$ $ $ $ $ Failed Inspection... Residential...$ must be paid prior to re-inspection Miscellaneous $ 146.

Similar documents
a. Test well for the purpose of community water supply or any other investigatory purpose per Ordinance 124 b. Monitoring Well

EAST WHITELAND TOWNSHIP FEE SCHEDULE 2018

BOROUGH OF NORTH WALES. Fee Schedule Effective: 01/01/2018

Minor Subdivision or Annexation Plans... $1,500.00

NEWLIN TOWNSHIP CHESTER COUNTY, PENNSYLVANIA

RESOLUTION NO

RESOLUTION # WHEREAS, The Board of Supervisors of Upper Southampton Township has established a fee schedule, and

RESOLUTION NO BUILDING, ZONING, AND SEWAGE ENFORCEMENT FEE SCHEDULE

PALMER TOWNSHIP NORTHAMPTON COUNTY, PENNSYLVANIA RESOLUTION#

RESOLUTION NO. 778 BOROUGH OF MALVERN CHESTER COUNTY, PENNSYLVANIA

East Vincent Township Chester County, Pennsylvania

UPPER SAUCON TOWNSHIP DEPARTMENT OF COMMUNITY DEVELOPMENT COMPREHENSIVE FEE SCHEDULE (Per Resolution )

FEES AND COST DEPOSITS FOR SUBDIVISIONS, LAND DEVELOPMENTS AND DEVELOPMENT MATTERS SKETCH PLANS

TOWNSHIP OF WEST EARL LANCASTER COUNTY, PENNSYLVANIA RESOLUTION

New Hanover Township

WHEREAS, it is necessary that an appropriate Fee Schedule be established sufficient to

TATAMY BOROUGH 2018 FEE SCHEDULE ADOPTED 1/2/18 EFFECTIVE 1/1/18

LIMERICK TOWNSHIP 646 WEST RIDGE PIKE LIMERICK, PENNSYLVANIA 19468

FORKS TOWNSHIP FEE SCHEDULE AS AMENDED 11/2017

RESOLUTION NO. 701 BOROUGH OF MALVERN CHESTER COUNTY, PENNSYLVANIA

Allen Township Northampton County, Pennsylvania TOWNSHIP S GENERAL FEE SCHEDULE FOR 2018

NEW BRITAIN BOROUGH SCHEDULE OF FEES (Revised December 15, 2017)

A RESOLUTION AMENDING THE FEE SCHEDULE OF THE TOWNSHIP OF AMITY, PENNSYLVANIA

ZONING & BUILDING PERMIT AND SUBDIVISION & LAND DEVELOPMENT PLAN MASTER FEE SCHEDULE PER RESOLUTION No

Springfield Township Bucks County SCHEDULE OF FEES AND CHARGES RESOLUTION #

2016 CALN TOWNSHIP FEE SCHEDULE REVISION 1 (Adopted 8/25/16)

WEST MANHEIM TOWNSHIP FEE SCHEDULE FOR SERVICES & PERMITS. Resolution #

City of High Point Development Fee Schedule

TOWNSHIP OF DOYLESTOWN APPLICATION FOR REVIEW OF SUBDIVISION OR LAND DEVELOPMENT PROPOSAL. Please PRINT; all information MUST be filled out completely

Location in Code Subject Fees

Worcester Township Fee Schedule

Land Use Permit Fee Residential Commercial/Industrial Cost per $1, $ 6.00 $ 6.00

Towamencin Township Fee Schedule

W E S T T O W N T O W N S H I P 1039 Wilmington Pike P.O. Box 79 West Chester, PA Westtown, PA PHONE: (610) FAX: (610)

9. Public (Federal, State, or local

RESOLUTION NO. 29 OF Town of Clinton Fee Schedule

EAST COCALICO TOWNSHIP BUILDING / ZONING PERMIT PROCEDURE AND GENERAL NOTES Revised 6/12/2012

NEW BRITAIN BOROUGH SCHEDULE OF FEES (Revised April 9, 2019)

