Disposition Codes, Description and Fees * SCHEDULE 1 - ADMINISTRATIVE FEES PART 1. Application, Renewal or Amendment of Disposition or Authorization CATEGORY FEES (see note #1) Code Disposition Type Application (see note #2) Renewal/Amendment (see note #2) Industrial PLC PPA PMS Licence of Occupation Pipeline Agreement Mineral Surface Agreement $900.00 $400.00 PML Miscellaneous Lease $1,800.00 Sand & Gravel PSM Surface Materials Lease $1,100.00 $400.00 Exploration Utility Exploration $525.00 $400.00 PLC PPA Licence of Occupation Pipeline Agreement $900.00 $400.00 PML Miscellaneous Lease $1,800.00 Commercial PLC PPA Licence of Occupation Pipeline Agreement $900.00 $400.00 PML Miscellaneous Lease $1,800.00 Non-Commercial PLC PPA PML Licence of Occupation Pipeline Agreement Miscellaneous Lease $900.00 $400.00 Agricultural PHP PGP Haying Permit Grazing Permit $25.00 N/A Miscellaneous Permit PMP Miscellaneous Permit $50.00 N/A *All fees are based on the Provincial Parks Fee Order 2016-1 09-15-2016 - Page 1 of 9
Trapping PLC Licence of Occupation $25.00 $25.00 Authorizations PTA LOA Temporary Field Authorization Letter of Authorization Disposition Digital Mapping $50.00 N/A Code Disposition Type Application-Renewals-Replacement Amendment All All $125.00 $50.00 Disposition Inspection Code Disposition Type First 3 Hours Each Additional Hour All All $250.00 $80.00 Reclamation Certificate Inspection Code Disposition Type Inspection Fee All All $300.00 Land Use Information Search and Routine Disclosure Code Disposition Type First 2 Hours Each Additional Hour All All $100.00 $50.00 Damage Assessments and Deposits Code Disposition Type Assessment/Deposit Fee All All Timber Damage Assessment (Note 4) (based on Alberta Agriculture and Forestry s annual Agriculture and Forestry Timber Damage Assessment Billing Rate Table) All All Construction Reclamation Deposit (Note 5) Not less than $5,000.00 All All Reclamation Deposit (Note 6) Not less than $10,000.00 PART 2. Assignment of Disposition or Addition of Lessees CATEGORY ASSIGNMENT/ADDITION OF LESSEES FEE Code Disposition Type Single Disposition Assignment Multiple Disposition Assignment PLC PPA PMS PML PSM Industrial Sand & Gravel Utility Commercial Non-Commercial Cottages $3,150.00 For The First Disposition: $3,150.00 For Each Additional Disposition: $400.00 09-15-2016 - Page 2 of 9
ANNUAL OR ADDITIONAL DISPOSITION FEES CATEGORY Code Disposition Type Use Definition/Example Term Annual & Other Fees Industrial PLC Licence of Occupation Structure the use of an area for an industrial-related structure. e.g. road, water intake, drainage or irrigation ditch, waste disposal site Annual Base Fee: not less than $25.00 Additional Fees: Roads (per km): - under 15m wide: $10.00-15-18m wide: $15.00 - more than 18m wide: $20.00 Water Intake (per site): $50.00 Drainage/Irrigation Ditch (per acre): $50.00 Waste disposal site (per acre): $1,500.00 #3, 4, 5, 6 Right-of-Way an electricity or communication distribution line (above or below ground) within a park for industrial use. Annual Fee (per acre): $25.00 e.g. power line, telephone line, fiber optic, internet cable a pipeline (for any fluid or gaseous substance) from a wellsite inside a park to a collection system outside the park, or for an existing transmission pipeline. PPA Pipeline Agreement Pipeline e.g. oil, gas or water pipeline Installation Fee (per acre): 1 st Pipeline: $1,500.00 2 nd Pipeline: (within same right-of-way) $500.00 Related Additional Pipeline (installed at a later date in the same or expanded right-of-way resulting in a new disturbance or re-disturbance): $1,500.00 One-time New Disposition Fee: $1,500.00 PMS Mineral Surface Lease Mineral Surface Disposition drill and/or operate a petroleum or natural gas well and facilities for the removal of petroleum or natural gas for an existing commitment. Annual Fee (per acre): $1,500.00 e.g. oil and gas wellsites, battery site, water well 09-15-2016 - Page 3 of 9
