Procurement Plan. 3. Proposed Procedures for CDD Components (as per paragraph of the Guidelines:

Procurement Method. Preparatio n of TORs/invi tation

Procurement Plan. II. Thresholds for Prior Review, Procurement Approaches and Methods

Procurement Plan. Prior Review Threshold (US$) 1. ICB and LIB (Goods) USD 3,000,000 All 2. NCB (Goods and Nonconsultant prior review by the bank

2. Project Implementation Agency: National Bureau of Statistics. 3. Date of the Procurement Plan Approval: June 12, 2018

Sample Procurement Plan

Sample Procurement Plan

Sample Procurement Plan

Sample Procurement Plan

PROCUREMENT PLAN (Textual Part)

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Procurement Plan Baseline

A New Page of the NEC Expedition - DSD s Initial Experience on 5 More NEC Pilot Contracts

Sample Procurement Plan

Greater Beirut Water Supply Project Additional Finance Addendum to the Resettlement Action Plan

Implementation Status & Results Brazil Santos Municipality (P104995)

Implementation Status & Results Macedonia, former Yugoslav Republic of Real Estate Cadastre & Registration Project (P083126)

Monthly Indicators + 7.3% + 6.6% + 8.3% Single-Family Market Overview Condo Market Overview New Listings Pending Sales.

CUSTOMER CONTRACT REQUIREMENTS Transactional Spares CUSTOMER CONTRACT SPM4A1-09-G-0004 DO 8009

Implementation Status & Results Colombia Bogota Urban Services Project (P074726)

The World Bank Turkey Land Registration and Cadastre Modernization Project (P106284)

Implementation Status & Results Brazil Santos Municipality (P104995)

CUSTOMER CONTRACT REQUIREMENTS Subcontractor CUSTOMER CONTRACT P

PROJECT FINANCIAL STATEMENTS REAL ESTATE REGISTRATION PROJECT. Report on the Republika Srpska part of the. of the

REPUBLIC OF MACEDONIA

SFR Condo Residential Lot Sales Inventory Sales Inventory Sales Inventory. Month YTD Month Month YTD Month Month YTD Month

Implementation Status & Results Colombia Bogota Urban Services Project (P074726)

REAL ESTATE REGISTRATION PROJECT

Public Disclosure Copy

Procurement Plan Mozambique: P Greater Maputo Water Supply Expansion Project

Public Disclosure Copy

PLANNING AND DEVELOPMENT SERVICES. Planning Cases. Case Type

Procurement Plan Governance and Policy Project for Federally Administered Tribal Areas (P156412)

CUSTOMER CONTRACT REQUIREMENTS Combat Track II Sustainment and Support CUSTOMER CONTRACT FA D-0002

WATER AND SANITATION DEVELOPMENT PROJECT (WSDP) SUMMARY PROCUREMENT PLAN (first eighteen months)

Sample Procurement Plan

Adnan Zoranić. Hrasnička cesta 15, Sarajevo, Bosnia and Herzegovina

While a project is typically acquired on a specific date

PROPINSIGHT A Detailed Property Analysis Report

Implementation Status & Results Macedonia, former Yugoslav Republic of Real Estate Cadastre & Registration Project (P083126)

The World Bank Turkey Land Registration and Cadastre Modernization Project (P106284)

LOCKHEED MARTIN CORPORATION PRIME SUPPLEMENTAL FLOWDOWN DOCUMENT (PSFD) ADDITIONAL TERMS AND CONDITIONS FOR SUBCONTRACTS/PURCHASE ORDERS UNDER

Dr. Jaser Khalaf Mahasenh

EXHIBIT A GOVERNMENT PROVISIONS APPLICABLE TO PRIME CONTRACT DAAJ09-95-C-A001

Sample Procurement Plan

Puerto Rico Housing Finance Authority Housing Stimulus Programs

Implementation Status & Results Croatia Integrated Land Administration System Project (P122219)

