Major Remodel Checklist (Please see attached flow charts for clarification of review and approval steps)

Similar documents
Minor Remodel Checklist

ADMINISTRATIVE REVIEW FOR AN ACCESSORY DWELLING UNIT

For and in consideration of the mutual covenants set forth in this Agreement, Association and Owner hereby agree as follows:

REQUEST FOR ALTERATION REVIEW VERANDA GARDENS HOMEOWNERS ASSOCIATION, INC.

Waterford Owners Association Construction Guidelines

Your Homeowners Association Property Improvement Handbook

GENERAL PLANNING APPLICATION FORM

EXCERPTS FROM SERAFINA GOVERNING DOCUMENTS

EXHIBIT "A" THE PRESERVE AT WILDERNESS LAKE COMMUNITY DEVELOPMENT DISTRICT 5844 Old Pasco Road, Suite 100, Wesley Chapel, Florida 33544

(voice) (fax) (voice) (fax) Site Plan Review

PLANNING APPLICATION FORM RESIDENTIAL

Special Land Use Permit Application Economic Development License Planning Division. Form will not be processed until it is completely filled out.

Spring Valley Property Owners & Recreation Corporation Policy #330: Architectural Control Committee Rules & Regulations Policy Page 1 of 6

SUBDIVISION APPLICATION

ARCHITECTURAL PROJECT APPLICATION

The Following Guidelines are to be used in conjunction with the Deed Restrictions for Rotonda West.

Accessory Dwelling Unit Permit

Development Related Fee Schedule Effective May 1, Plan Reviews. Remodeling, Alterations, Additions Residential and Commercial

PATIO PERMIT REGULATIONS

CROSSWATER CONDOMINIUM OWNERS ASSOCIATION

Center Township Department of Building Safety 150 Henricks Road, Butler, PA Phone: Fax:

Site Plan Application

ARCHITECTURAL PROJECT APPLICATION

Directions For Filling Out A CAMA MINOR Permit

ADC PROJECT APPLICATION

APPLICATION for MINOR SUBDIVISION REVIEW for CONCEPT and FINAL PLAT within COALVILLE CITY. Project Name: Project Address or Area: Name of Owner:

ADDITION/REMODEL APPLICATION CHECKLIST 2017 FBC. Please make sure you have ALL required copies before submitting permit application

Development Related Fee Schedule Effective May 1, Plan Reviews. Remodeling, Alterations, Additions Residential and Commercial

Planned Residential Development ( PRD ) Application

Charter Township of Garfield Grand Traverse County

ARTICLE 9 SPECIFICATIONS FOR DOCUMENTS TO BE SUBMITTED

Zoning Permit Application Information Sheet

9. Public (Federal, State, or local

HOMEOWNERS ASSOCIATION OF EAGLE CREEK, INC. ARCHITECTURAL REVIEW BOARD REQUEST FORM INSTRUCTIONS

BUILDING & INSPECTIONS DIVISION 200 East Wood Street Palatine, IL Telephone (847)

Revised Reroof Checklist

City of Midland Application for Site Plan Review

ARTICLE XXIII ADMINISTRATION

WINDWARDS HOMEOWNERS ASSOCIATION ARCHITECTURAL GUIDELINES

Lakewood at Darby Architectural Review Committee. Approvals Process

RESOLUTION NO NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF SATELLITE BEACH, BREVARD COUNTY FLORIDA, as follows:

SWYGERTS LANDING CODE. The resource for all Architectural Review Board related items.

Appendix A - REQUIRED PLAT CERTIFICATES... A-1

Pool Cage Application Packet

CHECKS PAYABLE TO: PGA/POA (Only cash and checks are accepted as payment)

TOWN OF MELBOURNE BEACH 2016 DEVELOPMENT APPLICATION

APPENDIX A BUILDING PERMIT AND RELATED FEES

SUBMITTAL REQUIREMENTS: The number indicates the number of copies for submittal (if applicable).