PML Miscellaneous Lease Structure/Facility infrastructure or facilities for industrial use. e.g. stockpile, storage 10% of the market value of the land on which improvements are located and 6% of the market value of the remaining land where the basis is for commercial (industrial) Utility PLC Licence of Occupation Structure the use of an area for public works. e.g. road, trail, erosion control structure, storm water pond, drainage ditch, gabion, water intake, storm water outflow Annual Base Fee: not less than $25.00 Additional Fees (not less than $50.00/acre): Road/Trail (per km) - under 15m wide: $10.00-15-18m wide: $15.00 - more than 18m wide: $20.00 Erosion Control Structure/Storm Water Pond/Drainage Ditch/Gabion (per acre): $50.00 Water intake/storm Water outflow: $50.00 Annual Fee (per acre): $50.00 Right-of-Way an electricity or communication utility line (above or below ground) across or within a park for public use. e.g. power line, telephone line, fiber optic, internet cable a pipeline across or within a park for public use., 10 PPA Pipeline Agreement Pipeline e.g. water, sewer or gas pipeline Installation Fee (per acre): 1st Pipeline: $1,500.00 2nd Pipeline: (within same right-of-way) $500.00 Related Additional Pipeline (installed at a later date in the same or expanded right-of-way resulting in a new disturbance or re-disturbance): $1,500.00, 10 10% of the market value of the land on which improvements are located and 6% of the market value of the remaining land where the basis is for commercial (utility) purposes (not less than $50.00/acre). PML Miscellaneous Lease Structure/Facility infrastructure or facilities for public use. e.g. emergency telecommunication tower 09-15-2016 - Page 4 of 9
Commercial PLC Licence of Occupation Structure the use of an area for a commercial/recreational structure. e.g. road, trail, airstrip, pier, dock, boat launch, erosion control structure, storm water pond, drainage ditch, gabion, water intake, storm water outflow, commercial water line, water well, waste disposal site Annual Base Fee: $25.00 Additional Fees: Road/Trail/Airstrip (per km): - under 15m wide: $10.00-15-18m wide: $15.00 - more than 18m wide: $20.00 Pier/Dock/Boat Launch (each): $100.00 Erosion Control Structure/Storm Water Pond/Drainage Ditch/Gabion (per acre): $50.00 Water Intake/Storm Water Outflow (per site): $50.00 Water Line (per acre): -1 st Pipeline: $150.00-2 nd Pipeline: $50.00 Water Well (per acre) $1,500.00 Waste Disposal Site (per acre) $1,500.00 Annual Fee (per acre): $25.00 Right-of-Way an electricity or communication utility distribution line (above or below ground) within a park to a commercial or recreational facility (i.e., cottage or lodge). e.g. power line, telephone line, fiber optic, internet cable a pipeline across or within a park for commercial services., 10 PPA Pipeline Agreement Pipeline e.g. water, sewer or gas pipeline Installation Fee (per acre): 1st Pipeline: $1,500.00 2nd Pipeline: (within same right-of-way) $500.00 Related Additional Pipeline (installed at a later date in the same or expanded right-of-way resulting in a new disturbance or re-disturbance): $1,500.00, 10 10% of the market value of the land on which improvements are located and 6% of the market value of the remaining land where the basis is for commercial PML Miscellaneous Lease Structure/Facility infrastructure or faciliies for commercial use. e.g. storage 09-15-2016 - Page 5 of 9
