Sewer Diversion under Section 104/116 of the Water Industry Act 1991

Similar documents
Adoption of a new sewer

Developer Services. Sewerage Technical Team: Fees for April 2018

PLEASE COMPLETE ALL SECTIONS USING BLOCK CAPITALS AND BLACK INK

Application for a sewer requisition and/or the diversion of an existing sewer

FURTHER THAT Consent B-19/16 be subject to the following conditions:

Highways Practice Note 029 Highways Act Section 72 Guidance March HPN Control Sheet

Development of a temporary grass multisport pitch and associated works (in addition to the previously approved park - Phase A).

FOR SALE. 200 dwellings residential development site. with a resolution to grant planning permission THE STEEDS, GREAT COXWELL, OXFORDSHIRE SN7 7NN

A guide to. Shared Ownership. for you - for your community - not for profit.

NOT TO BE SUBMITTED WITH SKETCH DESIGN APPROVAL Subdivision Checklist: Major Subdivision Final Plat

Property Development Connection Requirements (Sewer)

Planning Information Forum 23 rd November, 2016

HAUXTON MILL BUILDINGS CAMBRIDGE ROAD HAUXTON CAMBRIDGE

Independent Connection Providers Legal Process and Statutory Consents

ANNEXURE A. Referred to in the Contract For Sale of Land by Offer and Acceptance. made between as Buyer

Please note that this is the only official copy we will issue. We will not issue a paper official copy.

DEVELOPMENT OPPORTUNITY AT COURT DRIVE SHENSTONE LICHFIELD STAFFORDSHIRE WS14 0JQ

A guide to. Shared Ownership

ICP/IDNO Land Rights Guide

FOR SALE. 515 dwelling residential development site HIGHWORTH ROAD, SHRIVENHAM, OXFORDSHIRE, SN6 8BL. with outline planning permissions

DATED EXCLUSIVITY AGREEMENT. relating to LAND AT REDHAM LANE, PILNING, SOUTH GLOUCESTERSHIRE. between (1) P G WITHERS.

POLICY & PROCEDURE FOR THE TAKING IN CHARGE OF RESIDENTIAL DEVELOPMENTS

London Borough of Lambeth Room 205, Town Hall Brixton Hill, London SW2 1RW

Silverdale Water District 2017 Construction Agreement Developer to Build Extension

Please note that this is the only official copy we will issue. We will not issue a paper official copy.

Planning Permit 1146/2017, issued on 30/04/2018 by Sandra Stewart (Port Phillip City Council). SPEAR Ref: S114883H

3RD PARTY ENQUIRIES TECHNICAL QUESTION GUIDANCE NOTE

Renovation guide & application form

Fees and charges. Consenting and property information fees and charges. Effective from 1 July 2018

Committee of Adjustment Agenda

application to enter into residential tenancy agreement

Welsh Government Motorway and Trunk Road Network

GUIDELINES FOR BUILD OVERS

County of Santa Clara Finance Agency Controller-Treasurer

Conveyancing. Pricing. wardhadaway.com. Newcastle Leeds Manchester

LOT A. Range of modern and traditional farm buildings and acres of land Windsor Hill, Shepton Mallet FOR SALE BY AUCTION IN 8 LOTS

West Highfield Farm. Carlton in Coverdale, Leyburn

DEED OF OPTION DOUGLAS PAISLEY & EMERY SOLICITORS 46 LANGSTON PLACE EPPING NSW 2121 (PO BOX 215, EPPING NSW 1710) DX 4404 EPPING

CITY OF SARALAND FINAL SUBDIVISION PLAT REVIEW

Sloane Street, London SW1 9AX Fax:

CITY OF MCKINNEY ENGINEERING DEPARTMENT ENGINEERING DEVELOPMENT FINAL ACCEPTANCE CHECKLIST

Buying or Selling a Property Legal Terms Explained For St. James s Place Clients

5. That the Owner shall agree that all development Blocks shown within the Draft Plan will be connected to full municipal services.

