DEPARTMENT OF THE ARMY OFFICE OF THE CHIEF OF ENGINEERS WASHINGTON. D.C MAR

Similar documents
DEPARTMENT OF THE ARMY OFFICE OF THE CHIEF OF ENGINEERS WASHINGTON, D.C

APPENDIX M. Real Estate Plan

WITNESSETH, THAT: NOW, THEREFORE, the Government and the Non-Federal Sponsor agree as follows:

Appendix H: Real Estate Plan

1.1 Purpose. The purpose of this chapter is to summarize guidance on those requirements generally applicable to grant programs.

Federal Mandates and Willing Sellers: Real Estate Acquisition for the Missouri River Recovery Program

Public Notice U.S. ARMY CORPS OF ENGINEERS, GALVESTON DISTRICT AND TEXAS COMMISSION ON ENVIRONMENTAL QUALITY

CURRENT THROUGH PL , APPROVED 11/11/2009

AGREEMENT TO ACQUIRE LANDS BETWEEN THE DEPARTMENT OF THE ARMY ST. PAUL DISTRICT, CORPS OF ENGINEERS AND. THE CITY OF City, State

Department of Legislative Services Maryland General Assembly 2010 Session

Draft Integrated Feasibility Report and Environmental Assessment and Draft Finding of No Significant Impact

Appendix B Real Estate Plan

REGENTS POLICY PART V FINANCE AND BUSINESS MANAGEMENT Chapter Real Property

APPENDIX D REAL ESTATE PLAN

JANUARY 2016 MAMARONECK & SHELDRAKE RIVERS NEW YORK FLOOD RISK MANAGEMENT GENERAL REEVALUATION REPORT FOR THE VILLAGE OF MAMARONECK APPENDIX E

Evaluating and Processing Road and Utility Easement Proposals on Corps Lands and Flowage Easements

Dredged Material Management Plan Atlantic Intracoastal Waterway Port Royal Sound, South Carolina to Cumberland Sound, Georgia November 2015

Application Procedures for Easements or Rights of Way on City of Fort Collins Natural Areas and Conserved Lands March 2012

DRAFT INTEGRATED FEASIBILITY REPORT AND ENVIRONMENTAL ASSESSMENT

REAL ESTATE PLAN APPENDIX G

Draft Continuing Authorities Program Section 1135 Detailed Project Report and Integrated Environmental Assessment

CITY OF FORT COLLINS NATURAL AREAS AND CONSERVED LANDS EASEMENT POLICY

How Mitigation Banks and ILF Programs Can Help Conservation

Corte Madera Marsh Restoration Project Update

OPEN SPACE & RECREATION PLAN

SENATE, No STATE OF NEW JERSEY. 217th LEGISLATURE INTRODUCED SEPTEMBER 8, 2016

EXHIBIT A ENVIRONMENTAL COVENANT AND ACCESS AGREEMENT

December 21, The specific provisions of P.L that apply solely to the CDCA are:

APPENDIX D - REAL ESTATE

The University of Texas System Systemwide Policy. Policy: UTS Title. Environmental Review for Acquisition of Real Property. 2.

Wetlands Board Hearing Procedures

Orleans.. WITNESSETH THAT:

APPENDIX H REAL ESTATE REQUIREMENTS

UPPER MISSISSIPPI RIVER RESTORATION FEASIBILITY REPORT WITH INTEGRATED ENVIRONMENTAL ASSESSMENT

Conservation Easement Stewardship

REAL ESTATE PLAN. Final Integrated General Reevaluation Report and Supplemental Environmental Impact Statement

Chapter XVIII LAND USE REGULATION A. ZONING. The most significant scheme for controlling land use in America is zoning, by which

MARK TWAIN LAKE MASTER PLAN CLARENCE CANNON DAM AND MARK TWAIN LAKE MONROE CITY, MISSOURI

Technical Information Paper No

SENATE, No STATE OF NEW JERSEY. 218th LEGISLATURE INTRODUCED JANUARY 22, 2018

DECLARATION OF RESTRICTIVE COVENANTS. THIS DECLARATION OF RESTRICTIVE COVENANTS made this day of, 200_, by ( Declarant ). RECITALS

