Redevelopment. The vertical green wall featured in URA redevelopment project One Wanchai Redevelopment Eng (5)a.indd 22

Similar documents
Redevelopment: Tackling Urban Decay Effectively

Highlights of the Year

OPERATING REVIEW. URA s 4R work transforms and brings life to urban fabric

Operating Review. Redevelopment. Rehabilitation Revitalisation preservation

Content. Mission. Objectives. For the People. People First, a District-based and Public Participatory Approach. Redevelopment.

Preservation and Revitalisation

FOR VIBRANT LIFESTYLES THE REACH, YUEN LONG, HONG KONG

BUILDING FOR THE BETTER CHINA. Hong Kong

Planning & Design Division. Promote Building. Overall Research and Planning for Redevelopment Projects. Rehabilitation. Develop, Implement and Manage

HONG KONG EXAMINATIONS AND ASSESSMENT AUTHORITY 2019 HONG KONG DIPLOMA OF SECONDARY EDUCATION EXAMINATION ENGLISH LANGUAGE

Redeveloping/Upgrading old and dilapidate districts as a form of improving the urban quality of Hong Kong

S.F. Service Points Update Notice

THE HONG KONG HOUSING AUTHORITY. Memorandum for the Commercial Properties Committee. Shopping Centres Scheduled for Completion in 2000/2001

MEGA CUBE. Kowloon Bay, Hong Kong

Property Development. 1. YOHO Town, Yuen Long 2. Park Island, Ma Wan 3. Severn 8, The Peak 4. The Arch, Kowloon Station. Park Island, Ma Wan

Project Summary Major Property Development Projects in Hong Kong. Project Summary Major Property Development Projects in Hong Kong.

APPROVED URBAN RENEWAL AUTHORITY PRINCE EDWARD ROAD WEST / YUEN NGAI STREET DEVELOPMENT SCHEME PLAN NO. S/K3/URA2/2

High Park Grand Mong Kok, Hong Kong

Delia Memorial School (Hip Wo) Guidance notes on filling Student s Particulars Record

Gross Floor Area of HOS Flat by Phase / Estate

HOUSING MATTERS DISCUSSED AT DISTRICT BOARDS AND THEIR COMMITTEES (1 JUNE 1998 to 31 AUGUST 1998) Abbreviations : PDB Provisional District Board

Unopened Space: Mapping Equitable Availability of Open Space in Hong Kong Press Conference Report by Carine Lai

Progress Update on Shatin to Central Link (SCL) 2 May 2013

Government Vaccination Programme 2018/19 List of HA GOPCs for GVP Vaccination

Property Investment. 1. Two IFC, Central 2. International Commerce Centre, Kowloon Station 3. East Point City, Tseung Kwan O 4.

A Dissertation On Hang Hau Town And Ap Chai Wan By Kwok-shing Pun READ ONLINE

Collection Point Address

HONG KONG HOUSING AUTHORITY HOME OWNERSHIP SCHEME AND PRIVATE SECTOR PARTICIPATION SCHEME AND TENANTS PURCHASE SCHEME INFORMATION FOR APPLICANTS ON

Shatin to Central Link. Transport Advisory Committee 4 May 2011

S.F. Express Circle K Convenience Store Self-pickup Service Service Coverage: Kowloon

Selection Method for Shaw College Student Hostel Places 2014/2015 (Second draft)

Memorandum for the Subsidised Housing Committee of the Hong Kong Housing Authority. Public Rental Housing Allocation Plan for 2010/11

Centre and the Hong Kong Sectio

MTR to work closely and align with the Government on announcement mechanism in relation to Railway Protection Area

Selection Method for Shaw College Student Hostel Places 2017/2018 (Second Draft)

Self Service Terminal Service Hour Hong Kong District Branch

For the Hong Kong Housing Society, 1998/1999 has been a year of. facing challenges and finding solutions

HK Island Central. Central / Admiralty / Sheung Wan Admiralty Centre ifc (International Finance Centre) (One & Two) Shanghai Commercial Bank Building

Develop a GIS-based Electronic Mark Plant Circulation System in a collaborative and end-user computing approach

Task Force on Kai Tak Harbourfront Development. Residential Development at 1-5 Kai Hing Road, Kai Tak South (Kowloon Godown Site)

HOUSING MATTERS DISCUSSED AT DISTRICT BOARDS AND THEIR COMMITTEES (1 JULY 1999 to 30 SEPTEMBER 1999) Abbreviations : PDB Provisional District Board

Shaw College Selection Method for Student Hostel Places 2018/2019 (1st Draft)

CLP Power Extends Electric Vehicle Charging Network as Popularity of Green Motoring Accelerates

DEVELOPMENT PROJECTS COMPLETED

Survey on the Current Status of Industrial Buildings for Arts Activities and Future Demand Report Summary

