TOWN OF ST. PAUL 2505 Butscher s Block St. Paul, TX (Fax)

Similar documents
Collin County Development Services OSSF CONSTRUCTION INFORMATION SHEET

~ Please Detach and Save This Page ~

On Site Sewage Facility Information Sheet PROPERTY OWNER INFORMATION

Tri County Septic Wastewater Recycling Specialists PO Box 283 Royse City, TX

Certificate of Occupancy Application

SEPTIC PERMIT INFORMATION

CITY OF NAPERVILLE Transportation, Engineering, & Development (T.E.D.) Business Group

BUILDING PERMIT INSTRUCTIONS CONTRACTOR

SEPTIC PERMIT APPLICATION

Planning & Zoning FAQ

What is the first step in the Architectural Committee Improvement Application process?

OSSF Permit Application

SEPTIC PERMIT APPLICATION

Architectural Control Committee (ACC) Packet for Miscellaneous Construction 1 February 2018

STATE OF SOUTH CAROLINA RESIDENTIAL PROPERTY CONDITION DISCLOSURE STATEMENT

CITY OF JOHNSTOWN SCHEDULE OF PERMIT FEES

MILAM COUNTY HEALTH DEPARTMENT 209 SOUTH HOUSTON CAMERON, TEXAS PHONE (254) FAX (254)

JOHNSON COUNTY PUBLIC WORKS 2 North Mill Street/Suite 305, Cleburne, TX (817)

Town of Jamestown Single/Two-family Residential. Building Permit Application Packet

TOWN OF ARGYLE APPLICATION FOR ON-SITE SEWAGE FACILITY NEW CONSTRUCTION TCEQ REGION NUMBER COUNTY OF INSTALLATION. (Last) (First) (Middle)

Lawrence Township. Mercer County, New Jersey. Working with our Planning and Zoning Boards & A Guide to our Permit Process

NOTICE. Valuations for determining the building permit fee shall be set by the Building Official per International Building Code Section

WISE COUNTY DEPARTMENT OF BUILDING & ZONING PO BOX 570 / 206 EAST MAIN ST WISE, VA Applicant: Phone #:

HOME AMERICAN WARRANTY HOME SHIELD. Texas

Application for a Building/Zoning Permit

Date Received: Permit #:

MACOMB TOWNSHIP BUILDING DEPT TEL: (586) BROUGHTON ROAD FAX: (586) MACOMB MI 48042

CHICKEN COOP BUILDING REQUIREMENTS

preservation guide Types of preservation protection Frequently-asked questions Helpful contact information

WELCOME TO THE COMMUNITY!

Zoning Permit Application

STATE OF SOUTH CAROLINA RESIDENTIAL PROPERTY CONDITION DISCLOSURE STATEMENT

BOROUGH OF SAYREVILLE OFFICE OF CODE ENFORCEMENT 49 Dolan Street Sayreville, New Jersey (732) Fax (732)

City of Mascotte. 100 East Myers Blvd. * Mascotte, Florida * Phone (352) * Fax (352) FENCE CHECKLIST

COMMUNITY AND DEVELOPMENT SERVICES APPLICATION FOR RESIDENTIAL BUILDING PERMIT HOPKINSVILLE KY

Association: Administration:

The City of MIDWEST CITY 100 N. Midwest Blvd * Midwest City, Oklahoma (405) *TDD (405) * FAX (405)

COUNTY OF FREDERICK INSPECTIONS DEPARTMENT FEE SCHEDULE Approved July 14, COMMERCIAL FEES Minimum Fee $ unless stated otherwise

APPENDIX A BUILDING PERMIT AND RELATED FEES

FALLS COUNTY APPLICATION FOR PERMIT

MEETING CONDUCT. Thank you for attending! Let s make this a productive meeting!

SECTION 5: ACCESSORY USES

BUILDING PERMIT APPLICATION

Waterford Owners Association Construction Guidelines

Association. Association Administration. Garbage Services. Dear Homeowner,

PLEASANT HILL LAKES October ensure that it is safe for them to enjoy. 5. Please try to limit your trickor-treating

Village of Glen Ellyn Fee & Deposit Schedule Per Village Code 4-1-4

EXHIBIT A PERMIT & GENERAL BUILDING FEES SCHEDULE

NASSAU COUNTY MECHANICAL PERMIT APPLICATION

Town of Aurelius 1241 West Genesee St Rd Auburn, NY Ext # (fax)

Do You Know Your Rights and Duties As a Renter?

