OUR BACKGROUND DSQ Pty Ltd was formed in September 2016 from the restructure of the Definium Group of Companies. The DSQ team has vast experience in many facets of the Surveying profession including cadastral, engineering, planning, GIS, hydrographic surveying and data management systems. The majority of our work is in Queensland, however our team has experience working in many other areas including other states and territories of Australia, Torres Straits, New Guinea, New Zealand, UK and Oman. WE WILL LOOK AFTER YOU Your project will be managed under the scrutiny of one of our Senior Management team. DSQ employs qualified Surveyors who are registered with the Surveyors Board of Queensland. We have the ability to upsize quickly when projects require the flexibility and additional manpower. Our experienced team includes Cadastral Surveyors, Graduate Surveyors and Surveying Associates, Survey Assistants, GIS, Operators, Drafters, Finance and Administration personnel. LAND SURVEYING: WHAT WE DO BEST Land Boundary and Titling GIS Hydrographic Surveys Land Development Mapping Roads Rail and Infrastructure Inc. Unmanned Aerial Vehicles DON T WORRY, WE RE COVERED Professional Indemnity Insurance Public Liability Insurance $20,000,000.00 $50,000,000.00 Association of Consulting Surveyors CGU Insurance Limited Insurance Society Pty Ltd (ASCIS) WorkerCover WorkCover Queensland Note: Both the PI Insurance & PL Insurance can be increased to accommodate client specific requirements. INTEGRATED MANAGEMENT SYSTEMS DSQ Pty Ltd works to an Integrated Management System (IMS) conforming to Quality, Safety, and Environmental standards that was implemented in 2012. Our IMS is third party accredited under JAS- ANZ by Global Certification Pty Ltd. Safety Our Safety Management System conforms to AS/NZS ISO 4801:2001 standards. Quality Our Quality Management System conforms to AS/NZS ISO 9001:2008 standards. We hold Plan Examination & Endorsement accreditation with Queensland Department of Natural Resources & Mines (DNRM). Environmental As part of our commitment to environmental protection we have implemented an Environmental Management System conforming to AS/NZS ISO 14001:2004 standards. PROFESSIONAL MEMBERSHIPS As a proudly professional surveying business, DSQ Pty Ltd is a member of the following: The Surveying and Spatial Sciences Institute (SSSI) Australian Pipeline and Gas Association (APGA) The Australasian Hydrographic Society The Urban Design Institute of Australia (UDIA) The Queensland Master Builders Association Caloundra Chamber of Commerce Chinchilla Chamber of Commerce DSQ Pty Ltd 26 Premier Circuit Warana QLD 4575 PO Box 1073 Buddina QLD 4575 T 07 5437 8555 4 Inverai Road Chinchilla QLD 4413 T 07 4662 7573 ACN: 615 043 251 ABN: 91 615 043 251 Sunshine Coast Western Downs mail@dsqsurvey.com www.dsqsurvey.com Quality Safety Environment
WE RE EXPERTS IN PIPELINE PROJECTS DSQ Pty Ltd has quality expertise in all facets of Pipeline Projects due to their sound knowledge and extensive experience in the sector. Land tenure advice Project control networks and densification Construction setout Special crossing surveys As constructed surveys Predesign detail surveys Mapping Aerial Photography & Videography Machine guidance systems Environmental surveys Cultural heritage walk through surveys Auto Cad Civil 3D 2016 software 12D Model software GIS (MapInfo and Esri ArcGIS) Resumption and land acquisition surveys Pipeline easement surveys GIS corridor mapping Underground utility services surveys Conformance and deformation reporting Quality Safety Environment
2016 QCLNG Charlie Trunkline Jemena NGP Pipeline APA Group RCWP APA Group WRC QGC Wellpad Designs Origin Talinga Pond Location: Wandoan Project: QCLNG Charlie Trunk Pipeline, HV Power and Fibre Optic Cable Management. Client: Jemena (subcontract to Calder Harris Surveyors) Location: Tennant Creek to Mt Isa Project: Northern Gas Pipeline Tasks: Cadastral surveying for identification surveys and easement surveys in both Northern Territory and Queensland. Location: Wallumbilla Project: Reedy Creek to Wallumbilla Pipeline Tasks: Route location, control survey, feature survey, special crossings survey, cadastral easement surveys. Project: Wallumbilla Gladstone Pipeline and Roma Brisbane Pipeline Connection project Tasks: Cadastral survey for easement over proposed facility site, feature survey for civil design. Client: QGC Location: Surat Basin Project: Wellpad designs Tasks: Design of wellpad layout including balancing cut/fill earthworks quantities. Client: Origin Energy Project: Talinga Pond Relining Project Tasks: UAV surveys of the pond for conformance and volume calculations, recording aerial video footage of construction progress for the project team.
2015 QCLNG Lauren Trunkline Project: QCLNG Lauren Trunk Pipeline, HV Power and Fibre Optic Cable Management. Santos Roma West Phase 2a Gathering Project Client: Santos (subcontract to WDS) Location: Roma Project: Roma West Phase 2a Gathering Project Tasks: Surveying for the construction of gathering pipelines including setout, environmental survey, service location, HDD, as built data. APA Group Ballera Compressor Station Location: Ballera Project: Ballera Compressor Station Tasks: Surveying for the cadastral leases and location for the proposed APA compressor station. 2014 QCLNG GIS Data for As built Client: QGC Project: QCLNG GIS Data for As built Tasks: Create GIS data compliant with QGC GIS data format, using as built data for five major pipelines supplied by various civil contractors. BOC mlng Gas Project Client: Murphy Pipe and Civil Location: Miles Project: BOC mlng 100 dia steel gasline construction Tasks: Construction Setout, As constructed Surveys, GIS, As constructed alignment sheets, Data Management Dewhurst & Leewood Gathering Project Client: Santos (subcontract to Lean Field Developments) Location: Narrabri Project: Dewhurst & Leewood Gathering Project Tasks: Surveying for the construction of gathering pipelines including setout, environmental survey, service location, HDD, as built data.
2012 2014 QCLNG Export Pipeline Easements Client: QGC (subcontract to Amec) to Gladstone Project: Pipeline Easements Tasks: Cadastral surveying for the registration of easements over QGC's Export Pipeline. Talinga to Monreagh Client: APLNG (subcontract to WDS) Project: Monreagh Tasks: Surveying for the construction of the Fairymeadow Road to Condabri pipelines including setout, service location, as built data. QCLNG Trunkline Works Surat Basin Location: Surat Basin QLD Project: Constructing Trunklines and FOC for QGC from 2013 Management began in 2013. 2011 2008 to 2011 QCLNG Gathering Works Surat Basin Location: Surat Basin QLD Project: Constructing Gas Gathering Systems for QGC Tasks: Construction Setout, As constructed, GIS, Data Management began in 2012. Surat Gladstone Pipeline Client: Arrow Location: Gladstone Project: Pipeline Easements for Surat Gladstone Pipeline Tasks: Cadastral surveying for the registration of easements over part of Arrow Energy's Surat Gladstone Pipeline export pipeline corridor. QGC Surat & Bowen Basin Upstream CSG Development Client: QGC (subcontract to Unidel) Location: Surat & Bowen Basins Project: Upstream Infrastructure for QCLNG Project Tasks: Survey of infrastructure for CSG wells, gathering pipelines, access tracks, trunklines, lateral pipelines, field compressor stations, central process plants and ponds.