CUSTOMER CONTRACT REQUIREMENTS DARPA ACT CUSTOMER CONTRACT HR C-0001

GOVERNMENT PROVISIONS APPLICABLE TO PRIME CONTRACT DAAH23-02-C-0155

S/N COURSE TITLE 1ST BATCH 2ND BATCH FEE

Experiences with land consolidation and land banking in Slovenia since 1991

Involuntary Resettlement Due Diligence Report. ARM: Water Supply and Sanitation Sector Project Additional Financing

Arbitration and Dispute Resolution

PROJECT IMPLEMENTATION REPORT for 2012

JES2 and JES3 Releases. RSU Level. r6.0 build 151 r2.3, r2.2, r2.1 r2.3, r2.2, r2.1 RSU1803

Implementation Status & Results Croatia Integrated Land Administration System Project (P122219)

International funding projects in Republic Geodetic Authority

Extending limits of space. Geodetski zavod Celje

CUSTOMER CONTRACT REQUIREMENTS AV-8 CUSTOMER CONTRACT N D-1000

Protecting the Government's Interests When Subcontracting With Contractors Debarred, Suspended or Proposed

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB3229 Project Name. Land Registry and Cadastre Modernization Project Region

CUSTOMER CONTRACT REQUIREMENTS ALASA Phase II CUSTOMER CONTRACT HR C-0051

CUSTOMER CONTRACT REQUIREMENTS DLA Spares CUSTOMER CONTRACT SPRPA1-14-D-002U

Public Disclosure Copy

CUSTOMER CONTRACT REQUIREMENTS SOCOM - Chimera CUSTOMER CONTRACT H D-0005

Experience + Knowledge = Client Power

Curriculum Vitae for Fredrik Zetterquist

Implementation Status & Results Macedonia, former Yugoslav Republic of Real Estate Cadastre & Registration Project (P083126)

Roles, Responsibilities and Relationships About MPAC Property Assessment in Ontario Updates to Assessment Values in Year Products and Services Role

CITY OF BIHAĆ DEVELOPMENT PROJECT: BUSINESS ZONE KAMENICA

What is a Conditional Use? When is a Conditional Use Necessary? Who decides if I will get a Conditional Use Permit

HEC Sub-committee on Harbour Plan Review. Thirteenth Meeting

Springbrook Estates Sewer Improvement Area Informational Meeting Presented By Allen County Sanitary Engineering Department August 28, 2013

Implementation Status & Results Guatemala LAND ADMINISTRATION II APL (P087106)

Puerto Rico Housing Finance Authority Housing Stimulus Programs

FLORENCE NEIGHBORHOOD REVITALIZATION

S/N COURSE TITLE 1ST BATCH 2ND BATCH

The World Bank Integrated Land Administration System Project (P122219)

PROPINSIGHT A Detailed Property Analysis Report

The University of Massachusetts Campus Master Plan. Faculty Senate April 21st

QUESTIONS AND ANSWERS FOR: RFP# 13-34, RFP for Engineering Services for Gas Distribution System Improvements

RUV Registro Único de Vivienda

CUSTOMER CONTRACT REQUIREMENTS DLA CUSTOMER CONTRACT SPE4A1-15-G-0001

Implementation Status & Results Macedonia, former Yugoslav Republic of Real Estate Cadastre & Registration Project (P083126)

Home Based Business - Discretionary Use Application Form

Regional Cadastral Study Reforms in the Region

MVWD Financial Dashboard

July 2012 was $162,256. ($153,956). was $314,607. was $172,488. ($164,426). Kansas City Region Average Sales Price - Existing Homes

CONTRACTOR EMPLOYER

Public Disclosure Copy

PROPINSIGHT A Detailed Property Analysis Report

ParcelMap BC. Compiling a Parcel Fabric for the Province of British Columbia. WENDY AMY and ELLEN STYNER

ii. Minimum Property Requirements and Minimum Property Standards

Report Unlicensed Contractors with DBPR Mobile App. Licensing Regulation and Enforcement (LR&E) News

Accounts Payable: Accounting and Management Best Practices

NE Martin Luther King Jr. Blvd & Alberta Street Project. PDC Board of Commissioners Meeting August 19, 2015

CUSTOMER CONTRACT REQUIREMENTS EATTS3 CUSTOMER CONTRACT W911W6-12-D-0006

MAGRATH AND DISTRICT REGIONAL WATER SERVICES COMMISSION REGULATION

CUSTOMER CONTRACT REQUIREMENTS Proprietary CUSTOMER CONTRACT Loki

Common Terms and Conditions Guide Section 5 Government Contract Requirements Clause Number: 5052 Effective: 10/15/2002 Page: 1 of 9

The Effective Analyst: From Research to Execution. Contents are subject to change. For the latest updates visit

Transcription:

losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Contract Completed Contract Signed Procurement Ongoing Ref. No. Contract Description 1. Civil 2 4 5 6 7 8 9 10 11 12 13 Banja Luka Procure ment Method Review by Bank Prior/Post BD Prepared Invitation to Bid Expected Bid Opening Date Contract Award Contract amount Contractor s name Contract Completed 1.1 Completion of Filter Plant construction. Construction of filter room, construction of pipeline for connection of new and old treatment February Integral Inzinjering 1.1 plant 1 st Construction Phase ICB Prior Aug 22,05 Aug 24,05 Oct. 12,05 10, 06 2,886,459.53Laktasi, BiH Nov, 06 1.2. Chemicals Dosing Plant Construction with Chemicals Dosing Equipment Installation 1 st 1.2 Construction Phase ICB Prior July, 08 Aug,08 Oct,08 Dec,08 June, 09 Lukavac 1.3 Supply of materials, equipment and pipeline construction (to Dolezaj 1.3 WSR) NCB Prior Nov 11,05 Nov.14,05 Dec.16,05 1.4 1.5 1.6 February 27, 06 244,123.40 EGWinzinjering za gas I vodu, Sarajevo, BiH July, 06 1.4 Replacement of pipelines (water supply network) NCB Post March,08 April,08 June 08, June, 08 Nov,08 1.5 Rehabilitation, replacement and extension of Modrac and Tabaci water supply network NCB Post Dec, 07 March,08 April, 08 April,08 June, 08 1.6 Rehabilitation /extension of water treatment plant and well system ICB Prior Jan,08 Jan, 08 April,08 July,08 July, 09 Posusje 42816 Comment s are completed and paid in full. The contract realized and paid in full.

1.7 1.8 1.9 1.7 Construction of Tribistovo Posusje Pipeline (600 mm dia), 5 km ICB Prior March, 06 April 25, 06 June 5, 06 Oct., 27,06 1.8 Construction of Water storage reservoir (3000 cbm) ICB Prior June, 06 Sep.16,06 Oct.30,06 Mar.27, 07 KTM-BRINA d.o.o. and 1,394,307.78MAC BiH Dec, 07 Putovi d.o.o. and Hering d.d. Siroki 1,137,177.23Brijeg, BiH Febr, 08 1.9 Construction of Water Treatment Plant - 100 l/s capacity (Phase 1) ICB Prior Dec,07 Jan,08 March,08 April,08 Jan, 09 Cazin 1.10 1.10 Pipeline construction works ICB Prior Feb.,06 March,06 May 8,06 Aug.11,06 589,907.19 BC-GRADNJA d.o.o Dec., 07 Pale 1.11 Construction of for improvement of existing sewerage 1.11 collector Jahorina-Pale NCB Post Dec, 07 Jan, 08 March, 08 April, 08 Sept, 08 1.12 Construction for construction of new sewerage system Sator-Poljice (Development of the existing Jahorina sewerage 1.12 system NCB Post Nov, 07 Nov, 07 Jan, 08 March, 08 Sept,08 are. comletion date has been extanded till Dec.07 are. comletion date has been extanded til Feb. 08 are. comletion date has been extanded three times due to unforesee n soil conditions.

1.13 Construction for construction of measuring points (shafts for installation of measuring equipment) for remute reading of water consumption and installation 1.13 of measuring equipment. NCB Post April, 08 April, 08 July, 08 Sept,08 May, 09 2. Goods Banja Luka Total civil works 2.1 2.1.Chemicals Dosing Equipment Supply & Installation-1 st Construction Phase ICB Prior Jan 08, Febr,08 April,08 May,08 Dec,08 2.2. Water Treatment Plant Laboratory Equipment, Furniture-1 2.2 st Construction Phase ICB Prior July,08 July, 08 Oct,08 Decem,08 March,09 Lukavac 2.3 2.3 Supply of bulk water meters, valves, pressure reduction valves, and supply of material for pipeline repair ICB Prior Febr,08 Febrr,08 Mayl,08 July,08 Dec,08 2.4 Posusje 2.4.Supply of Materials and Equipment for Pipeline & Water Storage Reservoir Assembling ICB Prior Augt 5,05 Aug 12,05 Sept 22,05 Cazin 1.March 27, 06 2. March 6,06 1.March 15, 2006 1.Euro 648,067.04 2.Euro 311,765.954 1.Euro 1,360,533.6 2.5 Supply of pipes, fittings, materials and equipment for 2. March 15, 2006 2. 2.5 pipeline construction ICB Prior Aug 10,05 Aug 16,05 Sept 30,05 34,457.65 1. for Lot 1 Aqua Promet, Zagreb, Croatia 2. for Lot 2 HTC, Sarajevo, BiH 1..for Lot 1 CMC Slovenia 2.for Lot 2 Bosnaplast, Sarajevo Dec,06 Dec.06 This tender is to be rebidden because all bids submitted under first bidding have been rejected. Goods delivered, 10% payment is to be paid All Goods have been delivered and paid.

3. March 15, 3. Euro 2006 156,406.71 4.May 10,2006 4. Euro 48,450 3 for Lot 3 CMC Slovenia 4. for Lot4 Elin, Vienna Pale 2.6 Procurement of necessary basic material for construction of new fecal sewerage Sator-Poljice /Development of the existing Jahorina sewerage system(pipes, connecting fittings, prefabricated Euro Zagozen Slovenia 2.6 manholes, manhole covers etc) ICB Prior May 07 May 07 July, 07 3 Sept 07 74,353.74 Nov 07 2.7 Procurement of necessary equipment for remote reading of water consumption (water meters with remote accessories and appropriate softwares for radio remote control) and procurement of necessary equipment for leakage 2.7 detection with appropriate softwares ICB Prior Dec, 07 Feb, 08 April, 08 July, 08 Sept, 08 Total Goods Delivery term is extended until 11 Nov.07. Delivery is 3. Consultancy Assignments with Selection Methods and Time Schedule Contract Completed Contract Signed Procurement Ongoing 1 2 4 5 6 7 8 9 10 11 12 13 Ref 3. Consultants Services and No. Training Selection Method Review by Bank Prior/Post RFP Ready Invitation for EOI Proposal submission date Contract Awarded Contract amount Consultant s name Contract Comments completed

3.1 3.2 3.3 Lukavac 3.1 Water Treatment Plant Conceptual Febr, 08 Design and tender Documents CQ Post Nov,07 Nov,07 Dec, 07 Dec, 07 3.2 Construction Supervision for Water July, 09 Treatment Plant CQ Post March,08 March,08 May, 08 June, 08 3.3 Hydraulic network analysis and Evaluation zoning plan preparation CQ Post July, 06 13 July,06 Nov,07 Nov,07 January,08 is 3.4 Construction supervision for pipeline 3.4 construction works CQ Post Nov, 07 Nov, 07 Dec.07 Jan, 08 Febr, 08 3.5 Construction supervision for pipeline Febr,08 3.5 replacement works CQ Post Nov, 07 Nov, 07 Dec.07 Jan, 08 3.6 3.6 Construction Supervision for rehabilitation, replacement and extension of Modrac and Tabaci water supply network CQ Post Nov, 07 Nov, 07 Dec.07 Jan, 08 Febr,08 Posusje 3.7 3.7 Construction supervision for Pipeline IC Post Aug, 06 Aug,06 Aug, 06 3 May,07 3.8 3.9 3.8 Geological-geo-technical supervision for Pipeline IC Post Aug, 06 Aug,06 Aug, 06 17 July, 07 3.9 Construction supervision for Water Storage Reservoir IC Post April, 07 April, 07 Sept, 07 Sept,07 3.10 Electric supervision for Water 3.10 Storage Reservoir IC Post April, 07 April, 07 Oct, 07 Oct, 07 3.11 Construction supervision for Water 3.11 Treatment Plant IC Post Jan,08 Feb,08 March,08 May,08 3.12 Cazin 3.12 Supervision of Pipeline construction works CQ Post July 06 July 8, 06 July 24,,06 Nov,06 Pale 3.13 Preparation of cadastre (geodesic measuring and m,apping of GIS) of the existing sewerage collector Jahorina- Pale, as swell as near existing installations, and preparation final designwe for improvement of collector 3.13 Preparation of cadastre (geodesic CQ Post May, 07 June, 07 July, 07 30 Sep, 07 36,100 5,375 24,300 Triel/Damir Loncar Vinko Bilopalovic Mostar Best-soft d.o. Cazin, BiH Dec. 31,,07 Beoinzinjering 2000, Belgrade, Serbia Contract is signed and Jan,08 is Contract is signed Nov, 07 and is Febr, 08 Evaluation Febr, 08 Evaluation January, 09 Contract is and is extended until December 31,07 Contract is signed and

3.14 measuring and mapping of GIS) of the existing installations in the area of Sator- Poljice and preparing final design of sewerage connection at the area of Sator-Poljice USD 75,605.7 Dec, 07 3.14 Investigation of leakages on existing Water Supply System Jahorina (Leak Detection), and preparation of final design for improvement of existing WSS Jahorina (Leak Reduction) CQS Post Jan, 08 Feb, 08 March, 08 March, 08 July, 08 Total Consultants Services 6. Other Elements of the Project. Some to be defined and decided with subsequent revision of the Procurement Plan. Activity Description 4. Operational Cost 4.1 Project implementation N/A Post N/A TBD 4.2 Project Audits LCS Prior Total Operational Cost To follow sound commercial practice To be selected for various component s at different tomes 5. Urban Management Development Plans and Investments 5.1 Tuzla Canton 5.1.1 Implementation of Regional Plan: Drinking water treatment plant-krušik water resource-kalesija municipality ICB Prior Jan,08 Jan,08 March,08 April,08 March,09 5.1.2 Implementation of Regional Plan: Drinking water treatment plant-snje nica lake as water resource Teo ak municipality. ICB Prior March,08 March,08 May,08 June 08 April,09 5.1.3 Implementation of Regional Plan: Drinking water treatment plant- Kladanj municipality ICB Prior June,08 Aug,08 Sept,08 Oct,08 June,09

