OSSF Permit Application

Similar documents
TOWN OF ARGYLE APPLICATION FOR ON-SITE SEWAGE FACILITY NEW CONSTRUCTION TCEQ REGION NUMBER COUNTY OF INSTALLATION. (Last) (First) (Middle)

ON-SITE SEWAGE FACILITY PERMIT APPLICATION

SEPTIC PERMIT INFORMATION

SEPTIC PERMIT APPLICATION

SEPTIC PERMIT APPLICATION

MILAM COUNTY HEALTH DEPARTMENT 209 SOUTH HOUSTON CAMERON, TEXAS PHONE (254) FAX (254)

JOHNSON COUNTY PUBLIC WORKS 2 North Mill Street/Suite 305, Cleburne, TX (817)

FALLS COUNTY APPLICATION FOR PERMIT

WILSON COUNTY Health & Public Safety Office

Collin County Development Services OSSF CONSTRUCTION INFORMATION SHEET

On Site Sewage Facility Information Sheet PROPERTY OWNER INFORMATION

SEPTIC PERMIT CHECKLIST

SHORT PLAT Information

CITY OF ELSMERE 318 Garvey Avenue, Elsmere KY 41018

Commercial Requirements Packet Sheridan, Indiana Hamilton County

FINAL PLAT SUBMITTAL CHECKLIST

ACCESSORY STRUCTURE DEVELOPMENT ORDER APPLICATION (WITH RESTROOM PLUMBING)

Manor Township Zoning Permit Application (Section 702) Application Number Application Date / /

Name: Address: City/State Phone: *Please include the Commercial/Industrial/Other Establishment Sheet with permit

SUBDIVISION APPLICATION: RECOMBINATION PLAT or EXEMPT PLAT

Elko County Community Development

Individual Well Individual Septic. Community Well 19. What is the proposed method of sewage disposal? Public. None

NOTICE APPLICATION MUST BE FILLED OUT COMPLETELY.

PRELIMINARY PLAT Checklist

RESIDENTIAL DEVELOPMENT ORDER APPLICATION Application Fee $ PLEASE READ THE FOLLOWING INFORMATION CAREFULLY

S.T.E.P./GRINDER SEWER SYSTEM City of Lacey

Non-Plumbing Sanitary Permit Application

Conditional Use Sketch Plan Application Non-Residential Zone

CITY OF PAHOKEE SITE PLAN SUBMITTAL REQUIREMENTS

Septic Tank / Drainfield / Holding Tank Permit Application

BINDING SITE PLAN Checklist

Tri County Septic Wastewater Recycling Specialists PO Box 283 Royse City, TX

Sheds, Fences, Decks (All Permitted Structures Except New and/or Expansion of Principal Buildings )

Remember, PA One-Call before excavating. Simply dial 811 or

Irrigation Permit Requirements FOR OWNER/BUILDER

TOWN OF LAKE LURE LAND DISTURBANCE PERMIT (LESS THAN 1 ACRE) Permit Fee Permit No. LDP- (see Fee Schedule below) Approved:

Simple Land Division by Love and Affection - Application Checklist

SELLER DISCLOSURE STATEMENT IMPROVED PROPERTY

CITY OF LITTLE FALLS BUILDING PERMIT APPLICATION ALL BUILDING PERMITS ARE GOOD FOR ONE YEAR

APPLICATION FOR ZONING USE AND COMPLIANCE CERTIFICATE CENTER TOWNSHIP, BEAVER COUNTY, PA

SUBMITTAL REQUIREMENTS: The number indicates the number of copies for submittal (if applicable).

Onsite Wastewater Treatment System Remediation Project

EASEMENT ACCESS INSTRUCTION SHEET

MARIJUANA FACILITY CONDITIONAL USE PERMIT APPLICATION File No.

SUBMITTAL REQUIREMENTS: The number indicates the number of copies for submittal (if applicable).

MINOR SUBDIVISION INFORMATION

Walton County Planning and Development Services

Application for a Deminimus Development

CONTINUED USE AUTHORIZATION (REINSPECTION) PROCESS

Chelan County Department of Community Development 316 Washington Street, Suite 301, Wenatchee, WA Telephone: (509) Fax: (509)

WASHINGTON SELLER S RESIDENTIAL PROPERTY DISCLOSURE STATEMENT

ADDITION/REMODEL APPLICATION CHECKLIST 2017 FBC. Please make sure you have ALL required copies before submitting permit application

VACATING PLATS. The following documents are provided as required by the City of Conroe for use in the above titled platting submittals:

City of Yelm. Community Development Department BOUNDARY LINE ADJUSTMENT OR LARGE LOT SUBDIVISION

Charter Township of Garfield Grand Traverse County

New Hanover County Health Department Application for Improvement Permit and/or Authorization to Construct

Building Permit Application Instructions Please read and sign Town of Worcester (1) A land use permit is required prior to a building permit

City of Eustis Development Application

MINOR SUBDIVISION FINAL PLAT APPLICATION Town of Apex, North Carolina

MASTER SUBDIVISION FINAL PLAT APPLICATION Town of Apex, North Carolina

PUD Preliminary Plan/Plat Information & Application Packet

Land Use & Development Application

NASSAU COUNTY BUILDING DEPARTMENT MOBILE HOME APPLICATION CHECKLIST

City of Melissa, Texas Plat Dedication Language

Initial Subdivision Applications Shall Include the Following:

-PLUMBING- BUILDING PERMIT APPLICATION PACKET

EAST COCALICO TOWNSHIP BUILDING / ZONING PERMIT PROCEDURE AND GENERAL NOTES Revised 6/12/2012

APPLICATION FOR SITE PLAN CONTROL

INTRUCTIONS FOR BUILDING/USE PERMIT APPLICATION All applicable sections of this packet must be completed.

Construction Permit for Onsite Sewage Treatment System

PARK COUNTY DEVELOPMENT PERMIT APPLICATION

CITY OF SARALAND PRELIMINARY SUBDIVISION PLAT REVIEW

GROWTH MANAGEMENT DEPARTMENT POLICY

HARDIN COUNTY WATER CONTROL & IMPROVEMENT DISTRICT NO. 1 WATER AND SEWER USE ORDER

APPENDIX B. SUBMISSION REQUIREMENTS

APPLICATION FOR FARMSTEAD SPLIT

LOT SUBDIVISION LOT BLOCK SIZE

YAVAPAI COUNTY. Development Services

PETITION TO VACATE A STREET, ALLEY, OR EASEMENT APPLICATION

County of San Bernardino Department of Public Health Environmental Health Services

ACCESSORY DWELLING UNITS

Consent Application Form

CITY OF SARALAND FINAL SUBDIVISION PLAT REVIEW

Residential Re-Roof Permit Requirements FOR CONTRACTORS

A Final Plat will be reviewed concurrently with any other development review application(s) that is required.

COLUMBIA COUNTY LAND DEVELOPMENT SERVICES COURTHOUSE 230 STRAND ST. HELENS, OREGON (503) APPLICANT: Name:

6. LIST THE CAUSE DOCKETED NUMBER (E.G. ZONING CASE NUMBER, PLAT NUMBER...)

MAJOR RESIDENTIAL AND NONRESIDENTIAL SUBDIVISIONS

ARTICLE 9 SPECIFICATIONS FOR DOCUMENTS TO BE SUBMITTED

G R O W T H M A N A G E M E N T D E P A R T M E N T DEMOLITION PERMIT APPLICATION

PLANNING SERVICES FORM 3.3 SUBDIVISION APPLICATION COMMERCIAL OR BUSINESS PURPOSES

AFFIDAVIT FENCE OFFICE OF THE JACKSON TOWNSHIP ZONING DEPARTMENT P. O. BOX 517 GROVE CITY, OH 43123

Final Plat Mapping Requirements

City of Beacon Building Department

APPLICATION PROCEDURES FOR A MAJOR SUBDIVISION PRELIMINARY PLAT

MEDICAL HARDSHIP. TEMPORARY USE PERMIT APPLICATION For a Mobile Home

APPLICATION INSTRUCTION AND INFORMATION SHEET Minor Variance or Special Permission (Also see instructions on the application form)

APPLICATION FOR CONSENT TO SEVER LAND UNDER SECTION 53 OF THE PLANNING ACT

COMMERCIAL BUILDING PERMIT APPLICATION

APPLICATION INSTRUCTION AND INFORMATION SHEET Minor Variance or Special Permission (Also see instructions on the application form)

Transcription:

Project Address: OSSF Permit Application Permit #: Phone: 682-229-2402 Lot: Block: Subdivision: Public Water Supply or Private Well? Lot Size: Water Saving Devices? Yes No Is property in Floodplain? Yes No Owner Information: Name: Address: : : Fax Number: Mobile Number: Project Information Type of Dwelling: Residential Commercial Type of Construction: Reason for modification: Description of work: Number of Bedrooms Living Area (square footage) Number of Occupants Number of Days Occupied Number of Bathrooms and Showers New Existing/Minor Modification Modifications: Must submit any available original system designs and plans. Site diagram to include all existing structures, pools, sprinkler/disposal areas, slopes, landscaping, wells, and property lines. Aerobic modifications, must submit current maintenance contract and inspection. Type of OSSF System: Name of manufacturer: Brand of system: Aerobic Conventional Designer of system License Number Installer of system LIcense Number Site Evaluator LIcense Number Authorization is hereby given to the City's Designated Representative to enter upon the above described property for the purpose of lot evaluation and inspection of the on-site sewage facility. A permit to operate the facility will be granted when Notice of Approval is received by the City. I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of laws and ordinances governing this type of work will be complied with whether specified or not. The granting of a permit does not presume to give authority to violate or cancel the provisions of any other state or local law regulating construction or the performance of construction. Signature of Applicant: OFFICE USE ONLY: Approved by: Date: Date Approved: Total Fees: Issued Date: Issued By: BV Project #