TOWN OF FAIRPLAY BUILDING PERMIT APPLICATION FOR NEW CONSTRUCTION, ADDITIONS, AND REMODELS

City of Georgetown. Inspection Services

PROPERTY INSPECTION REPORT

Septic Tank / Drainfield / Holding Tank Permit Application

Permitting Fee Schedule

Questions and Answers on: R E A L E S T A T E C L O S I N G S

REGULATIONS. What Licensing Will I Need?

DECK, DETACHED-GARAGE, STORAGE-BUILDING, REPLACEMENT WINDOWS, CHIMNEY, SIGNS, SOLAR PANELS, FENCES, RETAINING WALLS, AGRICULTURAL BUILDINGS

Greg Mikolash, Development Review Supervisor ( ;

Irrigation Permit Requirements FOR OWNER/BUILDER

PRAIRIE TOWNSHIP RESIDENT GUIDE

Dear Vacation Rental Owner,

APPLICATION PACKET FOR RESIDENTIAL ADDITION COVER SHEET

WILSON COUNTY Health & Public Safety Office

RESIDENTIAL SINGLE FAMILY DETACHED & ATTACHED BUILDING PERMIT APPLICATION SUBMISSION PROCEDURES

6 TH EDITION (2017) OF THE FLORIDA BUILDING CODE IS IN EFFECT

Septic Tank / Drainfield / Holding Tank Permit Application

Spring Valley Property Owners & Recreation Corporation Policy #330: Architectural Control Committee Rules & Regulations Policy Page 1 of 6

APPLICATION PACKET FOR RESIDENTIAL ALTERATION COVER SHEET

Berkshire Taconic Community Foundation

Special Report All About

INSTRUCTIONS FOR APPLICATION IMPORTANT NOTICES

SEPTIC PERMIT CHECKLIST

Paper copies & an electronic copy (pdf) of the following drawings or plans: 1 full size scalable certified survey and 1 (11 x 17) copy

Cassia County Accessory Dwelling Unit (ADU) Permit Application

How Property Code Enforcement helps Preserve Neighborhoods. Dedicated to Improving the Quality of Life for Our Citizens

An Agent s Guide to Pre-Sale Renovation

Effingham County Health Department Environmental Health Division. Business Hours

PARK COUNTY DEVELOPMENT PERMIT APPLICATION

IBI Online Permits Center

Neighborhood Improvement Services (N.I.S.)

Information Needed for a Building Permit

Pavers, Concrete Driveways, Sidewalks, Patio and Pads Permit Requirements FOR OWNER/BUILDER

Texas AMERICAN HOME SHIELD HOME TWO-YEAR DUPLEX, TRIPLEX AND FOURPLEX SINGLE FAMILY HOMES WARRANTY MOBILE HOMES CONDOS AND TOWNHOMES NEW CONSTRUCTION

FENCE and or POOL BARRIER CHECKLIST

Answers to Submitted Questions Request for Qualifications - TIF Scattered Site Rehabilitation Program Date: March 9, 2017

ORDINANCE NO

AN ACT. relating to seller's disclosures in connection with residential BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS:

Example for a Single Family Home Annual Application fee: $50.00 Inspection fee $ (required once every four years) Total fee: $185.

ACCESSORY DWELLING UNITS

EXHIBIT A to Ordinance No PART 1

City of Fairlawn Zoning, Housing & Residential Building Department ANNUAL REPORT

SELLER DISCLOSURE STATEMENT IMPROVED PROPERTY

INDUSTRIAL New Construction Additions/Tenant Finish to existing facilities Minor Work Permit SUB-TOTAL (0) (0) (0) (0)

Secrets to Smooth Closing

WASHINGTON SELLER S RESIDENTIAL PROPERTY DISCLOSURE STATEMENT

Defiance County Operation & Maintenance Program Frequently Asked Questions

Before I can issue a permit, I need the following items:

PARTIAL SUBMITTALS WILL NOT BE ACCEPTED. REQUIRED MATERIALS FOR A COMPLETE APPLICATION ARE:

Transcription:

TOWN OF ST. PAUL 2505 Butscher s Block St. Paul, TX 75098-8046 www.stpaultexas.us 972-442-7212 972-905-7406(Fax) Mayor: Opie Walter Mayor pro tem: Robert Simmons Town Secretary: Robert A. London Municipal Judge: David Moore Building Inspector: Jim Olk: 214-850-5077 Code Enforcement Officer: Travis Caperton: Welcome to the Town of St. Paul! If you have any questions about the Town, Schools, Ordinances or Utilities give us a call or visit us at Town Hall. We are open Monday thru Thursday 9 am to 1 pm. Council meetings are open to the public and held the second Monday of each month at 7:30. For the Town s sake please use St. Paul rather than Wylie for your mailing address and reference the building permit information at the end of this document if you plan on any home enhancements. Some require a permit that will be processed here at Town Hall. Also on our website is information on North Texas Animal Control Authority - our animal control contractor. If you have not given us your name, please email it to us (townofstpaul@verizon.net) so that we may keep our citizen mailing list up to date. Other agencies ask that we inform you that: The Collin County Development Services Division requires regular aerobic system septic inspections. Each new owner of an existing aerobic system is required to provide the CCDSD with a completed change of ownership form within 15 days of closing date. (See attached) If you have an aerobic system please maintain your chlorine level for our noses sake. If you have an irrigation, sprinkler system and/or swimming pool, the Wylie Northeast Special Use District requires an annual backflow device inspection. WNESUD is the water supplier for all of St Paul s residents. (Inspections can be done via independent contractors or you can deal directly with the specified agency). The Collin County Voters Registration Office would like you to update your voter registration address. If you operate a business the State of Texas requires you to update the address of your sales certificate to your St. Paul address. Please note: home businesses are allowed only if run from a residence showing no visible evidence that it is there, ie. increased traffic, outside storage, noise, employees that do not live at that address. Only vehicles driven by a resident are allowed on a frequent basis and they are allowed to have the business logo on it.

Building Permit Information Why do I need a building permit? Building permits are mainly about safety. By enforcing construction standards, they give you the best chance to avoid fire, structural failure, and other perils. The best reason to obtain a permit is that it s legally required. Permit applications are available online (www.stpaultexas.us) or can be obtained at Town Hall. How does this benefit the property owner? (i.e. What s in it for me? ) It keeps your insurance valid. Work done without a permit can mean that your insurance company may not honor your policy. A fire resulting from work without a permit could leave you holding the bag. If someone falls off a deck built without a permit, your liability insurance may not cover injuries. Permits can keep you out of harm s way. It keeps your contractor honest. To beat out the price of a competitor, a profit-driven contractor might be tempted to cut corners. Would you know if he did? Permits require contractors use safe and sound methods and materials. Inspections assure you that this happens. It guides your do-it-yourself project. No matter how handy you are, it s unlikely you know everything about modern codes. If you never apply for a permit, you might go ahead with work that is unsound or even dangerous. The building inspector can guide you to do a project you can be proud of and that meets code. It s valuable when you sell your home. If you perform work without a permit, the buyer s inspector can find out. Permits are a matter of public record. In addition, you may be required to sign a Property Disclosure Statement, in which you must disclose all problems or defects in the property. The sale can proceed much more smoothly by having all the necessary permits for improvements done to your property. It can save you time and money. If you fail to get a required permit, you may be fined. You may also be required to remove or tear out completed work not up to code. Structures of any size that do not comply with property line setback distances may be required to be relocated or removed. When do I need a permit? It s always best to contact town hall when you are planning a project or repair to see if a permit is required. Many simple repairs do not require a permit but it s good to check. New construction almost always needs a permit. Remodeling a kitchen or a garage into a living space needs a permit. Building a shed, gazebo, carport, shade canopy or any structure that is larger than 120 sq. ft. requires a permit. Swimming pools. In-ground pools, spas, and above ground pools (over 5000 gallons) require permits. Irrigation/sprinkler systems, These need permits and backflow prevention devices need inspection. Foundation repairs need permits. Final engineering reports need to be submitted to our building official. HVAC, Water Heaters, Electrical and Plumbing upgrades and additions. Permits and inspections help protect you and your neighbors. New roofs need building permits. This is the most common permit violation we experience in St. Paul. The roofing companies know that permits are needed but a few may try to get in and out quickly to avoid getting a permit. Ultimately, the homeowner is responsible to ensure a permit is applied for and issued. Ask your contractor for a copy of his permit. New fences require permits. Whether it s made from pipe, wood, composite or wire a permit is needed. Commercial permit requirements. New owners of existing businesses or new start-ups require getting a new Certificate of Occupancy and new health, sign, or other permits when applicable. Again welcome! Town of St. Paul Council

