TOWNSHIP OF CAVAN MONAGHAN NEW COMMUNITY CENTRE
INCORPORATE PRE- PRE- ANTICIPATE FUTURE EISTING PARKING ENGINEERED FABRICATED EPANSION STRUCTURE CLADDING SYSTEM CONSTRUCTION GROUND FLOOR + PHASING PLAN
BUILDING ELEMENTS TO BE INCLUDED IN THE FIRST PHASE: Single pad NHL-size rink Spectator seating Upper level viewing Warm viewing from lobby 6 team change rooms and 2 official s change rooms Upper-level walking/running track Banquet hall, including bar and warming kitchen Fitness studio Multi-purpose room Parks and Recreation office space Concession/canteen, vending machine and ATM Storage for municipal purposes and for sport user groups Fully accessible facility with passenger elevator Fully wired with current technology and WiFi Spacious lobby with café style seating
-Positive feedback and suggestions were received and recorded -A number of suggestions have been immediately addressed, others to be addressed as the project evolves through the next stage of design PUBLIC GROUND CONSULTATION FLOOR PLAN
FUTURE ACCESS ROAD PHASE 2 PARKING (100) PHASE 3 PARKING (244) PHASE 2 EPANSION ARENA OUTDOOR RECREATIONAL SPACE VISIBLE ENTRANCE + COMMUNITY ROOMS HC PARKING DROP-OFF PARKING (100)_ FUTURE PEDESTRIAN CONNECTION SITE PLAN COUNTY ROAD 10 ACCESS TO EISTING PARKING LOBBY GREEN BUFFER TO CEMETERY EISTING CEMETERY CHANGE ROOMS COMMUNITY SPACES BACK OF HOUSE GREEN BUFFER TO CEMETERY TERRACE + OUTDOOR PLAY TEMPORARY GRAVEL ROAD FALLIS LINE ZONE OF EPANSION OF COMMUNITY SPACE FUTURE CONNECTION TO NEIGHBOURHOOD PHASE 3 EPANSION EISTING MUNICIPAL BUILDING
FALLIS LINE EISTING CEMETERY FUTURE PHASE NEW COMMUNITY CENTRE PARKING 100 STALLS COMMUNITY ROOMS TERRACE + PLAYGROUND DROP-OFF COUNTY ROAD 10 EISTING MUNICIPAL BUILDING AERIAL VIEW OF SITE FROM EAST
WEST ENTRY BACK OF HOUSE CHANGE ROOMS SPRINKLER COOLING TOWER RECY- GARCLING BAGE REFRIGERATION RESURFACER MECH. CR 6 CR 5 CR 4 CR 3 CR 2 CR 1 REF 1 MAINT. FITNESS STUDIO WC PLAYERS BENCHES LOBBY WARM VIEWING STORAGE ICE PAD (85ft x 200ft) WC MP ROOM KITCHEN STOR. TERRACE + OUTDOOR PLAY STORAGE MAINT. ELEC. ELEVATOR OFFICE large O/H door WC RECEP- CONCTION ESSION SERVICE/ LOADING AREA REF 2 BANQUET HALL MAINT. BENCH SEATING PENALTY/ TIMEKEEPER BENCH SEATING EAST ENTRY PARKING - 100 STALLS TOTAL 6 STALLS H/C PARKING GROUND FLOOR PLAN DROP-OFF
ROOF ACCESS CHANGE ROOM ROOF MECHANICAL ENCLOSURE MAINT. ELEV- ATOR ARENA BELOW OPEN TO LOBBY BELOW COMMUNITY ROOM ROOF - SKYLIGHTS AND MECHANICAL ENCLOSURES EIT 3-LANE RUNNING TRACK (+/- 175M) MAINT. WC WC SECOND FLOOR PLAN
PUBLIC SPACE CONNECTS THE ARENA TO THE COMMUNITY AERIAL VIEW OF BUILDING FROM NORTH-EAST
LOBBY + ENTRANCE
RUNNING TRACK COLD SIDE WARM SIDE COLD SIDE WARM SIDE ARENA LOBBY RAISED LOBBY = GOOD WARM VIEWING
COMMUNITY SPACES
COMMUNITY SPACES
FITNESS STUDIO 1300ft 2 STORAGE MAINT. IT/ELEC. MULTI- PURPOSE ROOM OFFICE RECEP. KITCHEN CONC. STORAGE UNIV. WC dancing ATM BANQUET HALL seating for 150 2500ft 2 WEST ENTRY VEST. LOBBY, FEATURE STAIR AND WARM VIEWING 2600ft 2 VEST. EAST ENTRY trophy case vending below stair stair up to track kid zone ELEV. 55 linear ft warm viewing (incl. charging stations) WOMEN S WC MEN S WC COMMUNITY SPACES
ARENA: RUNNING TRACK
OVERLOOKS LOBBY RUNNING TRACK OVERLOOKS ARENA AERIAL VIEW OF BUILDING FROM NORTH-WEST
ARENA: VIEWING
RUNNING TRACK BENCH SEATING/ DRINK RAIL ARENA DASHER BOARD SEATING
ARENA: CHANGE ROOMS
6 x 560ft2 change rooms 62 lin. ft bench space 376ft2 coaching area Includes: showers, toilets, bottle fill, stick corral 2 x referee rooms: larger barrier-free room can be programmed as female changeroom CR 6 CR 5 CR 4 (barrierfree) CR 3 (barrierfree) CR 2 (barrierfree) CR 1 (barrierfree) MAINT. REF 2 (barrierfree) REF 1 SERVICE MAINT. ARENA APRON - RINK SIDE BENCHES line of track above PLAYERS BENCH 2 PLAYERS BENCH 1 CHANGE ROOMS
NATURAL LIGHT
NATURAL LIGHT
NATURAL LIGHT
BUILDING ELEMENTS TO BE INCLUDED IN THE FIRST PHASE: Single pad NHL-size rink Spectator seating Upper level viewing Warm viewing from lobby 6 team change rooms and 2 official s change rooms Upper-level walking/running track Banquet hall, including bar and warming kitchen Fitness studio Multi-purpose room Parks and Recreation office space Concession/canteen, vending machine and ATM Storage for municipal purposes and for sport user groups Fully accessible facility with passenger elevator Fully wired with current technology and WiFi Spacious lobby with café style seating 50,000 ft 2 = BUILDING ON BUDGET
2017 2018 2019 2020 April May June July August Sept Oct Nov Dec Jan Feb Mar July Aug Sept Aug Task 3 10 17 24 1 8 15 22 29 5 12 19 26 3 10 17 24 31 7 14 21 28 4 11 18 25 2 9 16 23 30 6 13 20 27 4 11 18 25 1 8 15 22 29 5 12 19 26 5 12 19 21 28 22 29 5 12 19 26 2 9 16 3 Schematic Design Review needs analysis / info Site Survey Geotech ORCA meeting Outline Specifications/Briefs Public Meeting #1 Schematic Design Meeting Schematic signoff Design Development Meet Building/Fire Accessibility Committee Issue for Site Plan Control Traffic Study Council Meeting #1 Public Meeting #2 Design Development Meeting Class C costing Design Development Signoff Contract Documents GC prequalification Issue for Permit Public Meeting #3 Council Meeting #2 Integrated Team Meetings Class B Costing - 60% CD Tender and Award Tender Addenda Tender Review and Award Construction Construction Site Meetings Substantial Completion Occupancy Total Completion Warranty Warranty Period Warranty Review PROJECT SCHEDULE