PROJECT DESCRIPTION STATION 1300

Similar documents
COMMUNITY BENEFIT REQUIREMENTS & IMPACT FEES FOR DEVELOPMENTS IN VARIOUS CITIES

The demolition required for the project came before the Landmark Preservation Commission (LPC) on November 3, 2016, where no action was taken.

Chapter URBAN VILLAGE ZONING DISTRICTS

The Miramar Santa Monica

Supplemental Feasibility Study for Ravenswood, Oak Grove, Glenwood and Encinal Avenues Grade Separation. for the. City of Menlo Park

Delivering 300,000 SF First Phase Summer 2018 DESIGN & CONNECT.

Town Center Joint Commission Public Hearing #1: January 20, 2016

Fully Approved! Downtown Menlo Park REVITALIZED. ±55,000 Sq Ft Mixed-Use Development. Delivery Q TRANSIT - ORIENTED

Jasper 115 Street DC2 Urban Design Brief

The Philadelphia Code. In order to be eligible for any floor area bonuses pursuant to this section:

The Philadelphia Code. Table : Commercial and Commercial Mixed-Use Districts {For a printable PDF version, click HERE}

Community Development

1900 N Northlake Way, Wallingford, Seattle

1100, 1110 & th Avenue NE Bellevue, Washington

A 290-UNIT RESIDENTIAL DEVELOPMENT IN DOWNTOWN SAN JOSE

MEMORANDUM. I1 District Industrial Living Overlay District 110,703 square feet / 2.54 acres

The Cannery Marketplace Narrative. Purpose: Site Design Approach: Cannery Commerce District 10/18/2017

GREENSBORO DRIVE

BYLAW NUMBER 159D2016

Planning Commission June 25, Lincoln Boulevard

BUSINESS AND SPACES THAT WORK TOGETHER

4 LAND USE 4.1 OBJECTIVES

Agenda. Where are we in the process? Schedule Survey results Framework Plan Transportation Exercise. downtown kingsport master plan

320 Maple Mixed Use PDR Narrative Fort Collins, CO Project # 1525

UNCOMMON INSPIRATION AT THE INTERSECTION OF WORK AND SPACE

MEMORANDUM. C3A District Shoreland Overlay District 32,055 square feet / 0.74 acres. West Calhoun, adjacent to Cedar-Isles-Dean

AMENITY RICH LOCATION SUSTAINABLE DESIGN. properties.cbre.us/station1300 MENLO PARK, CA TRANSIT ORIENTED

8.5.1 R1, Single Detached Residential District

When every angle feels like luxury, you ve arrived.

DEVELOPMENT STANDARDS FOR RESIDENTIAL PROJECTS RESIDENTIAL BUILDING TYPES: APPROPRIATE ZONES AND DENSITIES 2-1

City of South San Francisco Page 1 of 5

Agenda. 28 Sep 2015 SPRC #4. Pg 1

EXHIBIT 1 PROJECT DESCRIPTION AND DESCRIPTION OF REQUESTED AREA VARIANCES REDEVELOPMENT OF 201 ELLICOTT STREET

BUILDING III TH AVE SE BUILDING IV TH AVE SE BUILDING V TH AVE SE

UPDATE Board of Selectmen June 20, 2017

{ ( ' INCENTIVES & BONUSES

WESTPORT CUPERTINO GENERAL PLAN AMENDMENT APP STEVENS CREEK BLVD, CUPERTINO, CA. KT Urban PRELIMINARY PLANTING PLAN 1" = 40'-0" 0' 10' 25'

Community Advisory Committee (CAC) Meeting #7 West Anaheim Youth Center May 26, 2016

RETAIL RESTAURANT OFFICE SPACE FOR LEASE

Community Affairs and Planning Committee Paul Allore, MCIP, RPP Director of Planning and Development Services

CBCWorldwide.com 2501 MARVIN RD. NE., LACEY WA. FOR MORE DETAILS CONTACT: Cell DANFORTH

Development Density. What Do Developments at Different Density Look Like?