Telecommunication Tower a telecommunication tower and/or associated facility. The market value of the land and the value of the opportunity to operate a tower at that location. PML Miscellaneous Lease Tourism Facility Cottage Lot e.g. telecommunication tower carrying out a long term commercial activity that supports outdoor recreation in a park. e.g. lodge (recreational, hunting, fishing), ski hill use an existing surveyed cottage lot to construct and maintain a cottage for personal recreational 10% of the market value of the land on which improvements are located and 6% of the market value of the remaining land where the basis is for commercial Other fees 7 deposits may apply: See Notes a) See Schedule 2 Part 1 b) See Schedule 2 Part 2 Additional Fee: c) See Schedule 2 Part 3 e.g. lake cottage #4, 5 Non-Commercial PLC Licence of Occupation Structure the use of an area for a noncommercial recreational structure. e.g. road, trail, pier, dock, boat launch, erosion control structure, water line, water well Annual base fee: $25.00 Additional Fees: Road/Trail/Airstrip (per km): - under 15m wide: $10.00-15-18m wide: $15.00 - more than 18m wide: $20.00 Pier/Dock/Boat Launch (each) $50.00 Erosion Control Structure $50.00 Water Line: Same fees as for a road Water Well (per acre): $25.00 Utility Line Right-of- Way an electricity or communication utility distribution line (above or below ground) within a park to a non-commercial or recreational facility (i.e., cottage or lodge). Annual Fee (per acre) $25.00 e.g. power line, telephone line, fiber optic, internet cable, 10 09-15-2016 - Page 6 of 9
PPA Pipeline Agreement Pipeline Agreement a pipeline across or within a park for non-commercial services. e.g. water, sewer or gas pipeline Installation Fee (per acre): 1st Pipeline: $1,500.00 2nd Pipeline: (within same right-of-way) $500.00 Related Additional Pipeline (installed at a later date in the same or expanded right-of-way resulting in a new disturbance or re-disturbance): $1,500.00, 10 PML Miscellaneous Lease Non Profit Recreational Lease operation of a facility by non-profit groups (i.e., registered charity or society) & municipalities for recreational 1% of the market value of the land. e.g. youth camp, church camp Agricultural PHP Agricultural Permit Haying short-term access for haying for conservation and range management Annual Permit Term Fee: $25.00 Hay Fee (per ton): $15.00 PGP Agricultural Permit Grazing short-term access for grazing of domestic livestock for conservation and range management Annual Permit Term Fee: $25.00 Monthly Fee: a) Zone A (per animal unit) $3.35 b) Zone B (per animal unit) $2.78 See Notes #7, 8 Miscellaneous Permit PMP Miscellaneous Permit Short Term Seasonal Camp or Activity erection and use of a temporary of a temporary structure and/or activities for commercial purposes for a short period. One Year or Less Permit Term Fee: Half of what would be payable as an annual fee if the disposition were a miscellaneous lease. e.g. temporary snow camp Trapping PLC Licence of Occupation Trapper s Cabin a trapper to construct and maintain a temporary or removable cabin for conducting trapping activities on the existing traplines. Annual Base Fee: $25.00 e.g. trapper s cabin See Note #9 09-15-2016 - Page 7 of 9