Selection Method for Shaw College Student Hostel Places 2016/2017 (Final Version)

Appendix: List of CLP Power s EV charging stations (14 December 2018)

Property Development 26 SUN HUNG KAI PROPERTIES LIMITED. Manhattan Hill, West Kowloon

18 D Shop D & Portion of Shop B, G/F, B. 16 B Shop B, G/F and Shop A2 & A3, Upper G/F, A2

Kowloon Region. Unit No. District Meeting Venue & Contact Tel. Meeting Time. The Salvation Army Chuk Yuen Children and Youth Centre

Shaw College Selection Method for Student Hostel Places 2019/2020

Proposed Residential Development at 1-5 Kai Hing Road, Kai Tak South

Selection Method for Shaw College Student Hostel Places 2017/2018 (First Draft)

Application Form Common Area Repair Works Subsidy / Interest-free Loan

Unit No. District Address/Tel Meeting Time

Property Investment. International Commerce Centre, Kowloon Station 38 SUN HUNG KAI PROPERTIES LIMITED

The Past, Present and Future Land-forming in Hong Kong

From Western District to Airport

Booth no: 1E-F12. Booth no: 1E-F15. Booth no: 1E-F19 ALFALFA ATELIER AMEBA DESIGN LIMITED AP CREATIVE LIMITED

Uphold the Rule of Law Seize the Opportunities Make the Right Choices

Unit No. District Address/Tel Meeting Time

Foreseeable Problems of Redevelopment of. Public Housing Estates a case study of Tsui. Ping (North) Estate

HOUSING MATTERS DISCUSSED AT DISTRICT BOARDS AND THEIR COMMITTEES (1 MARCH 1998 to 31 MAY 1998) Abbreviations : PDB Provisional District Board

/ 2736 BOULEVARD, NATHAN ROAD, TSIM SHA TSUI

SUN HUNG KAI PROPERTIES LIMITED ANNUAL REPORT 2001/02

Contribution of Manufacturing to GDP and Stock of Industrial Premises

Appendix. Office and Unit Lists. HKFYG Website: hkfyg.org.hk M21 Multimedia Web: M21.hk

THE HONG KONG HOUSING AUTHORITY. Memorandum for the Building Committee. Current Density Guidelines for Public Housing Development

MTR Transformation of CBDs in Hong Kong

THE HONG KONG HOUSING AUTHORITY. Memorandum for the Housing Authority. Secretary s Report Committee Work (September November 1998)

Proposed District Council Constituency Areas

Business in Hong Kong Property Development

HONG KONG HOUSING AUTHORITY

香港物業管理公司協會有限公司 The Hong Kong Association of Property Management Companies Limited

Quality Building Award 2018 Results Released New Category Introduced and Number of Jurors Increased to Enhance Industry Representation

BANK OF CHINA LIMITED (A joint stock company incorporated in the People s Republic of China with limited liability) Stock Code: 3988

S.F. Service Points Update Notice

Major SmarTone Authorised Resellers

Monthly update of MTR facilities for passengers with disabilities December 2017

New Business Districts Why Success or Failure

Hong Kong Property Business

TAI PO JOCKEY CLUB SWIMMING POOL

Task Force on Kai Tak Harbourfront Development

1

Annual Results SEHK Stock Code: 127

CURRICULUM VITAE (Updated )

Causeway Bay ( Sec. ) A of Marine Lot No. 269; RP of Sec. A of Marine Lot No. 269; and RP of Sec. E of Marine Lot No. 201

NOTIFIER JOB REFERENCE IN HONG KONG

FY2013 Annual Results. 26 September New World One Step Forward We Create New Living Experience

Parallel Lines : Railway Infrastructure Development and its interaction with Urban Growth in Hong Kong

Road to regaining Balance? Hong Kong office market in 2020

UNIVERSITY OF HONG KONG LIBRARY. Hong Kong Collection. Gift from: Information Services Dept., Hong Kong

Enriching Living. Quality. homes. We build. for Hong Kong people which connect to our network

Recommended District Council Constituency Areas

Hong Kong Property Transaction Analysis Report

New World One Step Forward. We Create New Living Experience. FY2014 Annual Results 24 Sep 2014

Chief Executive Mrs. Carrie LAM visits MiC Display Centre

Summary of Decision Made by the Home Ownership Committee

DRAFT. Urban structure of Hong Kong - historical timeline. ETH Studio Basel 4 5

HONG KONG PRIME OFFICE Monthly Report

Transcription:

Redevelopment The vertical green wall featured in URA redevelopment project One Wanchai. 22 12-13 Redevelopment Eng (5)a.indd 22 6/9/13 2:50 PM