Silver Lakes Ranch Design Guidelines

MOUNTAINSIDE HOMEOWNERS ASSOCIATION Architectural Change Request Application Cover Letter to Homeowners

Development Related Fee Schedule Effective May 1, Plan Reviews. Remodeling, Alterations, Additions Residential and Commercial

FY 2018 FEE SCHEDULE (Effective )

NOTE TO ALL VARIANCE APPLICANTS:

ZONING BOARD OF ADJUSTMENT BOROUGH OF MOUNTAIN LAKES, NEW JERSEY. CHECKLIST Section 40-22

APPLICATION PROCEDURE

BUILDING PERMIT INSTRUCTIONS CONTRACTOR

ZONING & BUILDING PERMIT AND SUBDIVISION & LAND DEVELOPMENT PLAN MASTER FEE SCHEDULE PER RESOLUTION No

Town of Jamestown Single/Two-family Residential. Building Permit Application Packet

CITY OF ESCONDIDO Planning Division 201 North Broadway Escondido, CA (760) Fax: (760)

9. STORAGE TANKS No fuel oil or other above ground outside storage tanks shall be erected, maintained or utilized on any lot.

TOWN OF HILLSBOROUGH

Issaquah Highlands Architectural Improvement Application

Conditional Use Sketch Plan Application Non-Residential Zone

Plat Checklist PLAT TYPES AND DESCRIPTIONS

CONDITIONAL USE PERMIT (CUP)

ARCHITECTURAL CONTROL COMMITTEE SUBMITTAL REQUIREMENTS Submit to Teri Edwards at (O)

APPLICATION. Telephone Fax Address. Telephone Fax Address FOR MARTIN COUNTY USE ONLY

ZONING AMENDMENT, PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: August 8, 2013

(a) Commercial uses on Laurel Avenue, abutting the TRO District to the

BEACH STORM DAMAGE REDUCTION EASEMENT

Condominium Unit Requirements.

HISTORIC PRESERVATION AND DESIGN REVIEW BOARD ("HP-DRB")

BUILDING PERMIT APPLICATION

Point Aquarius Property Owners Association Architectural Control Committee REQUEST FOR ARCHITECTURAL CONTROL COMMITTEE APPROVAL

TOWN OF ROME 1156 ALPINE DR. NEKOOSA, WI (715)

Zoning Permit Application Cover Page

SITE DEVELOPMENT PLAN REQUIREMENTS CHECKLIST

CITY OF PANAMA CITY BEACH Building and Planning Department

CUMBERLAND RIDGE SUBDIVISION COVENANTS, RESTRICTIONS AND CONDITIONS PHASE VI. 2 nd Draft

Zoning Permit Application

4. Building plans should include top of foundation elevation

SHORT PLAT Information

MAJOR RESIDENTIAL AND NONRESIDENTIAL SUBDIVISIONS

DETAILED GRADING PLAN CHECKLIST (TEARDOWN/REDEVELOPMENT)

ARTICLE 5 GENERAL REQUIREMENTS

LAKE REYNOVIA Architectural Rules and Regulations

~ Please Detach and Save This Page ~

MAJOR RESIDENTIAL AND NONRESIDENTIAL SUBDIVISIONS

DECLARATION OF RESTRICTIONS AND EASEMENTS OF OAKWOOD MEADOWS SUBDIVISION

CITY OF LITTLE FALLS BUILDING PERMIT APPLICATION ALL BUILDING PERMITS ARE GOOD FOR ONE YEAR

MANDATORY HOA DISCLOSURE SUMMARY FOR LONE STAR RANCH SINGLE FAMILY HOMES

LAND USE PERMIT APPLICATION

ARCHITECTURAL CONTROL COMMITTEE CANYON LAKE PROPERTY OWNER S ASSOCIATION IMPROVEMENT APPLICATION FOR PLAN APPROVAL TRACT LOT PHONE:

EAST COCALICO TOWNSHIP BUILDING / ZONING PERMIT PROCEDURE AND GENERAL NOTES Revised 6/12/2012

FENCE and or POOL BARRIER CHECKLIST

STATE OF NORTH CAROLINA * * DECLARATION OF RESTRICTIONS * OF CAROLINA SANDS, SECTIONS 1 and 2 COUNTY OF NEW HANOVER *

Plan and Zoning Commission Review Process

SECTIONS 1 THROUGH 4, SECTION 4-A, SECTIONS 5 THROUGH 11, SECTIONS 11-A AND 11-B, SECTIONS 12 THROUGH 17, SECTION 17-A, AND SECTIONS 18 AND

DEPARTMENT. A Current Contractor Listing: If the contractor is pulling the permit, they must be listed with the County

TOWN OF NEW SHOREHAM ZONING BOARD OF REVIEW APPLICATION PROCEDURE

Transcription:

Major Remodel Checklist (Please see attached flow charts for clarification of review and approval steps) SUBMITTAL FOR LOT VILLAGE OWNER A. Step One A: ARC Conceptual Design Review Please submit the following: Conceptual design and survey in both electronic format (pdf) and 24 x36 (minimum size) hard copy sheets. Copies must be submitted to the ARC office. Please refer to the Design Guide and Covenants for additional details. 1. SGPOA Application for ARC Approval of New Home Construction and Major Remodeling: Completed and signed by owner(s) and contractor 2. Non-Refundable Application Fee: Payable to SGPOA 3. New Home Construction Step One A Checklist: Initialed by owner/owner representative 4. Photographs: Multiple photographs of the lot including views of the buildable area, adjacent existing homes or structures and existing landscaping. Include a key to location and direction 5. Boundary & Topographical Survey: Survey by surveyor licensed to practice in the State of FL identifying current easements and all setbacks, major vegetation/plant massing, plus all trees three inches or greater in diameter 6. Site Plan (min. scale 1 = 20 ): Proposed building site overlay and footprint on Boundary & Topographical Survey. Location within setbacks of proposed driveway, porches, walks, boardwalks (if any), pool (if any), waste treatment system, trash receptacle enclosure, HVAC systems and other planned exterior equipment (with required screening) clearly indicated 7. Elevations: Conceptual drawings of all 4 elevations 8. When applicable: Location of regulatory setbacks, if any 9. Proposed List of probable siding and roofing materials, color 10. Any photos to illustrate the design intent 11. Other materials that owner or architect wish to submit (optional) ARC will review conceptual design for compliance with SGPOA Covenants and Design Guide ARC will issue written report to Owner within five (5) Full Business Days of ARC meeting IMPORTANT NOTE: Completion of all steps of the review and approval process is expected to take approximately three months depending on number of changes requested and response time for required changes. Any delay in supplying all requested items on this checklist will delay the progress of your review. Owner/Owner s Representative and Date 1712 MAGNOLIA ROAD, ST. GEORGE ISLAND, FL 32328 (850)927-2312 FAX (850)927-3039

Major Remodel Checklist (Please see attached flow charts for clarification of review and approval steps) B. Step One B: CRA Preliminary Design Review A set of 100% Construction Documents: The drawings should be delivered/transmitted to the ARC office in a 24 x 36 sheet format, 11 x 17 sheet format, and electronic PDF file format. 1. SGPOA Performance Deposit Agreement: Completed and signed by Owner(s) 2. Performance Deposit: Payable to SGPOA 3. New Home Construction Step One B Checklist: Initialed by owner/owner representative 4. Boundary & Topographical Survey: 5. Clearing and Coverage Calculations: Certified by a licensed professional Existing and proposed grades 6. When applicable: Location of wetland buffers and the Critical Habitat Zone; calculation of Critical Shoreline District Zone coverage 7. Site Plan and Site Plan Additions: (minimum scale: 1 = 20 ) Location of temporary chemical toilet and construction trash receptacle Major existing vegetation and any planned construction disturbances to same Proposed new landscaping shown on survey site plan with plant type, count and size noted Existing and proposed grades, including any required retaining walls Residence Occupants/Visitors parking plan Construction parking plan 8. Exterior Materials and Finishes Data Sheet: Include color and material samples of siding, roofing, all proposed colors; detail sheets on handrails, pool, pool fencing (if applicable), shutters, hardscape finishes and materials 9. Construction Documents: One set in an electronic PDF file must be delivered/transmitted to the ARC office and must include the following: Dimensioned floor/decking plans at minimum ¼ = 1 Exterior building elevations at minimum ¼ = 1, showing finish materials, roof slopes and heights; notate all materials A minimum of two (2) building sections at minimum ¼ = 1, which clearly illustrate heights. Verification total building height does not exceed 47 from lowest average natural grade to highest point Minimum one wall section (minimum ¾ = 1 scale) cut through a window, showing and noting construction details Under house screening, all equipment screening and trash receptacle screening detail Exterior lighting plan: locations and image of proposed light, showing finish Structural drawings, including foundation, signed and sealed by a Florida Licensed Engineer Additional drawings and information for free standing elements: Landscape plan, wastewater plans, gazebos, dune walkover, hardscape improvements with finish materials and color; pool (if applicable) with finish materials and colors. CRA will issue written report of recommendations to SGPOA ARC staff within ten (10) Full Business Days of receipt of all listed documents. This initial report may require owner changes and revisions. Owner/Owner s Representative and Date 1712 MAGNOLIA ROAD, ST. GEORGE ISLAND, FL 32328 (850)927-2312 FAX (850)927-3039

Major Remodel Checklist (Please see attached flow charts for clarification of review and approval steps) C. Step Two: ARC Committee Final Review Submit CRA approved construction drawings to ARC staff at least seven (7) business days prior to scheduled ARC meeting. If final CRA approved documents and all required documentation are received in the ARC office at least seven (7) business days prior to the next scheduled ARC meeting, the plans will be reviewed for action at the next scheduled ARC meeting. If the documents are not submitted within seven business days (7), the documents will be held until the following month s ARC meeting. The ARC will either approve the submittal and issue an approval letter for construction to begin or make recommendations for changes. If minor changes are requested by the ARC and agreed to by the owner, the ARC may approve the changes at the current meeting with the contingency of final ARC sign-off before issuing the approval letter. Once the approval letter has been received by the owner, the contractor must submit a final revised set of signed and sealed documents to the ARC and CRA prior to acquiring any permits or beginning construction. Final construction documents must be signed and sealed by a US licensed architect, with structural plans signed and sealed by a Florida licensed engineer. All steps of the review and approval process are expected to take approximately three (3) months, depending on number of changes requested and response time for required changes. Any delay in supplying all requested items will delay the progress of your review. D. Before Construction Begins: In addition to the final signed and sealed construction plans, all required permits must be supplied to the SGPOA office prior to commencing any work on site. E. After Construction Begins: Required Inspections & Sealed Certifications Please note: Any desired field changes must be immediately discussed with and approved by the ARC before being implemented. 1. Piling Installation: Certification required from owner s architect, surveyor or engineer that pilings have been located as shown on approved plans 2. Building Height: Certification required from FL licensed surveyor upon completion of framing certifying height from lowest natural grade elevation along the building perimeter to the highest point of the building 3. Framing Certification: Certification required from owner s builder that framing has been constructed in accordance with approved plans 4. Final Inspection: Owner must submit to the ARC office a copy of Franklin County Certificate of Occupancy, an As Built Final Survey signed by a surveyor licensed in FL and a clearing calculation certification of compliance with approved clearing percentage signed by a licensed professional. Owner must request a final CRA site review to be scheduled. F. Performance Deposit Return: The Performance Deposit will be returned according to section 6 of the Performance Deposit Agreement. 1712 MAGNOLIA ROAD, ST. GEORGE ISLAND, FL 32328 (850)927-2312 FAX (850)927-3039

ARC Approved 11/10/17 BOD Approved 11/18/17 SGPOA Application for ARC Approval Owner Contact Information Owner(s) name Project Address Owner(s) name Lot/Village Mailing address City State/Zip Email Phone Mobile Contractor Contact Information* Company Name Contact Mailing address Email City/State/Zip Phone Mobile *Required Type of Work Check all that apply New Home Construction Ancillary Garage/Carport Gazebo/Pergola Dock/Pier Pool/Pool Fence Major Remodel addition of 300ft 2 or greater of condition space or cargo lift House (300ft 2 +) Minor Remodel (Step 1 A, B and 2, if required) Conditioned space less than 300 ft 2 Mechanical Enclosure Dune walkover/boardwalk Trash Receptacle Enclosure Under house Screening Other (List) Minor Remodel Non-conditioned walled space (enclose porch, storage) Roof change (material/color) Siding change (material/color) Exterior addition of porch, deck, railing, stairs Other Painting (new color) Exterior addition of screen enclosure(s) Exterior addition of mechanical enclosures Hot Tub Enclose garbage receptacle Ancillary Structure(s) Gazebo/Pergola Detached Garage Detached Carport Other 1712 MAGNOLIA ROAD, ST. GEORGE ISLAND, FL 32328 (850)927-2312 FAX (850)927-3039

ARC Approved 11/10/17 BOD Approved 11/18/17 EMERGENCY YES/NO SGPOA Application for ARC Approval Demolition of Existing Structure Fill if more than 45 cubic yards Fill Sand Lime rock #57 Rock Oyster Shells Other Total Number of cubic yards Landscaping Please see the following websites for additional information: http://www.swfwmd.state.fl.us/publications/files/ffl_plant_selection_guide.pdf and http://fyn.ifas.ufl.edu Please note: Plants listed in the most current edition of The Exotic Pest Plant Council s List of Florida s Most Invasive Species and the List of Florida Prohibited Aquatic Plants (F.S. 369.25) are prohibited in the Plantation. Major Pool, Spa, Pool Fencing Driveway: aprons/pavers/changes Retaining wall(s) Lighting Terrace(s) Elevated Deck Walk(s) $1000 in total project Minor Irrigation Well Removing fewer than 5 trees Adding small shrubs Less than $1000 total project Adding low ground cover ROW revitalization Limited Clearing/Bush Hogging Storm Shutter(s) Solar Panel(s) Storm Shutter(s) Solar Panel(s) Waste Treatment System Replacing Waste Treatment System Replacing Drain field (complete Fill section above) Water Front Structure Dock Pier Boatlift Breakwater/Revetment Boardwalk Dune Walkover 1712 MAGNOLIA ROAD, ST. GEORGE ISLAND, FL 32328 (850)927-2312 FAX (850)927-3039

EMERGENCY YES/NO ARC Approved 11/10/17 BOD Approved 11/18/17 Application for ARC Approval Pursuant to the Amendment and Restatement of the St. George Plantation Owners Association, Inc. Protective Covenants ( Covenants ) and Design Guide of St. George Plantation Owners Association, Inc. ( Design Guide ), the Owner and Contractor acknowledge that all construction, alteration or addition of any kind, other than interior alterations not affecting the external appearance of a structure, on the Property requires prior written approval. We hereby request the approval of the preceding. Contractor acknowledges that he/she is responsible for the acts of all employees, subcontractors, and their agents and employees, and other persons performing work on the Property while they are on St. George Plantation. Owner and Contractor acknowledge they have received copies of and agree to comply with the restrictions and conditions of the Covenants and Design Guide regarding rules and regulations governing construction on the Property. Construction shall be completed in accordance with the final approved plans, which are incorporated by reference and will be made a part of this application. Owner(s)* Contractor Signature Date Signature Date Print Name Print Name *All persons or entities shown as owners on the recorded deed must execute this document. Use another sheet if more lines are needed. Alternatively, this document shall be executed by the person authorized to act on the behalf of the record owners pursuant to the Assignment of Agent, as submitted to the Association. In accordance with St. George Plantation Design Guide, Construction must be commenced within twelve (12) months after final written approval of the application and must be completed within eighteen (18) months after commencement of the project. For Office Use Only Date Date Application Fee $ Approval By ARC Performance Deposit Fee $ P.D. Return Final inspection accepted by ARC Page 6 of 10 ST. GEORGE PLANTATION

Effective date: September 1, 2015 ST. GEORGE PLANTATION OWNERS ASSOCIATION, INC. PERFORMANCE DEPOSIT AGREEMENT This Performance Deposit Agreement ( Agreement ) is made this day of, 201, by and between St. George Plantation Owners Association, Inc. ( Association ) and ( Owner ). WHEREAS, the Association has the duty to maintain development standards and protect property values in St. George Plantation and has the authority pursuant to Amendment and Restatement of the St. George Plantation Owners Association, Inc. Protective Covenants ( Covenants ) and Design Guide of St. George Plantation Owners Association, Inc. ( Design Guide ), as amended from time to time, to require financial assurance for construction projects in order to carry out this duty; and WHEREAS, Owner is the owner of property described as: Lot # Village House # and Street Name WHEREAS, this Agreement is required in order to assure the Association and the owners within the St. George Plantation that violations of Covenants and Design Guide by owners and contractors, and the construction and development of properties in ways that deviate from plans approved by the Association will not occur, or in the alternative, provide a remedy for same which may occur; and WHEREAS, the Association will incur Consulting Review Architect (CRA) fees for the project, which fees may be paid in whole or in part from the Performance Deposit referenced herein; and WHEREAS, the execution of this Agreement is a condition of application for approval of construction on the property described above, as provided by the Covenants and Design Guide. NOW, THEREFORE, in consideration of the premises and the mutual covenants contained herein, the parties agree as follows: 1. Owner shall provide and deliver to the Association the sum of Dollars ($ ) as a Performance Deposit for the [ ] dated. The Performance Deposit shall be held in a non-interest-bearing account in the name of the Association for the term of this Agreement. 2. The term of this Agreement shall expire on the earlier of three years from the date hereof or issuance of Written Notification of Compliance to the Owner in accordance with the Covenants. Construction must be commenced within twelve (12) months after final written ARC approval of the application and must be completed within eighteen (18) months after commencement of the project. 3. Owner shall comply with all provisions of the Covenants, Design Guide, other restrictions and rules, and approved plans for his or her lot. Owner shall complete the construction work in accordance with the final approved plans. All changes to the approved plans must be submitted for approval, along with revised plans and must be approved prior to site changes. Owner shall be responsible for violations of same by himself or herself and all of his or her contractors, sub-contractors, employees and associates. Failure of the Owner to comply with said provisions shall, after notice and an opportunity for hearing, within the time designated by the ARC, cause a forfeiture of all or part of the Performance Deposit in the amount required by the Association to remedy the violation(s). Page 7 of 10 ST. GEORGE PLANTATION

