KEY FIGURES ELBPHILHARMONIE

Similar documents
Guardian Glass products enable complex curved façade on Hamburg s new stunning concert hall

510 MAIN STREET WINNIPEG CITY HALL Green Blankstein Russell and Associates (Bernard Brown and David Thordarson, principal designers),

B Application example

Residencial Altos del Sabinal - "Viviendas desde *. Plaza y Trastero Incluido"

BUILDING SPECIFICATIONS

STAIRS Design & Construction

Residencial El Prado - "Viviendas desde *. Plaza y Trastero Incluido" Ensanche de Vallecas (caseta nº 1)

Residencial Bola de Oro - Edificio San Remo C/ Cerro de los Machos,

Multifaceted shapes. Press release

Arena Boulevard construction scheme

Residencial Puerta de Levante c/ Enric Valor 2,

1. PRESENTATION OF THE PROJECT

RIDDLE RIDDLE ASSOCIATES, INC.

Property condition survey for the Ewa Silo building located in the premises of the Port of Szczecin

EUR net EUR net if desired

The tower s name derives from the fact that it features a turn of 90 degrees between the bottom and top floor.

Unique Opportunity for the 21 st Century in Hamburg: Elbtower. Professor Jürgen Bruns-Berentelg CEO HafenCity Hamburg GmbH MIPIM / March 14th 2016

System furniture. Essentiel BENCH

P r o j e c t C a s e S t u d y

Strata Plan Fast Facts

Andraus high-rise, Sao Paulo, Brazil, February 1972

[BUILDING STATISTICS PART I]

EUR net EUR net if desired

Residencial Jardins del Castellarnau - Fase VII C/ Walter Benjamin 27, 08206

Emil Møllers Gade 41 Horsens, Denmark

BUILDING QUALITIES Santa Pola Bahia Arena GROUNDING WORKS STRUCTURE

House on Water Ltd naval architecture and marine engineering. References May First productions scheduled first.

8 Roman Way, Dibden Purlieu SO45 4RP

Renovating older apartment buildings A multi-disciplinary international project. Architectural design & construction

Pool Enclosure Permit Application

Type A-g 1-Bedroom 66 sq m / 710 sq ft #01-01

Luxurious living on the seafront. Best Development Multiple Units Bahrain

Domus 542 Colne Road Reedley BB10 2LD

Richards Medical Research Laboratories

Edificio Brillante C/ Periodista José Mª Carulla (esquina Avda. Andalucía),

DESIGN, ACCESS & PLANNING STATEMENT

FOR SALE. Prominent City Centre Mixed Use Investment Lennox House, Market St, Armagh BT61 7BW

ST. TERESA S GARDENS REGENERATION PARTNERSHIP

von Gerkan, Marg and Partners Architects

PRECINCT 11 SETIA ALAM YOUR WETLANDS SANCTUARY RETUSA 32 X 70 THREE STOREY LINKED SEMI DETACHED HOME FREEHOLD

Tables and worktop extensions

HTL Stahlbautag. Tobias Mähr

Berkenkamp Enschede, The Netherlands, 1988.

& School Buildings Mosque Building Primary School Nursery School Community Building Commercial Building Jogging Track Community Building A1, A2, A3, A

Machine for Living. A live-work complex in Zurich, designed by Müller Sigrist Architekten, is a city in itself.

Design and Access Statement Volume III Part 6 of 9 Plot A1. May 2018 Allies and Morrison

KING RICHARD DEVELOPMENT

St Johns Road, Isleworth

adjustable height mechanisms

Residencial Galera Playa - Edificios Fragata y Balandro Camino de La Galera,

T O W N V I L L A S F R E E H O L D

INITIAL ANNEXURE C SPECIFICATION AND SCHEDULE OF FINISHES: 1. GENERAL, BRICKWORK & PAINTING

Ramp. Bikes Ramp. Landing. Lift. Bikes. Stairs. Bedrm 1 Bedrm 2. Living Rm HWC m 2. Utility. Bthrm. Kitchen.