Redevelopment 2012/13 saw a substantial increase in the number of new redevelopment projects undertaken by the URA with the launching of six projects. Up until 31 March 2013, a total of 48 redevelopment projects, two preservation projects 1 and one revitalisation project 2 had been commenced by the URA. The 48 redevelopment projects provide around 13,500 new flats, 262,700 square metres of commercial space, 53,000 square metres of Government Institutional and Community (GIC) facilities, 100,000 square metres for other uses including offices and hotels, and 26,000 square metres of open space. 1 Blue House project: The Blue House Stone Nullah Lane/Hing Wan Street project commenced by the URA is no longer included as a preservation project since being handed over to the Commissioner for Heritage Office on 19 June 2012. 2 Mallory Street project: Previously classified as a preservation project, the Mallory Street/Burrows Street project now falls in the revitalisation project category in view of the extensive renovation works involved and the invigorative character of the proposed use. 23

Commencement of New Redevelopment Projects The six new redevelopment projects include the three projects launched under the URA s Demand led Redevelopment Project Pilot Scheme (Demand-led Scheme), the two pilot projects under the Redevelopment of Industrial Buildings Pilot Scheme and one URA-initiated project as detailed below. Demand led Projects It is a prerequisite of the Demand-led Scheme that once commenced, the actual implementation of Demand-led projects depends on the satisfaction of two conditions precedent, namely the acceptance by the owners of not less than 80% of the undivided shares of each lot within a project site of the relevant conditional acquisition offers and the authorisation of the Secretary for Development for the project to proceed. All the three Demand-led projects selected in the first round of Demand-led project applications conducted in late 2011 managed to meet the conditions precedent within 2012/13 and are being actively implemented. Pine Street/Oak Street, Tai Kok Tsui With buildings of between six and nine storeys erected between 1963 and 1967, the project covers around 865 square metres and is populated by 125 households. The project is expected to produce around 115 flats and 705 square metres of commercial space. During the second round of Demand-led project applications conducted in late 2012, four Demand-led projects were chosen. Two were commenced in April 2013 and two more in June 2013. 229A-G and 205-211A Hai Tan Street, Situated in close proximity to each other, these two modest scale projects (483 square metres and 470 square metres respectively) were built in the early 1960s comprising two buildings of eight and nine storeys each. Some 160 households will benefit from their redevelopment and around 140 flats and 940 square metres of commercial space will be provided. URA staff conducts briefing for affected residents of the demand-led redevelopment project. A resident enjoys the improved living condition after moving to a public housing unit. 24

Redevelopment Kowloon Road/Kiu Yam Street, Fuk Chak Street/Li Tak Street, Tai Kok Tsui The project site comprises an eight-storey building built in 1959 of around 600 square metres in size and occupied by around 120 households. Redevelopment can produce around 80 flats and 815 square metres of commercial space. This project is made up of two eight-storey buildings built in 1964, each fronting separate streets. The site covers around 716 square metres and is occupied by around 100 households. It can be redeveloped for about 96 flats and 643 square metres of commercial space. Wong Chuk Street, Existing view of the Kowloon Road / Kiu Yam Street project. Tung Chau Street/Kweilin Street, With a nine-storey building built in 1963, this project site is around 485 square metres in size and accommodates an estimated 96 households. Redevelopment can produce around 69 flats and around 424 square metres of commercial space. A nine-storey building built in 1964 of around 1,640 square metres in size and inhabited by some 280 households. It can be redeveloped for about 190 flats and around 2,100 square metres of commercial space. The heavily trafficked elevated West Kowloon Corridor with its attendant noise and fume nuisances runs adjacent to the site. These environmental impacts will be given due consideration in the project design. Press conference to announce the commencement of the Fuk Chak Street / Li Tak Street and the Wong Chuk Street project. 25

Redevelopment of Industrial Buildings Pilot Scheme The URA commenced two projects under this scheme in October 2012 and January 2013 respectively. 12P, Smithfield, Kennedy Town Yu Chau West Street, This project comprises a 12-storey industrial block built in 1972 with a site area of 944 square metres. Zoned for residential use, the project has the potential of producing around 180 flats and 200 square metres of commercial space. However, all of the owners within the project have objected to redevelopment by the URA and have confirmed their intention to redevelop the site themselves. Their objections had been upheld by the URA s Development Project Objection Consideration URA Director (Acquisition and Clearance) Industrial Building Mr Joseph Lee meets an owner of the industrial building. Committee. Subsequent to URA s recommendation, SDEV declined to authorise the URA to proceed with the project and the decision was gazetted on 5 July 2013. Existing view of the project. This project comprises a 10-storey industrial building built in 1962 and occupying a site area of 1,393 square metres. The site can be redeveloped to provide about 16,700 square metres of office and retail floor space in conformity with the zoning plan. URA staff conducts freezing survey at the project site. A submission had been made to the Secretary for Development to authorise the project to proceed. 26 12-13 Redevelopment Eng (5)a.indd 26 6/9/13 2:51 PM

