Tompkins County Industrial Development Agency

Similar documents
If projects are received at the counter to be submitted without prior draft review, the project will be deferred to the next meeting.

SEQRA (For Land Surveyors) Purpose of this Presentation

WHEREAS, the Board has reviewed Part 3 of the Full Environmental Assessment Form for the proposed Action.

TOWN OF BRISTOL. Ontario County, New York APPLICATION FOR LOT LINE ADJUSTMENT

***** Subchapter A. GENERAL PROVISIONS ***** PERMIT APPLICATIONS

TOWN OF AMHERST PLANNING DEPARTMENT SIDEWALK INSTALLATION REQUEST PROCEDURES

CITY OF FORT COLLINS NATURAL AREAS AND CONSERVED LANDS EASEMENT POLICY

FOR OFFICE USE ONLY Date Submitted Received By Fees Paid $ Receipt No. Received By Application No. Application Complete Final Action Date

CHAPTER 352 COUNTY LAND PRESERVATION AND USE COMMISSIONS

Syracuse Zoning Administration City Hall Commons 201 East Washington Street Syracuse, New York 13202

BRISTOL CONSERVATION COMMISSION INLAND WETLANDS AGENCY FORM IW-1 (Application for a Wetlands Permit)

CONDITIONAL USE PERMIT Application Packet

A. Preserve natural resources as identified in the Comprehensive Plan.

CHAPTER Committee Substitute for Committee Substitute for Senate Bill No. 2188

Rule 80. Preservation of Primary Agricultural Soils Revised and approved by the Land Use Panel during its public meeting on January 31, 2006.

DRAFT FOR PUBLIC HEARING (rev. March, 2016)

Special Use Permit - Planned Unit Development Checklist. Property Address:

TOWN OF WEBSTER Board of Appeals Application Form Area Variance

Chapter 210 CONDITIONAL USES

H5. Residential Mixed Housing Urban Zone

County of Kern HOME Program Housing Developer Pre-Application

Land Use. Existing Land Use

Down Payment and Closing Cost Assistance. Neighborhood Housing Services of Bedford Stuyvesant 1012 Gates Avenue Brooklyn, NY 11221

H4. Residential Mixed Housing Suburban Zone

19.12 CLUSTER RESIDENTIAL DISTRICT

Chapter 136. SOIL EROSION

ARTICLE 7. SPECIFIC USE STANDARDS

ARTICLE 7: PLOT PLANS AND SITE PLAN REQUIREMENTS AND REVIEW

MIDWAY CITY Municipal Code

Guide to Permitting Town of Groton, MA

IRS FORM 8283 SUPPLEMENTAL STATEMENT DONATION OF CONSERVATION EASEMENT

PROJECT SCORING GUIDANCE. Introduction: National Proiect Selection:

SATELLITE BEACH OFFICIAL CODE OF ORDINANCES PART II. CITY CODE CHAPTER 52. STORMWATER UTILITY

ZBA APPLICATIONS WILL NOT BE ACCEPTED WITHOUT A DENIAL LETTER ANNEXED. Name of Applicant: Suffolk County Tax Map No.:

Larimer County Planning Dept. Procedural Guide for 1041 PERMITS

PLANNING COMMISSION STAFF REPORT

State Environmental Quality Review NOTICE OF INTENT TO BE LEAD AGENCY. Village of Farmingdale Downtown Master Plan/BOA Nomination Study

Title 6 - Local Government Provisions Applicable to Special Purpose Districts and Other Political Subdivisions

Moore Township Planning Commission 2491 Community Drive, Bath, Pennsylvania Telephone: FAX: Rev:12/23/2013

H6 Residential Terrace Housing and Apartment Buildings Zone

CITY OF SARATOGA SPRINGS

Letter of Intent May 2017 (Revised November 2017)

MITIGATION POLICY FOR DISTRICT-PROTECTED LANDS

ARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of June 17, 2017

SITE PLAN REVIEW ADMINISTRATIVE REVIEW. Please Note: Once submitted to the County, all application materials become a matter of public record.

Chapter 100 Planned Unit Development in Corvallis Urban Fringe

SOUTHOLD TOWN ZONING BOARD OF APPEALS Phone (631) Fax (631)

5. That the Owner shall agree that all development Blocks shown within the Draft Plan will be connected to full municipal services.

4. If any perennial surface water passes through or along the property lines of the acreage, a minimum of 200 feet or frontage should be required.

GWINNETT COUNTY CSO CONSERVATION SUBDIVISION OVERLAY DISTRICT REQUIREMENTS

LINCOLN COUNTY FLOOD DAMAGE PREVENTION ORDINANCE

Napa County Planning Commission Board Agenda Letter

STAFF REPORT. Permit Number: Unlimited. Kitsap County Board of Commissioners; Kitsap County Planning Commission

Some Points Re Perpetuity - Code and Regulations

Town of Middleborough Conservation Commission 2014 Policy

COMMUNITY DEVELOPMENT DEPARTMENT 333 Broadalbin Street SW, P.O. Box 490 Albany, OR 97321

Landuse Consent Subdivision Consent Certificate of Compliance Variation/Cancellation of Consent Conditions Outline Plan Waiver

Land Use Application

Township of Tay Official Plan

SENATE, No STATE OF NEW JERSEY. 217th LEGISLATURE INTRODUCED SEPTEMBER 8, 2016

H-POLICY 1: Preserve and improve existing neighborhoods. Ensure that Prince William County achieves new neighborhoods with a high quality of life.

ARTICLE I. IN GENERAL

H5. Residential Mixed Housing Urban Zone

MARK TWAIN LAKE MASTER PLAN CLARENCE CANNON DAM AND MARK TWAIN LAKE MONROE CITY, MISSOURI

1.1 Purpose. The purpose of this chapter is to summarize guidance on those requirements generally applicable to grant programs.

GOVERNMENT CODE SECTION GOVERNMENT CODE SECTION 65302

MODEL DEED RESTRICTION FOR THE PENNSYLVANIA STATE PROGRAMMATIC GENERAL PERMIT-3 (PASPGP-3) DECLARATION OF RESTRICTIVE COVENANTS FOR CONSERVATION

PENINSULA TOWNSHIP DONATION of DEVELOPMENT RIGHTS ORDINANCE (DDR, No. 45)

Incorporated Village of Port Jefferson 88 North Country Road, Port Jefferson, NY Telephone: (631) Fax: (631)

COMPREHENSIVE PLAN FUTURE LAND USE MAP AMENDMENT APPLICATION

City of Brandon Brownfield Strategy

COGCC Staff s First Draft Proposed Rules Implementing Governor s Oil and Gas Task Force Recommendation Nos. 17 and 20 October 6, 2015

EXCERPTS FROM HALIFAX REGIONAL MUNICIPALITY CHARTER

ARTICLE VII. NONCONFORMITIES. Section 700. Purpose.

SECTION 1 INTRODUCTION TO THE PANAMA CITY BEACH COMPREHENSIVE GROWTH DEVELOPMENT PLAN

CHAPTER XVIII SITE PLAN REVIEW

Corman Park - Saskatoon Planning District Official Community Plan

FRESHWATER WETLANDS PROTECTION IN NEW JERSEY Tools for Municipal Action

Floodplain Development Land Use Review

HAVERHILL BUSINESS PARK PROTECTIVE COVENANTS (Revised 8/3/09) Purpose

Public Facilities and Finance Element

Kitsap County Department of Community Development. Staff Report and Administrative Decision

FEE The staff will let you know the current cost of filing an application. Make checks payable to the San Joaquin County Treasurer.

Central Pennsylvania Conservancy Project Selection Criteria Form

Interpretation of Conservation Purpose INTERNAL REVENUE GUIDANCE AS TO WHAT CONSTITUES A CONSERVATION PURPOSE

SUBURBAN AND URBAN RESIDENTIAL LAND USE

Application Procedures for Easements or Rights of Way on City of Fort Collins Natural Areas and Conserved Lands March 2012

FACT SHEET Brownfields Cleanup Program (BCP) KEY DEFINITIONS (see also ECL )

APPLICATION PROCESSING. CHECK WITH STAFF - Development Services Staff will explain the requirements and procedures to you.

HOW TO APPLY FOR A USE PERMIT

Housing Commission Report

SENATE BILL No. 35. December 5, 2016

Tiered Environmental Review Format (2017)

Kitsap County Department of Community Development. Notice of Administrative Decision

COLUMBIA COUNTY LAND DEVELOPMENT SERVICES COURTHOUSE 230 STRAND ST. HELENS, OREGON (503) APPLICANT: Name:

HOUSING ELEMENT GOALS, OBJECTIVES, AND POLICIES

JOINT PUBLIC NOTICE PUBLIC NOTICE

A Minor Land Excavation Operating Permit is used to:

SERVICE & IMPROVEMENT PLAN AND ASSESSMENT PLAN:

Conservation Easement Stewardship

Transcription:

Tompkins County Industrial Development Agency Administration provided by TCAD TOMPKINS COUNTY INDUSTRIAL DEVELOPMENT AGENCY BOARD OF DIRECTORS MEETING Thursday, February 8, 2018 4:00 PM Legislative Chambers Governor Daniel D. Tompkins Building 121 E. Court Street, Ithaca NY 1. CALL TO ORDER AGENDA 2. PRIVILEGE OF THE FLOOR 3. BUSINESS Page City Centre Energy Presentation Yamila Fournier, Whitham Planning & Design Administration Welcome New Members Appointment of 2018 Board Officers Appointment of Administrative Director Authorization of Check Signers Meeting Day & Time Discussion Memorandum of Understanding with TCAD 2 TCAD 2018 Work Plan 4 Old Business Delaware River Solar NY Newfield IV and V Final Approval Environmental Assessment Form Part 2 & 3 10 SEQRA Negative Declaration Narrative 22 SEQRA Resolution Negative Declaration of Environmental Significance 30 Public Hearing Minutes 34 Inducement Resolution NY Newfield IV 36 Inducement Resolution NY Newfield V 41 4. STAFF REPORT 5. APPROVAL OF MEETING MINUTES January 10, 2018 46 6. ADJOURNMENT Next Meeting: March 8, 2018 401 E. MLK Jr., Street, Suite 402B, Ithaca, New York 14850 phone: (607) 273-0005 fax: (607) 273-864

Memorandum of Understanding Tompkins County Area Development, Inc. & Tompkins County Industrial Development Agency AGREEMENT AGREEMENT, made by and between Tompkins County Area Development, a not-for-profit corporation of the State of New York, having offices at 401 East State Street, Suite 402B, Ithaca, New York, 14850, hereinafter referred to as TCAD, and Tompkins County Industrial Development Agency, hereinafter referred to as TCIDA. WITNESSETH WHEREAS, TCAD, as the community's lead economic development agency, offers financial assistance, technical assistance and real estate development services. TCAD is responsible for creating and implementing the comprehensive economic development strategy for the county that provides leadership to create a supportive economic environment. TCAD provides oversight for studies related to infrastructure and other issues necessary to support economic development. TCAD administers a revolving loan program, the Tompkins County Development Corporation, and Tourism Capital Grant Program. TCAD will provide administrative management to TCIDA. NOW, THEREFORE, in consideration of the agreements contained herein, the parties agree as follows: 1. The term of this agreement shall be from January 1, 2018 through December 31, 2018. 2. TCAD agrees to provide technical and administrative services as follows: Organize meetings of the Board of Directors and Committees of the Board. Staff and take minutes of meetings. Maintain IDA files and archives. Distribute applications and supporting documents to the IDA. Distribute the PILOT agreement and other documents and information to County Assessor, County Finance Department, and appropriate taxing authorities. File proper forms (412a) with County Assessor relating to PILOT agreements and property tax abatements. Comply with project public hearing and taxing authority notification requirements. Respond to questions about projects. Assist attorney with closings. Comply with NYS Public Authority Accountability Act regulations including filing of annual reports and other required information. Ensure Board certifies reports. Compile information for annual audit, work with auditors in this regard, update information online as required by NYS, and keep IDA Board informed of process. Create and maintain a web site as required by law. TCAD initials TCIDA initials Page 1 of 2 2

Monitor legislation impacting the IDA. Educate appropriate elected officials and their staff about the TCIDA s position on current or proposed legislation impacting IDAs and their projects. Recommend and advise the Board concerning changes to applications, policies, and bylaws. Educate board members on duties of public authorities. Promote the availability of IDA incentives to potential applicants. Meet with potential applicants to discuss IDA incentives, policies and procedures. Prepare applicants for IDA meeting. Create community benefit analysis to accompany each project application. Create job and wage report and annually review with IDA Board. Document and review with IDA Board all projects that fall short of performance goals. Implement recapture policy as necessary. Review PILOT payments to ensure accurate PILOT billing by taxing jurisdictions. Periodically compare actual assessments with those projected at time of application to help guide future tax payment and abetment estimates. Meet with current customers on a periodic basis to monitor status of projects. 3. TCIDA agrees to pay TCAD a sum of $343,747. Payments shall be made quarterly upon submission of an invoice. 4. The parties also acknowledge that this sum is for the above referenced services and economic development services provided for Tompkins County. See the attached work plan that outlines these services. 5. It is mutually agreed between the parties that an independent contractor relationship is hereby established under the terms and conditions of this Agreement. 6. The provision of this agreement shall be construed under the laws of the State of New York. IN WITNESS THEREOF, the parties hereto have executed this agreement as of the day and year first above written. DATE: John Rudd for TCAD DATE: Rich John for TCIDA TCAD initials TCIDA initials Page 2 of 2 3

TCAD 2018 WORK PLAN FINAL Adopted by TCAD November 30, 2017 Mission: TCAD is dedicated to building a thriving and sustainable economy that improves the quality of life in Tompkins County by fostering the growth of business and employment. Vision: A flourishing economy with exciting, innovative firms that inspire and attract a talented workforce. Organizational Strategies Build strategic, as opposed to transactional, relationships with our board, investors, customers, and external resources. Be forward-looking in developing our services, assets and resources. Ensure all activities are mission driven, developing: a wide range of quality employment opportunities for local residents; skilled workforce and entrepreneurs; business and property investment; and a high functioning ecosystem for business sectors. Target resources to support local businesses and entrepreneurs that have strategic reasons to be located here and are committed to the local community. Calculate and track impact of activities to guide decisions on utilization of scarce resources. Provide leadership on the key issues impacting the economy of the County, region and State. Core Activities Direct Services to Businesses Provide information and technical, financial and site location assistance that supports the creation, retention, expansion and attraction of businesses in Tompkins County. TCAD s focus is on wealth-creating, traded sectors including: Education, Manufacturing & High Tech, Visitors & Tourists, Utilities, Agriculture, and Mining. Economic Development Leadership to the County Provide leadership for the County s economic development activities, including long-term strategies and responses to near-term challenges and opportunities. Foster the leadership relationships and stakeholder engagement necessary to successfully implement local and regional economic development initiatives. Marketing, Communications & Development TCAD: Communicate our objectives and accomplishments to our investors, the businesses we provide services to and the community in general. Ensure long-term and diverse funding of TCAD. Local Economy: Participate in creating an environment in Tompkins County and New York State that supports economic growth. Promote Tompkins County as a good place to live and do business. General Administrative Functions Maintain economic and business information resources to increase accountability and well-informed policy decisions. Provide office and program administration, and facilitate staff development. TCAD Foundation (dba Finger Lakes Regional Prosperity Network) Administer the TCAD Foundation. TCAD 2018 Work Plan 1 4

Direct Services to Businesses Core Activities Administer five local programs: o o o o o Tompkins County Industrial Development Agency Tompkins County Development Corporation Revolving Loan Fund Program (TCAD, Minority and Women s, Countywide, USDA, Sustainable Business, and Town of Dryden) Empire Zones Program Tourism Capital Grants Program Connect businesses with appropriate incentives, services and technical assistance offered by other local, regional, State and federal programs with a particular focus on the State s CFA and URI funding. Provide financial assistance to businesses. Interpret and promote new regional, State and federal economic development programs. Undertake annual business retention and expansion (BR&E) visits with customers to establish and maintain strategic relationships and deliver targeted services. Collaborate with Tompkins County Workforce Development Board to assist businesses in meeting workforce goals. Work with the Center for Regional Economic Advancement and other Cornell programs to assist technology-related businesses to start, grow, locate and stay in Tompkins County. Provide site location assistance to key projects. Featured Activities Support the proposed Business Energy Navigator Program with financial support and networking with key customers. Understand and promote energy efficiency and carbon emissions reduction resources. Explore opportunities to encourage sustainability measures in existing direct service programs. TCAD 2018 Work Plan 5 2

Economic Development Leadership for the County Core Activities Provide thought and process leadership for the County s economic development activities, including long-term strategies and responses to near-term challenges and opportunities. Foster the leadership relationships and stakeholder engagement necessary to successfully implement local and regional economic development initiatives. Convey needs of customers to local, regional, State, and federal policy makers to refine existing economic development programs and to create new ones. Work with key community stakeholders to advance economic development policy goals at the local, State and federal level. Maintain partnerships with key organizations such as the Chamber of Commerce, Cornell University, Ithaca College, TC3 and other TCAD partners to develop policies and support activities that achieve TCAD s economic development objectives. Provide leadership to the Economic Development Collaborative for implementation of the Tompkins County Economic Development Strategy. Collaborate with the Workforce Development Board to improve the workforce pipeline that is critical to economic success. Act as the County s economic information resource. Prepare labor, business sector and other economic data analysis. Keep stakeholders and the public informed. Collaborate with public, private, and non-profit efforts to increase housing stock, especially affordable to the workforce. Work to sustain and improve airport service with the Air Service Board. Collaborate with the County and key stakeholders to address long-term and immediate energy needs and emissions goals in ways that contribute to a vital local economy. Participate in implementing recommendations of the Energy and Economic Development Task Force, and the County s Energy Strategy as appropriate. Maintain financial reserves and staff resources to nimbly respond to unexpected opportunities and challenges, or changing priorities, that emerge during the year. Featured Activities Continue to collaborate with the Workforce Development Board s efforts to establish a training program for entry-level employees in the advanced manufacturing sector. Implement a business attraction program with the College of Agriculture and Life Sciences at Cornell. Explore other target business attraction programs with colleges and other entities. To maintain a strong regional and State ED leadership role, work to have the new president of TCAD on the Southern Tier Regional Council and its Executive Committee. TCAD 2018 Work Plan 6 3

Marketing, Communications & Development Core Activities Ensure long-term and diverse funding of TCAD. Hold periodic Investor s Council meetings to engage TCAD investors. Promote the Industrial Development Agency, Tompkins County Development Corporation, Revolving Loan Funds and other incentive programs. Execute TCAD s marketing strategy to increase public awareness and investment. Communicate our objectives and accomplishments to our investors, the businesses we serve, and the community in general by utilizing the annual report to the community, annual meeting, Newsflash, construction site signage, advertisements, media relations, sponsorships, social media, and the website. Continue to update, refine, and promote the TCAD website, with a focus on content reorganization and a highlight on accomplishments. Participate in creating an environment in Tompkins County, the region and New York State that is supportive of economic growth. Promote Tompkins County as a good place to live and do business. Featured Activities Hire consultant to conduct and complete during 2018 the 201 2023 Investment Campaign. Following up on preliminary discussions with County Legislature administrative and elected leadership, acquire a 5-year committement to support approximately 1/3 rd of TCAD s operating budget for 201 through 2023. Implement the Communications and Marketing Strategy. Increase the public s understanding of TCAD s programs, including the IDA. Tell stories that communicate beneficial outcomes (e.g. jobs, housing, stronger tax base). TCAD 2018 Work Plan 7 4

General Administrative Functions Core Activities Provide overall office and program administration including finance and budget as well as human resources support. Administer ED programs, grants, and contracts, specifically: revolving loan funds, Tompkins County Industrial Development Agency, Tompkins County Development Corporation, TCAD Foundation. Provide fiscal management of TCAD s operations. Facilitate staff development, including training and succession planning for all positions. Perform a Board Self Evaluation on an annual basis. Continue to enhance Board engagement. Create the annual work plan. Track progress on work plan goals, and at year-end compare accomplishments to goals. Monitor the Public Authority Accountability Act/Public Authority Reform Act as it pertains to compliance for the TCIDA and TCDC. Periodically review/renew TCAD s organizational mission, strategy, values, and goals. Featured Activities Hire a successor to the current TCAD president (expected retirement in date of August 31, 2018). Support with both local and national search consultants,. TCAD 2018 Work Plan 8 5

TCAD Foundation Finger Lakes Regional Prosperity Network Core Activities Provide a regional umbrella to catalyze, plan, and seek new funding resources for regional partnerships in four impact areas: o o o o Rural Wealth Creation Workforce Development Entrepreneurship Energy Develop strategic partnerships across the region that are aligned with FLRPnet s core activities. Develop and begin to implement long-term business plan that includes a fund raising strategy. Expand FLRPnet Board with representatives from the region. Featured Activities Implement a pilot program of the Food Processing Business Incubation Program. Seek funding to expand the program to serve an approximately 12-county region. Host a leadership forum for the Finger Lakes region to identify overlapping regional economic development initiatives, seeking opportunities to strengthen these initiatives through collaboration. TCAD 2018 Work Plan 6

Full Environmental Assessment Form Part 2 - Identification of Potential Project Impacts Part 2 is to be completed by the lead agency. Part 2 is designed to help the lead agency inventory all potential resources that could be affected by a proposed project or action. We recognize that the lead agency=s reviewer(s) will not necessarily be environmental professionals. So, the questions are designed to walk a reviewer through the assessment process by providing a series of questions that can be answered using the information found in Part 1. To further assist the lead agency in completing Part 2, the form identifies the most relevant questions in Part 1 that will provide the information needed to answer the Part 2 question. When Part 2 is completed, the lead agency will have identified the relevant environmental areas that may be impacted by the proposed activity. If the lead agency is a state agency and the action is in any Coastal Area, complete the Coastal Assessment Form before proceeding with this assessment. Tips for completing Part 2: Review all of the information provided in Part 1. Review any application, maps, supporting materials and the Full EAF Workbook. Answer each of the 18 questions in Part 2. If you answer Yes to a numbered question, please complete all the questions that follow in that section. If you answer No to a numbered question, move on to the next numbered question. Check appropriate column to indicate the anticipated size of the impact. Proposed projects that would exceed a numeric threshold contained in a question should result in the reviewing agency checking the box Moderate to large impact may occur. The reviewer is not expected to be an expert in environmental analysis. If you are not sure or undecided about the size of an impact, it may help to review the sub-questions for the general question and consult the workbook. When answering a question consider all components of the proposed activity, that is, the Awhole action@. Consider the possibility for long-term and cumulative impacts as well as direct impacts. Answer the question in a reasonable manner considering the scale and context of the project. 1. Impact on Land Proposed action may involve construction on, or physical alteration of, NO YES the land surface of the proposed site. (See Part 1. D.1) If Yes, answer questions a - j. If No, move on to Section 2. a. The proposed action may involve construction on land where depth to water table is less than 3 feet. Relevant Part I Question(s) No, or small impact may occur Moderate to large impact may occur E2d b. The proposed action may involve construction on slopes of 15% or greater. E2f c. The proposed action may involve construction on land where bedrock is exposed, or generally within 5 feet of existing ground surface. d. The proposed action may involve the excavation and removal of more than 1,000 tons of natural material. e. The proposed action may involve construction that continues for more than one year or in multiple phases. f. The proposed action may result in increased erosion, whether from physical disturbance or vegetation removal (including from treatment by herbicides). E2a D2a D1e D2e, D2q g. The proposed action is, or may be, located within a Coastal Erosion hazard area. B1i h. Other impacts: Page 1 of 10 10

2. Impact on Geological Features The proposed action may result in the modification or destruction of, or inhibit access to, any unique or unusual land forms on the site (e.g., cliffs, dunes, NO YES minerals, fossils, caves). (See Part 1. E.2.g) If Yes, answer questions a - c. If No, move on to Section 3. a. Identify the specific land form(s) attached: Relevant Part I Question(s) No, or small impact may occur Moderate to large impact may occur E2g b. The proposed action may affect or is adjacent to a geological feature listed as a registered National Natural Landmark. Specific feature: c. Other impacts: E3c 3. Impacts on Surface Water The proposed action may affect one or more wetlands or other surface water NO YES bodies (e.g., streams, rivers, ponds or lakes). (See Part 1. D.2, E.2.h) If Yes, answer questions a - l. If No, move on to Section 4. Relevant Part I Question(s) No, or small impact may occur Moderate to large impact may occur a. The proposed action may create a new water body. D2b, D1h b. The proposed action may result in an increase or decrease of over 10% or more than a 10 acre increase or decrease in the surface area of any body of water. c. The proposed action may involve dredging more than 100 cubic yards of material from a wetland or water body. d. The proposed action may involve construction within or adjoining a freshwater or tidal wetland, or in the bed or banks of any other water body. e. The proposed action may create turbidity in a waterbody, either from upland erosion, runoff or by disturbing bottom sediments. f. The proposed action may include construction of one or more intake(s) for withdrawal of water from surface water. g. The proposed action may include construction of one or more outfall(s) for discharge of wastewater to surface water(s). h. The proposed action may cause soil erosion, or otherwise create a source of stormwater discharge that may lead to siltation or other degradation of receiving water bodies. i. The proposed action may affect the water quality of any water bodies within or downstream of the site of the proposed action. j. The proposed action may involve the application of pesticides or herbicides in or around any water body. k. The proposed action may require the construction of new, or expansion of existing, wastewater treatment facilities. D2b D2a E2h D2a, D2h D2c D2d D2e E2h D2q, E2h D1a, D2d Page 2 of 10 11

l. Other impacts: 4. Impact on groundwater The proposed action may result in new or additional use of ground water, or NO YES may have the potential to introduce contaminants to ground water or an aquifer. (See Part 1. D.2.a, D.2.c, D.2.d, D.2.p, D.2.q, D.2.t) If Yes, answer questions a - h. If No, move on to Section 5. a. The proposed action may require new water supply wells, or create additional demand on supplies from existing water supply wells. b. Water supply demand from the proposed action may exceed safe and sustainable withdrawal capacity rate of the local supply or aquifer. Cite Source: c. The proposed action may allow or result in residential uses in areas without water and sewer services. Relevant Part I Question(s) No, or small impact may occur Moderate to large impact may occur D2c D2c D1a, D2c d. The proposed action may include or require wastewater discharged to groundwater. D2d, E2l e. The proposed action may result in the construction of water supply wells in locations where groundwater is, or is suspected to be, contaminated. D2c, E1f, E1g, E1h f. The proposed action may require the bulk storage of petroleum or chemical products over ground water or an aquifer. D2p, E2l g. The proposed action may involve the commercial application of pesticides within 100 feet of potable drinking water or irrigation sources. E2h, D2q, E2l, D2c h. Other impacts: 5. Impact on Flooding The proposed action may result in development on lands subject to flooding. NO YES (See Part 1. E.2) If Yes, answer questions a - g. If No, move on to Section 6. Relevant Part I Question(s) No, or small impact may occur Moderate to large impact may occur a. The proposed action may result in development in a designated floodway. E2i b. The proposed action may result in development within a 100 year floodplain. E2j c. The proposed action may result in development within a 500 year floodplain. E2k d. The proposed action may result in, or require, modification of existing drainage patterns. D2b, D2e e. The proposed action may change flood water flows that contribute to flooding. D2b, E2i, E2j, E2k f. If there is a dam located on the site of the proposed action, is the dam in need of repair, or upgrade? Page 3 of 10 E1e 12

g. Other impacts: 6. Impacts on Air The proposed action may include a state regulated air emission source. NO YES (See Part 1. D.2.f., D,2,h, D.2.g) If Yes, answer questions a - f. If No, move on to Section 7. a. If the proposed action requires federal or state air emission permits, the action may also emit one or more greenhouse gases at or above the following levels: i. More than 1000 tons/year of carbon dioxide (CO 2 ) ii. More than 3.5 tons/year of nitrous oxide (N 2 O) iii. More than 1000 tons/year of carbon equivalent of perfluorocarbons (PFCs) iv. More than.045 tons/year of sulfur hexafluoride (SF 6 ) v. More than 1000 tons/year of carbon dioxide equivalent of hydrochloroflourocarbons (HFCs) emissions vi. 43 tons/year or more of methane Relevant Part I Question(s) D2g D2g D2g D2g D2g D2h No, or small impact may occur Moderate to large impact may occur b. The proposed action may generate 10 tons/year or more of any one designated hazardous air pollutant, or 25 tons/year or more of any combination of such hazardous air pollutants. c. The proposed action may require a state air registration, or may produce an emissions rate of total contaminants that may exceed 5 lbs. per hour, or may include a heat source capable of producing more than 10 million BTU=s per hour. d. The proposed action may reach 50% of any of the thresholds in a through c, above. e. The proposed action may result in the combustion or thermal treatment of more than 1 ton of refuse per hour. f. Other impacts: D2g D2f, D2g D2g D2s 7. Impact on Plants and Animals The proposed action may result in a loss of flora or fauna. (See Part 1. E.2. m.-q.) NO YES If Yes, answer questions a - j. If No, move on to Section 8. a. The proposed action may cause reduction in population or loss of individuals of any threatened or endangered species, as listed by New York State or the Federal government, that use the site, or are found on, over, or near the site. b. The proposed action may result in a reduction or degradation of any habitat used by any rare, threatened or endangered species, as listed by New York State or the federal government. c. The proposed action may cause reduction in population, or loss of individuals, of any species of special concern or conservation need, as listed by New York State or the Federal government, that use the site, or are found on, over, or near the site. d. The proposed action may result in a reduction or degradation of any habitat used by any species of special concern and conservation need, as listed by New York State or the Federal government. Page 4 of 10 Relevant Part I Question(s) No, or small impact may occur Moderate to large impact may occur E2o E2o E2p E2p 13

e. The proposed action may diminish the capacity of a registered National Natural Landmark to support the biological community it was established to protect. f. The proposed action may result in the removal of, or ground disturbance in, any portion of a designated significant natural community. Source: g. The proposed action may substantially interfere with nesting/breeding, foraging, or over-wintering habitat for the predominant species that occupy or use the project site. E3c E2n E2m h.the proposed action requires the conversion of more than 10 acres of forest, grassland or any other regionally or locally important habitat. Habitat type & information source: E1b i. Proposed action (commercial, industrial or recreational projects, only) involves use of herbicides or pesticides. j.other impacts: D2q 8. Impact on Agricultural Resources The proposed action may impact agricultural resources. (See Part 1. E.3.a. and b.) NO YES If Yes, answer questions a - h. If No, move on to Section. a. The proposed action may impact soil classified within soil group 1 through 4 of the NYS Land Classification System. b. The proposed action may sever, cross or otherwise limit access to agricultural land (includes cropland, hayfields, pasture, vineyard, orchard, etc). c. The proposed action may result in the excavation or compaction of the soil profile of active agricultural land. d. The proposed action may irreversibly convert agricultural land to non-agricultural uses, either more than 2.5 acres if located in an Agricultural District, or more than 10 acres if not within an Agricultural District. e. The proposed action may disrupt or prevent installation of an agricultural land management system. f. The proposed action may result, directly or indirectly, in increased development potential or pressure on farmland. g. The proposed project is not consistent with the adopted municipal Farmland Protection Plan. Relevant Part I Question(s) No, or small impact may occur Moderate to large impact may occur E2c, E3b E1a, Elb E3b E1b, E3a El a, E1b C2c, C3, D2c, D2d C2c h.other impacts: Page 5 of 10 14

. Impact on Aesthetic Resources The land use of the proposed action are obviously different from, or are in NO YES sharp contrast to, current land use patterns between the proposed project and a scenic or aesthetic resource. (Part 1. E.1.a, E.1.b, E.3.h.) If Yes, answer questions a - g. If No, go to Section 10. a. Proposed action may be visible from any officially designated federal, state, or local scenic or aesthetic resource. b.the proposed action may result in the obstruction, elimination or significant screening of one or more officially designated scenic views. c. The proposed action may be visible from publicly accessible vantage points: i. Seasonally (e.g., screened by summer foliage, but visible during other seasons) ii. Year round Relevant Part I Question(s) No, or small impact may occur Moderate to large impact may occur E3h E3h, C2b E3h d. The situation or activity in which viewers are engaged while viewing the proposed action is: i. Routine travel by residents, including travel to and from work ii. Recreational or tourism based activities E3h E2q, E1c e. The proposed action may cause a diminishment of the public enjoyment and appreciation of the designated aesthetic resource. E3h f. There are similar projects visible within the following distance of the proposed project: 0-1/2 mile ½ -3 mile 3-5 mile 5+ mile g.other impacts: D1a, E1a, D1f, D1g 10. Impact on Historic and Archeological Resources The proposed action may occur in or adjacent to a historic or archaeological NO YES resource. (Part 1. E.3.e, f. and g.) If Yes, answer questions a - e. If No, go to Section 11. a. The proposed action may occur wholly or partially within, or substantially contiguous to, any buildings, archaeological site or district which is listed on or has been nominated by the NYS Board of Historic Preservation for inclusion on the State or National Register of Historic Places. b. The proposed action may occur wholly or partially within, or substantially contiguous to, an area designated as sensitive for archaeological sites on the NY State Historic Preservation Office (SHPO) archaeological site inventory. c. The proposed action may occur wholly or partially within, or substantially contiguous to, an archaeological site not included on the NY SHPO inventory. Source: Relevant Part I Question(s) No, or small impact may occur Moderate to large impact may occur E3e E3f E3g Page 6 of 10 15

d. Other impacts: e. If any of the above (a-d) are answered Moderate to large impact may occur, continue with the following questions to help support conclusions in Part 3: i. The proposed action may result in the destruction or alteration of all or part of the site or property. ii. The proposed action may result in the alteration of the property s setting or integrity. iii. The proposed action may result in the introduction of visual elements which are out of character with the site or property, or may alter its setting. E3e, E3g, E3f E3e, E3f, E3g, E1a, E1b E3e, E3f, E3g, E3h, C2, C3 11. Impact on Open Space and Recreation The proposed action may result in a loss of recreational opportunities or a NO YES reduction of an open space resource as designated in any adopted municipal open space plan. (See Part 1. C.2.c, E.1.c., E.2.q.) If Yes, answer questions a - e. If No, go to Section 12. a. The proposed action may result in an impairment of natural functions, or ecosystem services, provided by an undeveloped area, including but not limited to stormwater storage, nutrient cycling, wildlife habitat. Page 7 of 10 Relevant Part I Question(s) D2e, E1b E2h, E2m, E2o, E2n, E2p b. The proposed action may result in the loss of a current or future recreational resource. C2a, E1c, C2c, E2q c. The proposed action may eliminate open space or recreational resource in an area with few such resources. d. The proposed action may result in loss of an area now used informally by the community as an open space resource. e. Other impacts: C2a, C2c E1c, E2q No, or small impact may occur Moderate to large impact may occur C2c, E1c 12. Impact on Critical Environmental Areas The proposed action may be located within or adjacent to a critical NO YES environmental area (CEA). (See Part 1. E.3.d) If Yes, answer questions a - c. If No, go to Section 13. a. The proposed action may result in a reduction in the quantity of the resource or characteristic which was the basis for designation of the CEA. b. The proposed action may result in a reduction in the quality of the resource or characteristic which was the basis for designation of the CEA. c. Other impacts: Relevant Part I Question(s) No, or small impact may occur Moderate to large impact may occur E3d E3d 16

13. Impact on Transportation The proposed action may result in a change to existing transportation systems. NO YES (See Part 1. D.2.j) If Yes, answer questions a - f. If No, go to Section 14. Relevant Part I Question(s) No, or small impact may occur Moderate to large impact may occur a. Projected traffic increase may exceed capacity of existing road network. D2j b. The proposed action may result in the construction of paved parking area for 500 or more vehicles. D2j c. The proposed action will degrade existing transit access. D2j d. The proposed action will degrade existing pedestrian or bicycle accommodations. D2j e. The proposed action may alter the present pattern of movement of people or goods. D2j f. Other impacts: 14. Impact on Energy The proposed action may cause an increase in the use of any form of energy. NO YES (See Part 1. D.2.k) If Yes, answer questions a - e. If No, go to Section 15. Relevant Part I Question(s) No, or small impact may occur Moderate to large impact may occur a. The proposed action will require a new, or an upgrade to an existing, substation. D2k b. The proposed action will require the creation or extension of an energy transmission or supply system to serve more than 50 single or two-family residences or to serve a commercial or industrial use. D1f, D1q, D2k c. The proposed action may utilize more than 2,500 MWhrs per year of electricity. D2k d. The proposed action may involve heating and/or cooling of more than 100,000 square feet of building area when completed. e. Other Impacts: D1g 15. Impact on Noise, Odor, and Light The proposed action may result in an increase in noise, odors, or outdoor lighting. NO YES (See Part 1. D.2.m., n., and o.) If Yes, answer questions a - f. If No, go to Section 16. a. The proposed action may produce sound above noise levels established by local regulation. Relevant Part I Question(s) No, or small impact may occur Moderate to large impact may occur D2m b. The proposed action may result in blasting within 1,500 feet of any residence, D2m, E1d hospital, school, licensed day care center, or nursing home. c. The proposed action may result in routine odors for more than one hour per day. D2o Page 8 of 10 17

d. The proposed action may result in light shining onto adjoining properties. D2n e. The proposed action may result in lighting creating sky-glow brighter than existing area conditions. f. Other impacts: D2n, E1a 16. Impact on Human Health The proposed action may have an impact on human health from exposure NO YES to new or existing sources of contaminants. (See Part 1.D.2.q., E.1. d. f. g. and h.) If Yes, answer questions a - m. If No, go to Section 17. a. The proposed action is located within 1500 feet of a school, hospital, licensed day care center, group home, nursing home or retirement community. Relevant Part I Question(s) No,or small impact may cccur Moderate to large impact may occur E1d b. The site of the proposed action is currently undergoing remediation. E1g, E1h c. There is a completed emergency spill remediation, or a completed environmental site remediation on, or adjacent to, the site of the proposed action. d. The site of the action is subject to an institutional control limiting the use of the property (e.g., easement or deed restriction). e. The proposed action may affect institutional control measures that were put in place to ensure that the site remains protective of the environment and human health. f. The proposed action has adequate control measures in place to ensure that future generation, treatment and/or disposal of hazardous wastes will be protective of the environment and human health. g. The proposed action involves construction or modification of a solid waste management facility. E1g, E1h E1g, E1h E1g, E1h D2t D2q, E1f h. The proposed action may result in the unearthing of solid or hazardous waste. D2q, E1f i. The proposed action may result in an increase in the rate of disposal, or processing, of solid waste. D2r, D2s j. The proposed action may result in excavation or other disturbance within 2000 feet of a site used for the disposal of solid or hazardous waste. E1f, E1g E1h k. The proposed action may result in the migration of explosive gases from a landfill site to adjacent off site structures. E1f, E1g l. The proposed action may result in the release of contaminated leachate from the project site. m. Other impacts: D2s, E1f, D2r Page of 10 18

17. Consistency with Community Plans The proposed action is not consistent with adopted land use plans. NO YES (See Part 1. C.1, C.2. and C.3.) If Yes, answer questions a - h. If No, go to Section 18. Relevant Part I Question(s) No, or small impact may occur Moderate to large impact may occur a. The proposed action s land use components may be different from, or in sharp C2, C3, D1a contrast to, current surrounding land use pattern(s). E1a, E1b b. The proposed action will cause the permanent population of the city, town or village C2 in which the project is located to grow by more than 5%. c. The proposed action is inconsistent with local land use plans or zoning regulations. C2, C2, C3 d. The proposed action is inconsistent with any County plans, or other regional land use plans. e. The proposed action may cause a change in the density of development that is not supported by existing infrastructure or is distant from existing infrastructure. f. The proposed action is located in an area characterized by low density development that will require new or expanded public infrastructure. g. The proposed action may induce secondary development impacts (e.g., residential or commercial development not included in the proposed action) h. Other: C2, C2 C3, D1c, D1d, D1f, D1d, Elb C4, D2c, D2d D2j C2a 18. Consistency with Community Character The proposed project is inconsistent with the existing community character. NO YES (See Part 1. C.2, C.3, D.2, E.3) If Yes, answer questions a - g. If No, proceed to Part 3. a. The proposed action may replace or eliminate existing facilities, structures, or areas of historic importance to the community. b. The proposed action may create a demand for additional community services (e.g. schools, police and fire) c. The proposed action may displace affordable or low-income housing in an area where there is a shortage of such housing. d. The proposed action may interfere with the use or enjoyment of officially recognized or designated public resources. e. The proposed action is inconsistent with the predominant architectural scale and character. Relevant Part I Question(s) f. Proposed action is inconsistent with the character of the existing natural landscape. C2, C3 E1a, E1b E2g, E2h g. Other impacts: No, or small impact may occur Moderate to large impact may occur E3e, E3f, E3g C4 C2, C3, D1f D1g, E1a C2, E3 C2, C3 Page 10 of 10 1

Full Environmental Assessment Form Part 3 - Evaluation of the Magnitude and Importance of Project Impacts and Determination of Significance Part 3 provides the reasons in support of the determination of significance. The lead agency must complete Part 3 for every question in Part 2 where the impact has been identified as potentially moderate to large or where there is a need to explain why a particular element of the proposed action will not, or may, result in a significant adverse environmental impact. Based on the analysis in Part 3, the lead agency must decide whether to require an environmental impact statement to further assess the proposed action or whether available information is sufficient for the lead agency to conclude that the proposed action will not have a significant adverse environmental impact. By completing the certification on the next page, the lead agency can complete its determination of significance. Reasons Supporting This Determination: To complete this section: Identify the impact based on the Part 2 responses and describe its magnitude. Magnitude considers factors such as severity, size or extent of an impact. Assess the importance of the impact. Importance relates to the geographic scope, duration, probability of the impact occurring, number of people affected by the impact and any additional environmental consequences if the impact were to occur. The assessment should take into consideration any design element or project changes. Repeat this process for each Part 2 question where the impact has been identified as potentially moderate to large or where there is a need to explain why a particular element of the proposed action will not, or may, result in a significant adverse environmental impact. Provide the reason(s) why the impact may, or will not, result in a significant adverse environmental impact For Conditional Negative Declarations identify the specific condition(s) imposed that will modify the proposed action so that no significant adverse environmental impacts will result. Attach additional sheets, as needed. Determination of Significance - Type 1 and Unlisted Actions SEQR Status: Type 1 Unlisted Identify portions of EAF completed for this Project: Part 1 Part 2 Part 3 20

Upon review of the information recorded on this EAF, as noted, plus this additional support information and considering both the magnitude and importance of each identified potential impact, it is the conclusion of the as lead agency that: A. This project will result in no significant adverse impacts on the environment, and, therefore, an environmental impact statement need not be prepared. Accordingly, this negative declaration is issued. B. Although this project could have a significant adverse impact on the environment, that impact will be avoided or substantially mitigated because of the following conditions which will be required by the lead agency: There will, therefore, be no significant adverse impacts from the project as conditioned, and, therefore, this conditioned negative declaration is issued. A conditioned negative declaration may be used only for UNLISTED actions (see 6 NYCRR 617.d). C. This Project may result in one or more significant adverse impacts on the environment, and an environmental impact statement must be prepared to further assess the impact(s) and possible mitigation and to explore alternatives to avoid or reduce those impacts. Accordingly, this positive declaration is issued. Name of Action: Name of Lead Agency: Name of Responsible Officer in Lead Agency: Title of Responsible Officer: Signature of Responsible Officer in Lead Agency: Signature of Preparer (if different from Responsible Officer) Date: Date: For Further Information: Contact Person: Address: Telephone Number: E-mail: For Type 1 Actions and Conditioned Negative Declarations, a copy of this Notice is sent to: Chief Executive Officer of the political subdivision in which the action will be principally located (e.g., Town / City / Village of) Other involved agencies (if any) Applicant (if any) Environmental Notice Bulletin: http://www.dec.ny.gov/enb/enb.html 21

NEGATIVE DECLARATION NOTICE OF DETERMINATION OF NO SIGNIFICANT EFFECT ON THE ENVIRONMENT In accordance with Article 8 (State Environmental Quality Review a/k/a SEQR) of the Environmental Conservation Law (the "Act"), and the statewide regulations under the Act (6 NYCRR Part 617) (the "Regulations"), the Tompkins County Industrial Development Agency ( Agency ) has considered the proposed NY Newfield IV, LLC and NY Newfield V, LLC applications (together, the Project ), which is more accurately described below. The Agency has determined: (i) that the proposed Project is a Type I Action pursuant to the Regulations; (ii) that the Agency has engaged in an environmental review of the Project; (iii) that upon conducting said review, the Agency has determined that the Project will result in no major environmental impacts and therefore will not have a significant effect on the environment; and (iv) therefore that an environmental impact statement is not required to be prepared with respect to said Project. THIS NOTICE IS A NEGATIVE DECLARATION FOR THE PURPOSES OF THE ACT. 1. Agency: The Agency is the Tompkins County Industrial Development Agency, Tompkins County, New York. 2. Contact for Further Information: Contact Person: Ms. Heather D. McDaniel, CEcD, AICP, EDFP Vice President, Director of Economic Development Services Address: Tompkins County Area Development 401 E. State St., Suite 402B Ithaca, New York 14850 3. Project Description: 14677020.1 NY Newfield IV, LLC and NY Newfield V, LLC (together, the Applicants ), submitted separate applications requesting that the Agency grant financial assistance and incentives for the construction and operation of a ground-mounted solar energy system, which shall include solar panels, inverters and pad mounted transformers, electrical trenches, deer fencing, and a temporary access lane, all of 22

which will be located on adjacent parcels totaling approximately 25.76 acres on the south side of Millard Hill Road in the Town of Newfield, Tompkins County (together, the Project ). 4. Project Location: The Project involves property located on the southern portion of 17 Millard Hill Road in the Town of Newfield, Tompkins County, which is further identified as tax parcels 3-1-42.254 and 3-1-42.255. 5. Reasons for Determination of Non-Significance: See Exhibit A attached hereto. DATED: February, 2018 TOMPKINS COUNTY INDUSTRIAL DEVELOPMENT AGENCY By:, Chair 14677020.1 23

Negative Declaration Exhibit A Criteria for Determining Significance As proposed, the reasonably anticipated environmental effects of the aforementioned Project will not be significant. This conclusion results from the thorough evaluation of the Project s attributes and its environmental effects against the criteria provided in NYSDEC regulations at 6 NYCRR 617 et. seq. A summary of this evaluation follows. Determination of Environmental Significance To determine whether the Project may have a significant effect on the environment, the impacts that may be reasonably expected to result from the proposed Project must be compared to criteria specified in NYSDEC regulations. (6 NYCRR 617.7). These criteria are considered indicators of significant effects on the environment. Criterion 1 A substantial adverse change in existing a) air quality; b) ground or surface water quality or quantity; c) traffic levels; d) noise levels; e) a substantial increase in solid waste production; f) a substantial increase in potential for erosion, flooding, leaching or drainage problems. a) Air quality The Project involves the installation of a ground-mounted photovoltaic solar energy system across two adjacent tax parcels. The property is comprised of vacant, undeveloped land that is covered in natural vegetation and surrounded by rural residential and farming uses. Once operational, the Project will not contain any emission-producing components. The Project may involve the potential for minor, temporary changes in air quality in the area immediately surrounding the site during the period of construction as a result of construction equipment. The Applicants and their contractors will take all necessary measures to mitigate any short-term construction-related impacts (e.g., using proper ventilation equipment). Given the rural setting of the Project and the anticipated duration and extent of construction activities, no significant adverse impacts associated with air quality are expected to occur. b) Ground or surface water quality or quantity No portions of the Project site are located within a floodplain or floodway, or immediately adjoining a sole source aquifer. Further, the Project site neither contains nor is it contiguous to a New York State regulated wetland. A small, unmapped wetland associated with an existing drainage swale exists along the eastern side of the property, but it is not within the 14677020.1 24

Project area and the Project has been designed to avoid this area entirely. A New York State regulated Class C stream is located southeast of the Project site and will not be affected by the proposed Project. While the project will result in an increase in impervious surface of approximately.03 acres, it is not anticipated to alter existing site conditions relative to surface water. In addition, specific erosion control measures (i.e., silt fences, stabilized construction entrance) will be implemented during construction so as to prevent those activities from adversely impacting existing site conditions or nearby water resources. c) Traffic levels The Project will be located in a rural setting and will not result in any measurable traffic disturbance during its operation. Once operational, a technician will visit the site approximately monthly to monitor the performance of the facility and conduct routine maintenance and repairs, as necessary. During construction, the Project will result in a slight increase in traffic to and from the site along Burdge Hill Road as Project-related materials are delivered and installed. This increase will be short-term in duration (approximately 3 months) and is not expected to require the development or implementation of any traffic control or management measures (i.e., flagging). As such, the Project is not anticipated to result in a significant adverse impact relative to traffic levels. d) Noise levels The Project s inverters and distribution transformers will generate very low level noise which will be consistent with ambient noise levels in the area. The equipment will produce a sound level of approximately 50dB at the closest property line, and figures from the United States Department of Transportation indicate that ambient noise levels in a rural area range from 40 db to 50 db. In addition, the inverters will be silent at night as the solar panels only generate power during daylight. While there is a potential for minor, temporary changes in noise quality due to typical construction-related activities, any such impacts to noise quality will be mitigated to the extent possible by using appropriate mufflers on heavy equipment and restricting construction hours (e.g., 7:00 a.m. to 5:00 p.m. from Monday through Friday). Accordingly, the Agency determines that any noise-related impacts associated with the Project will be insignificant. e) Substantial increase in solid waste production The Project will result in the generation of solid waste primarily during construction activities, with limited waste being generated during operations. All such waste shall be collected and disposed of by a licensed contractor at an existing solid waste facility in accordance with applicable laws and regulations. Once operational, the Project will result in the production of solar power without generating any waste by-products. As such, the Agency does not anticipate any adverse impacts associated with solid waste production. - 2-14677020.1 25