SPECIAL PUBLIC NOTICE

Marine Turtle Protection Act. Allows designation of Aquatic Preserves. Protects sea turtle nesting habitat (1953)

Chapter HABITAT CONSERVATION PLAN / NATURAL COMMUNITY CONSERVATION PLAN IMPLEMENTATION ORDINANCE

COASTAL CONSERVANCY. Staff Recommendation August 2, 2012 HARE CREEK BEACH COASTAL ACCESS TRAIL. Project No Project Manager: Lisa Ames

EASEMENT AGREEMENT (Distributor Performance Non-Exclusive)

Public Notice. Notice No Closing Date: August 16, 2018

FINDING OF NO SIGNIFICANT IMPACT TENNESSEE VALLEY AUTHORITY DISPOSAL FEE OWNERSHIP OF YELLOW CREEK INDUSTRIAL PARK PROPERTIES

Appendix K. Real Estate Plan

May 2011 REDEVELOPMENT PLAN FOR THE CALIMESA REDEVELOPMENT PROJECT AREA NO. 2 CALIMESA REDEVELOPMENT AGENCY. Ordinance introduced on, 2011

AT THE INTERSECTION OF LAND CONSERVATION AND RESILIENCE. THE ELIZABETH RIVER S URBAN LAND TRUST

Siting Renewable Energy: Land Use & Environmental Due Diligence. Polly B. Jessen Catherine M. van Heuven March 8, 2013

Appendix C. Real Estate. Brazos Island Harbor, Texas Channel Improvement Project Cameron County, Texas

Honolulu District U.S. Army Corps of Engineers

DECLARATION OF RESTRICTIVE COVENANTS

ORDINANCE NO WHEREAS, the Town of Jupiter ( Town ) has adopted a Comprehensive Plan

State Revolving Fund Loan Programs Guidance for Project Land Acquisition For SRF Financed Projects

Municipality of Anchorage PURCHASE AND SALE AGREEMENT FOR HLB Parcel C in Chugiak, Alaska

Municipality of Anchorage PURCHASE AND SALE AGREEMENT FOR LOT 17, NEVILLA PARK SUBDIVISION

SEQRA (For Land Surveyors) Purpose of this Presentation

CITY OF BONITA SPRINGS ZONING ORDINANCE NO

DEPARTMENT OF THE ARMY U.S. ARMY CORPS OF ENGINEERS, SAVANNAH DISTRICT 100 WEST OGLETHORPE AVENUE SAVANNAH, GEORGIA

ASSEMBLY, No STATE OF NEW JERSEY. 218th LEGISLATURE INTRODUCED FEBRUARY 1, 2018

APPENDIX B COMPLIANCE WITH THE GOVERNMENT CODE

Strategic Growth Council: Identifying Infill Barriers

EASEMENT AGREEMENT. hereinafter called Grantor, (whether grammatically singular or plural) and the:

ATTACHMENT 3 NOTICE OF EXEMPTION. Clerk of the Board County of Santa Barbara 105 E. Anapamu Street, Room 407 Santa Barbara, CA

Alabama State Lands Division Submerged Lands Permitting

CHAPTER Committee Substitute for Committee Substitute for House Bill No. 447

DEPARTMENT OF THE ARMY U.S. Army Corps of Engineers Washington, DC Regulation No May 2015

IN-LIEU FEE ENABLING INSTRUMENT

CHAPTER 6 CHESAPEAKE BAY PRESERVATION AREAS AND STREAM PROTECTION AREAS

UPPER MISSISSIPPI RIVER RESTORATION FEASIBILITY REPORT WITH INTEGRATED ENVIRONMENTAL ASSESSMENT

1.1. Implements policy and assigns responsibility pursuant to Reference (a) for the disposal of real property.

Appendix G. Non-Federal Letters of Support and Draft Real Estate Plan

IMPLEMENTING AGREEMENT. for the EAST CONTRA COSTA COUNTY HABITAT CONSERVATION PLAN/ NATURAL COMMUNITY CONSERVATION PLAN.

