PA Conditional Use Permit for Kumon Learning Center at 1027 San Pablo Ave.

Similar documents
PA Temporary Use Permit for Night Nation Run at Golden Gate Fields (1100 Eastshore)

PA Parking Adjustment for a change in use at 1300 Solano Ave.

City of San Juan Capistrano Supplemental Agenda Report

TOWN OF SAN ANSELMO PLANNING COMMISSION STAFF REPORT. For the meeting of January 11, Agenda Item 6C. Zone X (Minimal Flood Hazard Area)

PC RESOLUTION NO. 15~11-10~01 CONDITIONAL USE PERMIT (CUP)

SANTA BARBARA COUNTY ZONING ADMINISTRATOR STAFF REPORT August 30, 2007

Community Development Department Planning Division 1600 First Street + P.O. Box 660 Napa, CA (707)

TOWN OF SAN ANSELMO PLANNING COMMISSION STAFF REPORT. For the meeting of December 7, Agenda Item 5A

Community Development Department Planning Division 1600 First Street + P.O. Box 660 Napa, CA (707)

City of Huntington Beach Community Development Department STAFF REPORT

ZONING ADMINISTRATOR AGENDA

RESOLUTION NO. PC 18-14

Community Development Department Planning Division 1600 First Street + P.O. Box 660 Napa, CA (707)

ORDINANCE # AN ORDINANCE OF THE CITY OF ALBANY CITY COUNCIL APPROVING UNIVERSITY VILLAGE MIXED USE PROJECT ZONING MAP AMENDMENT

1.0 REQUEST. SANTA BARBARA COUNTY ZONING ADMINISTRATOR Coastal Zone Staff Report for Vincent New Single-Family Dwelling & Septic System

EL DORADO COUNTY PLANNING AND BUILDING DEPARTMENT ZONING ADMINISTRATOR STAFF REPORT VARIANCE

Community Development Department Planning Division 1600 First Street + P.O. Box 660 Napa, CA (707)

City of San Juan Capistrano Agenda Report. Honorable Mayor and Members of the City Council. Joel Rojas, Development Services Director ~ )P

RESOLUTION NO. P15-07

EL DORADO COUNTY DEVELOPMENT SERVICES ZONING ADMINISTRATOR STAFF REPORT VARIANCE

PLANNING COMMISSION STAFF REPORT October 31, 2013

Trio Petroleum, Inc. (PLN010302)

AGENDA CITY OF EL MONTE MODIFICATION COMMITTEE TUESDAY OCTOBER 23, :00 P.M. CITY HALL WEST CONFERENCE ROOM A VALLEY BOULEVARD

- CITY OF CLOVIS - REPORT TO THE PLANNING COMMISSION

SAN FRANCISCO PLANNING COMMISSION MOTION NO

EL DORADO COUNTY DEVELOPMENT SERVICES ZONING ADMINISTRATOR STAFF REPORT VARIANCE

City of San Juan Capistrano Agenda Report

Memo to the Planning Commission HEARING DATE: MARCH 22, 2018 Continued from the March 8, 2018 Hearing

Prepared by: Casey Kempenaar, Senior Planner

PLANNING COMMISSION STAFF REPORT June 18, 2015

PROJECT ADDRESS ASSESSOR S PARCEL NUMBER G.P. LAND USE DESIGNATION ZONING DISTRICT FLOOD HAZARD ZONE SITE ACREAGE AIRPORT SAFETY ZONE?

AGENDA COMMITTEE OPENING OF. use. given the. by staff. CHAIRPERSON DALLAS BAKER CITY PLANNER OFFICIAL TODD MORRIS CHIEF BUILDING

A G E N D A CITY OF BUENA PARK ZONING ADMINISTRATOR

RESOLUTION NO. PC

City of San Juan Capistrano Agenda Report

COUNTY OF SAN MATEO PLANNING AND BUILDING DEPARTMENT

SPECIAL USE PERMIT FOR TEMPORARY DEPENDENT HOUSING

CITY OF MONTEBELLO Community Development Department Planning Division 1600 W. Beverly Boulevard Montebello CA

EXHIBIT F RESOLUTION NO.