Town Banjaluka July,07 July,07 Dec, 07 Feb, 08 July, 08 5.1.4 Modernization of the local road Kola- Kantari-Zelenci- L=1 km NCB Post 5.1.5 Modernization of the local road Dragocaj- Dikijevci-Gradina-L=1 km NCB Post Jan,08 Jan,08 Feb,08 April,08 July, 08 5.1.6 Modernization of local road Stara pijedorska cesta-m.han-radinjaca-l=0.5 km NCB Post Jan,08 Jan,08 Feb,08 April,08 July, 08 5.1.7 Modernization of regional road B.Luka- S.Most (26 th km)-golesi-d.lokva-kola-l=1km NCB Post Jan,08 Jan,08 Feb,08 April08 July, 08 Municipality Srebrenica 5.1.8 Reconstruction and additional building on residential objects for common lining in the city of Srebrenica Lot 1-Buildings S4/1, S4/ and Building S- and Lot 2-Building S- 8 and Building S-10 Municipality Tomislavgrad (Canton Livno) NCB Prior (first NCB contract in RS) June, 07 November, 07 06 Dec, 07 Jan, 08 June, 08 5.1.9 Infrastructural works on industrial zone Vuciji brig Lot 1- Precipitation sewage system, Lot 2- Building of roads and green spaces and Lott 3- Low voltage power grid and public lighting NCB Post Nov, 07 Dec, 07 Jan, 08 Febr, 08 June, 08 Municipality Glamoc (Canton Livno) 5.1.10 Construction of pipeline Glamoc-Novo Selo Other cantons.municipalities 5.2 Goods Canton Sarajevo Total works NCB Prior (second NCB contract in the Federation) Aug, 07 November 07 Dec, 07 Febr, 08 June, 08 5.2.1 Procurement of the required software and procurement of the equipment required for realization of projects ICB Prior August 07 August, 07 12 Sep, 07 Nov, 07 Dec, 07 Other cantons-municipalities Tender is approved by the WB, and is to be advertised Tender advertised Bidding document is currently with the WB for the prior review Evaluation of bids is (this is rebidding)

5.3 Consultants services Tuzla canton Total Goods 5.3.1. The final part of the Predraft of the Regional Plan of Tuzla Canton for the period 2005-2005 SSS Prior 10 June, 05 27 June, 05 05 July, 05 08 Aug, 05 290,000 JP Zavod za urbanizam Tuzla 5.3.2. The execution of the urban plans, in accordance with priorities of Tuzla canton QCBS Prior Dec,07 Jan,08 March,08 April,08 July,08 Sarajevo canton 5.3.3 Production of digital model of canton Sarajevo terrain (DTM) 5.3.4 Study Strategic Environment Assessment 5.3.5 Prospective of the communications and connections development in Canton Sarajevo 5.3.6 Stability of the terrain in Canton Sarajevo 5.3.7 Achieving optimal energy supply in Canton Sarajevo 5.3.8 Functions of the centrality of the Capital City Second phase 5.3.9 Cultural-historical and natural heritage of Canton Sarajevo 5.3.10 Study of the economic activities Second phase CQS Post Feb, 07 March,07 April, 07 1 June, 07 140,000 Dec,05 Geodetski zavod Sarajevo 1 Sep, 07 QCBS Prior Nov, 07 Dec, 07 Feb, 08 March, 08 July, 08 CQS Post Jan, 07 Feb, 07 May, 07 6 Sep, 07 50,497.2 Saobracaj i komunikacije Sarajevo 6 Dec, 07 QCBS Prior Nov,07 Dec, 07 Feb, 08 March, 08 August, 08 CQS Post Nov, 07 Dec, 07 Feb, 08 March, 08 Sept, 08 CQS Post Aug, 07 Oct, 07 Nov, 07 Dec, 07 March, 08 CQS Post Aug, 07 Nov, 07 Nov, 07 Dec, 07 March, 08 CQS Post Aug, 07 Oct, 07 Nov, 07 Dec, 07 April, 08 5.3.11 Study of the housing and housing construction in Canton Sarajevo sociological study CQS Post Nov, 07 Nov, 07 Dec, 07 Jan, 08 May, 08 5.3.12 Study of the space vulnerability CQS Post April, 07 May, 07 June, 07 25 July, 07 USD 93,000 Urbanisticki institut Republike Slovenie, Ljubljana The contract is completed and paid in full. The contract is completed The contract is signed and is EOI advertised EOI advertised 25 Dec, 07 The contract is signed and is

5.3.13 Monitoring of the urban development. 5.3.14 TBD Other cantons/towns/municipalities Total Consultants services QCBS TBD Prior Nov, 07 Nov, 07 Jan, 08 Feb, 08 Dec 09 wb18862 L:\pp for UISDP.doc 03/04/2008 10:31:00 AM