WESTBROOK III & HIGHLAND III Live Work Town Center Townhomes

Installation and handling instructions PITT cooking in kitchen worktops

SHORT DESCRIPTION DORFSTRASSE Wengen DORFSTRASSE WENGEN NEW APARTMENTS WITH LIFT ABOVE SWISS MADE SHOP AND FRESH MARKET

WYNNUM. Units from $279,000 + GST WAREHOUSE - OFFICE - SHOWROOM

Design and Access Statement and Planning Statement. Application for Planning Approval. New Shopfront. 58 High Street West Glossop

RedStone Private Country Estate architectural guidelines

Redevelopment Daalseplein Utrecht

Chips New Islington Manchester

2018 APPLICATION FOR URBAN DESIGN REVIEW BOARD City of Des Moines, Iowa

Residencial Galera Playa - Edificio Bergantín Camino de La Galera,

FEATURES LOCATION BUILDING

EAMES HOUSE: A PRECEDENT STUDY Lea Santano & Lauren Martin

Stark HS. Housing Solutions. By:

glass façade and roof create fascinating play of light at entrance to gateway arch museum

Residencial Cármenes Balcón de Granada c/ Zahareña (Barranco del Abogado),

SHOREDITCH ELECTRIC LIGHT STATION E PULVERE LUX ET VIS

The first stone building in Žvėrynas and the first street paved with cobblestones: Birutės Street 18. Authentic historical heritage of Vilnius

The first stone building in Žvėrynas and the first street paved with cobblestones: Birutės Street 18. Authentic historical heritage of Vilnius

BAUHAUS IN THE HEART OF PASARÉT, 1026 BUDAPEST, HŰVÖSVÖLGYI ST 53/B

SCHEDULE B. Comprehensive Mixed Use Sign and Awning Package Replacing Section VI.P.3 of the Redevelopment Plan As amended January 22, 2013

THE NEW BEACON OF SOHO

Mil Palmeras BUILDING SPECIFICATIONS. FOUNDATION: Foundation and armed concrete beams.

LEGEND. A Apartments. T Townhouses

Les Saisons Sai Wan Ho Building Journal, June 2002

1 WAY STREET. Private Residence

Apartment , Ver A

Le Chateau. Rue du Chateau. Lasserre-de-Prouille. Aude. France, 11270

Chips New Islington Manchester

Rock Island County Courthouse History & Significance

INFO-PACK. Knight s Court Info Pack Page 1

Location. Description

Apartment Lifts There are individual lifts dedicated to the Building. Security lifts to all levels including car park.

Spatial Collage. project by SOPHIE VRENKEN. studio BORDER CONDITIONS. location RUHRGEBIET

Landmarks Approved Restoration of Iconic Red Brick Single-Family Gorgeous Open Concept Embraces Historical Detail and Modern Living

3.1 Existing Built Form

LUXURY IN THE NATURE.

Detached, Tortola, British Virgin Islands, Caribbean, British Virgin Islands

The moving play of reflections of slightly distorted structures, of shadow and light, superposed by the shiny red ceramic surface and its light

Access Statement for Dellfield Self-Catering unit

+44 (0) John Bryce Malcolm Jones +44 (0)

Residence 51. LOCATION John Kennedy Area, Limassol. STATUS Under Construction for SALE. COMPLETION DATE September 2010

Now you can live in a bungalow. In the sky.

City of Vancouver Zoning and Development By-law Planning, Urban Design and Sustainability Department

VIEW VISION OVERVIEW HEILBRONNER STR. 190 STUTTGART

West 1st Avenue By-law No (Being a By-law to Amend By-law 3575, being the Zoning and Development By-law)

Hill House, Dial Hill Clevedon, BS21 7HJ Guide Price 1,100,000

BELMONT STREET, CAMDEN, LONDON NW1 8HJ OFFICES FOR SALE SQFT & SQFT TOTAL SQFT AN OLD GRAND PIANO FACTORY,

Transcription:

KEY FIGURES ELBPHILHARMONIE SUBJECT AREA KEY FIGURES AREA OF THE BUILDING GFA of whole building Approx. 125,512 sq. m - Of which GFA of warehouse Approx. 61,333 sq. m - Of which GFA of new structure Approx. 64,179 sq. m GFA of concert area GFA of plaza GFA of plaza, public area GFA of hotel 30,121 sq. m 5,745 sq. m Approx. 3,100 sq. m Approx. 27,000 sq. m Number of rooms 244 GFA of multistorey car park 22,736 sq. m Number of parking spaces 520 GFA of residential units 12,801 sq. m Number of apartments 45 GFA of eateries GFA of eateries and conference facilities GFA of general areas (staircases, thoroughfares, equipment rooms) Total weight of the building: Height of former Kaispeicher A warehouse Height of plaza level 1,332 sq. m (4% of the building) 3,631 sq. m 16,387 sq. m Approx. 200,000 t 35 m 37.2 m 1

WAREHOUSE DIMENSIONS Length of northern side Length of eastern side Length of western side Length of southern side 108.6 m 85.1 m 21.6 m 125.9 m HEIGHT OF THE ELBPHILHARMONIE Highest point, western side Lowest point on the roof 110 m above sea level (Approx. 102 m above street level) 78 m ROOF Area 6,200 sq. m Number of roof sections 8 Weight Number of steel girders for the whole roof Special features Approx. 700 t total Approx. 1,000 girders Each girder is unique and made from sheet steel, 3D design Roof sequins - Quantity - Diameter - Material area - Perforations Special features and material used for the roof sequins Approx. 5,800 0.9 1.1 m 4,160 4,727 sq. m 11 15 mm Safe to walk on, aluminium panels, deep-drawn perforations, polyester powder coating 2