EXCEPTIONAL HIGH TECH CLASS A OFFICE SPACE IN DOWNTOWN BELLEVUE 1100, 1110, TH AVENUE NE BELLEVUE, WASHINGTON

1010 BRICKELL. Iconic Brickell Retail Space for Lease

60 South Market, San Jose ±234,439 SF. 15-story Class A office tower centrally located in downtown San Jose, CA. From 2,529 SF 17,977 SF Available

Cambridge Planning Board Zoning Submission Overview 7/25/2017

Urban Redevelopment Through Adaptive Reuse: From Blight to Bright

Chapter DOWNTOWN ZONING DISTRICTS

ST JOHNS COTTAGE, 73 ST JOHNS HILL, SHENSTONE, STAFFORDSHIRE WS14 0JE

1 Application Form 4

1111 Douglas Avenue. Burlingame, CA OFFERING MEMORANDUM

Rick Noll Commercial Realtor Direct (813)

GREENSBORO DRIVE

FACT SHEET DEVELOPMENT PLAN FOR PLANNED DEVELOPMENT AREA NO. 91 UNIVERSITY PLACE RESIDENCES DEVELOPMENT

Provide a diversity of housing types, responsive to household size, income and age needs.

DESIGN CRITERIA Ridegedale Center-Outparcel Restaurant, Minnetonka, MN

Urban Design Brief Dundas Street. London Affordable Housing Foundation. November Zelinka Priamo Ltd.

4 DEVELOPMENT STANDARDS FOR

Community Workshop #1 October 15, Redwood City. Regulatory Approaches to Implementing a Community Benefits Program

F O U R A D D R E S S E S, O N E G R E AT L O C AT I O N

Chair to close public hearing. Review Deadline: 60 Days: 8/18/ Days: 10/17/2017

60 South Market, San Jose ±234,439 SF. 15-story Class A office tower centrally located in downtown San Jose, CA. From 2,529 SF 17,977 SF Available

MPN. S broad street corner development site. 701 s broad street, philadelphia, pa 19147

ARTICLE 5. COMMERCIAL AND OFFICE DISTRICTS 5.1 PURPOSE STATEMENTS 5.2 USES 5.3 DIMENSIONAL STANDARDS 5.4 DESIGN STANDARDS 5.5 DK DISTRICT STANDARDS 5

Table of Contents. Concept Plan Overview. Statement of Compliance with Design Guidelines. Statement of Compliance with Comprehensive Plan

August 17, 2016 PROJECT INFORMATION:

FOR LEASE RETAIL SPACE

Brand New Class A Office Building on Libbie Mill Lake Delivering 2020

exclusive development offering

Equality and Access Plan The Abbey School, Reading

Appendix1,Page1. Urban Design Guidelines. Back to Back and Stacked Townhouses. DRAFT September 2017

VILLAGE CENTER ARLINGTON, VIRGINIA ADVISORY WORKING GROUP/ PLANNING COMMISSION FOR ORR PARTNERS 01/

Article 3. SUBURBAN (S-) NEIGHBORHOOD CONTEXT

A PREMIER 55+ COMMUNITY IN SALEM, NEW HAMPSHIRE FEATURING SINGLE FAMILY, DETACHED, MAINTENANCE FREE HOMES.

RETAIL & OFFICE SPACE FOR LEASE

EIA Model Test 7: R-O to R-O

AGENDA ITEM K3 Community Development

DRAFT Plan Incentives. Part A: Basic Discount

OFFICE AND PDR DELIVERY Q2 2017

DESIGN, ACCESS & PLANNING STATEMENT

201 College Avenue. Zoning Compliance. City of Ithaca, New York Date:

Proposed Development at Ajax Plaza Windcorp Grand Harwood Place Ltd.

A Building Area: 489,616 gross SF apartments, with 214,768 SF garage

the conditions contained in their respective Orders until January 1, 2025, at the discretion of the Director of Planning, Property and Development.

33 Forest Street #100, Lexington $699,000

P. H. Robinson Consulting Urban Planning, Consulting and Project Management

476 LICHFIELD ROAD, FOUR OAKS, SUTTON COLDFIELD, B74 4EL

FOR LEASE AVAILABLE NOW! RENTS STARTING AT $12/SF* OFFICE & RETAIL Street, Edmonton, AB

FOR LEASE. Pat Wolf (651) Sherry Hastings (651)

The Cross, Mold, Flintshire, CH7 1AZ Tel: Fax: Northop, Mold, Flintshire CH7 6BD

Article 80 Small Project Review Application

24-story, Class A Office Building Climate Control LEED Gold Certified Fire Life Safety Large, Efficient Floor Plates Elevators Ample Ceiling Height

UNIVERSITY DRIVE, COLLEGE STATION

MARKET COMMON CLARENDON - SP #339 AMENDMENT Arlington, VA

Nirvana La Route du Portinfer, Vale

BYLAW NO. 15/026 A BYLAW OF THE REGIONAL MUNICIPALITY OF WOOD BUFFALO TO AMEND THE LAND USE BYLAW NO. 99/059

PLANNING COMMISSION REPORT Regular Agenda -Public Hearing Item

City Avenue District Rezoning. Regional Center Area & Bala Cynwyd Retail District December 14, 2011 Public Hearing

Requested Information for 6701 W Sunset 2 messages

Amazon Corner New Retail

Transcription:

PROJECT DESCRIPTION STATION 1300 Introduction Several principles underpin Greenheart Land Company s design of Station 1300. Primary was to create a community resource: a place where people eat, shop, recreate, meet a friend or just hang out. This necessitates uses and spaces that would draw people in and a setting that would cause them to linger. In addition, we sought to honor the community by adhering to the provisions of the Downtown Specific Plan and to use its Vision Goals as a guiding principal. Further, it was our intent to do so in an environmental responsible manner. What has emerged is a transit oriented, mixed- use development at the 1300 El Camino Real/Derry site that will include community serving, residential, and office uses, as well as plazas and open spaces. Most parking will be underground, and site access and egress will be via three points on two public streets. Station 1300 will invite public use and take full advantage of its proximity to the Caltrain station. The goal is to create centers of activity that will serve the community, residents, and daytime users. Station 1300 will have the daytime population (office users) and evening population (residents) needed to invigorate the downtown and on- site retail areas. The design of the buildings will draw from the Spanish Eclectic style as interpreted by Pedro de Lemos at Allied Arts and Ramona Street and as reinterpreted at the well- regarded 1600 El Camino Real office building in Menlo Park. Station 1300 will be a public benefit development with a floor area ratio (FAR) of 150%. The maximum building height will be 48 ft. with façade heights not exceeding 38 ft. (For reference, the heights of the building elements at the condominiums at Merrill and Oak Grove, across the street from the Station 1300 apartments, are 42 ft. to 46 ft.) The development will conform to all the design standards and regulations set forth in the Specific Plan. The numerical parameters of Station 1300 are presented in the accompanying Fact Sheet. We will instill traffic demand management (TDM) programs to urge residents and office workers out of their cars. Further, we seek to achieve LEED platinum, the top environmental rating, and net zero energy (NZE) use for the office buildings and LEED gold for the residential buildings. 1

Circulation and Parking Garwood will be extended to connect Glenwood and Oak Grove and will be aligned with Merrill at Oak Grove to facilitate through traffic. This extension of Garwood will provide the missing link between Encinal and Ravenswood and thereby improve access to downtown and the Caltrain station for bicyclists and pedestrians. In addition, new bike routes will be installed on Oak Grove and Garwood. Parking will primarily be underground with two access points on Garwood and one on El Camino Real (ECR). This will result in the distribution of vehicle access and egress between ECR, Glenwood, and Oak Grove, with the use of ECR optional. Of the approximately 980 parking spaces, about 18 will be on the surface at the rear of the site for visitor convenience. The amount of underground parking required was determined by a shared parking study that recognizes that residents and office workers use parking at different time of the day. The garage will be user friendly. It will feature open air staircases to the plazas and pedestrian walkways to points of exit. In addition, there will be extensive bicycle storage areas with bike repair stations. Plazas and Open Space Underground parking allows the site to be opened- up to create plazas, gathering places, and other open spaces that will in total add up to over 48% of the site. Garwood/Oak Grove Plaza: This will be a high activity area where outdoor café dining, the main residential lobby, pedestrian access to underground retail parking and leasing office come together with the large archway entrance to the private courtyard that anchors the Garwood/Oak Grove corner. The plaza will face Caltrain station and bring additional activity to the station area. Central Plaza: The two C shaped buildings embrace a half acre plaza for public as well as office tenant use. It is designed for outdoor restaurant dining, relaxation and informal gatherings. It is envisioned as a sheltered and landscaped courtyard that will have accouterments such as sitting areas, decorative paving and fountains. Amphitheater: Beyond the Central Plaza there will be a space for outdoor entertainment. It will include seating and a performance area defined by a colonnade. Garwood Park: This park will soften the Garwood edge to the rear of the office buildings. It is designed for active recreation and, like the plazas, open to the public. 2

Other Open Spaces: The commercial and residential structures will be separated by broad landscaped areas that will provide not only a visual buffer, but a retreat for quiet relaxation. The residential building will encircle a private courtyard with a pool, outdoor kitchen, and other areas for the use of residents. Community Serving Uses Community Serving Uses include the following categories of uses as defined in the Specific Plan, Section H and permitted in the ECR NE- R zone (where the proposed development is located). D. Banks and other financial institutions E. Business services G. Eating and drinking establishments J. Offices, business and professional (limited to a single real estate office of no more than 2,500 SF) L. Personal improvement services M. Personal services N. Retail sales Community Serving uses at Station 1300 will be a minimum of 18,600 sf to a maximum of 28,600 sf and located in the following areas: Ground floor of residential building on Oak Grove: about 7,500 sf Ground floor of office buildings on ECR: minimum of about 10,100 sf to maximum of about 21,100 sf It is Greenheart s goal to have one or more family restaurants on ECR that will flow into the Central Plaza dining area. Oak Grove is seen as a possible location for specialty foods and a casual restaurant at the Oak Grove Plaza. Residences There will be about 181 rental units. Of these, there will be 10 below market rate (BMR) units to satisfy city requirements for the office space. Rental units will provide housing that is much more affordable than condos or other for sale housing in Menlo. The target market is young professionals, a demographic that is under represented in Menlo Park. They are also expected to appeal to downsizers who desire to walk to shopping and transit. Most of the apartments will be studio & one- bedroom units (51%) and two- bedroom units (45%). The design and scale of the apartments (average size 906 net sf.) and the amenities will cater to singles and couples. Units of this size will not appeal to families and experience and data indicate that there will be very few school aged children. 3

The Oak Grove wing of the residential building will encircle a private courtyard that will include a pool set within a highly landscaped environment. The amenity area will be contiguous with the leasing office and will open onto the pool area, which will include an outdoor kitchen and areas for lounging and entertaining. In addition, most residents will have private decks or patios. Offices Two high- quality Class A+ three story office buildings are designed to accommodate both tech users who prefer an open office layout and professional office users who prefer private perimeter offices. The buildings will also meet the needs of large as well as small tenants. Depending on the amount of community serving uses, the office use will total between about 192,000 and 203,000 SF. On the public street facing facades, the third floor will be set back and feature decks. The ground floor office spaces will be built to enable direct connections onto the plaza to facilitate the indoor/outdoor experience, as well as active use of the plaza for gatherings and events. Traffic Demand Management (TDM) The Greenheart TDM programs provide disincentive to drive, such as fees for parking, as well as incentives to use alternatives to single occupancy auto commuting. These will include such measures as free Caltrain Go- Passes to all office tenants and residents which permits 24/7 train access, on- site zip cars, showers and secure parking for bicyclists, and so forth. Sustainability The office buildings will be the first NZE certified private speculative office building in California. (The other 13 NZE buildings were built by educational institutions, government, or foundations). This will be possible with open loop geo- exchange which uses deep sixty- five degree ground water to heat in the winter and cool in the summer. Water is used for heat exchange only, it is not consumed, and is recycled back to the ground water source. Other elements of the system are enhanced insulation, photo voltaic panels, and a central heating and cooling plant that services businesses and residents on an efficient counter cyclical basis. 4

Station 1300 Summary Fact Sheet April- 16 Residential % Number Avg Size* Studio 11.6% 21 553 1 bdrm & 1bath 39.2% 71 727 2 bdrm & 2 bath 45.3% 82 1,090 3 bdrm & 2 bath 3.9% 7 1,617 Total 100% 181 906 * Unit Size is expressed in Net SF not Gross SF Buildings Size (SF) Size (SF) Residential Apartments 199,700 N/A Ground Floor Community Serving 7,500 N/A Total 207,200 N/A Commercial Office (Max to Min) 202,900 191,900 Community Serving Uses (Min to Max) 10,100 21,100 Total 213,000 213,000 Parking Spaces Community Serving 72 Office 658 Residential 245 Total 975 Underground 960 Surface 15 Parking requirements calculated using ULI Shared Parking analysis & metrics