. uilding 0. **LL DIMENSIONS ON THIS DRWING RE TO E HEKED ON SITE, DO NOT SLE FROM TO MEHNL/ELETRL/STRUTURL N 0.2 0. 0. rear of the property Unable to survey oncrete panel fence rwp under.m 2 2 1 Existing ar Park Spaces within client site boundary 1. 0. Ht 2.2m. Staircase 2 under.m under.m under.m 0.1. cill 1.m. 0 cill 1.m 2. Dye Room cill 1.m Ht 1.0m Ht 1.0m 0.02.. overed Secured icycle Store with 1 bicycle stands Unable to survey rear of the property 0.0 FL Storage rea Refuse Store.2 Roller Shutter Entrance. Eye Rodding SV Max ht 2.m 0.1 Ht 2.0m. / onveyer elt under.2m under.2m under.2m. under.2m Roller Shutter Entrance Trade ounter. under.m Section - 20 U Storage Storage Storage Storage rwp. Existing ar Park Spaces within client site boundary. under.m SP. under.m under.2m SV Elec Ht 1.m 1. Gas Staircase 1 under.1m.2 under.2m Ht 2.0m Ramp up Ht 2.0m Disabled 22 2. Main Entrance / Disablility ccess Male 10 2. 2. Office Female Kitchen 2. cill 1.m cill 1.0m Ht 1.0m cill 1.0m cill 1.0m cill 1.0m 2 secured bicycle stands for visitor.1 SV. RI Stage D Section - Planning Issue 22.0.1 PH Planning revision 2..12 PH 0.0 2.20.2..0.. Gully opyright head 1.m cill 0.m..1. Gourley Street...0 Proposed Development at Gourley Street, Proposed Ground Floor Plan Proposed Ground Floor Plan 121-001
N **LL DIMENSIONS ON THIS DRWING RE TO E HEKED ON SITE, DO NOT SLE FROM TO MEHNL/ELETRL/STRUTURL In order to ensure that there is minimal negligible impact on the existing footing, with respect to the boundary of the railways line. The construction of the first floor will be light weight cladding and kept to one storey only. 2 2 1 Up Staircase 2 1 onveyer elt cill 1.1m 121 Proposed New Floor GI =.m² Storage 1 Storage Storage Storage Storage Storage 2. 2. 2. - RI Stage D Planning Issue 22.0.1 PH Planning revision 01..12 PH Ht 2.2m Gas head 2.m cill 1.m 1. Staircase 1 Ht 2.0m 1 Section - Existing Roof elow Proposed First Floor Plan opyright Proposed Development at Gourley Street, Proposed First Floor Plan 121-002
**LL DIMENSIONS ON THIS DRWING RE TO E HEKED ON SITE, DO NOT SLE FROM TO MEHNL/ELETRL/STRUTURL N 2 2 1 0 x 1 U 12 U Staircase 2 00 00 10 onveyer elt Proposed New Second Floor GI =.m² 200 2 00 0 U 20 200 200 200 200 200 2. Female Male 10 100 00 00 100 00 cill 1.1m New Roof elow Office Office Office Office 200 WREHOUSE Kitchenette 2 2 2 1 0 22 Office 2 Office 1 onference Room 2. 1 Section - RI Stage D Planning Issue 22.0.1 PH Planning revision 01..12 PH 2 Gas head 2.m cill 1.m Section - 2 1. Staircase 1 Trade ounter Proposed Second Floor Plan opyright Proposed Development at Gourley Street, Proposed Second Floor Plan 121-00
N **LL DIMENSIONS ON THIS DRWING RE TO E HEKED ON SITE, DO NOT SLE FROM TO MEHNL/ELETRL/STRUTURL 2 2 1 New Roof elow RI Stage D Planning Issue 22.0.1 PH 2 Section - Proposed Roof Plan opyright Proposed Development at Gourley Street, Proposed Roof Plan 121-00
In order to ensure that there is minimal negligible impact on the existing footing, with respect to the boundary of the railways line. The construction of the first floor will be light weight cladding and kept to one storey only. 2 New luminium frames windows Logo Signage / Design specialised panel New composite metal cladding Proposed builiding height **LL DIMENSIONS ON THIS DRWING RE TO E HEKED ON SITE, DO NOT SLE FROM THIS DRWING; ONTRTORS RE TO TO MEHNL/ELETRL/STRUTURL ENGINEERS DRWINGS FOR ONFIRMTION. Existing builiding height 1st m 1200 New 10mm height handrail to comply with uilding Regulations Part M 0.0m 10 GF m Proposed North East Elevation (Gourley Street) GOURLEY STREET ELEVTION DTUM LEVEL = Proposed builiding height New luminium frames windows New composite metal cladding 2 In order to ensure that there is minimal negligible impact on the existing footing, with respect to the boundary of the railways line. The construction of the first floor will be light weight cladding and kept to one storey only. Existing builiding height New first floor extension external wall to be rendered RI Stage D 1st m rear of the property Planning Issue 22.0.1 PH Planning revision 01..12 PH GF m Proposed South West Elevation New luminium frames windows New composite metal cladding Logo Signage / Design specialised panel Proposed builiding height Existing builiding height New composite metal cladding New 10mm height handrail to comply with uilding Regulations Part M 1st m 1st m In order to ensure that there is minimal negligible impact on the existing footing, with respect to the boundary of the railways line. The construction of the first floor will be light weight cladding and kept to one storey only. opyright Unable to survey rear of the property GF 0.0m 10 GF m GF m GF.m Proposed Development at Gourley Street, Proposed North West Elevation (Gourley Place) Proposed South East Elevation Proposed Elevations 1 Drawn by heck by 121-00
00 **LL DIMENSIONS ON THIS DRWING RE TO E HEKED ON SITE, DO NOT SLE FROM TO MEHNL/ELETRL/STRUTURL Proposed New Second Floor 10mm light weight concrete holorib slab 0 x 1 U 22 2 x 11 U 2 00 12 U 200 20 U 1st m 00 20 U Proposed Section - In order to ensure that there is minimal negligible impact on the existing footing, with respect to the boundary of the railways line. The construction of the first floor will be light weight cladding and kept to one storey only. 2 2 1 RI Stage D Planning Issue 22.0.1 PH Planning revision 01..12 PH Proposed New Second Floor 10mm light weight concrete holorib slab 2 x 11 U 2 0 x 1 U 12 U Proposed New First Floor 200 20 U 1st m opyright 20 U Proposed Development at Gourley Street, Proposed Section - Proposed Section - and - 121-00