FOUNDATIONS Level of the ground floor raised by 3 m for the new Elbphilharmonie structure Pile foundations: Retrospective reinforced-concrete pile foundations (supplementing the 1,111 existing piles beneath Kaispeicher A) Depth of the in situ concrete piles Ground floor 8.50 m above sea level (HafenCity is at the standard flood protection height of 8 m above sea level) 1,745 634 Approx. 15 m CONCERT AREA GRAND CONCERT HALL Number of seats Approx. 2,100 (Laeiszhalle grand hall (2,027 seats) Berlin Philharmonie (2,440 seats)) Maximum distance from conductor Lowest circle seats (height) Highest circle seats Highest point of outer shell Diameter Height 30 m Approx. 51 m above sea level/12th floor Approx. 68 m above sea level/17th floor Approx. 88 m/23rd floor Approx. 30 50 m Approx. 25 m Number of entrances to the grand hall - For performers/backstage 3 entrances on the 12th floor (north, south, west) - For visitors 12 entrances 3

REFLECTOR Diameter (oval, bottom) Length 15 m 10 m Weight - Steel structure only - Steel incl. payload, stage equipment and white-skin cladding Components Area (hall floor and steps) Hall floor area Volume Weight Stage area 24 t Approx. 100 t Stage equipment (chain and cable hoists) Stage lighting Speakers 4 organ registers (remote console) - LED lighting around the edge of the circle and lights within the structure; the lower part pointing towards the hall is covered with white skin and a thin membrane is stretched over the upper part of the reflector (indirect, dimmable lighting for the hall) 3,300 sq. m Approx. 2,590 sq. m 23,000 cu. m 12,500 t 270 sq. m Distance between the outer shells ~ 1.30 m (0.2 4 m) Number of springs (steel springs affixed between the reinforced concrete ribs via brackets on the outer shell and a steel structure on the inner shell) Steel used during construction (excl. steel roof structure) 362 Approx. 1,100 t 4

INNER CLADDING,»WHITE SKIN«Area of the white skin Material used for the white skin 6,500 sq. m 3D-milled gypsum fibre panels Number of gypsum fibre panels Approx. 10,000 Size of each panel Weight of each panel Total weight 0.5 sq. m Approx. 30 125 kg 400 t RECITAL HALL Area Lowest point Highest point Accessed from Approx. 440 sq. m Approx. 41.36 m/9th floor Approx. 56.27 m/13th floor 10th floor Number of springs 56 Number of seats 550 (Laeiszhalle recital hall (594 seats) Berlin Philharmonie (chamber music hall 1,180)) Flooring Wall Doors Ceiling Parquet strip flooring, natural oak 3D-milled wooden panels (micro-shaped), oak 3D-milled wooden panels (micro-shaped), oak Ceiling in the hall made from reinforced concrete, coated black, with pendant luminaires Ceiling underneath the catwalks (suspended ceiling): 3D-milled wooden panels 5

THIRD CONCERT HALL/KAISTUDIO 1 Area Height (lowest to highest point) 133 sq. m (3rd floor) 174 sq. m (2nd floor) 2nd floor to 3rd floor Number of seats 150 (Laeiszhalle Studio E (170 seats)) FOYER Foyer staircases in the concert area 2 Walls Length of the bar, 13th floor Smooth, chalk-based mineral plaster 21 m CURVED ESCALATOR (LARGE) Length - Steel substructure per step - Vertical lift Approx. 80 m Consisting of 14 paired elements 21.43 m Incline 11 to 23 Speed Normal speed 0.3 m/s takes approx. 4.4 min. to reach the top Number of sequins 8,000 PLAZA ESCALATOR (SMALL) Length 20 m From 6th floor to 8th floor Incline 17.25 6

LIFTS From public area to plaza (ground floor to 8th floor, excl. apartments, hotel and eateries) 4 banks of lifts/9 cabins Total in the plaza and Philharmonie 11 Total in the private area 11 Total goods lifts 3 (3.5 t/4 t load capacity) Firefighting lifts 4 Total lift systems 29 Staircases 11 MATERIALS Steel used during construction of the Elbphilharmonie: 18,000 t (14,000 t reinforcing steel, approx. 4,000 t structural steel) Concrete used 63,000 cu. m (12,000 cu. m foundations, 51,000 cu. m shell, 2/3 exposed concrete) (30 different types of concrete in total) FACADE Glass elements (each element consists of 2 3 panes) Approx. 1,100, each with 2 3 panes Panes of glass (total) Approx. 2,200 - of which flat panes Approx. 1,605 - of which spherical curved panes Approx. 595 7