WEST NOTTINGHAM TOWNSHIP FEE SCHEDULE

BOROUGH OF BRIDGEPORT FEE SCHEDULE 2018

Subdivision and Land Development Plan Application

MIDDLESEX TOWNSHIP SCHEDULE OF FEES

MUDDY CREEK TOWNSHIP 2018 FEE SCHEDULE RESOUTION #

Appendix G Fee Schedule

BUILDING & ZONING SCHEDULE OF FEES Effective March 15, 2015

RESOLUTION NO AMENDING RESOLUTION NO TOWN OF BEL AIR S FEE SCHEDULE

Fee Schedule for Zoning, Building Permits, and Plan Review Services

BEFORE THE BOARD OF COUNTY COMMISSIONERS OF RICE COUNTY, KANSAS

RESIDENTIAL BUILDING PERMIT FEES. New Construction and Multi-Residential Construction* Including living, habitable space, basement, & garages

MUDDY CREEK TOWNSHIP 2019 FEE SCHEDULE RESOUTION #

Commissioners to enact, amend, and enforce technical construction and building codes; and,

THE BOARD OF COUNTY COMMISSIONERS

Town of Walworth Fee Schedule 2019

TOWN OF BLOOMSBURG COLUMBIA COUNTY, PENNSYLVANIA RESOLUTION NO SETTING VARIOUS FEES

ORDINANCE NO

PUTNAM TOWNSHIP. Schedule of Development Review Fees. As adopted by the Putnam Township Board August 16, 1995 Effective September 22, 1995

PERMIT FEES DOUBLED FOR CONSTRUCTION WITHOUT THE BENEFIT OF A PERMIT

Planning&Development Fee Standards

Wrightstown Township. Fee Schedule Resolution # Adopted 01/05/09

Building Division Fee Schedule January 2018

Development Related Fee Schedule Effective May 1, Plan Reviews. Remodeling, Alterations, Additions Residential and Commercial

Fees for construction of all buildings except single family dwellings, shall be calculated using Table 2.

ARTICLE V PRELIMINARY PLAN SUBMISSION

I. SUBDIVISION AND LAND DEVELOPMENT *

Development Related Fee Schedule Effective May 1, Plan Reviews. Remodeling, Alterations, Additions Residential and Commercial

Rules and Regulations. for. Building Control Fees. Revised January 2, 2018

Development Related Fee Schedule Effective May 1, Plan Reviews. Remodeling, Alterations, Additions Residential and Commercial

RULES AND REGULATIONS FOR ADMINISTRATION OF AREA DRAINAGE PLANS

TOWNSHIP OF O HARA ALLEGHENY COUNTY, PENNSYLVANIA

Application fee (Non-refundable) $20.00 Public Passenger Vehicle Chauffeur's License

FEES. Facility Rental/Damage Deposit $ Inspection, review, examine, search for, etc. of a public document

Greenbrier County Building Code Administrative Policy Manual

FERGUSON TOWNSHIP 2014 FEE SCHEDULE

UPPER MOUNT BETHEL TOWNSHIP NORTHAMPTON COUNTY, PENNSYLVANIA

Office of the Zoning Administrator and Planner. Saugatuck Township Planning and Zoning Applicants. Notice of Information for PC and ZBA Applicants

CITY OF BEL AIRE Schedule of Service, License and Permit Fees 2016

Moore Township Planning Commission 2491 Community Drive, Bath, Pennsylvania Telephone: FAX: Rev:12/23/2013

DESCRIPTION FEE UNIT MINIMUM BLDG FEE¹ New Building or Addition All occupancy classifications except

Chapter Fees (d) OFFICIAL ZONING MAP UPDATE (EXCLUDING FINAL PLATS) $10.00, PER LOT (e) HOME OFFICE PERMIT

RESIDENTIAL BUILDING/GENERAL PERMIT FEE SCHEDULE

THOMPSON-NICOLA REGIONAL DISTRICT INFORMATION TO APPLICANTS MANUFACTURED HOME PARK/ MANUFACTURED HOME PARK EXTENSION

Reynoldsburg Code of Ordinances. CHAPTER 1305 Permits and Fees

TOWNSHIP OF UPPER MACUNGIE LEHIGH COUNTY, PENNSYLVANIA. ORDINANCE NO [To be considered for Adoption June 1, 2017]

