Appendix F5 Reasonably Foreseeable Future Actions in Study Area

Similar documents
Appendix F5 Reasonably Foreseeable Future Actions in Study Area

Attachment C List of Parcels Potentially Affected

Bellevue Pacific Center Downtown Bellevue th AVE NE BELLEVUE, WA

PLANNING FOR NEW TRANSIT NODES IN BELLEVUE

Sunset Village SE 40th Place Bellevue, WA units Value-add opportunity

Jeanne Acutanza, PE President

BELLEVUE PACIFIC CENTER

Smart Growth in Mercer Island s Town Center

INVESTMENT or OWNER/USER OPPORTUNITY

Transfers of Property Q Sound Transit did not transfer any properties subject to RCW (1)(b) during the first quarter of 2018.

FAMILIES AND INDIVIDUALS

FOOTPRINT LIVING City of Oakland Pilot Program

AT BELLEFIELD TH AVENUE SE BELLEVUE, WASHINGTON Full Building Renovation Underway Soon at Mercer Pointe

BEAR CREEK. apartments

MEMORANDUM. Trip generation rates based on a variety of residential and commercial land use categories 1 Urban form and location factors the Ds 2

Building Livable Communities with Transit. Introduction to Financing Livable Communities. Portland Lindbergh City Center Case Study

Civica Office Commons TH AVE NE BELLEVUE, WASHINGTON

B. Subarea Provisions, including the Design Elements and Area of Special Concern and Potential Park/Open Space/Recreation Requirements;

MAPLE LEAF DEVELOPMENT SITE

Sound Transit s Office of Land Use Planning & Development Transit Oriented Development Quarterly Status Report Q2 2018

BUILDING 3. 85,876 Square Feet. Redmond Town Center Building NE 72nd Way Redmond, Washington 98052

6 NE 130TH STREET STATION TOD POTENTIAL

RESOLUTION NO. R To Acquire Real Property Interests Required for the Downtown Redmond Link Extension

EXCEPTIONAL HIGH TECH CLASS A OFFICE SPACE IN DOWNTOWN BELLEVUE 1100, 1110, TH AVENUE NE BELLEVUE, WASHINGTON

January 6, THE MARKET TALKS

TH AVE NE BELLEVUE, WASHINGTON

Offering Memorandum THE TIKI APARTMENTS Market Street Kirkland, WA. Exclusively offered by Paragon Real Estate Advisors

EXCEPTIONAL HIGH TECH CLASS A OFFICE SPACE IN DOWNTOWN BELLEVUE 1100, 1110, TH AVENUE NE BELLEVUE, WASHINGTON

BELLEVUE CORPORATE PLAZA COMPLETELY RENOVATED, CLASS A OFFICE TOWER IN DOWNTOWN BELLEVUE

Kirkland Research Center

6Roadway Closures / Limited Access Marine Corps Marathon Sunday, October 28 th, 2018

APPENDIX D: DEFINITIONS

Financing Transit Oriented Development Gerding Edlen Development Portland - Seattle - Los Angeles

East Link Light Rail Cost-Savings Ideas

PUBLIC NOTICE* Studies Requested: Parking analysis. Other Required Permits: Building Permit, Site Development Permit

EXPRESS LANES NORTHERN EXTENSION TECHNICAL REPORT SEPTEMBER 2016

SEATTLE DEVELOPMENT OPPORTUNITY

Available Office/Medical - Bellevue/Eastside

EXCEPTIONAL HIGH TECH CLASS A OFFICE SPACE IN DOWNTOWN BELLEVUE 1100, 1110, TH AVENUE NE BELLEVUE, WASHINGTON

THE NEWCASTLE DEVELOPMENT

Trenton Train Station Redevelopment Process. Applying the Principles of Successful Transit Oriented Development

TREASURE COAST REGIONAL PLANNING COUNCIL M E M O R A N D U M. To: Council Members AGENDA ITEM 9D

13 Major Nodes Introduction General

APARTMENT BUILDING DEVELOPMENT ST. LAURENT BOULEVARD OTTAWA, ONTARIO TIA SCOPING FORM. Prepared for:

Bellevue s Premier Office Location

Downtown Salt Lake City Proposed Arts and Cultural District

LIBERTY NORTHWEST CENTER

OTHELLO DEVELOPMENT SITE

Offering Memorandum LORRAINE APARTMENTS Franklin Ave E Seattle, WA. Exclusively offered by Paragon Real Estate Advisors

East Link Extension -- Bel-Red Segment Completion of Final Design Open House. September 16, 2014

Board of Supervisors' Agenda Items

STAFF SUMMARY OF S18-04 SPECIAL USE PERMIT APPLICATION

FAMILIES AND INDIVIDUALS

UV 1806 UV 1804 UV 6. Legend. B u r l e i g h C o u n t y. M o r t o n C o u n t y. Bismarck-Mandan MPO Study Area. M a n d a n.


Office, Industrial & Retail

Rezoning Petition Pre-Hearing Staff Analysis April 15, 2019

Building For Sale 401 Rainier Ave N Renton WA Offering Memorandum

The K E N S I N G T O N

ATTACHMENT C. Development Requirements

24-story, Class A Office Building Climate Control LEED Gold Certified Fire Life Safety Large, Efficient Floor Plates Elevators Ample Ceiling Height

Richardson s TOD Experience From ULI Panel Report to Breaking Ground. September 8, 2011

700 DEXTER SEATTLE, WA

ONE FLOOR REMAINING! FULL FLOOR AVAILABILITY 10,316 RSF

Bellevue s Premier Office Complexes. Over 4,000,000 RSF of interconnected Office, Retail & Hotels

A proposal that satisfies market, community, and financial needs. Market Community Financial

Bellevue s Premier Office Location

Bellevue s Premier Office Location

Bellevue s Premier Office Complexes. Over 4,000,000 RSF of interconnected Office, Retail & Hotels

Land Use Impacts of BRT

BOUTIQUE CLASS A OFFICE

III. PROJECT DESCRIPTION

Waterfront Project Summary ATTACHMENT 3

ENTERPRISE PARK AT CALVERTON (EPCAL)

VTA s BART SILICON VALLEY PROGRAM Phase 1 Berryessa Extension Project

YEAR ESTABLISHED OWNERSHIP STRUCTURE Professional Limited Liability Corporation. LICENSE Registered Architect, Washington State 1999

Cherokee Webster Development, LP. City of Webster, Texas Planned Development No. 3. Proposed Revision No. 4

5. Land Acquisition and Displacement

Bellevue s Premier Office Location

NORTH SEATTLE DEVELOPMENT SITE

Crown Pointe LAKE WASHINGTON BLVD NE KIRKLAND, WA

Bellevue s Premier Office Location

City of Cupertino AB 1600 Mitigation Fee Act Annual & Five Year Report for the fiscal years ending June 30, 2014 & 2015

Pittsburg Towne Center

VI. RESIDENTIAL DENSITY

KEY CENTER th Avenue NE Bellevue, Washington

REPORT OF THE PLANNING AND DEVELOPMENT DEPARTMENT FOR APPLICATION FOR REZONING ORDINANCE TO PLANNED UNIT DEVELOPMENT APRIL 21, 2016

STAFF REPORT FOR Z19-01 CONDITIONAL ZONING DISTRICT APPLICATION

8Land Use. The Land Use Plan consists of the following elements:

Economic Development Briefing for Advantis Real Estate Services Company. City of St. Petersburg Economic Development Department