Balcony elements made from glassreinforced plastic (»tuning forks«) - of which recessed balconies (concert area) Total area of glass element facade Pane thickness Approx. 103 6 Approx. 16,000 sq. m 48 mm LIGHTING Plaza Grand hall 600 plastic and glass globe lights, half-mirrored LED lights arranged in diamond shapes 1,000 lights, LED globe lights, special hand-blown luminaires made by Zumtobel, dimmable 8

PROJECT HISTORY The project Elbphilharmonie Hamburg The initial idea for rejuvenating Kaispeicher A was of the construction of the MediaCityPort - an office building for the media industry, which was to tower up to a height of 90 metres on top of the Kaispeicher A, with a gross surface area of 50,000 square metres. However, the end of the dotcom boom meant it was never actually built. Originally commissioned by the project developer Alexander Gérard, the star Swiss Architects Herzog & de Meuron came up with a project sketch the groundbreaking idea of a»hamburg Philharmonie«the construction of a concert hall on the historical warehouse, surrounded by commercial facilities and a publicly accessible Plaza. The spectacular design elated the Senate, the city government and the public. In May 2004 the ReGe Hamburg, a project development company owned by the city, was installed as the developer of the Elbphilharmonie Hamburg. The feasibility of the project was assessed and an utilisation concept was prepared, and then the private partners for the construction, the financing and 20 years of operation of the object were determined by means of a European tendering procedure. The contracts were assigned to Commerz Real AG and Hochtief Solutions AG within the property company Adamanta GmbH & Co. The approx. 45 freehold apartments entailed by the project lie in the responsibility of Hochtief as the property developer, who in this specific field cooperates with Quantum AG in a company named Skyliving GmbH. Construction progress Following the unanimous approval of the city government, construction work began on 2 April 2007 with the laying of the foundation stone. The Kaispeicher A was first completely gutted, with just the brick facades remaining intact. Then a further 634 reinforced concrete piles, in addition to the existing 1,111, were rammed 15 metres deep into the mud of the River Elbe, so that the building could support the 200,000 tonnes of the Elbphilharmonie Hamburg. On completion of the 26th storey, the last one in the bare brickwork, the topping-out ceremony took place in May 2010. The roof of the hall has been paved in November 2011. The shell construction was completed in November 2013. The installation of the»white skin«in the Grand Hall was commenced in December 2013. The facade was completed in January 2014; the roof was sealed in August 2014. After installation of the»white skin«was completed in February 2016, the concert area was able to be finished on schedule by 30 June. On 31 October 2016, in accordance with agreed deadlines, the Elbphilharmonie was handed over to the city of Hamburg. The Plaza has been publicly accessible since 5 November 2016, and the opening ceremonies for the concert area will be held on 11 and 12 January 2017. Problems during construction The building of the Elbphilharmonie Hamburg was accompanied by disputes between the municipal Elbphilharmonie Bau KG and the property development company Adamanta until summer 2013. Supplementary negotiations ended in November 2008 with a settlement (Amendment 4). At this time the costs of the project increased from 272 million Euro that had been forecasted in 2007 to 495 million Euro for the city. 30 November 2011 was agreed upon as the new completion date. 9

In 2010 the Hamburg state parliament launched a parliamentary committee of inquiry in order to determine the causes of the increase in costs. After more disputes and a temporary construction stop, the project partners signed an agreement for restructuring of the project in April 2013. The restructuring agreement stipulated among other points: Additional responsibilities assigned to Hochtief (assumption of any risks related to planning and construction, participation in a newly founded consortium with the architects, guaranteed meeting of quality requirements from the architects and the acoustician Yasuhisa Toyota, contractually warranted intermediate deadlines, as well as a binding date of completion) A new construction schedule (handover of the concert venue areas of the Elbphilharmonie by 30 June 2016; final inspection and acceptance of the Elbphilharmonie by 31 October 2016) Additional costs for the City of Hamburg (256.65 million Euro for the additional services executed by Hochtief and the architects). Thereby the overall costs for the city result in 789 million Euro. The construction continued smoothly after the restructuring agreement. Following the reorganisation agreement, construction progressed without issue. Press Contact: Tom R. Schulz, Elena Wätjen and Julia Mahns Press and Public Relations Phone: +49 40 357 666-258, -249, -245 presse@elbphilharmonie.de www.elbphilharmonie.de/en/press 10