A G E N D A CITY OF BUENA PARK ZONING ADMINISTRATOR

Planning Department 168 North Edwards Street Post Office Drawer L Independence, California 93526

CITY OF SONORA PLANNING COMMISSION SITE PLAN REVIEW APPLICATION

Community Development Department Planning Division 1600 First Street + P.O. Box 660 Napa, CA (707)

LAND USE AND ZONING OVERVIEW

CITY OF MERCED Planning & Permitting Division

Planning Commission Motion No HEARING DATE: AUGUST 14, 2014

COUNTY OF SACRAMENTO CALIFORNIA ZONING ADMINISTRATOR REPORT

RESOLUTION NO. WHEREAS, the Signal Hill Gateway Center has been developed in phases. overtime; and

STAFF REPORT PLANNING COMMISSION REGULAR MEETING OF DECEMBER 6,

Executive Summary Conditional Use

SANTA BARBARA COUNTY MONTECITO PLANNING COMMISSION Staff Report for Klink Lot Line Adjustment and Modification

This project is categorically exempt from the requirements of CEQA under Categorical Exemption, Section Existing Facilities.

REPORT TO PLANNING AND DESIGN COMMISSION City of Sacramento

ARTICLE VII. NONCONFORMITIES. Section 700. Purpose.

RESOLUTION PC NOW THEREFORE, the Planning Commission of the City of Duarte resolves as follows:

City of Placerville Planning Commission STAFF REPORT

MONTEREY COUNTY PLANNING COMMISSION

VARIANCE APPLICATION

Prepared by: Casey Kempenaar, Senior Planner

HOW TO APPLY FOR A USE PERMIT

Executive Summary Conditional Use and Office Development

Planning Commission Motion No HEARING DATE: MAY 3, 2012

Planning Commission Report

Use Permit # to establish beer and wine service with meals within an existing quick-service restaurant space.

Minor Use Permit Modification (MINMOD) Coastal Development Permit (CDP) Exempt APPROVE MINMOD/CDP San Elijo Avenue. Cardiff-by-the-Sea

In the matter of the application of FINDINGS & DECISION Daniel & Charmaine Warmenhoven (PLN020333)

CITY OF MERCED Planning & Permitting Division STAFF REPORT: #15-03 AGENDA ITEM: 4.3

City of Escondido Zoning Administrator

Memo to the Planning Commission HEARING DATE: JUNE 2, 2016 Continued from the March 12, 2016 Hearing

City of Brisbane. Zoning Administrator Agenda Report

Memo to the Planning Commission HEARING DATE: SEPTEMBER 22, 2016 Continued from the September 8, 2016 Hearing

MEMORANDUM. TERESA McCLISH, COMMUNITY DEVELOPMENT DIRECTOR

CITY OF PALMDALE COUNTY OF LOS ANGELES, CALIFORNIA RESOLUTION NO. CC

CITY OF MERCED Planning & Permitting Division STAFF REPORT: #17-01 AGENDA ITEM: 4.3

Sven & Katrin Nauckhoff (PLN030156)

ARTICLE 8: SPECIAL LAND USES

CITY OF MERCED Planning & Permitting Division STAFF REPORT: #12-21 AGENDA ITEM: 4.1

EFFECTIVE DATE JULY XX, 2016

Planning Commission Motion No HEARING DATE: DECEMBER 12, 2013

CANNABIS USE APPLICATION PROCESS and GENERAL REQUIREMENTS

1. Adopted the required findings for the project specified in Attachment A of the staff report dated February 6, 2004, including CEQA findings;

Planning Department 168 North Edwards Street Post Office Drawer L Independence, California 93526

3. Twelve additional letters of support submitted by the Applicant.

CHAPTER 3 PERMITS, PLANS AND ANNEXATION

Meiners Oaks Water District Public Ut lityyard and Bu lding

Applicant Address: 3325 Longview Drive, St 311. State/Zip: Ca/ Phone: (916)

DEPARTMENT OF CITY PLANNING

TENTATIVE PARCEL MAP TIME EXTENSION

ATTACHMENT B: CONDITIONS OF APPROVAL. Overholtzer Tentative Parcel Map Case No. 08TPM /TPM 14,744 Date: October 13, 2010

292 West Beamer Street Woodland, CA (530) FAX (530)

Planning Commission Report

PLANNING APPLICATION FORM RESIDENTIAL

Peter Pan Investors LLC (PLN030397)

