STATE UNIVERSITY of NEW YORK PROJECT CAPITALIZATION FORM (PCF) INSTRUCTIONS

Similar documents
POLICY 6600 CAPITALIZATION AND CONTROL OF ASSETS

CITY OF NORTH MANKATO CAPITAL ASSET POLICY ADOPTED: JANUARY 1, 2003 REVISED EFFECTIVE: _JANUARY 1, 2016

Capitalization and Depreciation Guidelines

Fixed Asset Management

County of Monterey. Capital Asset Policy

CALIFORNIA INSTITUTE OF TECHNOLOGY BUILDING AND LAND IMPROVEMENT CAPITALIZATION POLICY

FIXED ASSET PROCEDURES

EXHIBIT A FULL TEXT OF BOND PROPOSITION HILMAR UNIFIED SCHOOL DISTRICT CLASSROOM SAFETY, RENOVATION AND CONSTRUCTION MEASURE

SHARPSVILLE AREA SCHOOL DISTRICT

Administration s Finance Office Approval Date: 4/10/12 Effective Date: 4/10/12 Capital Assets and Property Review Date:

COLORADO STATE UNIVERSITY Financial Procedure Instructions FPI 4-1

Capitalization and Depreciation of Property, Plant, and Equipment

SUMMER VILLAGE OF YELLOWSTONE ACCOUNTING FOR TANGIBLE CAPITAL ASSETS CLASSIFICATION/CAPITALIZATION THRESHOLD/AMORTIZATION POLICY NO.

TOWN OF LINCOLN COUNCIL POLICY

The American University in Cairo. Financial Policies and Procedures

FISCAL POLICIES MANUAL... 1

CAPITAL ASSETS POLICY FOR THE VILLAGE OF FLOWER HILL. Section I. Capital Asset Definitions and Guidelines. I. (1) Overview

Diocese of Madison. Policy for Recording Capital Assets. A. Definition of Capital Asset. B. Categories of Capital Assets

Adopted: November 2013 MSBA/MASA Model Policy 704 Orig Revised: May 2015 Rev. 2009

No Surprises: What You Need to Know About the TPRs and Cost Segregation. Trent Baeckl, CPA Tax Senior Manager

NEBRASKA REAL ESTATE COMMISSION SELLER PROPERTY CONDITION DISCLOSURE STATEMENT Residential Real Property

Reg. Section 1.263(a)-3T(h)(3)(iii)(A) Amounts paid to improve tangible property (temporary).

Peters Township Sanitary Authority Capital Assets

Policy Title ACCOUNTING FOR TANGIBLE CAPITAL ASSETS

STATE OF SOUTH CAROLINA RESIDENTIAL PROPERTY CONDITION DISCLOSURE STATEMENT

Federal Rehabilitation Tax Credit

The Care and Keeping of Inventory and Fixed Assets

Managing Capitalization and Expense Depreciation

From Page 1 of form:

STATE OF SOUTH CAROLINA RESIDENTIAL PROPERTY CONDITION DISCLOSURE STATEMENT

TENANT DESIGN MANUAL UPDATED JUNE 2015

From Page 1 of form:

WASHINGTON SELLER S RESIDENTIAL PROPERTY DISCLOSURE STATEMENT

ADMINISTRATIVE MEMORANDUM COUNTY OF SAN MATE0

Vice President for Finance Policy/Procedure


University of Missouri System Accounting Policies and Procedures

Capital Asset Guidelines Update. Presented by Ben M. Riden, Jr., CPA,CGFM Christy Todd

TOWN OF SAN ANSELMO STAFF REPORT November 3, 2015

Page 1 of 5 Retrieval Number: 90,046

Version Date Comments / Changes 1.0 June 2006 Initial Policy Released 2.0 June 2012 Revised 3.0 November 2017 Revised

Account Code Definitions: Capital

Section: FS Financial Services. Department: Finance. FS-03 Tangible Capital Asset Policy. Policy Statement LEDUC COUNTY MUNICIPAL POLICY

Bedford County Board of Education

Be it enacted by the People of the State of Illinois,

TANGIBLE CAPITAL ASSETS

CONTRUCTION DISBURSMENT HANDBOOK MHDC MISSOURI HOUSING DEVELOPMENT COMMISSION 3435 Broadway Boulevard Kansas City, Missouri

Capitalization. POLICY OWNER: AVP for Finance and Controller

BUILDING PERMIT FEE ESTIMATE

Monroe County, Tennessee Property Tax Incentive Program Policies and Procedures

Seller s Property Disclosure Residential

NUMBER: A-7 SUBJECT: Controller APPROVED: Infrastructures Structures and. Software = 3 to. 5 years. capital asset. master file follows: should then

CITY OF PITTSBURG, KANSAS COMMUNITY IMPROVEMENT DISTRICT POLICY I. PURPOSE

Answers to Submitted Questions Request for Qualifications - TIF Scattered Site Rehabilitation Program Date: March 9, 2017

MUNICIPAL HOUSING REHABILITATION PROGRAM HANDBOOK

Capital Asset Accounting Policies POLICY STATEMENT

Capital Asset Procedures

SELLER S PROPERTY DISCLOSURE STATEMENT

LANE COUNTY BUILDING & ELECTRICAL PROGRAMS PERMIT FEE GUIDE

CAPITAL ASSET POLICY

TENANT DESIGN MANUAL UPDATED JULY 2016

Request for Proposal (RFP) Goodwill Industries of Greater Detroit (Goodwill) for OAKLAND COUNTY MICHIGAN WORKS! PONTIAC June 12, 2018

TENANT DESIGN MANUAL UPDATED JULY 2015

SCHOOL DISTRICT FIXED ASSET POLICY

OBTAINING A CERTIFICATE OF OCCUPANCY FOR UNAPPROVED DWELLING UNITS

PARISH OF ASCENSION OFFICE OF PLANNING AND DEVELOPMENT

Fee Resolution

CHARTER TOWNSHIP OF FENTON SEWER SYSTEM FINANCIAL OVERVIEW MARCH, 2018

LeaseAccelerator,Inc All Rights Reserved.

TENANT DESIGN MANUAL UPDATED JULY 2015

SELLER DISCLOSURE STATEMENT IMPROVED PROPERTY

BUILDINGS, LAND AND LAND IMPROVEMENTS

CAPITALIZATION POLICY

From Page 1 of form:

MILLER BUILDINGS, INC.

OREGON SELLER S PROPERTY DISCLOSURE STATEMENT

Planning&Development Fee Standards

Chicago Public Schools Policy Manual

TENANT DESIGN MANUAL UPDATED JULY 2015

I. Project Administration

TENANT DESIGN MANUAL UPDATED JULY 2015

TENANT DESIGN MANUAL UPDATED JUNE 2015

ES Tenant Relocation or Closeout

City of Wausau Building, Housing and Zoning Fee Schedule 2019

Final Repair Regulations and the Impact on Owners of Investment Real Estate

New Hope-Solebury School District Campus Revitalization Plan

Subject: Class: Number: ( ) Complete Revision Supersedes: Page:

Marshall & Swift SwiftEstimator

CAPITAL ASSETS. POLICY No

CAPITAL ASSETS MVECA. Presented by: Larry Weeks, CPA

TENANT DESIGN MANUAL UPDATED AUGUST 2015

NEBRASKA INVESTMENT FINANCE AUTHORITY LOW INCOME HOUSING TAX CREDIT PROGRAM COST CERTIFICATION PROCEDURES MANUAL

Accounting for Leases

Section 10 PHYSICAL FACILITIES

CONSTRUCTION DISBURSEMENT GUIDE MHDC 2400

INFORMATION GUIDE SECOND DWELLING UNITS BUILDING CODE BASICS

Understanding Mississippi Property Taxes

SOUTH VILLAGE TAX INCREMENT FINANCING DISTRICT (TIF) COMMERCIAL REHABILITATION PROGRAM GUIDELINES & APPLICATION

GENERAL INFORMATION. Landlord s Tenant Coordinator

JACKSONVILLE HOUSING FINANCE AUTHORITY

Transcription:

The Project Capitalization Form should be used for all capital projects on State University (SUNY) capital assets where design and construction costs are $100,000 or greater, and for all building and land acquisitions. Capital assets, as referred to within, include buildings, structures, land and land improvements, and infrastructure. See SUNY Capitalization Policy for additional information on capitalization criteria. This form should be completed when a capital project is substantially complete, the asset is placed in service (beneficially occupied), and project costs are known and/or can be reasonably estimated. Upon completion, this form should be submitted via email to PCF@sysadm.suny.edu or hardcopy to: Office of the University Controller SUNY Plaza, Room N528 Albany, N.Y. 12246 Fax: (518) 320-1544 Submission of this form will NOT close out financial accounts. Outstanding payments can still be processed for the project. For projects funded by State University Construction Fund (SUCF) appropriation, the Account Closeout (Attachment G) form must be sent to SUCF to close out financial account(s) associated with this project. When the project is funded by multiple funding sources, this form should be completed using the project number assigned by SUCF if any educational facility capital appropriations are used and associated project numbers should be listed below for other funding sources (e.g. DASNY and local campus operating or IFR). The form should include all expenditures for the project regardless of funding source. The funding amounts should correspond to the expenditures in each project account to support the total expenditures on the project (unexpended costs may be estimated). The Project Capitalization Form is in Excel format and is user friendly for entering data. Upon opening the document the cursor will be positioned at the start of the first field Campus. Use the "TAB" or arrow keys to move between fields on the form. Dollar amounts and percentages should be entered in whole numbers (without a decimal point). Specific instructions and definitions of the information required on the form are described below. Campus: Enter campus name. Campus Code: Enter appropriate SUNY campus code. (28xx0) Project Number: Enter project number assigned to project by SUCF (SUCF appropriations) or campus Facilities Department (locally funded) or DASNY (project number for DASNY administered projects). Associated Project Number(s): If the project is funded from multiple funding sources enter all associated project numbers used for this project (e.g., DASNY, local campus operating, and/or IFR funds). Project Title and Description: Enter name of project and a brief description. Include building name, type of work, or other associated projects, if appropriate. Rev 03/2018 Page 1

1. Project Type: Check appropriate box based on description below. New Construction - construction of a new building or structure, land improvement or infrastructure (i.e., capital asset) which did not previously exist. This does not include additions to existing capital assets. Rehabilitation - construction performed on an already existing capital asset to enhance its usefulness or extend its useful life. This also includes replacement of destroyed portions. Improvement (Addition) - adding a new component, additional space or costs incurred that will result in an asset performing functions that it previously did not perform (e.g., addition of air conditioning to a facility that was not previously air conditioned). Demolition - demolition of an existing capital asset as a stand-alone project. When a project includes demolishing a structure to make room for a new structure, the demolition costs should be included in the site preparation costs of the new structure and the New Construction box should also be checked. Acquisition - purchase of a capital asset including building(s), infrastructure, land, or land with an existing building(s) and infrastructure. 2. SUNY Chart Account Number(s): Enter all SUNY chart account numbers, including subaccounts that will be used for this project. Account numbers should be 8 digits (xxxxxx-xx). Not applicable for DASNY administered projects. 3. Design and Construction Cost Allocation: The cost of the design and construction of the project (exclude moveable equipment) should be allocated in percentages to its appropriate category. Percentages should be in whole amounts and total to 100% for all buildings. If more than three buildings are covered by this project, use the additional sheet (tab in Excel file called Add Bldgs ) and transfer the total component breakdown for all buildings to this form. a. Building Information: Enter building number(s) associated with the project if work is being performed on a building. This should be the building number from AiM Property Management System. The work performed on the building(s) should be broken down by component for each building. Component definitions are as follows: General Construction- basic construction components, such as foundation wall, interior foundations, slab, framing, exterior wall and structural floor. Site Preparation- excavation, clearing, grading, and filling. Roof - roof covering materials and roof drainage. Interior Construction- interior finish - floor and ceiling finish, partition materials, etc.. Heating, Ventilation and Air Conditioning (HVAC) - systems for heating, ventilating and cooling the building (e.g., furnace, boiler, rooftop units, etc.). Rev 03/2018 Page 2

