City of Sand Springs, Oklahoma Planning and Development Department Neighborhood Services Office Permit, License and Inspection Fees and Codes Revised July 1, 2010 Building Permit Fees Zoning Clearance Permit (Residential and Commercial) $25.00 Residential New or Addition - 0-600 sq.ft. $83.00 Residential New or Addition - 601-1,000 sq. ft. $165.00 Residential New or Addition - 1,001-2,000 sq. ft. $220.00 Residential New or Addition - 2,001-3,000 sq. ft. $275.00 Residential New or Addition - 3,001-4,000 sq. ft. $330.00 Residential New or Addition - 4,001-5,000 sq. ft. $385.00 Residential New or Addition - 5,001 sq. ft. and up $110.00 (per 1,000 sq. ft. or part thereof) Commercial New or Addition - 0-1,000 sq. ft $330.00 Commercial New or Addition - 1,001-5,000 sq. ft. $660.00 Commercial New or Addition - 5,001-10,000 sq. ft. $880.00 Commercial New or Addition - 10,001 sq. ft. and up $330.00 (per 5,000 sq. ft. or part thereof) Residential Remodel $83.00 Commercial Remodel - First 1,000 sq. ft. $165.00 Commercial Remodel - 1,001-5000 sq. ft. $330.00 Commercial Remodel - 5,001 sq. ft. and up $83.00 (per 1,000 sq. ft or part thereof) Carport, Porch, Patio Roof, Deck, Canopy, Awni $55.00 Swimming Pool $55.00
PERMIT, LICENSE AND INSPECTION FEES AND CODES - Page 2 Building Permit Fees Conditional Permit Fee $55.00 Beginning Work Without Permit Penalty $110.00 Plan Resubmittal Fee (Each Occurrence) $28.00 Permit Withdrawal Fee - Commercial $55.00 Permit Withdrawal Fee - Residential $28.00 Permit Revolving Fund Fee $4.50 Permit Revolving Fund Admn Fee $0.50 Park Fees Residential Park Fee - Angus Valley Farms $75.00 Plus Per Bedroom - Angus Valley Farms $25.00 Residential Park Fee - Brooklyn Heights $75.00 Plus Per Bedroom - Brooklyn Heights $25.00 Residential Park Fee - Cambridge Park Estates $75.00 Plus Per Bedroom - Cambridge Park Estates $25.00 Residential Park Fee - Country Club Colony $75.00 Plus Per Bedroom - Country Club Colony $25.00 Residential Park Fee - Edgewood at the Gables $250.00 Residential Park Fee - Gable Hills Apartments $250.00 Residential Park Fee - Greentree at Sand Springs $250.00 Residential Park Fee - Lakeside Park $75.00 Plus Per Bedroom - Lakeside Park $25.00 Residential Park Fee - Lakeside Ridge $75.00
Plus Per Bedroom - Lakeside Ridge $25.00 PERMIT, LICENSE AND INSPECTION FEES AND CODES - Page 3 Park Fees Residential Park Fee - Northridge Estates $75.00 Plus Per Bedroom - Northridge Estates $25.00 Residential Park Fee - Ridge at Whispering Creek $75.00 Plus Per Bedroom - Ridge at Whispering Creek $25.00 Residential Park Fee - Rolling Oaks V $75.00 Plus Per Bedroom - Rolling Oaks V $25.00 Residential Park Fee - Shadow Creek Estates $75.00 Plus Per Bedroom - Shadow Creek Estates $25.00 Residential Park Fee - Spring Lake Mountain Estates $75.00 Plus Per Bedroom - Spring Lake Mountai $25.00 Residential Park Fee - Stone Creek Estates $75.00 Plus Per Bedroom - Stone Creek Estates $25.00 Residential Park Fee - Stone Villa $75.00 Plus Per Bedroom - Stone Villa $25.00 Residential Park Fee - Village Estates $75.00 Plus Per Bedroom - Village Estates $25.00 Residential Park Fee - Walnut Ridge $75.00 Plus Per Bedroom - Walnut Ridge $25.00 Residential Park Fee - Westwood Estates $75.00 Plus Per Bedroom - Westwood Estates $25.00 Residential Park Fee - Duplex Dwelling $150.00 Plus Per Bedroom - Duplex Dwelling $25.00
Residential Park Fee - Per Multi-Family Dwelling Unit $250.00 Residential Park Fee - Per Mobile Home Lot or Space $250.00 PERM, LICENSE AND INSPECTION FEES AND CODES - Page 4 Park Fees Residential Park Fee - Single Family Dwelling $75.00 Plus Per Bedroom - Single Family Dwelling $25.00 Single Family Dwelling Park Fee applies to all other subdivisions and unplatted properties not listed above
PERM, LICENSE AND INSPECTION FEES AND CODES - Page 5 Other Permit Fees Blasting Permit $100.00 Plus Per Blast Charge $25.00 Certificate of Compliance $50.00 Certificate of Occupancy - Change in Use/Occupancy $50.00 Certificate of Occupancy - New Construction $50.00 Certified Mailing Fee - per letter $3.30 Copies - per page $0.25 Curb Cut/Sidewalk/Pavement Cut/Boring Permit $25.00 Demolition Permit $25.00 Earth Change Permit $25.00 Fiber Optic Cable Annual Fee - Per lineal ft. $1.00 Fiber Optic Cable Inspection Fee - Per lineal ft. $1.00 Fire Alarm System $50.00 Fire Suppression System - Structural $50.00 Flood Map Determination $25.00 Moving Permit $100.00 Oil Well Permit - New $600.00 Oil Well Permit - Annual Renewal $250.00 Public Nuisance Abatement Administrative Fee $200.00 Public Works Plan Review (per sheet) $50.00 Public Works Record Drawing (per utility) $200.00 Regular Mailing Fee - per letter $0.50 Sign - 100 sq. ft. or less (one side) $55.00 Sign - 101 or more sq. ft. (one side) $110.00 Sign - Outdoor Advertising 250 sq. ft. or less (per side) $165.00 Sign - Outdoor Advertising over 250 sq. ft. (per side) $330.00 Sign - Portable (30 day limit, one time per year) $50.00 Sign - Promotional (10 day limit, four times per year) $50.00 Sign - Promotional (40 days consecutively, one t $50.00
Special Assessment Letter $25.00 Temporary Use Permit (30 day limit) $100.00 Zoning Code Book $25.00 Water Tap Permit $50.00 PERM, LICENSE AND INSPECTION FEES AND CODES - Page 6 Miscellaneous License Fees Beer - Annual (on-and-off premises consumption) $20.00 Liquor Store - Annual (Package Store) $700.00 Mixed Beverage - New Mixed Beverage - Renewal $900.00 Wine - New $500.00 Wine - Renewal $450.00 Amusement Device/Pool-Billiard Table - Annual $15.00 Auctioneer License $50.00 Carnival - First Day $100.00 Plus Each Additional Day $100.00 Itinerant Peddler/Vendor - Good for one year (fix $75.00 Solid Waste Permit Fee (per cubic yard) $5.00 Trade License Fees Electrical Contractor License $125.00 Mechanical Contractor License $125.00 Plumbing Contractor License $125.00 Water Tap Installer License $125.00
PERM, LICENSE AND INSPECTION FEES AND CODES - Page 7 Inspection Fees Residential Building $55.00 Commercial Building $110.00 Reinspection/Miscellaneous Inspection $28.00 Zoning Field Inspection $25.00 Electrical Final - Single-Phase (100-270 volt) 10 $83.00 Plus Per 100 Amps or Part Thereafter $28.00 Electrical Final - Three-Phase 100 Amp Service $138.00 Plus Per 100 Amps or Part Thereafter $28.00 Temporary Construction Pole - TBC $28.00 Temp To Building Meter Service $28.00 Electrical Service Change Out $55.00 Electrical Miscellaneous $28.00 Plumbing Final - First Five Fixtures $55.00 Plumbing Final - Next Seven Fixtures $55.00 Plus Any Addition Fixtures $11.00 Water Service $28.00 Sewer Service $28.00 Gas Service $28.00 Water-Sewer-Gas Service - At One Time $55.00 Rural Water Line Inspection $55.00 Temporary Gas Service $28.00
Plumbing Miscellaneous $28.00 Furnace Only - Up to 150,000 BTUs (each unit) $55.00 Furnace Only - 150,001-300,000 BTUs (each unit) $83.00 Furnace Only - More Than 300,000 BTUs (each unit) $110.00 Cooling - Up to 3 Tons (each unit) $83.00 Cooling - Over 3 Tons and Up to 5 Tons (each unit) $110.00 Cooling - Over 5 Tons (each unit) $165.00 Chiller Cooling Unit - Per Ton $3.00 Slab Duct Inspection $28.00 Mechanical System Change Out $55.00 Mechanical Miscellaneous $28.00 Updated 11/24/2010