ARCHITECTURAL CONTROL COMMITTEE SUBMITTAL REQUIREMENTS Submit to Teri Edwards at (O)

Similar documents
Waterford Owners Association Construction Guidelines

Woodway, TX ARCHITECTURAL CONTROL COMMITTEE

~ Please Detach and Save This Page ~

SUMMARY RESTRICTIONS FOR PRAIRIE CROSSING SUBDIVISION

REQUEST FOR ALTERATION REVIEW VERANDA GARDENS HOMEOWNERS ASSOCIATION, INC.

Secondary Dwelling Unit

The Bristol ELEVATION C & D

RESIDENTIAL PLAN APPROVAL AND INSPECTION FEES. 2. Inspection fee $.25 per sq. ft. Minimum Inspection Fee of $25.00

ZONING PERMIT APPLICATION and INSTRUCTIONS

GALLATIN COUNTY Land Use Permit Information & Application

Construction Restrictions

TOWNSHIP OF DOYLESTOWN APPLICATION FOR REVIEW OF SUBDIVISION OR LAND DEVELOPMENT PROPOSAL. Please PRINT; all information MUST be filled out completely

Packet for New Home Construction

BOROUGH OF MOUNT ARLINGTON ZONING PERMIT APPLICATION PROCEDURE 419 Howard Blvd., Mt. Arlington, NJ (973) ext. 14

Architectural Control Committee (ACC) Packet for Miscellaneous Construction 1 February 2018

MCPC MONONGALIA COUNTY PLANNING COMMISSION 243 High Street, Rm 110, Morgantown, WV Phone Fax

MENARD COUNTY ZONING PERMIT APPLICATION (PLEASE READ BEFORE PROCEEDING WITH APPLICATION)

L L O T DESIGN GUIDELINES. Appendices

Zoning Permit Application Cover Page

Issaquah Highlands Architectural Improvement Application

SWIMMING POOL PERMIT APPLICATION PACKET

Addendum A Lake Country Village

City of East Orange. Department of Policy, Planning and Development LAND USE APPLICATION & SITE PLAN REVIEW CHECKLIST

ARTICLE 8C SITE CONDOMINIUM DEVELOPMENT ORDINANCE

LAND USE PERMIT INFORMATION PACKET

Watertown City Council

WINDWARDS HOMEOWNERS ASSOCIATION ARCHITECTURAL GUIDELINES

INSTRUCTIONS FOR FILING A PLANNING/ZONING BOARD APPLICATION

PROCEDURE GUIDE AND APPLICATION FOR A DEVELOPMENT PERMIT TO CLEAR AND GRADE A PARCEL OF LAND

BEAR CREEK TOWNSHIP ZONING PERMIT APPLICATION

NOTE TO ALL VARIANCE APPLICANTS:

APPLICATION FOR A VARIANCE

An application to the Zoning Board of Appeals is not complete and will not be scheduled until all of the following information has been provided:

DEMO ITEM SUBJECT COMPARABLE SOLD # 1 COMPARABLE SOLD # 2 COMPARABLE SOLD # 3

APPLICATION FOR MAJOR SUBDIVISION APPROVAL (PRELIMINARY PLAT)

City of Midland Application for Site Plan Review

Township of Moorestown

Your Homeowners Association Property Improvement Handbook

SITE DEVELOPMENT PLAN APPLICATION PAHRUMP REGIONAL PLANNING DISTRICT

FLYING L RANCH PROPERTY OWNERS ASSOCIATION, INC 566A Flying L Drive Bandera, TX ARCHITECTURAL CONTROL COMMITTEE (ACC) INFORMATION

ZONING HEARING BOARD APPLICANTS

CITY OF EMILY VARIANCE APPLICATION

LOT SPLIT APPLICATION

CITY OF BELLE GLADE. 110 Dr. Martin Luther King Jr. Blvd., West Belle Glade, FL Telephone (561) Fax (561)

