2. Project Implementation Agency: National Bureau of Statistics. 3. Date of the Procurement Plan Approval: June 12, 2018

Procurement Plan. 3. Proposed Procedures for CDD Components (as per paragraph of the Guidelines:

WATER AND SANITATION DEVELOPMENT PROJECT (WSDP) SUMMARY PROCUREMENT PLAN (first eighteen months)

Procurement Plan. Prior Review Threshold (US$) 1. ICB and LIB (Goods) USD 3,000,000 All 2. NCB (Goods and Nonconsultant prior review by the bank

PROCUREMENT PLAN (Textual Part)

Procurement Plan Governance and Policy Project for Federally Administered Tribal Areas (P156412)

PROCUREMENT PLAN (Textual Part)

PROCUREMENT PLAN (Textual Part)

Sample Procurement Plan

PROCUREMENT PLAN (Textual Part)

Procurement Plan Mozambique: P Greater Maputo Water Supply Expansion Project

Project: Rwanda Stunting Prevention and Reduction Project: P

PROCUREMENT PLAN (Textual Part)

Sample Procurement Plan

Public Disclosure Authorized

PROCUREMENT PLAN (Textual Part)

Contract Completed Contract Signed Procurement Ongoing

Sample Procurement Plan

Greater Beirut Water Supply Project Additional Finance Addendum to the Resettlement Action Plan

Prior Review Thresholds

Procurement Plan. I. General

I. General. II. Goods and Works and non-consulting services. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized

Procurement Plan. 3. Proposed Procedures for CDD Components (as per paragraph of the Guidelines: To Be Initiated.

Public Disclosure Copy

3 and above Less than 3 Less than 1 Recommended to advertise for 7 days for RFQ above 0.5

PROCUREMENT PLAN (Textual Part)

PROCUREMENT PLAN (Textual Part)

REPUBLIC OF MACEDONIA

Public Disclosure Copy

Sample Procurement Plan

Public Disclosure Copy

FROM RESIDENTIAL LICENSES TO FULL TITLE IN TANZANIA

CONTRACTING - BID LAWS

PROCUREMENT PLAN (Textual Part)

OVERVIEW OF HOUSING DEVELOPMENT CORPORATION, LONDON (HDC)

PROCUREMENT PLAN (P162086)

PROCUREMENT PLAN (Textual Part)

Developer Services. Sewerage Technical Team: Fees for April 2018

Development assessment and compliance fees 2010/11

Re-announced. Request for Quotation (RFQ)

Request for Proposal (RFP)

RP464 THE UNITED REPUBLIC OF TANZANIA MINISTRY OF WATER. Resettlement Policy Framework. for. Water Sector Development Programme.

Involuntary Resettlement Due Diligence Report. ARM: Water Supply and Sanitation Sector Project Additional Financing

Permit Expiration and Permit Renewal Fees. General Administration Fees

OFFICE OF THE CITY ADMINISTRATIVE OFFICER

STATEMENT OF WORK PORTABLE TOILETS & SEPTIC SYSTEM WASTE REMOVAL SERVICES

Public Facilities and Finance Element

LEMA MANAGEMENT PLAN PROPOSAL WITHIN THE BOUNDARIES OF THE WESTERN KANSAS GROUNDWATER MANAGEMENT DISTRICT NO. 1

PROPOSED SECRETARIAT FOR THE FOOTBALL ASSOCIATION OF ZAMBIA, LUSAKA

Revenue Summary Chart - Sewer Service Fees

UTTAR PRADESH JAL NIGAM

PRESSURE SEWER SYSTEM GUIDELINES

The World Bank Turkey Land Registration and Cadastre Modernization Project (P106284)

12. STAFF REPORT ACTION REQUIRED SUMMARY. Date: September 21, Toronto Public Library Board. To: City Librarian. From:

Date Received: Application Complete? YES / NO

Procurement Plan. I. General

The Federal Democratic Republic of Ethiopia MINISTRY OF WORKS AND URBAN DEVELOPMENT

STAFF REPORT. Financial Impact Statement There are no immediate financial impacts associated with the adoption of this report.

P420 PROCUREMENT, & DISPOSAL OF LAND AND ASSETS

Legislative Brief The Land Acquisition, Rehabilitation and Resettlement Bill, 2011

Unregulated water sales information pack Boneo GMU

Chapter 13 Fredericton - Moncton Highway

PROCUREMENT PLAN (Textual Part)

Land Information System as new instrument for Land Administration: Case Examples. Mike Cheremshynskyi Consultant, Land Administration Expert

Alternative Project Delivery Strategies for Expansion and Renovation

Implementation of a PPP Transaction in the Rural Water Sector in Uganda. IFC - PPP Transaction Advisory Dakar, June 4, 2012

Implementation Status & Results Brazil Santos Municipality (P104995)

SERVICE CONTRACTS (except for A/E professional services) AND PURCHASE CONTRACTS (purchasing apparatus, supplies, materials, or equipment)

Request for Proposals. Milton Reservoir Lease or License. Weld County, Colorado

Section 3 Right-of-Way

Implementing Agency Department of Housing, Ministry of Local Government, Urban Development, Housing and Environment

MAGRATH AND DISTRICT REGIONAL WATER SERVICES COMMISSION REGULATION

Second Land and Real Estate Registration Project. between KYRGYZ REPUBLIC. and INTERNATIONAL DEVELOPMENT ASSOCIATION

apply sustainability principles to all residential developments in Ardee;

NEW YORK CITY ECONOMIC DEVELOPMENT CORPORATION POLICY REGARDING THE ACQUISITION AND DISPOSITION OF REAL PROPERTY

Lease Renegotiation Status Report 2017

CHAPTER County of Alameda Onsite Wastewater Treatment Systems Ordinance

SUFFOLK COUNTY INDUSTRIAL DEVELOPMENT AGENCY

TOWNSHIP OF SOUTHGATE ASSET MANAGEMENT PLAN ROADS, BRIDGES, STORM, FACILITIES, WATER AND WASTEWATER ASSETS. In association with:

BROOKLYN BRIDGE PARK CORPORATION POLICY ON THE ACQUISITION AND DISPOSITION OF REAL PROPERTY. Board of Directors Meeting.

Project Information Document/ Integrated Safeguards Data Sheet (PID/ISDS)

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB3229 Project Name. Land Registry and Cadastre Modernization Project Region

Evaluating the award of Certificates of Right of Occupancy in urban Tanzania

$ 3, GST exempt minimum fee per application (up to 40 acres) DC Bylaw review (where no subdivision is provided for in the DC Bylaw)

WATER DUE DILIGENCE:

LAKE WORTH DRAINAGE DISTRICT OPERATING POLICIES TABLE OF CONTENTS

Valley View Sewer District Open House/Public Meeting

YESSO 18 Months Procurement

CITY OF HONDO, TEXAS REQUEST FOR PROPOSAL FOR REAL ESTATE BROKER SERVICES TO SELL CITY PROPERTY RFP#

Schedule 51: Consolidated Schedule of Tangible Capital Assets

Request for Proposals For Outdoor Advertising - Billboards. At the Following Locations. TelPosta Towers: Roof Top on Tower 2 (Kenyatta Avenue)

LOCAL AUTHORITY WORKS PART 8 - PROCEDURE

June 8, The Honorable Eric Garcetti Mayor, City of Los Angeles Room 300, City Hall 200 North Spring Street Los Angeles, CA 90012

TORONTO MUNICIPAL CODE CHAPTER 849, WATER AND SEWAGE SERVICES AND UTILITY BILL. Chapter 849 WATER AND SEWAGE SERVICES AND UTILITY BILL 1

QUESTIONS AND ANSWERS FOR: RFP# 13-34, RFP for Engineering Services for Gas Distribution System Improvements

Transcription:

I. General Plan 1. Project Information Country: Tanzania Project Name: Second Water Sector Support Project (WSSP II) Project ID: P150361 2. Project Agency: Ministry of Water and Irrigation Dar es Salaam Water Supply and Sewerage Authority Dar es Salaam Water Supply ans Sewerage Corporation 3. Date of the Plan: April 2017 4. Period Covered by this Plan: First 18 Months II. Thresholds for Review, Approaches and Methods A. Goods, Works and Non-Consulting Services Category Approaches and Methods (US$ millions) Review (US$ millions) Open International Open National Request for Quotation (RfQ) Works 10 15.0 < 15 0.2 Goods, IT, and nonconsulting services B. Consulting Services 2 5 < 5 0.1 Category Review Short List of National s (US$ million) (US$ millions) Consulting Services Engineering and Construction Supervision s (Firms) 1 0.3 0.3 Individual s 0.3 NA. NA. [Overall Project Risk is SUBSTANTIAL] Notes: Terms of Reference: Terms of Reference for all contracts shall be cleared by the Bank, regardless of whether the assignment is for prior or post review. Advertisement: Consultancy Service for Contracts estimated to cost US$ 300,000 equivalent and above per contract shall be advertised in UNDB online in addition to advertising in National News Paper(s) of wide circulation and/or Regional News Paper(s). 1

Page 1 PROCUREMENT PLAN Tanzania : Second Tanzania Water Sector Support Project General Information Country: Tanzania Banks Approval Date of the Original Plan: 2017-04-13 Revised Plan Date(s): (comma delineated, leave blank if none) 2018-05-21 Project ID: P150361 GPN Date: Project Name: Second Tanzania Water Sector Support Project Loan / Credit No:,, IDA / V0310 Executing Agency(ies): Dar Es Salaam Water Supply and Sewarage Authority, Ministry of Water and Irrigation, Dar es Salaam Water and Sewerage Corporation WORKS Draft Pre-qualification Draft Bidding Document Specific Bidding Documents as Proposal Submission / TZ-MOW-12669-CW-RFB / Drilling Works for Ground Water Monitoring Network in Wami- Ruvu and Internal Drainage Basins Resources Management (IWRM) 2017-09-01 2017-09-06 2017-10-18 2017-11-17 2017-12-22 2018-06-20 TZ-MOW-12670-CW-RFB / Construction of office and water laboratory buildings for Wami- Ruvu Basin Water Board (BWB) Headquarter at Morogoro and Water Users Association (WUA) Offices at Msowero and rehabilitation and extension of office building for Wami-Ruvu BWB in Dodoma. Resources Management (IWRM) 2018-06-04 2018-06-09 2018-07-21 2018-08-20 2018-09-24 2019-03-23 TZ-MOW-12671-CW-RFB / Civil Works Construction and Installation of Water Resources Monitoring Gauges in all the nine Basins in Tanzania Resources Management (IWRM) 2018-07-02 2018-07-07 2018-08-18 2018-09-17 2018-10-22 2019-04-20 TZ-MOW-12673-CW-RFB / Construction of Office Block for the Proposed Water Resources Centre of Excellency (COE) in Dar es Salaam Resources Management (IWRM) 2019-03-04 2019-03-09 2019-04-20 2019-05-20 2019-06-24 2019-12-21 TZ-DAWASA-6487-CW-RFB / Construction of water Supply Distribution Networks Part 1 from University Reservoir to Bagamoyo Request for Bids Open - International 0.00 Canceled 2017-02-28 2017-03-05 2017-05-04 2017-06-18 2017-07-23 2018-01-19 TZ-DAWASCO-10088-CW-RFB / Construction of water supply distribution network Part 1. (from University reservoir to Bagamoyo) Request for Bids Open - International 0.00 Canceled 2017-04-19 2017-04-24 2017-06-05 2017-07-05 2017-08-09 2019-01-31 TZ-DAWASCO-25524-CW-RFB / Construction of Water Supply Distribution Network Part I, from University Reservoir to Bagamoyo Town Request for Bids Open - International 2017-09-25 2017-09-30 2017-11-11 2017-12-11 2018-01-15 2019-07-09 TZ-DAWASCO-10084-CW-RFB / Construction of Decentralized Fecal Sludge Management (FSM) treatment (about 50 units@usd120,000 per unit starting with 10 units first phase)(c2-w04) 2018-05-15 2018-05-20 2018-07-01 2018-07-31 2018-09-04 2019-09-04 TZ-DAWASCO-10078-CW-RFB / Construction of Public toilets in selected areas (C2-W08) 2018-06-15 2018-06-20 2018-08-01 2018-08-31 2018-10-05 2019-04-03 TZ-DAWASCO-10079-CW-RFB / Construction of Condominium sewerage (about 250 houses/scheme (C2-W07) 2018-06-20 2018-06-25 2018-08-06 2018-09-05 2018-10-10 2019-10-10 TZ-DAWASCO-10081-CW-RFB / Construction of transfer stations (about 30 units@usd40,000 per unit) first phase (C2-W05) 2018-06-29 2018-07-04 2018-08-15 2018-09-14 2018-10-19 2019-10-19 TZ-DAWASCO-10083-CW-RFB / Construction of off-grid water supply small piped schemes to serve about 100,000 people @ USD 50 per capita (several packages-first phase) (C2-W06) 2018-06-27 2018-07-02 2018-08-13 2018-09-12 2018-10-17 2020-04-09 TZ-DAWASA-6497-CW-RFB / Construction of Mbezi Beach Waste Water Treatment Plant (Design and Build Operation) Request for Bids Open - International Y 2018-04-20 2018-07-06 2018-07-06 2018-04-25 2018-09-04 2018-10-04 2018-11-08 2020-05-01 TZ-DAWASA-55914-CW-RFB / Construction of Pumping station and Sewerage Network Request for Bids Open - International Review 2018-04-19 2018-04-24 2018-06-08 2018-07-08 2018-08-12 2019-11-10 TZ-DAWASCO-62380-CW-RFB / Dar es Salaam Performance Based Water Loss Reduction and Management Contract (C2- W02) Request for Bids Open - International Y 2018-05-18 2018-08-03 2018-08-03 2018-05-23 2018-10-12 2018-11-11 2018-12-16 2020-06-08 GOODS

Page 2 Draft Pre-qualification Draft Bidding Document Specific Bidding Documents as Proposal Submission / TZ-MOW-10924-GO-RFB / Supply of Water Users Associations Survival Working Kits Resources Management (IWRM) 2017-05-30 2017-06-04 2017-06-25 2017-07-25 2017-08-29 2017-11-27 TZ-MOW-11480-GO-RFB / Supply of eighteen four-wheel Drive Vehicles for the Basin Water Boards and MoWI's Division of WR. Resources Management (IWRM) 2017-07-03 2017-07-08 2017-08-07 2017-08-28 2017-10-02 2017-12-31 TZ-MOW-12602-GO-RFB / Supply of Motorbikes and Bicycles (100 of each) to support 100 WUAs Resources Management (IWRM) 2017-07-03 2017-07-08 2017-08-07 2017-08-21 2017-09-25 2017-11-24 TZ-MOW-12667-GO-RFB / Supply of office data management tools and equipment including ICT equipment Resources Management (IWRM) 2018-03-01 2018-03-06 2018-04-05 2018-05-05 2018-06-09 2018-09-07 TZ-MOW-12668-GO-RFB / Supply of Communication Strategy Materials Resources Management (IWRM) 2017-10-02 2017-10-07 2017-11-06 2017-12-06 2018-01-10 2018-04-10 TZ-MOW-12610-GO-RFP / Supply of water quality monitoring equipment and tools Resources Management (IWRM) 2017-07-01 2017-07-06 2017-08-05 2017-09-04 2017-10-09 2018-04-07 TZ-MOW-12605-GO-RFB / Supply of surface and groundwater monitoring network gauges monitoring instruments for large dams and sediment monitoring equipment Resources Management (IWRM) Request for Bids Open - National 2017-07-03 2017-07-08 2017-08-07 2017-09-06 2017-10-11 2018-04-09 TZ-DAWASCO-10124-GO-RFB / Supply of domestic water meters Request for Bids Open - National 0.00 Canceled 2017-04-20 2017-04-25 2017-06-06 2017-07-06 2017-08-10 2017-11-08 TZ-DAWASCO-10095-GO-RFB / Renewal of pipeline (pipes for network rehabilitation) 0.00 Canceled 2017-04-24 2017-04-27 2017-04-29 2017-06-10 2017-07-10 2017-08-14 2017-10-13 TZ-DAWASCO-25523-GO-RFB / Supply of PVC Pipes and Fittings for Network Rehabilitation 297,298.91 Under 2017-09-05 2017-10-06 2017-09-10 2017-10-22 2017-11-21 2018-04-18 2017-12-26 2018-03-26 TZ-DAWASCO-10121-GO-RFB / Supply of Billing equipment (this is specific to hand held meter reading/billing tools) 0.00 Canceled 2017-04-18 2017-04-27 2017-04-23 2017-06-04 2017-07-04 2017-08-08 2017-10-07 TZ-DAWASCO-15274-GO-RFB / Supply of Domestic Water Meters for Utility Modernization and Expansion of Water Supply Distribution System (Packages 2B & 2F) Request for Bids Open - National 0.00 Canceled 2017-05-24 2017-08-14 2017-05-29 2017-08-18 2017-07-10 2017-10-20 2017-08-09 2017-09-13 2018-01-11 TZ-DAWASCO-53619-GO-RFB / Supply of Domestic Water Meters for Utility Modernization and Expansion of Water Supply Distribution System (Packages 2B & 2F) (C2-G01) Request for Bids Open - National 2018-03-20 2018-03-25 2018-05-06 2018-06-05 2018-07-10 2018-11-07 TZ-DAWASCO-10122-GO-RFB / Supply and installation of SCADA System, i.e. Bulk meters, pressure meters, central station meters, telemetry for network management and clampon and acoustic equipment for leak detection (C2-G02) 2018-05-31 2018-06-05 2018-07-17 2018-08-16 2018-09-20 2019-03-19 TZ-DAWASCO-25525-GO-RFB / Supply of Data Loggers 0.00 Canceled 2017-09-05 2018-02-23 2017-09-10 2017-10-22 2017-11-21 2017-12-26 2018-03-26 TZ-DAWASCO-25525-GO-RFB / Supply of Data Loggers (C2-G03) 2018-03-20 2018-03-27 2018-03-20 2018-04-06 2018-04-17 2018-05-17 2018-06-21 2018-09-19 TZ-DAWASCO-54120-GO-RFB / Supply of PVC Pipes for Network Rehabilitation (C2-G05) 2018-03-16 2018-03-21 2018-04-11 2018-05-02 2018-06-01 2018-07-06 2018-10-04 NON CONSULTING SERVICES Draft Pre-qualification Draft Bidding Document Specific Bidding Documents as Proposal Submission / CONSULTING FIRMS Contract Type Combined Evaluation Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Technical Terms of Reference Report and Draft Signed Contract Contract Completion Notice Request for Proposals as Proposals / Minutes Proposal Negotiated Contract

Page 3 TZ-DAWASA-6490-CS-QCBS / for review of design and construction supervision of Mbezi Beach waste water treatment plant, pumping station and sewerage network Review 2017-02-14 2017-03-07 2017-04-04 2017-05-02 2017-06-01 2017-07-06 2017-08-10 2018-08-10 TZ-DAWASA-6494-CS-CQS / Preparation of ESIA and RAP for the Mbezi Beach Waste Water Treatment Plant Open - National 2017-02-28 2017-03-02 2017-03-14 2017-04-11 2017-05-02 2017-06-06 2017-12-03 TZ-MOW-10915-CS-QCBS / Modernizing Hydrological and Meteorological Monitoring Systems Resources Management (IWRM) 2017-03-30 2017-04-28 2017-06-02 2017-06-30 2017-07-30 2017-08-29 2017-10-03 2019-11-30 TZ-MOW-10921-CS-QCBS / Operational Decision Support System through Enhanced Hydro- Meteorological Services Resources Management (IWRM) 2017-04-11 2018-01-10 2017-05-12 2018-03-22 2017-06-16 2017-07-14 2017-08-13 2017-09-12 2017-10-17 2018-10-17 TZ-MOW-11533-CS-CQS / Technical Assistance for strengthening Ground water Resources Development and Management in Tanzania Open - National 2017-08-10 2017-08-31 2017-10-14 2017-11-13 2017-12-18 2018-06-16 TZ-MOW-11545-CS-CQS / Technical Assistance on Supporting of IWRMD at National and Basin Levels Open - National 2017-08-30 2017-09-20 2017-11-03 2017-12-03 2018-01-07 2018-07-06 TZ-MOW-11548-CS-CQS / Technical Assistance on Preparation of Water Resources Use Charges Regulations Open - National 2017-08-30 2017-09-20 2017-11-03 2017-12-03 2018-01-07 2018-07-06 TZ-MOW-11553-CS-CQS / Consultancy for Development and of Laboratory Information Management System Open - National 2017-09-20 2017-05-18 2017-10-11 2018-03-20 2017-11-24 2017-12-24 2018-01-28 2018-07-27 TZ-MOW-11558-CS-CQS / Consultancy for Conceptualization and strategic planning for COE Open - National 2017-11-30 2017-12-21 2018-02-03 2018-03-05 2018-04-09 2018-10-06 TZ-MOW-11854-CS-QCBS / Consultancy services for National Hydrological Aquifer Mapping Resources Management (IWRM) 2017-08-18 2018-01-10 2017-09-08 2018-03-22 2017-10-22 2017-11-19 2017-12-19 2018-01-23 2018-02-27 2019-02-27 TZ-MOW-11857-CS-QCBS / Operational Decision Support System Through Enhanced Hydro- Meteorological Services Resources Management (IWRM) Open - International 2017-10-05 2017-11-04 2017-12-18 2018-01-15 2018-02-14 2018-03-21 2018-04-25 2019-04-25 TZ-MOW-11864-CS-QCBS / Modernizing Hydrological and Monitoring Systems Resources Management (IWRM) Open - International 2017-07-27 2017-08-17 2017-09-30 2017-10-28 2017-11-27 2018-01-01 2018-02-05 2019-02-05 TZ-MOW-11875-CS-CQS / the study of institutional set up for water Resources Centre of Excellence Open - National 2017-05-25 2017-06-15 2017-07-29 2017-08-28 2017-10-02 2018-03-31 TZ-MOW-11878-CS-CQS / Design and Supervision for Centre of Excellence Building Open - National 2017-05-25 2017-06-15 2017-07-29 2017-08-28 2017-10-02 2018-03-31 TZ-MOW-11389-CS-QCBS / design review and supervision of construction of office and laboratory buildings for Wami- Ruvu Basin Water Boards Headquarter Morogoro and Water Users Associations Offices at Msowero and rehabilitation and extension at Dodoma Open - International 2017-09-05 2017-09-26 2017-10-24 2017-11-21 2017-12-21 2018-01-25 2018-03-01 2019-03-01 TZ-MOW-10918-CS-QCBS / Catchment Conservation in Wami- Ruvu Basin 2017-03-30 2017-04-28 2017-06-02 2017-06-30 2017-07-30 2017-08-29 2017-10-03 2018-10-03 TZ-MOW-12527-CS-QCBS / Institutional development support technical assistance COE Resources Management (IWRM) Open - International 2017-10-20 2017-11-10 2017-12-24 2018-01-21 2018-02-20 2018-03-27 2018-05-01 2019-05-01 TZ-MOW-12529-CS-CQS / preparation of future investments Resources Management (IWRM) Open - International 2017-07-03 2017-07-24 2017-08-21 2017-09-04 2017-10-09 2018-04-07 TZ-DAWASA-6480-CS-QCBS / Construction Supervision of Distribution Networks Part 1- from University Reservoir to Bagamoyo Open - International 0.00 Canceled 2017-02-14 2017-03-07 2017-04-04 2017-05-04 2017-06-03 2017-07-08 2017-08-12 2018-08-12

Page 4 TZ-DAWASCO-10055-CS-QCBS / Consultancy for Construction supervision of distribution networks Part 1 - From University Reservoir to Bagamoyo. Open - International 0.00 Canceled 2017-03-27 2017-04-27 2017-04-17 2017-05-04 2017-05-31 2017-09-08 2017-06-28 2017-07-28 2017-09-01 2017-10-06 2020-03-24 TZ-DAWASCO-28217-CS-QCBS / Supervision of Construction of Water Supply Distribution Network Part 1, from University Reservoir to Bagamoyo Town 2017-09-12 2017-09-12 2017-09-12 2017-10-10 2017-11-09 2018-02-20 2017-12-14 2018-01-18 2020-07-06 TZ-MOW-44490-CS-CQS / Consultancy services for Consolidation of Data, Information and Models from the IDA / V0310 IWRMD Plans and Preparation of Requirements Specification for WRIS & Web Portal Open - National 277,090.70 Signed 2018-01-18 2015-02-19 2018-02-08 2018-03-24 2015-10-06 2018-04-23 2016-12-21 2018-05-28 2016-12-23 2018-11-24 TZ-DAWASCO-10062-CS-QCBS Detailed Engineering Design, Bidding Documents and Off-Grid Water Supply Works in Dar es Salaam Open - National 0.00 Canceled 2017-10-18 2017-10-11 2017-11-08 2017-12-22 2018-01-19 2018-02-18 2018-03-25 2018-04-29 2019-04-29 TZ-DAWASCO-53652-CS-QCBS Detailed Engineering Design, Bidding Documents and Off-Grid Water Supply Works in Dar es Salaam (C2-C04) Open - National 2018-03-30 2018-04-20 2018-06-03 2018-07-01 2018-07-31 2018-09-04 2018-10-09 2019-10-09 TZ-DAWASCO-10066-CS-QCBS Detailed Engineering Design, Bidding Documents and Off-Grid Sanitation Works in Dar es Salaam Open - International 0.00 Canceled 2017-09-12 2017-10-03 2017-11-16 2017-12-14 2018-01-13 2018-02-17 2018-03-24 2019-03-24 TZ-DAWASCO-53675-CS-QCBS Detailed Engineering Design, Bidding Documents and Off-Grid Sanitation Works in Dar es Salaam (C2-C07) Open - International 2018-04-05 2018-04-26 2018-06-09 2018-07-07 2018-08-06 2018-09-10 2018-10-15 2020-10-15 TZ-DAWASCO-10065-CS-QCBS / NRW consultancy: asset management, hydraulic model, DMA installation for NRW management, NRW management Material Handbook, customer metering and billing (multiple) (C2 C06) Open - International 2018-08-06 2018-08-27 2018-10-10 2018-11-07 2018-12-07 2019-01-11 2019-02-15 2020-02-15 TZ-DAWASCO-53747-CS-QCBS / Consultacy servises for ESIA study for the 10 FSM in Dar es Salaam (C2-C08) Open - International 2018-05-30 2018-06-20 2018-08-03 2018-08-31 2018-09-30 2018-11-04 2018-12-09 2019-12-09 TZ-DAWASCO-53755-CS-QCBS / Consultacy services for ARAP /RAP study 10 FSM in Dar es Salaam (C2-C09) Open - International 2018-06-12 2018-07-03 2018-08-16 2018-09-13 2018-10-13 2018-11-17 2018-12-22 2019-12-22 TZ-DAWASCO-53757-CS-QBS / Consultancy services for preparation of specifications for SCADA system and TOR for NRW consultancy (C2-C10) Quality Based Open - National Review 2018-04-30 2018-05-21 2018-07-04 2018-08-01 2018-08-31 2018-09-30 2018-11-04 2019-01-03 TZ-MOW-54418-CS-QCBS / Consultancy Services on Water Resources Management Financing Options Resources Management (IWRM) 2015-02-03 2015-02-13 2015-09-23 2015-11-13 2016-02-10 2016-07-01 2018-12-15 2019-06-13 TZ-MOW-54421-CS-QCBS / Preparation of Integrated Water Management and Development Plan for Wami/Ruvu Basin Resources Management (IWRM) 2015-02-03 2015-02-13 2015-09-07 2015-11-12 2016-04-04 2016-12-21 2017-06-01 2017-11-28 TZ-DAWASCO-28457-CS-QCBS / Performance Improvement Program - PIP Consultancy (C2- C05) Open - International 2018-06-20 2018-07-11 2018-08-24 2018-09-21 2018-10-21 2018-11-25 2018-12-30 2019-12-30 INDIVIDUAL CONSULTANTS