LINCOLN COUNTY, NORTH CAROLINA PLANNING & INSPECTIONS DEPARTMENT FEE SCHEDULE ADOPTED AUGUST 15, 2016 EFFECTIVE SEPTEMBER 6, 2016

SUBDIVISION AND LAND DEVELOPMENT. 185 Attachment 20

RESOLUTION NO. 83 OF 2011

ALPINE TOWNSHIP ZONING ORDINANCE TABLE OF CONTENTS

Remember, PA One-Call before excavating. Simply dial 811 or

Township of Salisbury Lehigh County, Pennsylvania REQUEST FOR PROPOSALS EMERGENCY SERVICES COMPREHENSIVE REVIEW

PROFESSIONAL ESCROW AGREEMENT

PUD Ordinance - Thornapple Manor #2 of 1998

ARTICLE III GENERAL PROCEDURES, MINOR PLANS AND FEE SCHEDULES

Caroline County, Maryland Department of Planning & Codes FEE SCHEDULE Tel: Fax:

SCHUYLKILL TOWNSHIP SUBDIVISION APPLICATION FORM REVISED June 30, Name of Applicant: Address: Telephone No.: Contact: Fax:

City of Pleasant Hill. Master Fee Schedule

Covington Water District Rate Table III Connection Charges and Related Fees 2018 Budget

BUILDING PERMIT SUBMITTAL REQUIREMENTS

SECTION 3.1 Zoning Permit Required for Construction, Land Use and Development.

MANHEIM BOROUGH 2016 Fee Schedule

ZONING and PA UNIFORM CONSTRUCTION CODE (UCC) PERMIT APPLICATION. I. Zoning Permit Section Date Received Ins. Addendum Y N

Transcription:

RESOLUTION 2017-11 2017 SCHUYLKILL TOWNSHIP FEE SCHEDULE REVISED JANUARY 3, 2017 & NOVEMBER 1, 2017 A RESOLUTION OF THE BOARD OF SUPERVISORS OF SCHUYLKILL TOWNSHIP, CHESTER COUNTY, SETTING THE SCHEDULE OF SUBDIVISION, LAND DEVELOPMENT, ZONING AND OTHER FEES AND CHARGES, AS FOLLOWS: All Permit Fees are Non-Refundable A Pennsylvania Department of Labor & Industry Fee of $4.50 is required for each Construction or Building Permit All Application Fees are payable when Application is made. 1. BUILDING PERMITS A. All dimensions shall be based on exterior wall measurements B. All permits required for rebuilding after fire or Act of God using previous foundation will be issued at a reduced fee (75% of calculated fee). To allow 75% of calculated fee, building must be secured and kept secured, and reconstruction is treated as new construction. C. Submitted plans are subject to review by the Zoning Officer and Building Official. Additional reviews done after the first review will be billed separately from the building permit fee. All review fees are to be paid prior to issuance of a building permit. Plans may be subject to review by Township Engineer and may require additional fees. Engineer review fees will be escrowed. D. Residential (R-3 as defined by the Uniform Construction Code) i) New Construction...... $ 500.00 application fee plus $0.37 per sf. (i.e., new home, detached garage, porches, addition with no major interior renovations) ii) Interior & Exterior Renovations/Alterations.. $ 200.00 application fee plus $16.00 per $1,000 construction cost (i.e., kitchens, bathrooms, changes in exterior wall covering, structural damage & repair, finished attic/basement, outdoor living/entertaining area, etc.) iii) Solar/Geothermal Energy...... $ 200.00 application fee plus $16.00 per $1,000 construction cost iv) Generator Installation...... $ 160.00 v) HVAC Replacement...... $ 120.00 vi) Electrical Service Upgrade...... $ 100.00 vii) Electrical Only...... $ 85.00 viii) Plumbing Only...... $ 85.00 ix) Accessory Structure... < 500 sf... $ 115.00 x) Swimming Pool... In-Ground... $ 25.00/$1,000 construction cost ($350 min.) Above Ground under 42... $ 80.00 Above Ground over 42... $ 160.00 xi) Decks... <than 500 sf... $ 40.00 plus $0.75/sf 500 sf 1,000 sf... $ 160.00 plus $0.50/sf >than 1,000 sf... $ 115.00 plus $0.25/sf electrical (if applicable)... $ 85.00 xii) Patios, Pavers, Walkways & Driveways... <than 500 sf... $ 30.00 plus $0.75/sf 500 sf 1,000 sf... $ 55.00 plus $0.50/sf >than 1,000 sf... $ 105.00 plus $0.25/sf plus E&S Grading Permit electrical (if applicable)... $ 85.00 [1]

