Rapide District, near Wrightstown, WI District_0001 View east from the canal toward Lock property District_0004 USACOE Survey Marker just north of dam District_0002 View west toward canal at upper end of Lock District_0005 View northeast toward upper gates and residence District_0003 View south toward Rapide Croche Dam District_0006 View northeast toward upper gates with new concrete barrier under construction in foreground 1
Rapide District, near Wrightstown, WI District_0007 View west-southwest toward upper gates District_0010 View east toward flywheels on the south side of the upper end of the lock District_0008 View north toward valve wall between upper gates and permanent AIS barrier (under construction) District_0011 View west toward flywheels on the north side of the upper end of the lock District_0009 View north towards tripod enclosure with shack and residence beyond District_0012 View east toward flywheels on the north side of the upper end of the lock 2
Rapide District, near Wrightstown, WI District_0013 View southeast toward concrete AIS barrier under construction WI_Outagamie County_Rapide District_0016 View west toward upper gate and sill WI_Outagamie County_Rapide District_0014 View south toward towards tripod enclosure at upper end of lock WI_Outagamie County_Rapide District_0017 View east toward lower gate showing canal walls District_0015 View west toward upper gate showing concrete lock walls District_0018 View east of lower gate 3
Rapide District, near Wrightstown, WI District_0019 View east toward canal with Fox River beyond District_0022 View northwest along the length of the lock with southeast tripod in foreground District_0020 View north toward concrete approach wall at lower gate District_0023 View north showing chamber wall and residence District_0021 View north toward top of lower gate with new concrete barrier under construction District_0024 View south showing AIS barrier under construction at lower end of the lock 4
Rapide District, near Wrightstown, WI District_0025 Date 1934 incised in poured concrete to mark the completion of construction; northeast corner of lock District_0028 View south toward chamber wall showing snubbing posts District_0026 View south toward lower gate with AIS barrier under construction District_0029 View north from across the lock toward keepers residence and shack District_0027 View south toward C.R. Meyer workers installing new concrete AIS barrier District_0030 View north of lock keepers residence showing principal facade 5
Rapide District, near Wrightstown, WI District_0031 View southeast of Lock keepers residence District_0034 View west of lock tenders shack District_0032 View southwest of lock keepers residence District_0035 View south of lock tenders shack District_0033 View east of lock tenders shack District_0036 View north into interior of lock tenders shack 6
Rapide District, near Wrightstown, WI District_0037 View north toward lock tenders shack showing detail view of light fixture District_0040 View north toward metal utility building with garage behind District_0038 View north toward concrete block utility building with residence behind District_0039 View east toward metal utility building 7