9. Public (Federal, State, or local

ADMINISTRATIVE REVIEW FOR AN ACCESSORY DWELLING UNIT

Addendum A Edgewater Heights Seller: Edgewater Heights, LLC Buyer: Property: Offer to Purchase dated:

CITY OF CHICAGO AN APPLICATION TO THE CHICAGO PLAN COMMISSION UNDER THE LAKE MICHIGAN AND CHICAGO LAKEFRONT PROTECTION ORDINANCE

Application for Pool and Pool Fence (revised 3/14/17)

Accessory Dwelling Units (ADUs)

Accessory Dwelling Unit Permit

MACOMB TOWNSHIP BUILDING DEPT TEL: (586) BROUGHTON ROAD FAX: (586) MACOMB MI 48042

A. Application Procedure

Town of Cary Real Estate Plat Review Process and Certificates

DEPARTMENT. A Current Contractor Listing: If the contractor is pulling the permit, they must be listed with the County

MINOR ALTERATIONS PROCEDURE

LOT IMPROVEMENT APPLICATION

The ARCHITECTURAL REVIEW PROCESS

BOROUGH OF BANGOR ZONING PERMIT APPLICATION PACKET. Submission Checklist

Charter Township of Garfield Grand Traverse County

COMMUNITY AND DEVELOPMENT SERVICES APPLICATION FOR RESIDENTIAL BUILDING PERMIT HOPKINSVILLE KY

APPLICATION PROCESS FOR PROJECT REVIEW

I. Requirements for All Applications. C D W

EAST COCALICO TOWNSHIP BUILDING / ZONING PERMIT PROCEDURE AND GENERAL NOTES Revised 6/12/2012

PATIO PERMIT REGULATIONS

CITY OF LITTLE FALLS BUILDING PERMIT APPLICATION ALL BUILDING PERMITS ARE GOOD FOR ONE YEAR

SUBDIVISION APPLICATION

STEP 1: SOIL EVALUATION

TOWN OF RIB MOUNTAIN

TOWN OF HILLSBOROUGH

(a) Commercial uses on Laurel Avenue, abutting the TRO District to the

Major Subdivision Application Packet. Revised June 2018

ZONING & LAND USE APPLICATION

The Vanderbilt OPTIONAL ELEVATION C

SWIMMING POOL GUIDELINES

The Anegada OPTIONAL ELEVATION C. *Rendering is an artist s conception and is for illustrative purposes only.

ZONING CHANGE/SUP APPLICATION

CERTIFICATION OF THE APPROVAL OF WATER AND SEWERAGE SYSTEMS

SUBDIVISION AND LAND DEVELOPMENT. 185 Attachment 20

Lakewood at Darby Architectural Review Committee. Approvals Process

Final Plats for Major Residential and Commercial Subdivisions Checklist

CITY OF EL MIRAGE DEVELOPMENT APPLICATION PROCESS

Village of Glen Ellyn Fee & Deposit Schedule Per Village Code 4-1-4

Point Aquarius Property Owners Association Architectural Control Committee REQUEST FOR ARCHITECTURAL CONTROL COMMITTEE APPROVAL

Exhibit THIRD AMENDED PUD WRITTEN DESCRIPTION. Willens Claire Lane PUD

The Bridgeport OPTIONAL CRAFTSMAN STYLE. *Rendering is an artist s conception and is for illustrative purposes only.

SPEAR S RANCH ON SALADO CREEK ARCHITECTURAL CONTROL COMMITTEE IMPROVEMENT GUIDELINES

ARCHITECTURAL MODIFICATION GUIDELINES

BUILDING PERMIT APPLICATION

JOINT PLANNING BOARD APPLICATION FORM

HOMEOWNERS ASSOCIATION OF EAGLE CREEK, INC. ARCHITECTURAL REVIEW BOARD REQUEST FORM INSTRUCTIONS

Addendum A Brookdale Estates

ZONING COMPLIANCE PERMIT APPLICATION

Brittni Place Homeowners Association, Inc. Design Guidelines

TOWN OF NEW SHOREHAM ZONING BOARD OF REVIEW APPLICATION PROCEDURE

ADDITION/REMODEL APPLICATION CHECKLIST 2017 FBC. Please make sure you have ALL required copies before submitting permit application

CITY OF MADEIRA, OHIO APPLICATION FOR LOT SPLIT INCLUDING PROPOSED PANHANDLE LOTS AND VARIANCES REQUESTED

BUCKINGHAM COUNTY BUILDING PERMIT CHECKLIST

DAMMERON VALLEY LANDOWNERS ASSOCIATION ARCHITECTURAL GUIDELINES [May, 2010] PREFACE

VARIANCE APPLICATION

Transcription:

ARCHITECTURAL CONTROL COMMITTEE SUBMITTAL REQUIREMENTS Submit to Teri Edwards at tedwards@crescentcommunities.com (O) 980-321-5180 Date Submitted Builder Community Phase / Lot# Address SPEC or CUSTOM (circle one) _ Application for Final Design Approval (Exterior materials must be specified by manufacturer, color name and number if applicable. If exterior material is a custom color, then sample must be provided). _ One (1) site plan (size - 11x17) _ One (1) set of plans (size - 11x17) including roof plan. _ Construction Escrow Information Form _ Copy of fully executed contract (custom) or appraisal from the bank (Spec) _ Waiver of Right of First Refusal or Re-Sale Certificate This may already be on file. _ Featured Builder or Non-Community Builder Agreement This may already be on file. _ Marketing Fee Acknowledgement Form _ Check for Marketing Fee _ Check for Plan review _ Check for Construction Escrow Deposit Check Information for Plan Review: _ $650.00 Check for the following communities: The Point, The Farms, Falls Cove, Northview Harbour, Sailview, The Peninsula, _ $750.00 Check for the following communities: Springfield, Ballantyne Country Club, Chapel Cove. The Sanctuary COMMUNITY BUILDERS: Check Information for Construction Escrow: _ The Point, The Farms, Falls Cove, Northview Harbour, Sailview, The Peninsula, Springfield, Ballantyne Country Club or Chapel Cove - $1,000.00 Construction Escrow Deposit check for each house should be made payable as listed above. _ The Sanctuary - $5,000.00 Construction Escrow Deposit check for each house should be made payable as listed above. NON-COMMUNITY BUILDERS: Check Information for Construction Escrow: _ The Point, The Farms, Falls Cove, Northview Harbour, Sailview, The Peninsula, Springfield, Ballantyne Country Club or Chapel Cove - $2,500.00 Construction Escrow Deposit check for each house should be made payable as listed above. _ The Sanctuary - $7,500.00 Construction Escrow Deposit check for each house should be made payable as listed above. ***Payable Information for Checks: o Falls Cove Falls Cove Development, LLC o The Farms The Farms, LLC o Sailview / Northview Harbour Crescent Communities NC, LLC o The Point / The Peninsula The Point on Norman o Springfield Springfield Crescent, LLC o Ballantyne Country Club Crescent Communities NC, LLC o Chapel Cove Chapel Cove at Glengate, LLC o The Sanctuary The Sanctuary at Lake Wylie, LLC

CRESCENT COMMUNITIES APPLICATION FOR FINAL DESIGN APPROVAL Date Submitted Builder Community Non-community Community_ Phase / Lot# Address SF Total: Heated Unheated Basement: Finished SF Unfinished SF Total Price: $ Home Price: $ Lot Price: $ (resale Yes or No) Submit this form with one (1) copy of final site and house plans of the home to be built. A $ dollar deposit shall be made with each plan until such time that final plans have been submitted for approval, and a $ _ dollar balance for Landscape/Construction Escrow is maintained in each builder s respective escrow account. Name of Lot Owner: Address: Telephone: Work Home: _ I. Final Site Plan (size 11x17) Location (with dimensions and materials) should be illustrated for each of the following site improvements on the Building Envelope Lot Plan: A. Drainage and erosion control, if required by Community Guidelines. B. House and other improvements (garage, decks, patios, swimming pools, tennis courts, etc.) within Building Envelope C. Front, rear and side yard setbacks dimensioned D. Driveway, sidewalks, and utility easements as shown on recorded plat (include sewer pump system) if applicable E. Fences and walls (including retaining walls) Approved: _