Effective date: September 1, 2015 ST. GEORGE PLANTATION OWNERS ASSOCIATION, INC. PERFORMANCE DEPOSIT AGREEMENT 4. Additional funds shall be required by the ARC to supplement the initial Performance Deposit upon the occurrence of a violation or violations by an Owner or those for whom he or she is responsible which may require that all or part of the initial Performance Deposit be withdrawn to remedy the violation(s) or when the payment of CRA fees or any other expenses of the Association related to the project causes the amount of the Performance Deposit to be less than the full amount set out in Paragraph 1 hereof. The full amount of the required Performance Deposit must be maintained with the Association at all times during the term of this Agreement. Failure of the Owner to deposit the required additional funds within ten (10) days after the request for same is made by the ARC will justify issuance by the ARC of a stop work order on the construction project. 5. Owner shall notify the ARC, in writing, when the construction project is complete and request an inspection of the property. Any amount of the Performance Deposit which is not used shall be returned to the Owner depositing same; provided, however, the Association shall deduct from said Performance Deposit prior to its return all monetary obligations due to the Association which remain unpaid at the time of such return. 6. The Performance Deposit, less deductions, if any, shall be returned to the Owner within thirty (30) days after the issuance of the Written Notification of Compliance by the ARC and presentation to the ARC of a copy of the Franklin County Certificate of Occupancy in the event of new construction, major addition or major renovation. Return of the Performance Deposit shall be made payable to the Owner depositing same. If, after a period of two years, reasonable efforts to contact the appropriate owner thereof having failed, the Performance Deposit shall be declared unreturnable by the ARC and such determination shall be immediately reported to the Board of Directors of the Association. Upon concurring determination by the Board of Directors that the Performance Deposit is unreturnable, it shall be transferred to the General Operating Funds of the St. George Plantation Owners Association, Inc. 7. The remedies, penalties and/or fines provided for in this agreement are in addition to any other remedies, penalties and/or fines provided to the ARC and Association under Covenants and Florida law. Executed by the parties hereto effective on the date first written above. Witnesses: Owner(s)* Witnesses: St. George Plantation Owners Association, Inc. By: Title: *All persons or entities shown as owners on the recorded deed must execute this document. Use another sheet if more lines are needed. Alternatively, this document shall be executed by the person authorized to act on the behalf of the record owners pursuant to the Assignment of Agent, as submitted to the Association. ACTIVE: 7461190_1 Page 8 of 10 ST. GEORGE PLANTATION

Effective date: 17 November 2014 Exterior Materials & Finishes Data Sheet SUBMITTAL FOR LOT VILLAGE OWNER Property Zone Bay View Midland Gulf View Item Material Color* Description Driveway Pavers Aprons Walk(s) Other masonry Foundation/Piers Lighting - Landscape Exterior Doors Door Frame/Trim Door Hardware Windows Window Trim, Sash Decks Exterior Stairs, Landing Handrail/Balusters Other Exterior Garage Doors Roofing Flashing Gutters and Downspouts Ridge and roof vents Other roofing Page 9 of 10 ST. GEORGE PLANTATION

Effective date: 17 November 2014 Exterior Materials & Finishes Data Sheet Item Material Color* Description Body/Siding Trim and Cornice Stucco Fascia, Frieze, Corner Boards Soffit/Gable Vents Columns Under House screening/screen porch Lighting - House Shutters Storm Shutter Decorative Solar Panel(s) Other Other Structures Item Material Color* Description Mechanical Enclosure Trash Enclosure Boardwalk Dock Dune Walkover Louvers - Screening Garage/Carport Gazebo/Pergola Patio Exterior Stairs Pool/Spa Pool Fencing Pool Deck *Color sample must be provided. Please refer to the ARC Design Guide for further details. Page 10 of 10 ST. GEORGE PLANTATION