xiii) Fence Permit...... $ 80.00 xiv) Manufactured Housing... Removal Permit... $ 100.00 Installation Permit... $ 200.00 xv) Sprinklers... Residential Permit... $ 400.00 includes 1½ hours of plan review (must meet base requirements) Additional Review... $ 72.00 per hour xvi) Failed Inspection... Residential...$ 80.00-must be paid prior to re-inspection E. Miscellaneous i) Re-roofing without Structural Repairs...... $ 146.00 (Structural Repairs fall under Repairs/Alterations) ii) Retaining Wall (any wall over 2 in height)...... $ 16.00 per $1,000 estimated cost ($200.00 minimum) Walls 3 high or over will require Township Engineer review; Engineer review fees will be escrowed.) iii) Signs...... $ 160.00 per installation iv) Temporary Structures...... $ 100.00 (i.e., tents, construction trailer, road side stands) v) Special Events (i.e. carnivals; haunted houses, etc.) $ 200.00 vi) Demolition...... $ 200.00 per building (1) Commercial or Industrial structures will be billed hourly. (2) Demolition fee is half price if building is suitable for fire training as determined by the Fire Chief. (3) If a building is 50 years old or older, demolition must be reviewed by the Historical Commission F. Commercial / Industrial / Institutional i) New Construction or Additions...... $ 1,000.00 application fee plus 2% construction cost ii) All Structural Repairs & Alterations...... $ 500.00 application fee plus 2% construction cost iii) Any other construction not specifically...... Actual Cost of Review by Zoning delineated above Officer, Code Enforcement Officer and Township Engineer. Engineer Review Fees will be escrowed. iv) Fire Protection Permit (1) Sprinkler...Commercial Permit... $ 750.00 includes 1½ hours of plan review (must meet base requirements) Additional Review... $ 110.00/hr (2) Fire Alarm (detection)commercial Permit... $ 750.00 includes 1½ hours of plan review (must meet base requirements) Additional Review... $ 110.00/hr (3) Fire Inspections... Commercial... Building Code Official s current hourly rate (hotels motels, assembly, institutional, business, medical, factory, retail, industrial high hazard, storage, utility and any miscellaneous or similar buildings) v) Failed Inspection, Commercial...... $ 160.00 vi) Use & Occupancy, Commercial...$ 250.00 Any inspection time over 2 hours is at a rate of $100/hour ANY CONSTRUCTION STARTED AND/OR COMPLETED WITHOUT A BUILDING PERMIT WILL REQUIRE THE FILING OF A BUILDING PERMIT APPLICATION, AND THE PERMIT FEE BEING DOUBLED [2]