Executive Summary. Conditional Use HEARING DATE: MAY 11, 2017

Planning Commission Motion No HEARING DATE: JUNE 14 TH, 2012

ARTICLE 2 ZONING DISTRICTS AND MAPS

CITY OF SANTA ROSA COMMUNITY DEVELOPMENT DEPARTMENT STAFF REPORT FOR PLANNING COMMISSION SEPTEMBER 10, 2015 APPLICANT FILE NUMBER MJP

Executive Summary Conditional Use

Secondary Dwelling Unit

WALNUT CREEK DESIGN REVIEW COMMISSION STUDY SESSION STAFF REPORT

Transcription:

TO: FROM: SUBJECT: ALBANY PLANNING & ZONING COMMISSION ANNE HERSCH, AICP, CITY PLANNER PA 15-001Conditional Use Permit for Kumon Learning Center at 1027 San Pablo Ave. DATE: January 28, 2015 Property Owner Al Satake 1035 San Pablo Ave. Suite 12 Albany, CA 94706 Applicant/Representative: Philippe Peyron 1935 Everidge Ct. Walnut Creek, CA 94597 PROJECT: Kumon Learning Center CUP FILE: PA 15-001 GP LU: General Commercial ZONING: SPC-San Pablo Commercial PLANNER: Anne Hersch Original filing: January 5, 2015 Date Deemed Complete: January 14, 2015 Date of Notice Posted/Mailed: January 16, 2015 Date of Public Hearing: January 28, 2015 Total number of days to hearing: 23 days REQUEST The applicant is seeking Conditional Use Permit approval for a Kumon Learning Center at 1027 San Pablo Ave. The proposed location includes a 900 sq. ft. office space. The business will be open two days each week, Wednesday from 2-6:30pm and Saturday from 10am-1pm. There will be a maximum of 130 students enrolled in the program with a maximum of 30 students on-site at any time. Off-street parking is provided in the shared parking lot behind the business. There are seven (7) employees total. STAFF RECOMMENDATION Staff recommends that the Planning & Zoning Commission review and approve the Conditional Use Permit subject to the attached findings and Conditions of Approval.

SITE LOCATION Site Location ZONING MAP Site Location Page 2

BACKGROUND The subject lot is 27,500 sq. ft. with an existing 6,900 sq. ft. single-story commercial building built in 1973. Existing uses at the site include Christopher s Nothing Fancy Café, Odd Lots Wine shop, and a karate studio. The proposed location was most recently used as a copy services center. ANALYSIS Conditional Use Permit The applicant is proposing to operate a Kumon Learning Center two days per week, Wednesday from 2-6:30pm and Saturday from 10am-1pm. There will be a maximum of 130 students enrolled in the program with a maximum of 30 students on-site at any time. Offerings include math and reading tutoring. Pursuant to Section 20.16.050 (K), a tutoring center falls under the definition of Schools, Public or Private. This type of use requires a Conditional Use Permit. K. Schools, Public or Private. Facilities for kindergarten through twelfth (12 th ) grade, or adult education, and private educational institutions. Parking Pursuant to Section 20.28.030 (B) of the Albany Municipal Code, Schools, Public or Private has a parking requirement of 1 space per employee plus 1 space per 10 students. Based on the enrollment, the Code requires three (3) parking spaces during the hours of operation and seven (7) spaces for employees. There is a shared parking lot located behind the building with 21 off-street parking spaces. Page 3

Photos. Existing Parking Lot Signage The applicant has provided exterior signage details as part of this application. The space includes 20 linear feet of storefront facing San Pablo Ave. Section 20.32.090 (B) allows 3 sq. ft. per lineal front feet of building space, or 60 sq. ft. of signage. The applicant has proposed an 18 sq. ft. sign to be inserted within the existing signage Page 4

frame above the storefront. The applicant has also provided blade sign detail, though dimensions were not included. Page 5

Page 6

ENVIRONMENTAL REVIEW Staff recommends that the proposed project be considered categorically exempt from the requirements of CEQA per Section 15332, In-Fill Development Projects of the CEQA Guidelines, which allows the construction small facilities or structures. ATTACHMENTS 1. Analysis of Zoning Requirements 2. Draft Findings for Approval 3. Draft Conditions of Approval 4. Project Application & Plans Page 7