Collin County Development Services Permit Application Mailing Address (Street, City and Zip): to mail OSSF (Septic) License to Operate System (Street, City and Zip): REPAIR UPGRADE IN CITY LIMITS # OF BEDROOMS # OF BATHS # OF KITCHENS with ISLAND: Y or N ATTACHED or DETACHED Y or N FIREPLACE Y or N w/ LOG LIGHTER: Y or N HEAT ELECTRIC or LP WATER HEAT: ELECTRIC or LP CONTRACTOR INFORMATION PLEASE PROVIDE THE COMPANY NAME, ADDRESS AND TELEPHONE NUMBER FOR EACH APPLICABLE CONTRACTOR WORKING ON THE PROJECT COMPANY NAME ADDRESS (STREET, CITY, ZIP) PHONE BUILDER: SEPTIC SITE EVALUATOR: (INDIVIDUAL'S NAME)---- - --- - - SEPTIC INSTALLER: (INDIVIDUAL'S NAME) PHONE#: ALT. PHONE#: OWNER SIGNATURE:-------------- DATE: REVJSE'D 8130/ll

COLLIN COUNTY DEVELOPMENT SERVICES DEPARTMENT 4690 Community Ave., Suite 200 McKinney, Texas 75071 AEROBIC WASTEWATER TREATMENT SYSTEMS HOMEOWNERS INFORMATION Collin County does not require Aerobic Systems. Alternative systems are available. License to Operate: A dwelling/building must not be occupied until the septic system has passed the final inspection and has been issued a License to Operate. Maintenance Contracts: Maintenance contracts go into effect the day the system is approved. The original installation contract is good for 2 years from that date. Maintenance contracts must be maintained at ALL times. After 2 years the owner is responsible to renew the contract, but not required to use the original installer. Renewals must be submitted to our department 30 days prior to the expiration of the contract. Testing and Reporting: Maintenance companies shall inspect a system 3 times a year minimum. This shall be done at 4-month intervals. Copies of the report shall be sent to our Department and to the homeowner. Chlorine: Chlorine must be maintained in surface irrigation systems at ALL times. Chlorine is present to destroy any waterborne diseases that may be present. The homeowner is responsible to make sure the system always has chlorine (even if your maintenance contract includes adding the chlorine). Approved chlorine tablets must be used, not swimming pool chlorine. Property Access: The owner must provide access to the aerobic unit when requested by the Maintenance Company and/or our department. This shall be provided during normal working hours (8am - 5pm, Monday - Friday). Collin County inspectors are not required to ask permission to enter your property for the purpose of spot checking your septic system or investigating related complaints. Problems: If a problem arises with a unit after installation, contact the Maintenance Company immediately. If at any time a problem is not corrected or the company fails to provide the required maintenance, contact our department. Altering the Aerobic Unit: Once an aerobic unit has been installed and inspected, it may not be altered (by the owner or a licensed installer) in A.ISI way. This includes moving or changing the spray of the sprinklers or connecting another residence to the system. If something needs to be altered you must come to our office and apply for a Septic Repair/Upgrade Permit. I have read and understand the requirements outlined above. I understand that it is my responsibility to learn about current and new regulations passed by Collin County and the State of Texas. Further, I agree to meet all state and county regulations. Land owner signature: Date: Permit #:

CHANGE OF OWNERSHIP OSSF (AEROBIC) SYSTEM Each new owner of an existing Aerobic System is required to provide the Collin County Development Services Division with a completed Change of Ownership form within 15 days of the closing date. ORIGINAL PERMIT NUMBER:--------------- PREVIOUS OWNER'S NAME:---------------- PROPERTY ADDRESS: NEW OWNER'S NAME:------------------ NEW OWNER'S SIGNATURE DATE ***NOTE: Aerobic septic system owners are required to provide a Maintenance Contract and Homeowner's Information Sheet along with their Change of Ownership form.*** Collin County Development Services, 4690 Community Ave., Suite 200, Mckinney, TX 75071 972-548-5585 Metro 972-424-1460 ext. 5585