2. TOWNSHIP ROAD ENCROACHMENT / HIGHWAY OCCUPANCY PERMITS A. If the Township determines that the permitted work is of sufficient magnitude or importance to warrant assignment of one or more persons to inspect the permitted work on a more than spot inspection basis, the permit will so indicate and the permitted shall be charged for additional fees and expenses incurred by each assigned inspector and the Township. Escrow i) Township Road Occupancy-new driveway Per PennDOT Fee Schedule $ 1,000.00 if required by Twp. ii) Township Road Occupancy-utilities Per PennDOT Fee Schedule $ 10,000.00 Bond/Year if required by Twp. iii) State Road (issued by PennDOT) Per PennDOT Fee Schedule -- 3. ZONING HEARING BOARD (non-refundable filing fee) A. For Change of Zoning...... $ 3,000.00 B. Residential...... $ 750.00 i) Continuance...... $ 300.00 C. Multi-Family Dwellings...... $ 750.00 plus $50.00 per unit D. Non-Residential...... $ 1,500.00 i) Continuance...... $ 500.00 E. Signs (FR, R-1, R-2 Districts)...... $ 500.00 F. Signs (all other Zoning Districts)...... $ 750.00 G. Appeal of Zoning Officer...... $ 1,500.00 Hearing Transcripts must be ordered directly from the Court Reporter. They may be viewed at the Township office but copies cannot be provided. 4. PETITIONS (non-refundable) A. Amendment to the SLDO...... $ 3,000.00 5. CHALLENGE TO VALIDITY OF ORDINANCE & CURATIVE AMENDMENTS A....... $ 7,500.00 6. CONDITIONAL USE A. Residential...... $ 2,000.00 i) Continuance (each)...... $ 300.00 B. Non-Residential...... $ 5,000.00 i) Continuance (each)...... $ 500.00 In addition to these fees, the applicant may be required to pay additional fees as allowed by the Municipal Planning Code ( MPC ). Fees are non-refundable. [3]

7. MISCELLANEOUS HEARINGS / APPEAL OF UNIFORM CONSTRUCTION CODE A. Miscellaneous Hearings...... $ 1,000.00 8. ACT 537 REVISION A. Residential...... $ 1,000.00 plus Township Engineer s fees B. Non-Residential...... $ 2,000.00 plus Township Engineer s fees 9. SUBDIVISION AND LAND DEVELOPMENT The subdivision and land development plan filing fee is payable at the time of preliminary plan submission. A sketch plan may be submitted for review by the Township prior to preliminary plan submittal. A deposit of $1,000 must accompany a sketch plan submittal along with a form agreeing to reimburse the Township for review fees over and above the $1,000 deposit. At the time of the Preliminary Application or Preliminary/Final Application, along with the filing fee and the subdivision and land development application, the Applicant or Developer will be required to deposit an escrow check with the Township for review of the plans. Escrowed funds must be replenished when depleted by fifty percent (50%) on the original amount and the project has the potential to incur further costs. Upon the recording of the subdivision plan by the Applicant or Developer with the Chester County Recorder of Deeds, or upon final action by the Board of Supervisors, or upon withdrawal of the Application by the Applicant or Developer, and after payment of all advertising, engineering, legal and other expenses incurred by the Township, the balance of the escrow deposit shall be refunded to the Applicant. Funds held in the escrow account shall not be returned until all Township invoices have been paid by the applicant. No final plans will be signed and/or released by the Board of Supervisors until all conditions of approval, fees and costs for the review of the subdivision or land development have been paid in full. The applicant shall pay all County Planning Commission, County Health Department, PaDEP, PennDOT, recording fees and any other regulatory agency fee holding jurisdiction. A. Lot Line Change Escrow Total i) Residential...$ 250.00... $ 1,000.00... $ 1,250.00 ii) Non-Residential...$ 500.00... $ 2,000.00... $ 2,500.00 B. Sketch Plan... 50% of applicable... $ 1,000.00 Preliminary Plan fee C. Residential: These fees apply to residential projects for sale, condominium ownership or rental; any type of buildings either as a subdivision or single tract land development, or an agricultural subdivision (except for guidelines in Article I, Section 107, Subdivision, MPC, Act 247, as amended). Base Fee Fee Each Lot/Unit Escrow i) 1-Lot Land Development...$ 25.00... None... $ 2,000.00 ii) 1-5 Lots / Units...$ 75.00 Plus... $ 10.00/Lot/Unit... $ 5,000.00 iii) 6-15 Lots / Units...$ 100.00 Plus... $ 10.00/Lot/Unit... $ 7,500.00 iv) Over 15 Lots / Units...$ 100.00 Plus... $ 10.00/Lot/Unit... $ 10,000.00 [4]

