THE EASTERN
The Eastern 2
A SOLID FOUNDATION HVK Co., Ltd is a joint venture between Hung Viet Construction- Investment JSC and KRDF03. And KRDF (Korea Real-Estate Development Fund) is a real estate investment fund operated by KIMC, Korea Investment Trust Management Co., Ltd., who has been one of the leading asset management companies in Korea for over 30 years. KIMC has been investing and operating more than $ 1 billion US funds in Vietnam, our first priority among various investment countries, and KRDF has invested into projects such as: Luxel apartment (Phu My Hung, District 7, HCMC) Han Viet Tower (Hai Ba Trung Ward, Hanoi) Posco E&C Viet Nam: Posco E&C Viet Nam belongs to Posco Group, one of the top 5 construction companies in Korea. Posco marks its name with outstanding projects such as: Diamond Plaza (District 1, HCMC) Tulip apartment (Phu Thuan, District 7, HCMC) Charm Plaza (Di An, Binh Duong) Splendora (Bac An Khanh new urban area, Hanoi) Chắc nền tảng tài chính. Vững kinh nghiệm lâu bền. 3
VISION EAST IS OPPORTUNITY According to developing strategy, HCM City will develop toward the east, district 2 and district 9 will be administrative centre, knowledge urban area and hi-tech park. Same as Seoul, HCM City will be developed belongs main streets, convenient for traffic of all directions. Hanoi Highway line is chosen to be main centre line for the formation and the development of new urban areas along in the present and future. Gang Nam, Seoul Bun Dang, Pan Kyo New town 175,200 Unit Yong In Dong Back, Juk Jeon 31,000 Unit Dong Than New Town 41,000 Unit Oh San, Pyung Taek 110,139 Unit CATCH THE OPPORTUNITY TO INVEST NOW Seoul-Busan High Way 4
POSITION Connecting favorable infrastructure to main streets and works which are completed or on progress The building is located on Lien Phuong street, Phu Huu Ward, District 9, away from the east ring road 100m. It takes 15-20 minutes to reach city centre with Ring Road line, Dong Tay Boulervard. It takes 5-10 minutes to reach District 2 with Hanoi Highway extended 150m. It takes15 minutes to reach District 7 with Ring Road line and Phu My bridge. Quickly connecting to Binh Duong, Dong Nai and Long Thanh International Airport with Long Thanh Dau Giay Highway. 5
The Eastern The Eastern Building is located on Lien Phuong street, Phu Huu Ward, District 9 in the east of the city. Total area: 15,869 m2 including 2 blocks with 22 floors: Block A has 20 floors in height and 320 flats. Block B has 22 floors with 328 flats. With ventilated basement. Ground Floor: Trading area. CONSTRUCTION DENSITY: 28,79% 6
OUTSTANDING FEATURES Position Surrounded by projects and villas Design Modern Design: -Open view -Single Corridor -Ventilation slots Feng Shui The land with larger in the back supports the residents will be prosperous and healthy 2/22/20 7
VIEW TOWARD VILLA PARK 8
PROXIMITY TO FACILITIES At The Eastern, you have everything for your perfect life Supermarket, shopping centre Entertainment areas: tennis court, swimming pool Kindergarten, bank Security guard 24/24. 2/22/20 9
TYPES OF FLATS The Eastern has many types of flats, meeting diverse demands and suitable with all customers: 01 bedroom 02 bedrooms 03 bedrooms Penthouse 10
01 Bed room Total area Living room Bedroom Kitchen Balcony Bathroom Laundry room Entrance : 59.19 m2 : 26.83 m2 : 15.03 m2 : 4.97 m2 : 4.00 m2 : 3.97 m2 : 1.5 m2 : 2.89 m2 11
02 Bedrooms (type F) Total area Living room Main bedroom Bathroom (Main bedroom) Bedroom 2 Bathroom: Laundry room Kitchen Entrance :78.784m2 :28.965 m2 :15.946m2 :3.543m2 :10.836m2 :4.157m2 :3.599m2 :7.403m2 :4.335m2 12
03 Bedrooms(type I) Total area Living room Main bedroom Bathroom (main bedroom) Bedroom 2 Bedroom 3 Kitchen Balcony Bathroom Laundry room Entrance :96.517m2 :31.002m2 :15.570m2 :3.517m2 :12.395m2 :12.227m2 :8.439m2 :3.408m2 :3.350m2 :3.408m2 :3.200m2 13
03 Bedrooms(type J) Total area Living room Main bedroom Bathroom (main bedroom) Bedroom 2 Bedroom 3: Kitchen Balcony Bathroom Laundry room Entrance :104.453m2 :40.506m2 :12.834m2 :3.338m2 :17.423m2 :9.765m2 :6.144m2 :2.773m2 :4.482m2 :3.120m2 :4.066m2 14
3 Bedrooms(type K) Total land area : 111.35 m2 Living room : 37.95m2 Main bedroom : 17.82 m2 Bathroom : 7.43 m2 (main bedroom) Bedroom 2 : 11.7 m2 Bedroom 3 : 11.00 m2 Kitchen : 7.32 m2 Balcony : 3.3 m2 Bathroom : 3.52m2 Laundry room : 3.32 m2 Entrance : 7.98 m2 15
Penthouse Total area :248.157m2 Living room :84.337m2 Main bedroom : 35.070 Bathroom :11.68 (main bedroom) Bedroom 2 :15.421m2 Bedroom 3 :15.343m2 Bedroom 4 :16.483m2 Kitchen :31.421m2 Balcony :18.072m2 Bathroom 2 :5.034m2 Bathroom 3 :3.413m2 Laundry room :2.102m2 Entrance :9.78m2 16
FLAT PRICE 20,000,000 VND/ m2 22,000,000 VND/ m2 Included VAT -Handling over full house including: Completed wall, ceiling Completed kitchen Completed toilet All will be completed with high-class brand name like Livart -Security system 24/24 with video phone, automatic entrance with security card -Facilities such as shopping centre, kindergarten, outside entertainments such as swimming pool, tennis court. 17
PAYMENT PHASE Payment 1: Payment phase Payment rate(% of flat value) Payment deadline Construction Progress Deposit 20,000,000 VND After signing the deposit contract Finished pile base Phase1 10% included deposit Phase 2 5% Phase 3 5% Phase 4 5% Phase 5 10% Phase 6 10% Phase 7 10% After signing sale contract, March, 2012 After 3 months from contract signing date, June, 2012 After 6 months from contract signing date, September 2012 After 9 months from contract signing date, december 2012 After 12 months from contract signing date, march 2013 Sau 15 tháng kể từ ngày kí hợp đồng, tháng 06 năm 2013 Sau 18 tháng kể từ ngày kí hợp đồng, tháng 09 năm 2013 Finished pile base Finished Ground floor Finished 4 th floor Finished10 th floor Finished16 th floor Finished roof Finished rough Phase 8 40% Handing over flat, quarter 4, 2012 Handed over flat Phase 9 5% Total 100% Receiving certificate of house owner 18
PAYMENT SCHEDULE Payment 2: Payment phase Deposit Phase 1 Payment rate (% of flat value) 20,000,000 VND 35%, included deposit Phase 2 60% Phase 3 5% Total 100% Payment deadline Construction progress After signing deposit contract After signing sale contract, Feb/2012 Receiving flat, Nov/2013 Receiving certificate of house owning Finished pile base Finished pile base Handed over flat 19
Favor policy for staff Subject: 100 first customers Favor: Good position Choose payment installment Directly discount 5% on price 20
THANK YOU