3. Design and Construction Cost Allocation, building information, continued: Plumbing- general plumbing, fixtures and installation of sinks, lavatories, drinking fountains, bathtubs, showers, water heaters, water closets, etc.. Electrical- wiring, lighting, etc.. Fire Protection and Safety- sprinkler systems, fire alarm systems, fire detection systems, etc. Elevators- elevators and elevator landings. Environmental Remediation (qualifying for capitalization): Clean-up to prepare property for sale, to prepare property for use when the property was acquired with known or suspected pollution that was expected to be remediated, to restore a pollution-caused decline in service utility that was recognized as an asset impairment or acquired capital assets that a have future alternative use. (Please complete questionnaire within PCF tab Enviro Remed) Miscellaneous- all other building project costs that cannot be allocated to any other component (excludes Furniture, Fixtures and Equipment (FF&E)). b. Land Acquisitions: For acquisitions consisting of land and building(s), the building cost and land cost must be segregated and reported appropriately. The cost of land should include the costs of closing the transaction and obtaining title, including commissions, surveys, legal fees, title search, insurance, taxes, etc. Please indicate acreage and description, including intended use. c. Infrastructure: Infrastructure assets are defined as long-lived capital assets that normally are stationary in nature and can be preserved for a significantly greater number of years than most capital assets. Examples include roads, bridges, tunnels, drainage systems, water and sewer systems, and heat, electrical and gas distribution systems. d. Land Improvements: Land improvements include parking lots, retaining walls, fencing, outdoor lighting, outdoor athletic fields, and other non-building improvements. If more than one is listed, please provide the breakdown by percentage for each Land Improvement. (Refer to Tab for multiple Land Improvement breakdown). e. Non-qualifying Items: Non-qualifying improvements include such items as routine repairs and maintenance, painting, stand-alone studies that are not allocated to specific projects and exclusions determined on an individual project basis. f. Non-Qualifying Environmental Remediation: An example of a non-qualifying environmental remediation project would be the clean-up of a spill or leak, such as soil refinement or water purification, to return the asset to its original state when acquired or Rev 03/2018 Page 3

built (unless it is done in preparation for sale of the asset). Also, it includes treatment of environmental contamination such as asbestos removal, air monitoring, or lead paint removal. NOTE: Percentages (Costs) assigned to items e. and f. for non-qualifying items will be excluded from the total capital asset amount. Therefore, please be accurate when assigning these percentages. 4. Funding Source: Funding sources for the project should be included as defined: Educational facilities capital appropriation - Funding from SUCF State capital appropriated funds (002 and 384 funds). Dormitory capital appropriation - Funding for Residence Halls from Bonds issued through the Dormitory Authority of the State of New York (DASNY). Hospital capital appropriation - Funding for Hospitals from SUCF State capital appropriated funds (002 and 384 funds). Local campus operating and income fund reimbursable (IFR) - Funding from state appropriations and self-supporting funds. SUNY fund numbers: 00300 State Purpose 007xx Member Items 34510 State University Income Fund Reimbursable 34531 Stabilization Fund 34547 State University Tuition Reimbursement Account (SUTRA) Dormitory operating & IFR (DIFR), Rehab and Repair - Funding from Residence Hall selfsupporting funds. SUNY fund numbers: 33947 Dormitory Income Fund Reimbursable 074xx Dormitory Rehab and Repair Fund Hospital operating & IFR (HIFR) - Funding from Hospital self-supporting funds. SUNY fund numbers: 34522 Hospital Operations 34546 Hospital Income Fund Reimbursable Research Foundation - Funding from Research Foundation accounts. Federal Funding - Funding from Federal Grants. Auxiliary Services Corporation (ASC) - Funding from the ASC. Campus should note whether the monetary contribution from the ASC was a gift to the campus or whether it was part of a leasehold agreement that the ASC is going to capitalize as an asset on their balance sheet. Campus Foundation - Funding from the Campus Foundation. Campus should note whether the monetary contribution from the Foundation was a gift to the campus or whether it was part of a leasehold agreement that the Foundation is going to capitalize as an asset on their balance sheet. Rev 03/2018 Page 4

Other - Includes funding from alumni associations, student associations, NYPA, NYSERDA, Economic Development Agencies, grant funds, or any other third party including matching fund programs (please identify source). 5. Beneficial Occupancy/Physical Completion Date: Enter the date the project is substantially complete or placed in service (beneficially occupied). This may occur prior to final payment or the release of retention funds on a project. 6. Total Project Cost: If all project expenses have been incurred and recorded, no estimating is necessary, use the actual costs. a. Equipment in RAMI (Real Asset Mgmt Info Sys) if equipment is included on this line, please provide the asset number(s) associated with this project that were entered into the SUNY RAMI System (10 positions). There is an additional Tab for multiple assets to be entered. If not entered in the system, please provide a brief description of the type of equipment along with an explanation (i.e. furniture; chairs, tables-below the capitalization threshold, etc). b. If all costs for the project have not yet been disbursed, the total project costs should include all disbursed amounts plus an estimate of the costs to complete the project. Also, please reference the estimated future disbursement amount in the Estimated costs to complete included in Total Project Costs box. Contact Information - Please type contact name, date, e-mail, and other information as requested at the bottom of the form prior to submitting. Rev 03/2018 Page 5