D. Non-Residential Subdivisions: These fees apply to applications for subdivision and conveyance of land for non-residential uses, not proposed for land development as defined in Section 107 of the Municipal Planning Code. Number of Lots & Units Base Fee Fee Each Lot/Unit Escrow i) 1-5 Lots/Units...$ 150.00 Plus... $ 30.00 Lot/Unit... $ 5,000.00 ii) Over 5 Lots...$ 200.00 Plus... $ 25.00 Lot/Unit... $ 7,500.00 E. Non-Residential Land Development: These fees apply to all projects or sections of mixed projects which are for non-residential use for sale, condominium, lease or rent in any type of building on a single tract of land. Number of Developed Acres Base Fee Fee Gross Floor Area i) 1 Building under 250 sf...$ 25.00... Plus... None ii) Under 5 acres...$ 250.00... Plus... $ 30.00/1,000 sf iii) 5 49.99 acres...$ 300.00... Plus... $ 30.00/1,000 sf iv) 50 99.99 acres...$ 300.00... Plus... $ 30.00/1,000 sf v) Over 100 acres...$ 300.00... Plus... $ 30.00/1,000 sf vi) Escrow Fees (1) 1-Building <250 sf...$ 1,000.00 (2) Under 5 acres...$ 2,500.00 (3) 5 49.99 acres...$ 5,000.00... Plus... $ 50.00 for every acre or partial acre >5 acres (4) 50 99.99 acres...$ 7,500.00... Plus... $ 50.00 for every acre or partial acre >50 acres (5) Over 100 acres...$ 10,000.00... Plus... $ 50.00 for every acre or partial acre >100 acres F. Recording of Deeds of Dedication... $ 150.00 No fee for deeds involving additional rights-of-way along existing public roads. G. Residential Approval Verification Fee... $ 100.00 (per Act 46 of 2010) H. Commercial Approval Verification Fee... $ 500.00 (per Act 46 of 2010) 10. DRAINAGE/STORMWATER MANAGEMENT PLAN/E & S CONTROL/GRADING A.... $ 200.00 B. Land Use i) Residential... $ 100.00 ii) Non-Residential... $ 100.00 C. Relative amount of earth disturbance i) Residential (1) Impervious area < 500 sf... $ 100.00 (2) Impervious area 500 2,500 sf... $ 500.00 (3) Impervious area > 2,500 sf... $ 700.00 [5]

[6] ii) Non-Residential (1) Impervious area < 3,500 sf... $ 500.00 (2) Impervious area 3,500 43,560 sf... $ 1,000.00 (3) Impervious area > 43,560 sf (1 acre)... $ 2,000.00 D. Relative Size of Project i) Total Tract Area < 1 acre (43,560 sf)... $ 200.00 ii) Total Tract Area 1 5 acres... $ 500.00 iii) Total Tract Area 5 25 acres... $ 800.00 iv) Total Tract Area 25 100 acres... $ 1,000.00 v) Total Tract Area 100 200 acres... $ 1,750.00 vi) Total Tract Area > 200 acres... $ 2,500.00 E. Stormwater Control Measures i) Detention Basins & other controls which... $ 400.00 require a review of hydraulic routings ii) Other Control Facilities F. Site Inspection Notes & Instructions 1. Item A is mandatory for all permit applications 2. Select the appropriate classification under Items B, C, & D. 3. For Item E, determine the total number of each type of facility and multiply the fixed fee per facility. 4. For Item F, the first site inspection is included in the fee, and therefore is mandatory. During construction, additional inspections may be required, and will be billed to the applicant/permit holder at the current inspection rate. 11. MISCELLANEOUS FEES A. Real Estate Transfer Tax Recorder of Deeds/Chester Co. 1% of monies collected B. Earned Income Tax Collected by Keystone Collections Group.. 1.25% - resident rate C. Local Services Tax Collected by Keystone Collections Group. $ 52.00/year D. Tax Collector i) Duplicate Bills...... $ 5.00/parcel ii) Tax Certification...... $ 20.00/parcel iii) Written Real Estate Tax Document...... $ 25.00 iv) Returned Checks...... Amount charged by financial institution E. Certification i) Certificate of Use & Occupancy/existing structures... $ 80.00 ii) Floodplain Letter (1) Residential Use...... $ 200.00/letter (2) Non-Residential Use...... $ 200.00/letter