ATTACHMENT 1 ANALYSIS OF COMPLIANCE WITH ZONING REQUIREMENTS 20.12 Zoning Districts and Permitted Uses General Plan: Neighborhood Commercial Zoning: SPC- San Pablo Commercial 20.16 Land Use Classifications Neighborhood Commercial Surrounding North - SPC East R-3 Property Use South - SPC West SPC 20.20.080 Secondary Residential Units. 20.24.020 Table of Site Regulations by District. 20.24.030 Overlay District Regulations. Not Applicable. 20.24.040 Hillside Residential Regulations. Not applicable 20.24.050 Floor-Area-Ratio. 20.24.060 Setback Areas, Encroachments. 20.24.100 Distances between Structures. 20.24.110 Fences, Landscaping, Screening. 20.24.130 Accessory Buildings. 20.28 Off-Street Parking Requirement. See Analysis. 20.40 Housing Provisions Page 8

20.44 Non-conforming Uses, Structures and Lot 20.48 Removal of Trees 20.52 Flood Damage Prevention Regulations 20.100.030 Use Permits. See Analysis. 20.100.040 Variances. 20.100.010 Common Permit Procedures. Public notice of this application was mailed on January 16, 2015, in the form of mailed notice, to property owners and occupants within a 300-foot radius, and posted in one location. 20.100.050 Design Review. Page 9

ATTACHMENT 2 FINDINGS Findings for Conditional Use Permit approval (Per section 20.100.030.D of the AMC) Required Finding 1. Necessity, Desirability, Compatibility. The project s size, intensity and location of the proposed use will provide a development that is necessary or desirable for, and compatible with, the neighborhood or the community. 2. Adverse Impacts. The project s use as proposed will not be detrimental to the health, safety, convenience, or general welfare of persons residing or working in the vicinity, or physically injurious to property, improvements or potential development in the vicinity, with respect to aspects including but not limited to the following: a. The nature of the proposed site, including its size and shape, and the proposed size, shape and arrangement of structures; b. The accessibility and traffic patterns for persons and vehicles, the type and volume of such traffic, and the adequacy of proposed offstreet parking and loading; c. The safeguards afforded to prevent noxious or offensive emissions such as noise, glare, dust and odor; d. Treatment given, as appropriate, to such aspects as landscaping, screening, open spaces, parking and loading areas, service areas, lighting and signs; 3. Consistency with Zoning Ordinance, General Plan and Specific Plan. That such use or feature as proposed will comply with the Explanation The General Plan designates this area for commercial uses. Additionally, the existing building meets City zoning standards for location, intensity and type of development. The applicant has agreed to conditions of approval that are expected significantly reduce the potential for noise or other public nuisance impacts on nearby residents and businesses. The proposed project will complement existing businesses in the area. Page 10

applicable provisions of this Chapter and will be consistent with the policies and standards of the General Plan and any applicable specific plan. Page 11

ATTACHMENT 3 DRAFT COMMUNITY DEVELOPMENT DEPARTMENT CONDITIONS OF APPROVAL SPECIAL 1 SPECIAL 2 SPECIAL 3 SPECIAL 4 SPECIAL 5 The business shall operate on Wednesdays from 2-6:30pm and Saturday from 10am-1pm. Any change to the operating hours shall require an amendment to the Conditional Use Permit. Renting the facility for unrelated special events is not allowed without review and approval of the Community Development Department. The Community Development Department shall refer any such application to the Planning and Zoning Commission and/or the Chief of Police if the proposed function may generate significant noise, parking, or other neighborhood impacts. The applicant shall install bicycle racks and work with City staff on the placement of the facilities. The City may pay for the installation of the bicycle racks and seek full reimbursement from the applicant for the cost of the racks and installation. All functions in the space must comply with City noise standards. It is strongly recommended that the applicant provide bicycle parking inside the building. GENERAL PROJECT CONDITIONS Gen-1 Project Approval. This Conditional Use Permit approval is for 1027 San Pablo Ave., as substantially shown and described on the project plans, except as may be modified by conditions herein. Plans date received January 5, 2015, as presented to the Planning and Zoning Commission on January 28, 2015. For any condition herein that requires preparation of a Final Plan where the project developer has submitted a conceptual plan, the project developer shall submit final plan(s) in substantial conformance with the conceptual plan, but incorporate the modifications required by the conditions herein for approval by the City. GEN-2 Project Approval Expiration. This Conditional Use Permit approval expire on February 11, 2016 (one year from the date on which this approval becomes effective) or at an alternate time specified as a condition of approval, unless a building permit has been issued and construction diligently pursued. The approval may be renewed by the Community Development Director for a period up to an additional two (2) years, provided that, at least ten (10) days before expiration of one (1) year from the date when the approval becomes effective, an application for renewal of the approval is filed with the Community Development Department. The Community Development Director may grant a renewal Page 12