Redevelopment URA-initiated Redevelopment Projects Tonkin Street/Fuk Wing Street, This project covers an area of over 1,200 square metres and includes buildings in generally poor condition of five to seven storeys built between 1955 and 1958 and occupied by around 140 households. This sizeable project can be redeveloped to provide 175 flats and around 1,490 square metres of commercial floor space. Residents attend a briefing session conducted by URA staff. Other Projects of Note Ma Tau Wai Road/Chun Tin Street, To Kwa Wan Sai Yee Street, Mong Kok Following the tragic collapse of a building on Ma Tau Wai Road in January 2010, the URA stepped in and commenced this project which comprises two rows of over 50-year-old tenement buildings which affect about 213 households. This is the first ever project that the URA has undertaken without private sector involvement as a joint venture partner. Following gazettal of the land resumption in January 2013, the site had reverted to Government in April 2013. A joint venture tender was awarded in September 2012 for this sports themed redevelopment where under a special local sports-shop arrangement, former sportsshop operators will be offered priority to lease space within the retail portion of the future development. Foundation works commenced in May 2013. 27

Kwun Tong Town Centre, Kwun Tong Peel Street/Graham Street, Sheung Wan URA s largest project to date, the Kwun Tong Town Centre project covers a total site area of 5.3 hectares and affects around 1,300 households. The project is expected to produce around 2,000 new flats, 112,000 square metres of commercial space, and 13,400 square metres of public open space. This complex project is being implemented in three phases, with the site divided into five Development Areas. As at 31 March 2013, Development Areas 2, 3 and 4 have been reverted to the Government and clearance The URA has helped some hawkers to re-build their run-down pitch adjacent to the Graham Street/Peel Street project. is continuing while superstructure works are in progress for Development Area 1. The phased development approach will enable the early reprovision of the existing Kwun Tong Jockey Club Health Centre to Development Area 1. In addition, this approach has required the temporary reprovision of existing Government offices in Development Area 4 to premises nearby which was Existing view of the century old wet market. completed in May 2012, thereby vacating the site for use as interim GIC facilities to reprovision the hawker This project will help improve the living conditions of bazaars, Public Light Bus terminus and public toilet some 300 households. A phased development approach from Development Areas 2 and 3. is adopted in implementing the project to cater for the preservation of a century old wet market which falls outside the project boundary. This approach also allows the fresh-food operators currently operating in the first phase, and who wish to continue their businesses, to be moved to temporary shop premises within the project site. Upon completion of the project s low-rise retail block, the fresh-food operators will be able to operate there if they so choose. The joint venture development tender for Site B was awarded during the year. Acquisition of outstanding Overall master layout plan of the Kwun Tong Town Centre Project. interests in Sites A and C is continuing. 28 12-13 Redevelopment Eng (5)a.indd 28 6/9/13 2:51 PM

Redevelopment Lee Tung Street/McGregor Street, Wan Chai Staunton Street/Wing Lee Street, Sheung Wan This residential and commercial redevelopment project in Wan Chai will reflect a Wedding City theme that features Hong Kong s early wedding traditions, a culture gallery and a retail area for wedding-related trades such as wedding dresses, flowers, decorations, cakes, hair salons, jewellery, photo studios and wedding planners; offer space for social enterprises; preserve three pre-war shophouses; provide a public open space between Johnston Road and Queen s Road East; and provide a new east-west pedestrian link with open spaces. This is also the first URA project that comes with a formalised comprehensive environmentally-friendly policy. It has been planned to reduce greenhouse gas emissions from the project by about 23%. Construction is now underway and completion is targeted for 2015. Facilitating Services Under its facilitator role, the URA has so far provided services to three facilitation projects during 2012-13. A fourth project has also been taken up in April 2013. The original Site A of the project comprising the Wing Lee Street area and the Bridges Street Market site was excised from the Development Scheme Plan (DSP) following the URA s proposed alternative implementation concept for conserving Wing Lee Street. Corresponding amendments to the approved DSP and the approved Sai Ying Pun and Sheung Wan Outline Zoning Plan were gazetted in July 2011 and approved by the Executive Council in May 2012. Subsequently, the Town Planning Board (TPB) endorsed a revised Planning Brief for Sites B and C based upon which the URA prepared a Master Layout Plan which was approved by the TPB in May 2013. Kai Tak Flat-for-Flat Development Construction of the URA s first ever self-developed housing estate for the site designated for provision of Flat-for-Flat units at Kai Tak, commenced in July 2012. Piling is complete with basement excavation and superstructure works underway since April 2013. The URA has adopted modest design features for the development which has recently obtained a provisional BEAM Platinum Award. The development is called 煥然壹居 in Chinese, a name chosen in a territory-wide naming competition. The English name De Novo is used for the development. An artist impression of the Kai Tak Flat-for-Flat development. 29