iii) Zoning Certification (1) Residential...... $ 200.00/letter (2) Non-Residential...... $ 200.00/letter F. Written Zoning Opinions...... $ 250.00/letter (Upon written request and not associated with a permit application. Letter to be mailed upon payment of fee) G. Fire Prevention Inspection Fee (check with Fire Marshall). $ 250.00 to Fire Company H. Annual Manufactured Home Park Permit...... $ 100.00 I. Blasting Permit...... $ 125.00 J. Fireworks & Fireworks Sales Permit...... $ 125.00 each event K. Police i) Peddler s Permit...... $ 25.00 per instance ii) Alarm Fees/False Alarms (per calendar year) (1) First Third Incident...... No Fee (2) Fourth Fifth Incident...... $ 25.00 each incident (3) Sixth Seventh Incident...... $ 50.00 each incident (4) Eight and up...... $ 100.00 each incident iii) Accident Report...... $ 15.00 per report iv) Incident Report...... $ 10.00 per report v) Non-Arrest Fingerprinting...... $ 10.00 L. Photocopies i) In-house copies...... $ 0.25 (b & w) $ 0.50 (color) ii) Outside copies...... actual cost from vendor M. Publications Postage Additional i) Zoning Ordinance...... available on-line only ii) Subdivision & Land Development Ordinance... available on-line only iii) Zoning Maps...... $ 2.00 iv) Comprehensive Plan...... $ 50.00 v) Open Space Plan...... $ 50.00 vi) Act 537 Plan...... $ 50.00 N. Road Department Re-Installation of Signs...... $ 150.00/sign O. Returned Checks...... $ 25.00 + Bank Fees To be paid in cash or certified check 12. TOWNSHIP CONSULTANT FEES A. Township Engineer...... as per 2017 Gilmore & Associates, Inc. Professional Services Fee Schedule B. Township Solicitor...... $ 175.00/hour (as per Butera, Beausang, Cohen & Brennan, PC) [7]

C. Zoning Hearing Board Solicitor...... $ 160.00/hour (as per Patrick McKenna, Esq. Gawthrop Greenwood, PC) D. Township Code Enforcement Officer...... as per 2017 Keystone Municipal Services Professional Services Fee Schedule ANY FEE NOT COVERED BY THE FEE SCHEDULE SHALL BE DETERMINED ON A CASE-BY-CASE BASIS BY THE BOARD OF SUPERVISORS OF SCHUYLKILL TOWNSHIP. ALL FEES ARE NON-REFUNDABLE UNLESS DETERMINED ON A CASE-BY-CASE BASIS BY THE BOARD OF SUPERVISORS OF SCHUYLKILL TOWNSHIP 13. PAYMENT FOR SERVICES Payment for any permit, service, filing fee, application, appeal, hearing, or any other service as provided by the Township and contained herein is due upon receipt of said request. Should payment not be made, made in full and payment returned by the bank for non-sufficient or insufficient funds, the Township shall not provide any of the above services until payment is made in full. NOW THEREFORE, BE IT RESOLVED, by the Board of Supervisors of Schuylkill Township that the official schedule of subdivision, land development, zoning and other fees and charges is hereby revised, amended and adopted as set forth above, this 1st day of November, 2017. Attest: SCHUYLKILL TOWNSHIP BOARD OF SUPERVISORS Madeline Harbison, Township Secretary [8]