OSSF Plan Review Checklist Project Address: Date Received: Valuation: The items listed below are required for OSSF review. OSSF Permit Application OSSF Technical Information Sheet Site Evaluation (soil, topography, vegetation) Site Diagram Original and to scale (Must include spray area, elevations, grading, trees, vegetation, ditches, drainage easements, creeks, floodplain area) System Name and Design - systems of 5000 gallons or more MUST be submitted to the Texas Commission on Environmental Quality for review. Spray Irrigation Design Pump/Alarm Diagram (gallons must be clearly marked) Affidavit Surface Irrigation (to be completed by owner of property.) Must be notarized and filed with Denton County Records. After sale or transfer of property a Transfer of Ownership is to be submitted to the City with new owner(s) name. System Installers Registration (Copy) and Certification Maintenance Agreement to be submitted at time of application in order to construct the OSSF. An updated initial contract is also to be submitted to reflect date of sale by the builder for a new single family dwelling or date of notice of approval for an existing single family dwelling with new owner(s) name. Contractor Registration required for OSSF Installer.

OSSF Technical Information Sheet Project Address: Owner s Name: Professional Design required? Yes No If yes, attached? Yes No Sewer (House Drain) Type and size of pipe: Slope of sewer pipe to tank: Daily Wastewater usage rate: Q = (Gallons / Day) Treatment Unit A. Septic Tank: Dimensions Liquid Depth (Tank bottom to outlet) Size Required Size Proposed B. Aerobic: Pretreatment Tank? Yes No Manufacturer Model # Size Required Size Proposed C. Other: _ (Please attach description) Disposal System Type: Loading Rate: Area Required Area Proposed Additional Information (This material must be attached for review to be completed) Site Evaluation Scaled Site Drawing to include spray area Pump Alarm Diagram Filed Affidavit Construction is not permitted until application is approve and a permit is issued. Unauthorized construction can result in Civil and/or Administrative Penalties. Designer s Signature Reg. # Date

OSSF Transfer Of Ownership 210 OSSF Drive (Please Print) Address: Permit #: Previous Owner: New Owner: Date of Sale of Property: The undersigned acknowledges that a properly installed sewage facility can malfunction for various reasons including but not limited to increases in water usage, water leaks, seasonally high water tables, soil conditions, rainfall, and/or low evaporation rates. It is the owner s responsibility to correct, change, increase, or update the system if failure occurs to a properly installed system. A current signed maintenance contract must be submitted to the City of Hudson Oaks within 30 days of transfer of property. The owner must maintain and operate the facility as required by all City, State and Federal regulations. Signature of New Owner: Application Date:

AFFIDAVIT TO THE PUBLIC THE COUNTY OF PARKER STATE OF TEXAS According to Texas Commission on Environmental Quality Rules for On-Site Sewage Facilities, this document is filed in the Deed Records of Parker County, Texas. The Texas Health and Safety Code, Chapter 366 authorizes the Texas Commission on Environmental Quality (Commission) to regulate on-site sewage facilities. Additionally, the Texas Water Code (TWC), 5.013, gives the commission primary responsibility for implementing the laws of the State of Texas relating to water and adopting rules necessary to carry out its powers and duties under the TWC. The Commission, under the authority of the TWC and the Texas Health and Safety Code, requires owner's to provide notice to the public that certain types of OSSFs are located on specific pieces of property. To achieve this notice, the commission requires a deed recording. Additionally, the owner must provide proof of the recording to the OSSF permitting authority. This deed certification is not a representation of warranty by the Commission of the suitability of the OSSF, nor does it constitute any guarantee by the Commission that the appropriate OSSF was installed. An OSSF requiring a maintenance contract, according to 30 Texas Administrative Code 285.91(12) will be installed on the property described as (insert legal description):. Before me, the undersigned, personally appeared on who, after being duly sworn upon oath, states that he/she is the owner of record of the tract or parcel of land situated in Parker County, Texas, identified above. The undersigned further states that a surface application on-site sewage treatment system has been installed in accordance with the permitting provisions of the. The undersigned has entered into a continuous maintenance contract. All maintenance must be performed by an approved company, and a signed maintenance contract must be submitted to Parker County Deed of Records within 30 days after the property has been transferred. Further, the undersigned states that he/she will, upon any sale or transfer of the property, provide the new owner a copy of the planning materials for the OSSF. A copy of the materials can be obtained from Parker County Deed of Records or the City of Hudson Oaks. (Owner's Signature) WITNESS MY / OUR HAND(S) ON THIS DAY OF, 20. (notary seal) Notary Public, State of Texas / Printed Name My Commission Expires: ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- (DO NOT WRITE BELOW THIS LINE)