Illustrative Rendering ANABLE BASIN. Project Overview December 20, 2017

Similar documents
Quayside Site Plan NOVEMBER 29, 2018

68 COOPER STREET. Inwood Residential Development Site

Inwood NYC Update. CB 12 Land Use Committee May 3, 2017

Date: June 17, Recreation and Park Commission. Dawn Kamalanathan Planning Director

DRAFT FOR DISCUSSION PURPOSES ONLY. Port Credit Local Area Plan Built Form Guidelines and Standards DRAFT For Discussion Purposes

MAS Comments for the New York City Council on the Jerome Avenue Rezoning Proposal, CEQR No. 17DCP019X, Bronx, NY

Cambridge Ordinance Committee Zoning Submission Overview 8/2/2017

Matter of Ortiz v Cooper Union for Advancement of Science & Art NY Slip Op 51733(U) Decided on August 8, Supreme Court, New York County

PLANNING FOR THE FUTURE OF NEW YORK CITY

Generic Environmental Impact Statement. Build-Out Analysis. City of Buffalo, New York. Prepared by:

On December 15, 2017, the Board of Supervisors approved the legislative amendments associated with the Pier 70 Mixed Use District Project (Project).

2014 Plan of Conservation and Development. Development Plan & Policies

ORDINANCE NO. AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF DALY CITY REPEALING AND REPLACING CHAPTER RE: INCLUSIONARY HOUSING

MAS Comments for the City Planning Commission on the East Harlem Rezoning Proposal

Town of Truckee. Contents. Article I - Development Code Enactment and Applicability. Chapter Purpose and Effect of Development Code...

Poughkeepsie City Center Revitalization Plan

Cambridge Planning Board Zoning Submission Overview 7/25/2017

Jasper 115 Street DC2 Urban Design Brief

Washington Boulevard + Kirkwood Road Special General Land Use Plan (GLUP) Study "Plus"

H-POLICY 1: Preserve and improve existing neighborhoods. Ensure that Prince William County achieves new neighborhoods with a high quality of life.

Overview. Foundation: Physical Design Framework 2011 Phase 2 Study

October 23, 2013/Calendar No. 9 C ZMK. 1. changing from an M1-1 District to an R6A District property bounded by:

3804 Wilson Boulevard (Staples Site) Special General Land Use Plan Study

INDUSTRIAL MIXED-USE ZONING An analysis of design considerations. AsianNeighborhoodDesign Draft:

The University of Texas at Dallas Campus Master Plan Update Town Hall Meetings. September 6-7, 2018

Comparative chart on Berkeley proposed Downtown zoning initiative June 20, 2014

FUTURE LAND USE. City of St. Augustine Comprehensive Plan EAR-Based Amendments

Technology Park Planned Unit Development Technology Park PUD-IP

6-6 Livermore Development Code

Pre-Nomination Study of the

Class Lecture #2: Zoning

HOPE SF. HOPE SF Task Force Vision. HOPE SF Task Force Principles. HOPE SF Key Next Steps

In order to permit maximum applicability of the PUD District, PUD-1 and PUD-2 Districts are hereby created.

LAND USE AMENDMENT ITEM NO: 05

SHAPING WOOD WHARF CANARY WHARF S NEW PHASE

Town of Clinton, Connecticut Action Plan for the Historic Unilever Property and Area. Steering Committee Meeting #5 Implementation Strategies

Affordable Housing Plan

Executive Summary Planning Code Text Amendment HEARING DATE: MAY 10, 2018

H5. Residential Mixed Housing Urban Zone

CB-5 INCLUSIONARY AIR RIGHTS

Long Range Development Plan (LRDP) Mission Bay Community Workshop #2

III. Environmental Setting

NEW MARKET COMMONS. AJ Thoma III, CCIM N Walnut St., Champaign, IL DEVONSHIRE REALTY

Bay Meadows Specific Plan Amendment San Mateo, California

Equitable Housing Initiative. February 18,

Offering Memorandum for the Subject Property located at: th Avenue, San Diego 92103

Broadway Corridor Framework Plan Pearl District Business Association November 10, 2015