Public Law th Congress An Act

Sandy Oakleaf Memorial Tennis Courts Background Information

Climate Change and Conservation Easement Clause Databank

Appendix B Draft Real Estate Plan

For the reasons set forth in the preamble, the Department proposes to amend 25 CFR 151

PURCHASE AGREEMENT ACCORDINGLY, FOR VALUABLE CONSIDERATION, RECEIPT OF WHICH IS HEREBY ACKNOWLEDGED, THE PARTIES AGREE AS FOLLOWS:

TRANSFER OF SURPLUS PROPERTIES USING NEW LEGISLATIVE AUTHORITIES

REVIEWED BY: Administrator Counsel Program Mgr. (Name): Board Committee Engineer Other

NOW, THEREFORE BE IT RESOLVED by the Mayor and Council as follows:

I. Intent and Purpose

THE COUCHICHING CONSERVANCY LAND STEWARDSHIP POLICY. As approved by the Board, April 30, 2007

4. Itemized cost data for cost of construction certified by a Professional Engineer.

CODING: Words stricken are deletions; words underlined are additions. hb er

NEW YORK CITY WETLANDS TRANSFER TASK FORCE PROPERTY ASSESSMENT FORM

INDIAN RIVER COUNTY, FLORIDA. The Honorable Members of the Planning and Zoning Commission DEPARTMENT HEAD CONCURRENCE

SUBJECT: Skagit River Levee and Channel Improvements - Meeting with Skagit County Officials

TransNet Environmental Mitigation Program: Land Acquisition and Restoration Process and Criteria

PRELIMINARY DECISION

METROPOLITAN COUNCIL 390 North Robert Street, St. Paul, MN Phone (651) TDD (651)

APPENDIX C REAL ESTATE PLAN BOULEVARD RESACA, BROWNSVILLE, TX CAMERON COUNTY, TEXAS

FIRE ISLAND INLET TO MORICHES INLET FIRE ISLAND STABILIZATION PROJECT TECHNICAL SUPPORT DOCUMENT

77th OREGON LEGISLATIVE ASSEMBLY Regular Session. Enrolled. House Bill 2417

Amended Noise Mitigation Plan

Su-Knik Mitigation Bank Modification Memorandum

Transcription:

DEPARTMENT OF THE ARMY OFFICE OF THE CHIEF OF ENGINEERS WASHINGTON. D.C. 2031 4-1 000 MAR 3 1 2006 CEMP-NAD (1 0-1-7a) THE SECRETARY OF THE ARMY 1. I submit for transmission to Congress my report on the general reevaluation of the Poplar Island, Maryland, project. It is accompanied by the report of the district and division engineers. Section 537 of the Water Resources Development Act (WRDA) of 1996, as amended, directed that the Secretary of the Arrny carry out a project for the beneficial use of dredged material at Poplar Island, Maryland. Operations to restore Poplar Island, Maryland, by the beneficial use of material dredged for the maintenance of the Port of Baltimore navigation channels commenced in 2000. Those operations are continuing. Detailed study of the project expansion was conducted under the authority of Section 204 of WRDA 92, as amended (U.S.C. 2326). Through the current general reevaluation, the reporting officers propose a plan to modify and expand the existing project at Polar Island, Maryland. Preconstruction engineering and design activities for the modified project will be continued under the authority cited above. 2. Land subsidence, rising sea level, and wave action are causing valuable remote island habitats to be lost throughout the Chesapeake Bay. The Poplar Island Environmental Restoration Project,, is an environmental restoration project located in the Chesapeake Bay; approximately 39 miles (34 nautical miles) south-southeast of the Port of Baltimore. The existing project will beneficially use up to 40 million cubic yards (mcy) of dredged material from the Federal navigation channels serving the Port of Baltimore to ultimately restore 1,140 acres of remote island habitat in Chesapeake Bay, including 570 acres of tidal wetlands. The reporting officers recommend a 575-acre expansion of the existing Poplar Island, Maryland, project into the shallow bay waters to the north and northeast of the existing project and an increase of the elevation of the upland habitats associated with the currently authorized project by about 5 feet (a vertical expansion plan component). These project modifications would use an additional 28 mcy of dredged material from Federal navigation channels. The additional island acreage created would be comprised of 29 percent wetland habitat (1 65 acres), 47 percent upland habitat (270 acres), and 24 percent open water habitat (130 acres of open-water embayment habitat plus 10 acres of tidal gut habitat). This habitat would improve productivity in the surrounding area, while providing an environmentally sound method for the use of dredged material from the Chesapeake Bay approach channels to the Port of Baltimore. Cost effectiveness and. incremental cost analysis techniques were used to evaluate alternative ecosystem restoration plans. The

recommended plan is the most efficient and cost-effective and provides the greatest environmental benefits 0.f several alternatives considered. The recommended plan is the national ecosystem restoration plan (the NER plan). Based on the analysis for the Poplar Island expansion, operations of the expansion and the existing project will be modified to include the placement of dredged material from the southern approach channels to the C&D Canal south of the Sassafras River and also placement of dredged material from other Federal navigation channels at the PIERP. As the various elements of the restoration project are constructed, existing structures and facilities will be adapted to accommodate passive recreational andlor educational uses compatible with the project's ecosystem restoration purpose and objectives. Recreation and education components of the plan include: boat docking facilities, kiosks with informative signage, self-guidedlinterpretive nature trails and boardwalks, avian observation areas, picnic areas, and other restinglviewing areas. These facilities could support volunteer opportunities to participate in environmental stewardship, such as bird census and research opportunities, as well as research opportunities for educational institutions. 3. Cost sharing principles of Section 204 of WRDA 1992 are applicable to the current project as authorized in Section 537 of WRDA 1996. Project cost sharing for environmental restoration under Section 204 of WRDA 1992 requires that the non-federal sponsor provide 25 percent of the cost associated with construction of the project for the protection, restoration, and creation of aquatic and ecologically related habitats, including provision of all lands, easements, rights-ofway, and necessary relocations. Cost sharing for recreation features requires that the non- Federal sponsor provide 50 percent of the cost associated with construction cost. Recreation facilities will be constructed on existing project lands required for the environmental restoration. Further, the non-federal project sponsor must pay 100 percent of the operation, maintenance, replacement, and rehabilitation costs associated with the project. The first cost for the project expansion is estimated as $256.1 million at October 2005 price levels. The Federal Government share of the project first cost for the expansion of the project would be $192.1 million and the non-federal share of the costs would be $64 million. Operations, maintenance, repair, rehabilitation, and replacement (OMRR&R) costs for the completed project are projected to be less than 2 percent of the total project cost and would be a non-federal responsibility. The first costs of the recommended recreation facilities are estimated at $600,000. The Federal Government and the non-federal sponsor would each share 50 percent of the cost or $300,000. The OMRR&R cost for the recreation features are estimated at $5,000 annually and are the responsibility of the non-federal project sponsor. 4. The cost of the recommended environmental restoration plan is justified by the restoration of approximately 165 acres of wetland habitat, 270 acres of upland habitat, and 130 acres of sheltered open water habitat and would provide for achievement of these habitat increases in the most cost-effective manner. The habitats constructed as part of the project expansion would restore additional remote island habitat, a scarce and rapidly vanishing ecosystem niche within the Chesapeake Bay region that provides a vital connection for avian species between open-

water and mainland terrestrial habitats within the region. The lateral and vertical expansion would also provide additional important foraging habitat for special-status species such as the Federal-listed Bald Eagle, which nests on Coaches Island adjacent to the project; and bird islands in the wetland cells of the lateral expansion would be specii7cally designed to encourage nesting by State-listed Least Terns. The lateral and vertical expansion of the pro-ject would continue the contribution of the existing project to the goals of the Chesapeake Bay Program watershed partnership through its habitat and ecosystem recovery and preservation efforts. Recreation features are economically justified, providing average annual benefits of $133,000. Based on an average annual cost of $39,000, the recreation features have net annual benefits of $93,500 and a benefit to cost ratio of 3.4. 5. I generally concur with the findings, conclusions, and recommendations of the reporting officers. The plan as developed is technically sound, economically efficient, and environmentally and socially acceptable. The plan conforms with essential elements of the U.S. Water Resources Council's Economic and Environmental Principles and Guidelines for Water and Related Land Resources Implementation Studies and complies with other administrative and legislative policies and guidelines. 6. The views of interested parties, including Federal, State, and local agencies, have been considered. Specific requests have been made for additional coordination with the U.S. Fish and Wildlife Service and the National Marine Fisheries Service as detailed designs proceed on the project with respect to the final foot print of the open water embayment features and extent of borrow activities. USACE has agreed to continue close coordination with these agencies and other affected parties as the design and construction process continues. 7. Accordingly, I recommend implementation of the authorized project in accordance with the reporting officers' plan with such modifications as in the discretion of the Chief of Engineers may be advisable. My recommendation is subject to cost sharing, financing, and other applicable requirements of WRDA 86, as amended. Also, this recommendation is subject to the non-federal sponsor agreeing to comply with all applicable Federal laws and policies, including the following requirements: a. Provide a minimum of 25 percent of total ecosystem restoration costs as further specified below: 1) Provide 25 percent of design costs allocated by the Government to ecosystem restoration in accordance with the terms of a design agreement entered into prior to commencement of design work for the project; 2) Provide, during -the first year of construction, any additional funds necessary to pay the full non-federal share of design costs allocated by the Government to ecosystem restoration;

3) Provide all lands, easements, and rights-of-way, including suitable borrow, and perform or ensure the performance of all relocations determined by the Federal Government to be necessary for the construction, operation, and maintenance of the project; 4) Provide all improvements required on lands, easements, and rights-of-way to enable the proper placement of dredged or excavated material associated with the construction, operation, and maintenance of the project; 5) Provide, during construction, any additional amounts as are necessary to make its total contribution at least 25 percent of ecosystem restoration costs. b. Provide 50 percent of total recreation costs as further specified below: 1) Provide 25 percent of design costs allocated by the Government to recreation in accordance with the terms of a design agreement entered into prior to commencement of design work for the project; 2) Provide during the first year of construction, any additional funds necessary to pay the h.11 non-federal share of design costs allocated by -the Government to recreation; 3) Provide all lands, easements, and rights-of-way, including those required for relocations, and borrowing of material, and the disposal of dredged or excavated material; perform or ensure the performance of all relocations; and construct all of the improvements required on lands, easements, and rights-of-way to enable the disposal of dredged or excavated materials all as determined by the Government to be required or to be necessary for the construction, operation, and maintenance of the recreation features; 4) Provide, during construction, any funds necessary to make its total contribution for recreation equal to 50 percent of the recreation costs; 5) Provide during construction, 100 percent of the total recreation costs that exceed an amount equal to 10 percent of the Federal share of total ecosystem restoration costs. c. For so long as the project remains authorized, operate, maintain, repair, replace, and rehabilitate the project, or functional portion of the project, at no cost to the Federal Government, in a manner compatible with the project's authorized purposes and in accordance with applicable Federal and State laws and regulations and any specific directions prescribed by the Federal Government. d. Shall not use the project or project lands, easements, and rights-of-way as a wetland bank or mitigation credit required for another project.

e. Provide and maintain recreation features and public use facilities open and available to all on equal terms. f. Give the Federal Government a right to enter, at reasonable times and in a reasonable manner, upon property that the non-federal sponsor, now or hereafter, owns or controls for access to the project for the purpose of inspection, and, if necessary after failure to perform by the non-federal sponsor, for the purpose of completing, operating, maintaining, repairing, replacing, or rehabilitating the project. No completion, operation, maintenance, repair, replacement, or rehabilitation by the Federal Government shall operate to relieve the non-federal sponsor of responsibility to meet the non-federal sponsor's obligations, or to preclude the Federal Government from pursuing any other remedy at law or equity to ensure faithful performance. g. Hold and save the United States free from all damages arising from the construction, operation, maintenance, repair, replacement, and rehabilitation of the project and any projectrelated betterments, except for damages due to the fault or negligence of the United States or its contractors. h. Keep and maintain books, records, documents, and other evidence pertaining to costs and expenses incurred pursuant to the project, for a minimum of three years after completion of the accounting for which such books, records, documents, or other evidence are required, to the extent and in such detail as will properly reflect total project costs, and in accordance with the standards for financial management systems set forth in the Uniform Administrative Requirements for Grants and Cooperative Agreements to State and Local Governments at 32 CFR Section 33.20. i. Perform, or ensure performance of, any investigations for hazardous substances that are determined necessary to identify the existence and extent of any hazardous substances regulated under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), PL 96-510, as amended, 42 U.S.C. 9601-9675, that may exist in, on, or under lands, easements, or rights-of-way that the Federal Government determines to be required for the construction, operation, and maintenance of the project. However, for lands that the Federal Government determines to be subject to the navigation servitude, only the Federal Government shall perform such investigations unless the Federal government provides the non-federal sponsor with prior specific written direction, in which case, the non-federal sponsor shall perform such investigations in accordance with such written direction. j. Assume, as between the Federal government and the non-federal sponsor, complete financial responsibility for all necessary cleanup and response costs of any CERCLA regulated substances located in, on, or under lands, easements, or rights-of-way that the Federal

Government determines to be necessary for the construction, operation, or maintenance of the project. k. Agree, as between the Federal Government and the non-federal sponsor, the non-federal sponsor shall be considered the operator of the project for the purpose of CERCLA liability. To the maximum extent practicable, operate, maintain, repair, replace, and rehabilitate the pro-ject in a manner that will not cause liability to arise under CERCLA. 1. Comply with the applicable provisions of the Uniform Relocation Assistance and Real Property Acquisition Policies Act of 1970, Public Law 91-646, as amended (42 U.S.C. 4601-4655), and the Uniform Regulations contained in 49 CFR Part 24, in acquiring lands, easements, and rights-of-way, required for the construction, operation, and maintenance of the project, including those necessary for relocations, the borrowing of materials, or the placement of dredged or excavated material, and inform all affected persons of applicable benefits, policies, and procedures under said Act. m. Comply with all applicable Federal and State laws and regulations, including, but not limited to: Section 601 of -the Civil Rights Act of 1964, PL 88-352 (42 U.S.C. 2000d); Department of Defense Directive 5500.1 1 issued pursuant thereto; Army Regulation 600-7, entitled "Nondiscrimination on the Basis of Handicap in Programs and Activities Assisted or Conducted by the Department of the Army;'' and all applicable Federal labor standards including, but not limited to, 40 U.S.C. 3 141-48 and 40 U.S.C. 3701-08 (reversing, codifying, and enacting without substantial change the provisions of the Davis-Bacon Act (formerly 40 U.S.C. 267a et seq.), the Contract Work Hours and Safety Standards Act (formerly 40 U.S.C. 327 et seq.) and the Copeland Anti-Kickback Act (formerly 40 U.S.C. 276c et seq.), 8. The recommendation contained herein reflects the information available at this time and current departmental policies governing formulation of individual projects. It does not reflect program and budgeting priorities inherent in the formulation of a national civil works construction program nor the perspective of higher review levels within the executive branch. Consequently, the recommendation may be modified before it is transmitted to the Congress as a proposal for authorization and implementation funding. However, prior to transmittal to the Congress, the sponsors, the State, interested Federal agencies, and other parties will be advised of any modifications and will be afforded an opportunity to comment further. CARL A. STROCK Lieutenant General, USA Chief of Engineers