of an approval where there is no change in the original application, or there is no request to change any condition of approval. Gen-3 Fees. The applicant shall pay any and all City and other related fees applicable to the property, as may be modified by conditions herein. Fees shall be based on the current fee structure in effect at the time the relevant permits are secured, and shall be paid before issuance of said permit or before any City Council final action approval. Notice shall be taken specifically of Plan Check, Engineering, Fire and Inspection Fees. The project developer shall also reimburse the City for direct costs of planning; building and engineering plan check and inspection, as mutually agreed between the City and developer. GEN-4 GEN-5 GEN-6 GEN-7 Appeals. The Albany Municipal Code provides that any action of the Planning staff may be appealed to the Planning and Zoning Commission, and any action of the Planning and Zoning Commission may be appealed to the City Council as per the procedures described in Section 20.100.080. The City Clerk will then schedule the matter for the next available City Council meeting. Requirement for Building Permit. Approval granted by the Planning and Zoning Commission does not constitute a building permit or authorization to begin any construction or demolish an existing structure. An appropriate permit issued by the Community Development Department must be obtained before constructing, enlarging, moving, converting, or demolishing any building or structure within the City. Fire Department Approval. As part of a building permit application, the applicant shall submit written documentation that all requirements of the Albany Fire Department have, or will be, met to the satisfaction of the AFD. Engineering Approval. As part of a building permit application, the applicant shall submit written documentation that all requirements of the Public Works Department have, or will be, met to the satisfaction of the City Engineer. GEN-8 GEN-9 Construction Hours. Construction activity shall be restricted to the hours of 8:00 a.m. to 6:00 p.m. Mondays through Saturdays, and 10:00 a.m. to 6:00 p.m., Sundays and legal holidays, unless otherwise approved in writing by the City Engineer for general construction activity. Failure to comply with construction hours may result in stop work orders or other administrative actions. Archeological Remains. In the event subsurface archeological remains are discovered during any construction or preconstruction activities on Page 13

the site, all land alteration work within 100 feet of the find shall be halted, the Community Development Department notified, and a professional archeologist, certified by the Society of California Archeology and/or the Society of Professional Archeology, shall be notified. Site work in this area shall not occur until the archeologist has had an opportunity to evaluate the significance of the find and to outline appropriate mitigation measures, if deemed necessary. If prehistoric archeological deposits are discovered during development of the site, local Native American organizations shall be consulted and involved in making resource management decisions. GEN-10 GEN-11 GEN-12 GEN-13 Modifications to Approved Plans. The project shall be constructed as approved. Planning staff may approve minor modifications in the project design, but not the permitted land use (per MC 20.12). A change in an item requiring discretionary approval and any other changes deemed appropriate by the Planning staff shall require further Planning and Zoning Commission approval through the Design Review process. Hold Harmless Agreement. Pursuant to Albany Municipal Code Section 20.100.010 (N), the applicant (including any agent thereof) shall defend, indemnify, and hold harmless, the City of Albany and its agents, officers and employees, from any claim, action, or proceeding against the City or its agents, officers or employees to attack, set aside, void, or annul the City's approval concerning this application. The City will promptly notify the applicant of any such claim action or proceeding and cooperate fully in the defense. Public Improvements Standards. Public improvements shall be designed and constructed in accordance with the City's Standard Specifications and Standard Details, unless specifically waived in writing by the City Engineer. Title 24 Standards. All construction shall be designed and built in accordance with California Title 24 handicap accessibility standards. Appropriate details and specifications shall be incorporated into the plans and submitted at time of building permit application. GEN-14 Energy Conservation Standards. All buildings shall be designed in accordance with the State of California energy conservation standards for non-residential buildings. The necessary plans and documentation shall be submitted at time of building permit application. Appeals: The Albany Municipal Code provides that any action of the Planning and Zoning Commission may be appealed to the City Council, if such appeal is filed within 14 days of the date of the action. Appeals may be filed in the Community Development Department by completing the required form and paying the required fee. The City Clerk will then schedule the matter for the next available City Council meeting. Page 14