II. Final House Plans (size 11x17) Heated finished square footage: First Floor Plan Name: Second Floor Elevation: Third Floor Custom or Spec: Basement Unfinished List Price: (Inc. Lot) Basement Finished Master Bedroom Location: TOTAL (Heated) # of Bedrooms: Half Baths: _ Full Baths: TOTAL (Overall) Sq. Ft. Garage: _ Estimated Completion _ Approved: III. Final House Elevations (size 11x17) Front, side and rear elevations shown Design exterior and layout appropriateness Approved: IV. Exterior Specifications: Submit samples with Manufacturer specifications Manufacturer/Material Color/Name Foundation: Ext. Primary: Ext. Secondary: Roof: Trim: Wall: Front Door: Shutter: Garage Door: Window: Other: Approved:

V. ACC Required and Suggested Modifications: Required: Suggested: VI. Final Approval Granted as noted; however, construction start is subject to Approval to commence work Granted with Approval to commence work Denied Reviewed and Approved by: Advisory Design Professional Date Crescent Resources, LLC Date APPROVAL OF FINAL PLANS ALONE DOES NOT MEAN CONSTRUCTION MAY START. VII. Approval to Commence Work _ 1. _ 2. _ 3. Private driveway (ratable cost) paid (if applicable) Site visit to review staking. Receipt of contract for construction between owner and Featured Builder In accordance with the receipt of the above items as required in the Architectural and Landscape Guidelines, you are approved to commence construction on this lot. Authorized ACC Member Date

CRESCENT COMMUNITIES CONSTRUCTION ESCROW INFORMATION SHEET Date Submitted Builder Community Non-community Community Phase / Lot# Address Owner s Name: _ Owner s Address: Owner s Phone #: Owner s E-mail: Builder s Name: Builder s Address: Builder s Phone #: Builder s E-mail: Notices to be given regarding the use of the Construction Escrow Deposit will be done in conjunction with the Architectural, Landscape, and Lake Buffer Guidelines (if applicable). In accordance with the Enforcement Section of the Community Documents, the Declarant shall have the right to enter the above referenced lot to remedy any violation that remains after the Owner or Owner s Agent has been notified as referenced above and in the Architectural, Landscape, and Lake Buffer Guidelines (if applicable). Owner s Signature: *If the contact person is someone other than the owner, have that responsible party fill out the following: In place of the Owner, I, agree to accept the terms and conditions for notification regarding the use of the Construction Escrow Deposit as outlined in this document, the Covenants, Conditions, and Restrictions, and the Architectural, Landscape, and Lake Buffer Guidelines (if applicable). Responsible Party s Signature: Method of Contact: ACC USE ONLY: Construction Escrow Utilized: Date Reason Amount 1. _ 2. _ 3. _ Builder Paid _ Owner Paid Attach Copy of the check (Office Use Only)

MARKETING FEE ACKNOWLEDGEMENT HOME CONSTRUCTION CONTRACT ONLY 11.02.12 Purchaser(s): Builder: Property: Lot, Community Address: Co-Broker: Firm: Agent Name: Home Price $ $ Lot Price $ $ Total Contract Price Including Lot Cost: $ X 2% Total Marketing Fee $ Sign Credit $ $ Rendering Credit $ (Speculative Homes Only) Total Due at ACC Submittal $ $ BUILDER: _ By: Name: Title: DEVELOPER: By: Name: Title: