Section SKETCH PLAN REVIEW

Similar documents
ARTICLE 8C SITE CONDOMINIUM DEVELOPMENT ORDINANCE

APPLICATION FOR PRELIMINARY PLAT RESIDENTAIL. FILING FEE: $ for the first 20 lots; $10.00 for each additional lot over 20

SECTION 10 STANDARD PLATS

ARTICLE III GENERAL PROCEDURES, MINOR PLANS AND FEE SCHEDULES

Town of Minden Subdivision Application

I. Requirements for All Applications. C D W

Application for Preliminary Plat Checklist

TOWNSHIP OF BORDENTOWN LAND DEVELOPMENT APPLICATION CHECKLIST. General Requirements for all Applications

WESTON COUNTY FINAL PLAT APPLICATION

SECTION 6 - APPROVAL OF PLATS. Whenever any subdivision of land is proposed, and before any permit for the

TOWN OF LERAY PLANNING BOARD Minor Subdivision Application Packet

ARTICLE 15 - PLANNED UNIT DEVELOPMENT

ARTICLE V. PRELIMINARY PLAT

Sketch Plan 2018 Bargersville Plan Commission Application Kit

Initial Subdivision Applications Shall Include the Following:

APPLICATION PROCEDURE

SUBDIVISION APPLICATION CHECKLIST SKETCH PLAN PRELIMINARY PLAT FINAL PLAT

ARTICLE SINGLE FAMILY SITE CONDOMINIUM DEVELOPMENT STANDARDS

Residential Minor Subdivision Review Checklist

APPLICATION FOR MAJOR SUBDIVISION APPROVAL (PRELIMINARY PLAT)

BOSSIER CITY PARISH METROPOLITAN PLANNING COMMISSION 620 Benton Rd. Bossier City, LA Phone: Fax: PRELIMINARY PLAT

SUBMITTAL REQUIREMENTS

TOWNSHIP OF SPRINGBROOK SUBDIVISION AND LAND DEVELOPMENT

Residential Major Subdivision Review Checklist

BY THE CITY COMMISSION ORDINANCE NO.:

SUBDIVISION APPLICATION

PRELIMINARY PLAT Checklist

Town of Norwich, Vermont SUBDIVISION REGULATIONS

CHAPTER 3 PRELIMINARY PLAT

PLANNED UNIT DEVELOPMENT (PUD)

Residential Subdivision Preliminary Plat Application

TOWN OF ROXBURY PLANNING BOARD

STONE COUNTY PRELIMINARY PLAT CHECKLIST. Note: Applications need to be in the office by 2 p.m. on the cutoff day.

CITY OF SARALAND PRELIMINARY SUBDIVISION PLAT REVIEW

STATE OF MICHIGAN COUNTY OF MARQUETTE, TOWNSHIP OF NEGAUNEE LAND DIVISION, SUBDIVISION AND CONDOMINIUM ORDINANCE

FINAL PLAT APPLICATION

CONDITIONAL USE PERMIT APPLICATION FOR AN EXCAVATION/BORROW PIT INSTRUCTIONS

ELK RAPIDS TOWNSHIP ANTRIM COUNTY, MICHIGAN ORDINANCE NO

UPPER MOUNT BETHEL TOWNSHIP, NORTHAMPTON COUNTY, PA MINOR SUBDIVISION FINAL PLAN CHECKLIST* YES** NO

Request for Action form is also defined as an application to be considered by the Planning Commission.

Lake County Planning, Building and Development Department

PLYMOUTH PLANNING BOARD APPLICATION FOR A MINOR SUBDIVISION OR MAJOR SUBDIVISION

MAJOR RESIDENTIAL AND NONRESIDENTIAL SUBDIVISIONS

MAJOR SUBDIVISION PRELIMINARY PLAT CHECKLIST

CONDOMINIUM REGULATIONS

MINOR & MAJOR SUBDIVISION APPLICATION

A. Appropriate agency responsible for transportation review for the subject property.

All roads developed to access four (4) or more parcels shall be constructed to Park County Road and Bridge Standards.

City of Prior Lake APPLICATION FOR PRELIMINARY PLAT

THE COUNTY BOARD OF SUPERVISORS OF THE COUNTY OF DOUGLAS DOES ORDAIN AS FOLLOWS:

ARTICLE V PRELIMINARY PLAN SUBMISSION

ZONING & LAND USE APPLICATION

TABLE OF CONTENTS. Page TITLE, SHORT TITLE, AND PURPOSE SUBMISSION AND REVIEW PROCEDURES

CHAPTER 22 SUBDIVISION AND LAND DEVELOPMENT. Part 1 General Provisions. Part 2 Application Procedure and Approval Process

E L M E R B O R O U G H L A N D U S E B O A R D APPLICATION COVER SHEET (to be completed for all applications and appeals)

SHORT PLAT APPLICATION CHECKLIST City of White Salmon. Application completed with notarized signatures

These can be obtained at the City s Engineering Department or on the City s website (

City of Midland Application for Site Plan Review

APPLICATION for MINOR SUBDIVISION REVIEW for CONCEPT and FINAL PLAT within COALVILLE CITY. Project Name: Project Address or Area: Name of Owner:

CHAPTER 22 SUBDIVISION AND LAND DEVELOPMENT

A.3. ARTICLE 7 PLAN REQUIREMENTS FOR MINOR SUBDIVISION AND/OR LAND DEVELOPMENT

MUDDY CREEK TOWNSHIP PO BOX 239 PORTERSVILLE, PA SUBDIVISION AND LAND DEVELOPMENT APPLICATION

BRIDGETON SUBDIVISION APPLICATION CHECKLIST

Town of Shelburne, Vermont

ELMORE COUNTY LAND USE & BUILDING DEPARTMENT 520 E 2 nd South Mountain Home, ID (208) Preliminary Plat Application

APPLICATION FOR PRELIMINARY PLAT CERRO GORDO COUNTY, IOWA

The Filing Fee for a Minor Plat is $ PLUS $20.00 per lot created

Preliminary Subdivision Application (Minor) (Three (3) lots or less)

City of Sanibel. Planning Department STAFF REPORT

Guide to Minor Developments

ARTICLE 13 CONDOMINIUM REGULATIONS

these areas are compatible with such conditions. [Section (6) (c) C. R. S.]

Chapter 100 Planned Unit Development in Corvallis Urban Fringe

Preliminary Plat/Final Plat Application

City of Colleyville Community Development Department. Subdivision Application Packet

City of Prior Lake APPLICATION FOR REGISTERED LAND SURVEY

(if more than one, give square footage for each) ANNEXATION LOT LINE Adjustments PRE/FINAL PLAT SPECIAL USE PERMIT

SUBDIVISION PLAT CHECKLIST. The following information shall be include on the plat:

COMMERCIAL SITE PLAN & CONDITIONAL USE PERMIT REVIEW PROCESS & CHECKLIST

Guide to Combined Preliminary and Final Plats

PRELIMINARY SUBDIVISION PLAN APPLICATION INSTRUCTIONS

City of Prior Lake APPLICATION FOR COMBINED PRELIMINARY AND FINAL PLAT

Town of Bristol Rhode Island

TOWN OF LEWISTON PLANNING BOARD APPLICATION

R e z o n i n g A p p l i c a t i o n S u b m i s s i o n R e q u i r e m e n t s

APPLICATION PROCEDURES FOR A MAJOR SUBDIVISION PRELIMINARY PLAT

Incorporated Village of Lattingtown 299 Lattingtown Road P.O. Box 488 Locust Valley, New York

APPLICATION FOR 555 Washington Street Tentative Map Red Bluff, CA Subdivision Map (530) ext Parcel Map.

City of Leavenworth DEPARTMENT OF DEVELOPMENT SERVICES MAJOR SUBDIVISION APPLICATION 1

Charter Township of Plymouth Zoning Ordinance No. 99 Page 208 Article 21: Residential Unit Developments Amendments: ARTICLE XXI

Condominium Unit Requirements.

SKETCH PLAN TOWN OF GYPSUM (Revised 12/29/2015)

SUBDIVISION APPLICATION

Preliminary Subdivision Application (Major) (Four (4) lots or more)

SUBDIVISION AND LAND DEVELOPMENT. 185 Attachment 20

SUBDIVISION APPLICATION

ARTICLE 14 PLANNED UNIT DEVELOPMENT (PUD) DISTRICT

Chapter 22 PLANNED UNIT DEVELOPMENT.

Preliminary Plat Information & Application Packet

MINOR PLAT FILING APPLICATION

Transcription:

Section 210 - SKETCH PLAN REVIEW 1. Within 30 days of receiving a complete application for a subdivision involving three or more lots, the Zoning Administrator shall refer the matter to the first available agenda of the Development Review Board. 2. Each sketch plan application must include as a minimum, but not limited to, the following information: A. Written statement to include, as a minimum, the following: 1) Conformance with the Town Plan (reference to page and section of Town Plan required). 2) Current use of land to be developed. 3) Easements and Zoning (Easements must be shown on sketch). 4) Existing and proposed restrictions on land. 5) Impact of the development on the community, including traffic, schools, water, sewer treatment, fire and police protection, etc. 6) Name and address of the owner of record of the tract to be subdivided and of all adjoining property owners and those across roadways; a. At least 15 days prior to hearing, all adjoining property owners and property owners directly across roadway, water course excluding Lake Champlain, or shared private access road from applicant s property, must be notified via certified mail return receipt requested. b. If neighbor notification is accomplished by certified mail, return receipts shall be submitted to the Development Review Board at or prior to the hearing on the application. 7) Names and addresses of all participants with a financial interest in the development. 8) If application is signed by someone other than the owner of record, a Power of Attorney or a letter of authorization for that applicant shall be submitted to the Development Review Board from the record owner(s). 9) Rights of way upon the property to be developed. B. Preliminary Drawings (with scale and north arrow) and description of: 1) Key features of the site, including water courses (drainage), wetlands, significant topography (slopes, soil), open and wooded lands, and unique natural or cultural features and the manner in which such site elements are to be conserved, in what land use district/s project is located; 2) General type, layout and dimensions of lots (including leased lots), roads to be built to existing Town ordinances and Town bylaws, utilities, drainage systems, streetlights, landscaping, existing and proposed restrictions on land (easement, zoning, etc.), screening to be planted or retained. 3) Provisions for sidewalks must be indicated on the Sketch Plan.

C. Final Drawings (with scale and north arrow) and description of: 1) General site location, in relation to public roads and the nearest intersections; 2) Boundaries and areas of all contiguous land of the owner(s) of record, and of the proposed subdivision; The subdivider shall attend the meeting of the Development Review Board on the sketch plan to discuss the proposal and the requirements of these Zoning Bylaws and Subdivision Regulations. The Development Review Board shall study the sketch plan and may reasonably continue the sketch plan review to subsequent meetings in order to visit the site, consult with appropriate agencies, organizations and officials, and make recommendations to the subdivider regarding required improvements or changes needed for conformance with the planning standards and zoning regulations herein. The Development Review Board may reasonably require submission of such additional information as it deems necessary to determine conformance with these Bylaws, including but not limited to a property survey, contour map and engineering details of proposed improvements, by properly licensed professionals. Within 45 days of conclusion of the sketch plan review process, the Development Review Board shall issue and mail its written decision to the applicant via certified mail with return receipt requested, either accepting the sketch plan as proposed, accepting it with stated conditions, or denying it.

TOWN OF ST. ALBANS SUBDIVISION SKETCH PLAN CHECKLIST The following information as a minimum is required as part of the Subdivision Sketch Plan Application: Location of subdivision (show a copy of tax map or equivalent) Zoning District(s) involved Identifying information including name of record owner of land, north arrow, date and scale (not smaller than one inch equals 200 feet) Name of Subdivision, if any Name of any proposed roads. Boundaries with approximate dimensions Approximate location of existing and proposed water courses, wooded areas and other significant physical features. Approximate layout of existing and proposed streets, easements and rightsof-way Approximate layout of existing and proposed water and sewer utilities and facilities Approximate layout of proposed open spaces reserved for parks, playgrounds or other common or public uses Layout of proposed lots with approximate dimensions and areas; all lots should be numbered Location of any 100 year flood plan or wetland boundaries Is subject property affected by the: Special Features Overlay District? Wetlands Overlay Map? Names of abutting and across-street property owners on map and a list

TOWN OF ST. ALBANS SUBDIVISION PROCEDURES AND APPLICATION SKETCH PLAN: Application for approval of a subdivision plan shall be made on a form provided by the Zoning Administrator and shall be filed with the ZA at the town Zoning Office. Prior to a formal public hearing, the applicant shall submit Sketch Plans for review, discussion and classification. Sketch Plans should include the entire planned subdivision, even if approval is to be requested for only an initial phase. Such plans shall be submitted to the Zoning Administrator at least twenty-two (22) days before a regularly scheduled meeting of the Development Review Board. Applicants are encouraged to explore different schemes by presenting several alternative plans that represent thoughtful site planning and are in keeping with the goals of the current Town of St. Albans Town Plan. The Development Review Board shall review the Sketch Plan, taking into consideration the requirements of the St. Albans Subdivision Regulations, the St. Albans Zoning Bylaws and other Ordinances then in effect. The Development Review Board shall also consider the Sketch Plan s conformity with the Town s Comprehensive Plan. Sketch review is intended to be an informal exchange of ideas between the applicant and the Development Review board and presentations and suggestions are not binding. Approval of a Sketch Plan shall not constitute approval of the subdivision plat and is merely authorization to proceed to the next step in the subdivision review process. A subdivision Sketch Plan must include the information on the subdivision Sketch Plan Checklist. Eight (8) copies of the concept plans must be submitted for review. Sketch approval expires six (6) months from the date of approval by the Development Review Board. FINAL PLAN Within six (6) months of receiving Sketch Plan approval the subdivider shall submit a complete application for preliminary review of the subdivision plan to the Zoning Administrator. If the application is not submitted within six (6) months, a new Sketch Plan must be submitted for review. A final subdivision application must contain all the information on the Final Plan Checklist including the plan as well as supporting written material. Eight (8) copies of the plan must be submitted for review. A public hearing will not be scheduled until a complete Final Plan application is received. A public hearing shall be held by the Development Review Board after being duly warned and after notice is given to abutting and across-street property owners. Within forty-five (45) days after the close of the public hearing the Development Review Board shall approve, modify and approve, or disapprove the plan. Failure to so act within forty-five (45) days shall be deemed approval of the Final Plan. Final Plan approval is effective for a period of one hundred eight (180) days.

DEVELOPMENT REVIEW BOARD OF THE TOWN OF ST. ALBANS Application For Sketch Plan for the Subdivision of Land Application No. Tax Map No. Applicant: Record Owner: Address: Address: Phone No. (day) Phone No. (day) Signed by Landowner or Agent (A letter of authorization must accompany submittal if signed by agent) Date: Professional Advisors Address: Phone No. Total Acreage of Subdivision No. of Proposed Lots Acreage of each proposed lot Subdivision Name: Proposed Road Name(s) Zoning District(s): Brief description of size and type of subdivision: How does the subdivision proposal meet the Goals and Objectives of the Town s Comprehensive Plan?

TOWN OF ST. ALBANS DEVELOPMENT REVIEW BOARD P.O. Box 37 St. Albans Bay, VT 05481 (802) 527-1672 Fax: (802) 524-5816 Email: satzoning@comcast.net SUBDIVISION SKETCH PLAN Application Number: Title: Property Owners: Applicants: Brief Description of Request: Master Exhibits List:

SKETCH PLAN REVIEW SECTION 201 1. Conformance to Town Plan. (Reference to page & section of Town Plan Required) 2. Current Use of the land to be developed. 3. Easements, Covenants and/or Zoning. (Easements must be shown on sketch) 4. Existing and proposed restrictions of land. 5. Impact of the development on the community. a. Traffic: b. Schools: c. Water/Sewer Treatment:

d. Police and Fire protection: 6. Names and address of owner of record of the tract of land to be subdivided and all adjacent property owners and property owners directly across roadway or shared private access road from applicants property. a. Owners: b. All adjacent property owners and property owners directly across roadway or shared private access road to be notified via certified return receipt requested mail prior to hearing: c. Proof of mailing required. Certified mail return receipt. Final Drawings (with scale and north arrow) and description of: 1) General Site location in relation to public roads and the nearest intersections: 2) Boundaries and areas of all contiguous land of the owner(s) of record and of the proposed subdivision.

The Subdivider shall attend the meeting of the Development Review Board on the Sketch Plan to discuss the proposal and the requirements of the Bylaws. The DRB shall study the Sketch Plan and may reasonably continue the Sketch Plan Review to subsequent meetings in order to visit the site, consult with appropriate agencies, organizations and officials, and make recommendations to the subdivider regarding required improvements or changes needed for conformance with the Planning standards and Zoning regulations herein. The Development Review Board may reasonably require submission of such additional information as it deems necessary to determine conformance with these Bylaws, including, but not limited to, a property survey, contour map and engineering details of proposed improvements by properly licensed professionals. Within forty-five (45) days of conclusion of Sketch Plan Review process, the DRB shall issue and send its written decision to the applicant either accepting the Sketch Plan as proposed, accepting it with stated conditions or rejecting it.