Authorizations PTA Temporary Field Authority Access Authorization temporary access to a site in relation to an existing commitment/disposition. e.g. remediation project, trail maintenance, spill cleanup, vegetation control Less than One Year N/A LOA Letter of Authorization Access access for temporary activities that may be outside of existing disposition conditions. Less than One Year N/A e.g. cottage lot improvement, authorizes OHV use, road widening PART 1. Annual Summer Cottage Lot Lease Fees at: SCHEDULE 2 SUMMER COTTAGE LOT OR RV LOT LEASE FEES Beauvais Lake Provincial Park (PP), Crimson Lake PP, Dillberry Lake PP, Gooseberry Lake PP, Kinbrook Island PP, Winagami Lake PP Leases Eligible for Fee Review August 1, 2016 August 1, 2017 2018 August 1, 2019 2020 Annually $720.00 $840.00 $960.00 $1,080.00 $1,200.00 Between August 1, 2016 to July 31, 2017 $720.00 $840.00 $960.00 $1,080.00 $1,200.00 Between August 1, 2017 to July 31, 2018 $600.00 $840.00 $960.00 $1,080.00 $1,200.00 Between August 1, 2018 to July 31, 2019 $600.00 $600.00 $960.00 $1,080.00 $1,200.00 Between August 1, 2019 to July 31, 2020 $600.00 $600.00 $600.00 $1,080.00 $1,200.00 Between August 1, 2020 to July 31, 2021 $600.00 $600.00 $600.00 $600.00 $1,200.00 PART 2. Annual Fees For: Summer Cottage Lot Lease at Cypress Hills Provincial Park-Elkwater Townsite Summer Cottage Lot and RV Lot Lease at Oldman Dam Provincial Recreation Area Leases Eligible for Fee Review August 1, 2016 August 1, 2017 2018 August 1, 2019 2020 Annually $840.00 $980.00 $1,120.00 $1,260.00 $1,400.00 Between August 1, 2016 to July 31, 2017 $840.00 $980.00 $1,120.00 $1,260.00 $1,400.00 Between August 1, 2017 to July 31, 2018 $700.00 $980.00 $1,120.00 $1,260.00 $1,400.00 Between August 1, 2018 to July 31, 2019 $700.00 $700.00 $1,120.00 $1,260.00 $1,400.00 Between August 1, 2019 to July 31, 2020 $700.00 $700.00 $700.00 $1,260.00 $1,400.00 Between August 1, 2020 to July 31, 2021 $700.00 $700.00 $700.00 $700.00 $1,400.00 09-15-2016 - Page 8 of 9
PART 3. Annual Additional Fees for Cottage Lot and RV Lots Listed in Parts 1 and 2 of Schedule 2 Acreage and Waterfront Footage Fees August 1, 2016 August 1, 2017 2018 August 1, 2019 2020 Additional fee, if applicable, for each additional acre, or part of an acre, for lots exceeding one acre. Additional fee, if applicable, per frontal foot for waterfront lots. $200.00 $200.00 $200.00 $200.00 $200.00 $4.00 $4.00 $4.00 $4.00 $4.00 NOTES: 1. Cheques should be made payable to the Government of Alberta. (All fees herein specified are exclusive of GST). 2. Fees must be submitted with each disposition application or amendment. 3. A partial kilometre or acre is charged as one full kilometre or acre. 4. The Timber Damage Fee is based on the estimated value of any timber removed due to development of the disposition. The rate is based on Alberta Agriculture and Forestry s annual Agriculture and Forestry Timber Damage Assessment Billing Rate Table. 5. The Construction Reclamation Deposit applies to new disturbances and is returned when construction is completed and approved. The Construction Reclamation Deposit shall not be less than $5,000.00. 6. The Reclamation Deposit is returned once a site has a) received a Reclamation Certificate or b) been returned to an appropriate environmental standard. The Reclamation Deposit shall not be less than $10,000.00. 7. Zone A includes: Beauvais Lake Provincial Park (PP), Bow Valley PP, Chain Lakes PP, Cypress Hills PP, Dinosaur PP, Dry Island Buffalo Jump PP, Midland PP, Oldman Dam Provincial Recreation Area (PRA), Willow Creek PP, Writing-on-Stone PP. 8. Zone B includes: Cooking Lake-Blackfoot Grazing-Wildlife and Provincial Recreation Area (PRA), Figure Eight Lake PRA, Glenbow Ranch Provincial Park (PP), Lakeland PRA, Miquelon Lake PP, Vermilion PP. 9. There is an annual land use fee of $25.00, unless the Minister has waived the annual fee. 10. Fees do not apply to rural electrification associations or gas cooperatives. Notes 4, 5, 6 may apply. 09-15-2016 - Page 9 of 9