INCLUSIONARY HOUSING PROGRAM IMPLEMENTATION GUIDELINES

REPORT TO THE BOARD OF GOVERNORS

CITY PLANNING COMMISSION January 27, 2010 / Calendar No. 4

CITY OF PORT ORCHARD

Sustainable Development Plans and Codes: Highest and Best Use and Market Value Problems and Solutions

Ann Arbor Downtown Zoning Evaluation

City of Westminster

JEROME AVE ASKS FOR THE REZONING PLAN AND DRAFT SCOPE OF ENVIRONMENTAL REVIEW

H5. Residential Mixed Housing Urban Zone

TOD: Types of Capital Investment

Dr af t Sant a Bar b ar a Count y Housing Elem ent

LeBreton Flats Redevelopment Development Summary Chart (First Subdivision)

DRAFT Inclusionary Housing Survey. Prepared for San Francisco s Technical Advisory Committee

H6 Residential Terrace Housing and Apartment Buildings Zone

LITTLE MOUNTAIN ADJACENT AREA REZONING POLICY

HPD and Housing New York. NYC Department of Housing Preservation & Development

Town of Williamstown, Massachusetts Request for Proposal (RFP) for Affordable Housing Development. 59 Water Street RFP.

PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: April 18, 2019

Building Livable Communities with Transit. Introduction to Financing Livable Communities. Portland Lindbergh City Center Case Study

ROUTE 13 COPART STORAGE FACILITY PROPERTY

BE IT ORDAINED by the Township Council of the Township of West Windsor, County of

METRO JOINT DEVELOPMENT PROGRAM: POLICY Updated January 2017

CPC CA 3 SUMMARY

HOUSING ELEMENT. 3. group and foster home construction. 1. increase the supply of new affordable housing with: a regional housing trust fund;

STAFF REPORT. Permit Number: Unlimited. Kitsap County Board of Commissioners; Kitsap County Planning Commission

307 Sherbourne Street - Zoning Amendment Application - Preliminary Report

BYLAW NUMBER 256D2017

FACT SHEET DEVELOPMENT PLAN FOR PLANNED DEVELOPMENT AREA NO. 91 UNIVERSITY PLACE RESIDENCES DEVELOPMENT

East Side Community Meeting

Errata Case Report. Candlestick Point Hunters Point Shipyard Phase 2 Development Project HEARING DATE: JUNE 3, 2010

MEMORANDUM. DATE: November 9, 2016 PC Agenda Item 3.B. Planning Commission Chair Thompson and Commissioners

OFFICE OF THE CITY ADMINISTRATIVE OFFICER

Brooklyn Borough President Recommendation CITY PLANNING COMMISSION 22 Reade Street, New York, NY FAX # (212)

City of Peachtree City. Annexation Review Process

ADUs and You! Common types of ADUs include mother-in-law suite, garage apartments and finished basements.

Municipal Brownfield Perspectives May 19, Mark Gregor Manager of Environmental Quality City of Rochester, New York 5/13/2016

HOUSING & RESIDENTIAL AREAS

Town of Bethlehem 20/20 Advisory Committee. Committee Meeting March 14, 2008 Elsmere Fire House, Poplar Drive 7:45 9:30 a.m.

TREASURE COAST REGIONAL PLANNING COUNCIL M E M O R A N D U M

Boston East. Fort Point Associates, Inc. Urban Planning Environmental Consulting Project Permitting. May 31, 2013

River North (RiNo) Overlays.

Retail at the center of Washington, D.C.

Planning and Building Department

Name of Project. Channeling Growth in the Nation s Capital: Attaining the Attributes of a Globally Competitive City

40-58 Widmer Street - Zoning Amendment Application - Preliminary Report

4.2 LAND USE INTRODUCTION

Executive Summary Planning Code Text & Zoning Map Amendment HEARING DATE: APRIL 2, 2015

Puyallup Downtown Planned Action & Code Changes. January 10, 2017

County Lot C Redevelopment

TH STREET NW

PERMITTED USES: Within the MX-1 Mixed Use Neighborhood District the following uses are permitted:

III. Environmental Setting

1. Allow a workable, interrelated mix of diverse land uses;

Transcription:

Illustrative Rendering ANABLE BASIN Project Overview December 20, 2017

PROJECT OVERVIEW PROPOSED ACTIONS ENVIRONMENTAL ANALYSIS 2

For over 70 years, Plaxall has been an innovator, business incubator, and community partner. Art Gallery 3

Project Location AN ABLE BASIN Project Overview 12/20/2017 4

Anable Basin represents a unique opportunity to create a new waterfront experience for LIC. Existing Anable Basin Waterfront AN ABLE BASIN Project Overview 12/20/2017 5

We are proposing a new special district that establishes a framework for the mixed-use redevelopment of 14.7 acres that surround Anable Basin. Special Anable Basin District Illustrative Site Plan 6

The proposed special district would transform Anable Basin over the next 15 years into a vibrant new live-work district for LIC residents, workers, and visitors. Illustrative Rendering 7

The special district framework ensures that new Anable Basin development will deliver a dynamic new pedestrian realm and a range of public benefits. URBAN DESIGN Pedestrian lanes and open space Flood resilience at the waterfront Dynamic pedestrian realm Architecture inspired by LIC context PUBLIC BENEFITS Mixed-income housing Jobs and economic development Expanded school capacity New access to the LIC waterfront SPECIAL DISTRICT FRAMEWORK Permits residential and commercial development Ensures delivery of policy objectives Establishes physical characteristics 8

Urban Design New open space would connect Gantry Plaza State Park with future sites to the north. Raised Edge 9

Urban Design New open space would connect Gantry Plaza State Park with future sites to the north. Raised Edge 10

Urban Design Streets and lanes fronted by active ground floor uses to enhance pedestrian experience. Active Ground Floor Uses 11

Urban Design Loft-scale bases with large floor plates would reflect the legacy of manufacturing in LIC. Loft Scale Building Bases 12

Urban Design Towers above bases set back from the streets/basin would maximize light and air. Tower Setbacks 13

The Special Anable Basin District will provide a range of community benefits to LIC residents, workers, businesses, and families. Innovation Hub Up to 335,000 SF for production/ light industrial uses Mixed-Income Housing Approximately 4,995 units of housing at full-build, of which 25% will be affordable 1,250 units School Site A site on 11 th Street for a new 700+ seat public school Public Waterfront Access A total of 3.1 acres of new open space around the 3.7 acre basin Enhanced Resiliency Promoting flood resiliency for the district and neighborhood beyond Job Creation At least 2,200-2,600 permanent jobs, $450 million in annual economic impact, and 10,000+ construction jobs 14

PROJECT OVERVIEW PROPOSED ACTIONS ENVIRONMENTAL ANALYSIS 15

Special District Framework Allows for a flexible development program Establishes maximum permitted residential and non-residential density per site Establishes height/bulk requirements Includes requirements for affordable housing, production/light industrial space and transfer of a school site 16

Proposed Floor Area Residential Non Resi. 6.72 FAR 7.72 FAR Residential Non Resi. 6.16 FAR 7.16 FAR Residential Non Resi. 5.75 FAR 6.75 FAR 17

Proposed Actions Zoning Map Amendment To map a new Special Anable Basin (AB) District To rezone districts from M1-4 and M1-4/R6A to M1-5/R7-2, M1-5/R8, and M1-5/R9 18

Proposed Actions Zoning Text Amendment Create a new Special AB District Map a Mandatory Inclusionary Housing (MIH)-designated area Amend the Northern Hunter s Point Waterfront Access Plan to cross reference to requirements in the proposed Special AB District text Additional Potential Discretionary Actions NYSDEC Tidal Wetlands permit Local, state, and federal funding/financing for residential development Disposition of the proposed school site to the NYC School Construction Authority (SCA) Special permit for any future hotel development 19

Schedule 20

PROJECT OVERVIEW PROPOSED ACTIONS ENVIRONMENTAL ANALYSIS 21

CEQR Analysis Framework RWCDS EIS will consider TWO Reasonable Worst Case Development Scenarios (RWCDS) Representing illustrative development programs allowable under the proposed actions EIS will determine and disclose the potential environmental consequences of those reasonable worst case programs Analysis year: 2034, based on a 15-year buildout 22

Open Space Conceptual Program by Land Use CEQR Analysis Framework RWCDS Scenarios 1 and 2 RWCDS 1 RWCDS 2 Residential 4,337,000 GSF 3,196,000 GSF Dwelling Units 4,995 units 3,652 units Non-Residential 663,000 GSF 1,736,000 GSF General Non-Residential (Office, Retail, Arts & Cultural) 328,000 GSF 1,481,000 GSF Production / Light Industrial 335,000 GSF 255,000 GSF Community Facility 141,000 GSF Parking 642,000 GSF Parking Spaces 1,824 spaces Hotel - 123,000 GSF TOTAL 5,783,000 GSF 5,837,000 GSF Public Open Space 3.1 acres Note: Includes the 12 projected development sites and one potential development site; totals may not sum due to rounding. 23

Adjacent projects Assessment of future conditions will include general background growth and other specific projects in project area NYCEDC proposal at 44 th Drive site NYCDOT planned improvements Rezoning Boundary Plaxall Sites Non-Plaxall Sites EDC RFP Sites Paragon Paint Sites Illustrative Site Plan 24

CEQR Analysis Framework Technical Analysis Areas Land Use, Zoning, and Public Policy Socioeconomic Conditions Community Facilities and Services Open Space Shadows Historic and Cultural Resources Urban Design and Visual Resources Natural Resources Hazardous Materials Water and Sewer Infrastructure Solid Waste and Sanitation Services Energy Transportation Air Quality Greenhouse Gas Emissions/Climate Change Noise Public Health Neighborhood Character Construction 25

CEQR Analysis Framework Technical Analysis Highlights Transportation Intersection Impact Analysis Traffic - Analysis of Weekday AM, Midday, PM and Saturday peak hours Parking - Up to 1,824 total parking spaces Transit - Court Square Station (E, G, M and 7 trains) - Vernon Boulevard/Jackson Avenue Station (7 train) - Pedestrian analysis - Safety analysis 26

CEQR Analysis Framework Technical Analysis Highlights Land Use, Zoning and Public Policy Community Facilities and Services - Public Schools - Police & Fire - Child Care - Outpatient Health Care - Libraries Socioeconomic Conditions - Potential direct and indirect business displacement - Potential direct and indirect residential displacement Hazardous Materials - Several sites have been/are being investigated and one site remediated under the New York State Brownfield Cleanup Program (BCP) - All BCP sites will be remediated Air Quality Assess potential for mobile source and stationary source impacts Assess potential industrial source emissions Water and Sewer Infrastructure Construction Assess potential impacts on existing uses Assess cumulative construction effects of Plaxall and adjacent concurrent development Mitigation and Alternatives potential industrial emissions 27

Illustrative Rendering ANABLE BASIN Project Overview December 20, 2017

Project Schedule 29

Focus Issue: Resiliency 30

Focus Issue: Resiliency 31

Focus Issue: Affordable Housing Consistent with MIH, 25% of residential development will be permanently affordable. Assuming full build-out maximizing residential space, the project would create ~1,250 units of affordable housing out of the ~4,995 that could be built. Under this MIH option, units would be made available to households earning 60% of the Area Median Income for the NY metro area. 60% AMI HPD Guidelines Unit Size Rent/Mo. Studio $761 1 Bedroom $963 2 Bedroom $1,166 3 Bedroom $1,339 HH Size Income Limit 1 person $40,080 2 persons $45,840 3 persons $51,540 4 persons $57,240 32

Focus Issue: Production/Light Industrial Space and Local Jobs The Special Anable Basin District would require new residential or commercial development at Anable Basin to set aside 7% of floor area for production/light industrial uses (P/LI), or 5% of floor area if 10% of FAR is provided for commercial office. At full build-out, the special district would deliver up to 335,000 SF of new P/LI space to the LIC Waterfront. The proposed P/LI use group definition reflects the diversity of local businesses that are present at Anable Basin and throughout LIC. P/LI Permitted Uses Food production Clothing manufacturing Artist studios Design and fabrication of emerging technologies Breweries/distilleries Custom furniture production Radio or television studios Adult education Life sciences Jewelry manufacturing 33