GUIDANCE ON AGREEMENTS WITH THE SECRETARY OF STATE FOR TRANSPORT UNDER SECTION 278 OF THE HIGHWAYS ACT 1980

I Harris. Melbourne. John Quirk, Member. Merits Review of Refusal

4.60 Acres or Thereabouts Accommodation Land Shirley Lane, Rodsley, Ashbourne, Derbyshire, DE6 3AL

REGISTER OF LOCAL LAND CHARGES OFFICIAL CERTIFICATE OF SEARCH

REGISTER OF LOCAL LAND CHARGES OFFICIAL CERTIFICATE OF SEARCH

FOR SALE. A residential development plots with outline planning permission for 2, 3 or 4 dwellings

PURCHASE OF FREEHOLD OR LEASEHOLD RESIDENTIAL PROPERTY

Guidelines for the Approval of New Homes Sales Offices (Building Permits, Agreements, Securities)

Equity Release Mortgages (please contact us for a bespoke quote

Telephone : (02) MOBILE: Station Street Eungai Rail APPLICATION FORM

SOUTH TIPPERARY COUNTY COUNCIL

AGENDA ITEM SUMMARY BUSINESS OF THE CITY COUNCIL CITY OF GOLDEN, COLORADO. Quasi Judicial Matter

AFFORDABLE HOME OWNERSHIP ALLOCATION POLICY

For and in consideration of the mutual covenants set forth in this Agreement, Association and Owner hereby agree as follows:

shared ownership explained... a guide to your future... Contact our Home Ownership support team today

ADVICE NOTE BUYING AND SELLING YOUR FLAT. A summary of the typical events when buying and selling a leasehold flat

LAND EAST OF STILTON PETERBOROUGH

PUBLIC RIGHTS OF WAY. Guidance for Planners and Developers

THE OFFER TO PURCHASE

DATE: April 26, 2017 REPORT NO. CD Members of the City of Brantford Committee of Adjustment

Deed of Agreement for Easement [in relation to Connection Contract Contestable ASP/1 Connection]

Septic Tank / Drainfield / Holding Tank Permit Application

CALL FOR ENTRIES ELIGIBILITY CATEGORIES ENTRY FEES JUDGING PROCESS

LAND OFF THETFORD ROAD WATTON, NORFOLK

GUIDE TO SELLING YOUR SHARED OWNERSHIP HOME

A Guide to the Land Severance Process

FOR SALE BY PRIVATE TREATY

COLLIER COUNTY Growth Management Department Engineering Review Services

SUBDIVISION Application Information

CITY OF PETALUMA HOUSING PROGRAM REQUEST FOR PROPOSALS FY

MINOR SUBDIVISION FINAL PLAT APPLICATION Town of Apex, North Carolina

Taking In Charge Policy For Housing Developments

1. Purchaser please provide the full name and address of the proposed purchaser

Residential Development Opportunity

PRE-BID MEETING MINUTES/ADDENDUM #1 S. LAKEVIEW DRIVE DRAINAGE IMPROVEMENT PROJECT BID NUMBER PW

The Conveyancing Association Protocol For England and Wales

LAND AT GREAT CLERKES FARM LITTLE SAMPFORD, THAXTED, ESSEX

Experienced, efficient property professionals

Former Bus Depot, Eascott Road, Swindon, SN1 3LS. Residential Development Opportunity Site Area: 0.61 Hectares (1.508 Acres)

THE CHARTERED INSTITUTE OF LEGAL EXECUTIVES UNIT 10 CONVEYANCING * CASE STUDY MATERIALS

THE SUBDIVISION AND LAND DEVELOPMENT REVIEW PROCESS

The learner can: 1.1 Give examples of types of transaction carried out in a conveyancing office.

SECTION B DEVELOPER OR GROUP SERVICE APPLICATION PROCEDURES

Instructions for APPLICATION FOR CONSENT

FOR SALE ASSET MANAGEMENT OPPORTUNITY

Sample Building Name, Sample Road, Sample Town, Sample County, RG1 8DB

What if the tenant can t be contacted at the end of the tenancy?

Flinders Avenue, Lara Planning Scheme Amendment Combined Application for Rezoning and Multi-Lot Subdivision Reference : Decembe

CHECKLIST FOR DEVELOPERS

SUBDIVISION APPLICATION

BRUNSWICK-GLYNN COUNTY JOINT WATER AND SEWER COMMISSION

Example for a registered Freehold purchase of 150,000 (this estimate does not include Help to Buy Scheme or New build properties).

Thank you for your interest in leasing a property with dethridgegroves Real Estate.

Notice of Intention by Rob Huntley, a Reporter appointed by the Scottish Ministers

THE LAND POOLING RULES OF THE KINGDOM OF BHUTAN 2009 ROYAL GOVERNMENT OF BHUTAN MINISTRY OF WORKS AND HUMAN SETTLEMENT

Have all applicants provided 100 points of ID (as per attached information sheed)?

City of Winter Haven. Application for Vacating Street, Alleys, and Public Ways. And Redirecting Traffic

Transcription:

Mr Kurt Robbins Hill Cannon Consulting LLP Evans Business Centre Hartwith Way Harrogate North Yorkshire HG3 2XA Your ref Our ref DS4018287 Name Jose Varela Phone 0800 009 3921 Email developer.services@thameswater.co.uk 22 September 2016 Dear Kurt, Sewer Diversion under Section 104/116 of the Water Industry Act 1991 Site The Weatsheaf, 36 Dores Road, Swindon, SN2 7QT Thank you for your diversion application for the above site. Due to the non-strategic nature of the sewer you would like to divert, we would process your original S185 Sewer Diversion application under a Section 104/116 diversion agreement. This will allow your own suitably qualified contractor (so long as they have operatives qualified for working in confined spaces) to undertake the diversion works, which will be inspected by and subject to a legal agreement. Diversion of a sewer under Section 104/116 requires to agree to adopt the new sewer in advance of construction (S104), and divest/abandon as a public sewer the old section (S116). Following the technical review of your design we are pleased to confirm that your proposals as shown on drawing number 16100-01 Rev P1 and 16100-04 Rev P1 are acceptable to us in principle, subject to completion of a suitable Section 104/116 Agreement. Our acceptance is also subject to certain conditions and statements which are listed below. 1. Please offset the run between manholes FM2 and FM3 approximately 1m into the highway so that we can have the usual 3m easements from the proposed new houses and it does not fall under the kerb line. 2. Please note that you will need also to apply for a Build Over application to verify the integrity of the existing surface water sewer. 3. All plans should include the following statement: All adoptable drainage works to be constructed as detailed in Sewers for Adoption, 7 th edition or as stipulated in s Addendum. 4. No private drainage shown coloured on the proposed Agreement plan. Please show the existing public sewers in black, the diverted foul section in red and the abandoned section in orange. Please show also a thick green line as the site boundary (this is required for the wording in the agreement). 5. Diverted sewer material should be vitrified clay as the existing sewer.