NC 54/I-40 Corridor Master Plan Draft Land Use Blueprint

Plan Area and Current Facilities

Business Retention and Attraction

Downtown Development Focus Area: I. Existing Conditions

8.5.1 R1, Single Detached Residential District

DTLA RETAIL CONDOMINIUMS FOR SALE OR LEASE

Ref. No Task 3. May 31, 2016

THE WOODLANDS 100 UNIT MULTIFAMILY RENTAL TOWNHOME DEVELOPMENT SNOQUALMIE RIDGE, WA A SEATTLE SUBURBAN COMMUNITY

A p p e n d i x : B a c k g r o u n d I n f o r m a t i o n T a b l e o f C o n t e n t s

RARE EAST SIDE INVESTMENT OPPORTUNITY th Place NE Kirkland WA 98034

Transcription:

Appendix F5 Reasonably Foreseeable Future Actions in Study Area

Appendix F5 WSDOT SR 519 Intermodal Access Project, Phase 2; South Atlantic Corridor (WSDOT) The intent of these improvements to SR 519 is to separate car, freight, pedestrian, and rail traffic to improve traffic flow and reduce the risk of collisions. 2008 None I-90 Two-Way Transit and HOV Operations (WSDOT and Sound Transit) The project will provide full-time HOV lanes for eastbound and westbound traffic on the outer I-90 roadways and will retain the existing reversible lane operations in the center roadway (Implementation of Alternative R-8A). Stage 1 complete Stage 2 unknown Stage 3 unknown Hazardous materials, construction impacts, water resources SR 520 Bridge Replacement and HOV Project (WSDOT) Project to improve access and mobility from Seattle to Redmond. Unknown Parks, historic resources, Section 4(f), water resources, wetlands, fisheries, wildlife hazardous materials, visual I-405 NE 10th Street Extension (WSDOT) Phase 2 of the NE 10th Street Extension WSDOT will construction the portion of the bridge over I-405. Economic, visual, construction I-405 Bellevue Nickel Project SE 8th to I-90 (WSDOT) Addition of one new general-purpose lane in each direction along I-405 between SE 8th Street and I-90. Extend the southbound HOV lane from I-90 to SE 8th Street. Fisheries, hazardous materials, water resources, wetlands, wildlife, and construction SR 520 /West Lake Sammamish to SR 202 Project (WSDOT) Project to widen SR 520 in Redmond from two to four lanes in each direction and build a new ramp from westbound SR 202 to westbound SR 520. Fisheries, hazardous materials, water resources, wetlands, wildlife, visual and construction I-405 NE 8th Street to SR 520 Braided Crossing (WSDOT) Sound Transit ST2 City of Mercer Island Construct new structures to separate northbound traffic exiting to SR 520 from traffic entering I-405 in Bellevue. The project also adds a new eastbound collector distributor lane along SR 520 to separate the on- and off-ramps between I-405 and 124th Avenue NE traffic and a new on ramp at NE 10th Street to SR 520. Extends Central Link light rail to the north, south and east and increases bus and Sounder service. 2009 Environmental document in progress 2009 Project specific impacts to be determined Town Center District To support the development of the Town Center District as the primary urban center for Mercer Island. Currently being implemented Mercer Island Private Development Projects Aljoya at Mercer Island (ERA Living Senior Housing) 112 independent and assisted-living units 24,829 square feet resident amenities 7800 Plaza 9,181 square feet commercial 24 units 7700 Central 18,000 square feet retail 189 units In design East Link Project Draft EIS F5-1

Appendix F5 BRE 14,100 square feet commercial 165 units City of Bellevue Downtown Implementation and Subarea To support the development of downtown Bellevue as the primary urban center of the Eastside. For related development refer to Table F5-4. Document completed 2006, to be implemented Hazardous materials, right-of-way, utilities, wetlands, wildlife, and visual Bel-Red Corridor Project The proposed action is the adoption of amendments to various city planning documents to designate new land uses and identify supporting transportation improvements for redevelopment of the Bel-Red corridor. Document completed 2007, to be implemented Hazardous materials, right-of-way, public services, utilities, visual, and construction Bellevue Private Development Projects Ashwood II Senior housing, 168 units Belcarra Apartments 320 apartments 11,500 square feet retail Belletini Senior housing, 150 units 3,000 square feet retail Bellevue Place Hyatt Hotel 350 hotel rooms 130,000 square feet exhibition Bravern 1.5 million square feet office 240,000 square feet retail City Center East 700,000 square feet office and retail Washington Square 400 condos 2 levels retail Avalon Meydenbauer 368 apartments 80,000 square feet retail (Safeway) 1020 Tower 175 condos Retail, theater Ashwood Park Expansion Bellevue Towers 480 condos 22,500 square feet retail Group Health/Overlake 200,000 square feet Ambulatory Care Facility Tower 333 348,000 square feet office 14,500 square feet retail Vue Hanover 202 residential units 2,000 square feet retail Metro 112 300 apartments 25,000 square feet commercial Meydenbauer Inn 68 apartments F5-2 East Link Project Draft EIS

Appendix F5 Bellevue at Main Street 138 apartments 33,000 square feet retail Bellevue Plaza 800 residential units 16,000 square feet retail Euro Tower I 18 residential units Marriott Hotel 376 rooms The Summit Building C 300,000 square feet office Legacy Apartments 250 apartments, 11,000 square feet retail Odegard Bellevue Apartments 50 apartments 500 square feet commercial 8th Street Office Highrise 800,00 square feet office 10,000 square feet retail Vida Condominiums 241 residential units 8,000 square feet retail Ventana on Main 68 apartments Pacific Regent Phase II Senior housing, 168 units City of Redmond SR 520 and NE 36th Street Project (Redmond) Bear Creek Parkway Extension Project (Redmond) Microsoft and the City of Redmond have partnered to construct a bridge across SR 520 connecting NE 31st Street to NE 36 Street. This project will provide a route to bypass downtown Redmond. 2008 Environmental document in progress 2008 Hazardous materials, right-of-way, utilities, floodplains, wildlife, vibrations, visual, and construction Overlake Neighborhood Update and Implementation (Redmond) The updated Overlake Neighborhood includes land use changes and public investments for the Overlake Neighborhood through 2030. approved in 2007, implementation ongoing Utilities, water resources, wetlands, and visual Redmond Downtown Neighborhood The Downtown Neighborhood includes land use changes and public investment for the Downtown Neighborhood through 2022. approved in 2006, implementation ongoing Transportation, utilities, water resources, wetlands, and visual Redmond Private Development Projects Microsoft Expansion (Microsoft/Redmond) Microsoft is expanding its Redmond Campus to include an additional 3.1 million square feet of new office to accommodate an additional roughly 12,000 employees. East Link Project Draft EIS F5-3

Appendix F5 Group Health Property 665,000 square feet of office 190,000 square feet of retail 290 room hotel 1,445 residential units 5,152 parking stalls Master ning, 2008 Redmond River Park 316 apartments 145 room hotel 108,600 square feet office 18,800 square feet retail Cleveland Street West 135 condos 6,000 square feet retail Cleveland Street East 115 condos 6,500 square feet retail Portula ca 24 town homes Center Pointe 130 condos 15,000 square feet retail Tudor Manor 9 townhouses 2008 Perrigo Park 15 condos White Swan 38 condos 12,000 square feet retail Redmond Court 21 townhomes Parkside Apartments 60 apartments Joint City of Bellevue/City of Redmond Bellevue/Redmond Overlake Transportation Study (BROTS) (Bellevue/Redmond) The objective of BROTS is to jointly manage land use and traffic congestion in the Overlake neighborhood and Bel-Red Corridor. Ongoing; adoption of successor agreement targeted for 2008. N/A King County Redmond Transit Oriented Development 3-story parking garage 324 apartments 15,000 square feet retail None North Mercer-Enatai Interceptors Brightwater Reclaimed Water Pipeline ning Phase 2012 2030 To be determined Regional Wastewater Treatment t Water resources, geology, wetlands, parks, energy, construction F5-4 East Link Project Draft EIS