page 4 of the RFP, the lowest cost respondent may not be determined to be the most responsive one when all factors of evaluation of the proposal have been considered. However, the quoted fee structure will be an important factor in the determination of the successful proposal. Question: Are you thinking about a future expansion with this project? Answer: Possible Responses to Written Questions Received by May 20, 2015 Deadline Written Question: Item 9 says the bid documents must be completed by November 1, 2015. That means bids would be due in December with perhaps a January award and start of construction a time of year when foundations are unable to proceed due to weather. What is driving the accelerated design time line? Answer: The time line is accelerated. Tentative time line, subject to change: Dec 2015 Preparation of bid documents Jan 2016 Bid released Feb 2016 Bid award Apr 2016 Start construction Written Question: Item 11 says the project must be completed by August 2017. A project of this size can be completed in one calendar year, so can we assume that bid documents could be completed in January or February so that construction could actually start in spring of 2016? Answer: Tentative time line, subject to change: Dec 2015 Preparation of bid documents Jan 2016 Bid released Feb 2016 Bid award Apr 2016 Start construction Written Question: How does the college propose to handle the cost of soil borings, geotechnical analysis, additional site survey work (if necessary), testing during construction, special inspections, procurement of FF&E, etc.? These are not usually part of the architect s fee but could be handled by the architect for the convenience of the owner at an additional cost. Answer: The college will manage soil borings, geotechnical analysis, and additional site survey work (if necessary), and they will be funded through the project. Testing during construction, special inspections, and procurement of FF&E will be handled by the architect Written Question: Per the discussion at the pre-proposal meeting on 5/19, it is understood that DASNY will be the Authority Having Jurisdiction and that they will be conducting design reviews. Please confirm anticipated milestones (i.e. 30%, 65%, etc ) and approximate review timelines. Answer: DASNY will review drawings at 60% and 100% completion. Review and response time will be five to six weeks. 4

Written Question: Per the discussion at the pre-proposal meeting on 5/19 please confirm requirements for site plan review/approvals by agencies other than DASNY (i.e. Town of Plattsburgh Planning/Zoning, Clinton County Planning Board, etc ) Answer: As per DASNY, there should be no other agency review. Written Question: Per the discussion at the pre-proposal meeting on 5/19 please confirm that a new roadway is to be developed between the existing campus loop road and the existing gravel parking area/proposed building site and the this roadway may be bid as a separate project in summer/fall of 2015. Answer: The awarded architectural firm will be responsible for the design/engineering of the access road. The college will be responsible for the bidding of the road. Road construction will be deducted from total construction budget. Written Question: Can existing site survey and utility information be provided electronically to assist in design and survey scoping? Answer: An copy is included with this addendum (see last two pages). Written Question: Per the discussion at the pre proposal meeting on 5/19, it is understood that additional information on project requirements is expected from DASNY in the near future. If this information could potentially impact the RFP responses, please consider extending the deadline so firms can respond accordingly. Answer: The information from DASNY concerns their fee, so upon receiving the final approval it will not warrant a change in the deadlines outlined in the RFP. Written Question: Is the access road to be designed as part of the project? If yes, is the fee to be included in the overall fee or separated out? If the access road is done as an early bid package does the fee need to include weekly site observations and other typical Construction administration tasks? Answer: Yes, the access road is to be designed as part of the project and it will be included in the overall fee. The fee for the access road does not need to include weekly site observations and other typical construction administration tasks. Written Question: Is the study to bring water to the building site and evaluate the water availability and capacity included in this scope? If yes, should the fee be separated out or included in the overall fee? Answer: Yes it is included in this scope. The fee for this should be included in the overall fee. Written: Evaluation criteria on page 4 shows proposal scoring to include 25 points for Location of Firm Relative to the Project. Is there a specific range of scoring planned based on radius, mileage, time, or other factor? Are you looking for this subject to be addressed in the proposal as far as responsiveness capability? Answer: This is part of our evaluation criteria as stated in RFP. 5

Written: Also with respect to the evaluation criteria, the five criteria listed amount to 100 points, absent pricing submittal. Can you explain the weighted factor(s) of the listed criteria versus pricing? Answer: This is part of our evaluation criteria as stated in RFP. Additional Scope of Work Generator installation Parking lot expansion Site utilities ( water, sewer, storm water, natural gas) Access road Sidewalks and landscaping Installation of a small scale wind turbine (already owned by college and on premises) Installation of small photovoltaic array 6

Scale 1" = 175' Plot Date: 04/06/2015 Plot Time: 9:45 AM

The site location of the AMI is in location 2. To the north you will see that there is gas and sanitary available at approximately 150 feet from the site. To the west on the access road you will find primary three phase power coming up the hill, again located about 150 feet from the site. To the east approximately 600 feet away would be the location of the closest water main.