6. Trees and shrubs of a large size or heavy canopy, or with a moderate or high water demand must not be planted within any sewer easement. 7. Please verify levels of existing sewers on site before start of the works. NEXT STEPS 1 LEGAL AGREEMENT Please supply the following information so that we can instruct our solicitors to prepare the Agreement. 2No. copies of the technically approved adoptable drainage layout plan to be included in the agreement. Please also send electronic (pdf) copies. Payment for our inspection fees to the value of 945.74, representing 2.5% of the scheme estimate. Please note that in addition our solicitors will also request a fee in the region of 600 to draft the legal agreement (please pay that money to our solicitors on their request and inform your solicitor). A completed copy of the enclosed Legal Instruction Form. Please complete all sections marked Developer/. requires a cash deposit in lieu of the normal bond or surety. The deposit must be paid before any sewer diversion works begin on site and should be equal in value to the full estimate of the proposed diversion works. In this case estimates the value of the work to be 37,829.55. This deposit is fully refundable (in stages) once the diversion has been completed, inspected to our satisfaction, and the developer has fulfilled his obligations as set out in the standard clauses of the aforementioned Agreement. (see pages 158-159 of Sewers for Adoption 6 th edition). 80% will be refunded following the Provisional Certificate (see below) and the remaining 20% following the Final Certificate. Please note that no works can begin until the Section 104/116 Agreement has been signed and the cash deposit paid. 2 SITE INSPECTIONS Gravity Sewer Please provide 1 copy of the adoptable drainage layout plan, this will be submitted to our Field Engineer to complete the inspections. They will contact you to arrange this. Please fill Site Inspections Contact Details form and send back. The reference number (or Service Order) for inspections for your site is: 80466240 Please quote it on any inspection related enquiry. 3 PROVISIONAL CERTIFICATE AND REFUND OF 80% DEPOSIT In order to issue the Provisional Certificate of Substantial Completion we will need the following items in place: 1) Signed Agreement 2) Satisfactory inspection and CCTV Survey of the adoptable sewers 3) As Built drawings 4) Confirmation that at least 50% of the properties are occupied

4 FINAL CERTIFICATE AND REFUND OF REMAINING 20% DEPOSIT Following the 12 months Maintenance Period we will carry out a final inspection before issuing the Final Certificate. Please contact the Field Engineer to arrange the final inspection quoting the Service Order provided. The reference number for your application is DS4018287; please quote this in any future communications. If you have any questions please give the Helpdesk a call on 0800 009 3921. We are open 8am-5pm, Monday to Friday, or you can email us at developer.services@thameswater.co.uk. We look forward to hearing from you. Yours sincerely Jose Varela Adoptions Engineer Strategic Partnering Planning for and enabling growth, Clear Water Court,,, Berkshire, Helpdesk: 0800 009 3921 Email: developer.services@thameswater.co.uk

LEGAL INSTRUCTION PRO FORMA - TO BE COMPLETED BEFORE THAMES' SOLICITORS WILL PROGRESS SECTION 104 AGREEMENT *1. Developer/ Name and location of Development Name: 2. TWE Reference Number *3. Developer/ Developer's solicitor's details DS4018287 *4. Developer/ *5. Developer/ *6. Developer/ Developer's details (Note: please enter details of all developers, if there are more than one) Owner's details if different to Developer (Note: please enter details of all Owners, if there are more than one) Adjoining Owners who need to be a party to the Agreement (Note please enter details of all Adjoining Owners, if there are more than one) 8. TWE Cash deposit in lieu of the normal bond or surety 37,829.55 9. TWE Inspection Fees 945.74 *10. Developer/ Period of Construction and Period of construction:. date it starts from (Note : The planned completion date for the S.104 Agreement must NOT be more than 3 months from the date you provide us with the completed Instruction Pro Forma). Start date:

LEGAL INSTRUCTION PRO FORMA - TO BE COMPLETED BEFORE THAMES' SOLICITORS WILL PROGRESS SECTION 104 AGREEMENT *11. Developer/ *12. Developer/ Layout Plan(s) Is a Deed of Easement required? Drawing Number(s)16100-1... NO *14. Developer/ Will the party to the Deed of Easement be the Owner or the Adjoining Owner? Is there a Pumping Station? (Whether or not transfer is to happen at a later date) 15. TWE Does this instruction include the transfer of a Pumping Station? *16. Developer/ Are there any above ground surface water Balancing Facilities? NO

CONTACT DETAILS FOR INSPECTIONS FORM Please fill and return application reference: DS4018287 FULL NAME AND COMPANY: PHONE: EMAIL: