Staff Report REZONING BOUNDARY OPTIONS FOR NEW DOWNTOWN GATEWAY COMMERCIAL ZONING. April 24, 2018

Similar documents
ITEM # 42 DATE: COUNCIL ACTION FORM

COMMISSION ACTION FORM SUBJECT: ZONING TEXT AMENDMENT FOR LINCOLN WAY CORRIDOR PLAN DOWNTOWN GATEWAY COMMERCIAL ZONING DISTRICT STANDARDS

LINCOLN CORRIDOR REDEVELOPMENT PROJECT UPDATE FOR DOWNTOWN GATEWAY FOCUS AREA

PC Staff Report 11/18/2013 Z Item No. 1-1

Planning Commission June 25, Lincoln Boulevard

ARLINGTON COUNTY, VIRGINIA

Master Plan Review SILVER SPRING CBD. Approved and Adopted February Updated January 2013

Generic Environmental Impact Statement. Build-Out Analysis. City of Buffalo, New York. Prepared by:

CPC CA 3 SUMMARY

Place Type Descriptions Vision 2037 Comprehensive Plan

ORDINANCE NO

Rapid City Planning Commission Rezoning Project Report

Request. Recommendation. Recommended Motion. Planning Division Department of Community and Economic Development

GENERAL DESCRIPTION STAFF RECOMMENDATION IMPLEMENTATION REQUIREMENTS

Land Use, Transportation, and Infrastructure Committee of Denver City Council FROM: Scott Robinson, Senior City Planner DATE: December 6, 2018 RE:

RIGHT-OF-WAY ACQUISITIONS AND RELOCATIONS TECHNICAL MEMORANDUM FOR RTD SOUTHWEST CORRIDOR EXTENSION PROJECT. January 2010

United States Post Office and Multi-Family Residential; and, Single- Family Residence with an Apartment

Planning Justification Report

PLANNING COMMISSION WILLIAMSBURG, VIRGINIA WORK SESSION AGENDA Wednesday, May 23, 2012

307 Sherbourne Street - Zoning Amendment Application - Preliminary Report

COMMUNICATION URBAN DESIGN REVIEW BOARD CITY OF DES MOINES, IOWA NOVEMBER 1, 2016, 2016 MEETING

HOUSING ELEMENT I. GOALS, OBJECTIVES AND POLICIES

City of Oshkosh Zoning Update

Evolution of the Vision for NE 181st Street Study Area

APPENDIX B RESIDENTIAL DENSITY

PLANNING COMMISSION STAFF REPORT

TRANSIT-ORIENTED DEVELOPMENT PLAN EXISTING CONDITIONS REPORT LAWRENCE TO BRYN MAWR MODERNIZATION

density framework ILLUSTRATION 3: DENSITY (4:1 FSR) EXPRESSED THROUGH BUILT FORM Example 1

95 Merchant Drive Unit B1, D&E Montrose, Colorado 81401

Future Land Use Categories & Nodes December 23, Future Land Use Categories

DEVELOPMENT DEPARTMENT STAFF REPORT STAFF REPORT VARIANCE AND WAIVER THE ROSALYNN APARTMENTS

GENERAL PLAN UPDATE SPECIFIC AREAS OF THE CITY

REZONING GUIDE. Zone Map Amendment (Rezoning) - Application. Rezoning Application Page 1 of 3. Return completed form to

Lawrence SmartCode Infill Plan

CITY COUNCIL AND BURA AGENDA MEMORANDUM

Planning and Zoning Commission STAFF REPORT REQUEST. DSA : Zone Change from R-3 (Multi-Family Residential) to B-4 (Community Services).

Downtown Development Focus Area: I. Existing Conditions

STAFF REPORT. Permit Number: Unlimited. Kitsap County Board of Commissioners; Kitsap County Planning Commission

COMMISSION ACTION FORM SUBJECT: ZONING TEXT AMENDMENT TO ALLOW SHORT-TERM RENTALS WITHIN APARTMENT UNITS.

Overview. Central Street Master Plan. Appendix B: Zoning

RD:SSL:JMD 11/23/2015 RESOLUTION NO.

NJAC 5:97-2.2(e), the provision of affordable housing shall be based on the issuance of

REQUEST STAFF RECOMMENDATION. On April 26, 2012, Signature Books Inc., represented by Dave Richards, submitted petitions for the following amendments:

Town Center South End Development Area District

NOTICE OF MEETING AND AGENDA FOR THE PLANNING COMMISSION OF SPRINGVILLE, UTAH... JANUARY 23, 2018

ARTICLE 3: Zone Districts

CITY PLANNING COMMISSION CITY OF NEW ORLEANS EXECUTIVE DIRECTOR. City Planning Commission Staff Report. Executive Summary

SHEPHERD COMMUNITY ZONING STUDY SPECIAL STUDY. September 21, Regional Planning Agency

Prepared By: 03/20/2013. feet EFU RR-5. Zoning. Taxlots. Subject UR-1. Information is deemed reliable but not guaranteed. RR-5

Memorandum TO: HONORABLE MAYOR AND CITY COUNCIL. FROM: Planning Commission. DATE: September 28, 2015 SUBJECT: SEE BELOW COUNCIL DISTRICT: 3

Staff Report to the Clallam County Planning Commission March 2, 2004 Page 1

Master Plan Review DAMASCUS. Approved and Adopted May Damascus Page 1 of 19 Updated July 2014 based on Adopted DMA

Washington-Hillside Small Area Study

Request Subdivision Variance (4.1 (m)(1) of the Subdivision Regulations) Staff Recommendation Approval. Staff Planner Jonathan Sanders

Understanding the Development Review Process in the City of Minneapolis

ARTICLE 3 ZONING DISTRICTS AND ZONING MAP. Table of Contents

PLANNING COMMISSION REPORT Regular Agenda - Public Hearing Item

Staff recommends the City Council hold a public hearing, listen to all pertinent testimony, and introduce on first reading:

Town of Waxhaw Board of Commissioners. Waxhaw Police Department Community Meeting Room Tuesday January 12, 2016

Staff Report. Planning Commission Public Hearing: October 17, 2007 Staff Recommendation: Denial

A. Districts Concept

AFFORDABLE WORKFORCE HOUSING REPORT OF THE WORKING GROUP Recommendations for our Region Approved February 22, 2006

PUBLIC DRAFT May 2017 Zoning Districts Use Regulations Definitions (partial)

Bylaw No , being "Official Community Plan Bylaw, 2016" Schedule "A" DRAFT

JEFFERSON COUNTY, WEST VIRGINIA Office of Planning and Zoning 116 East Washington Street, 2 nd Floor P.O. Box 716 Charles Town, WV 25414

Reaching Landlords/Tenants for Deeper Energy Savings

The Real Estate Council of Austin Questionnaire to Candidates Austin City Council November 4, 2014 Election

Request for Recommendation

Advance Auto Parts Building For Sale

Planning Justification Report for 324 York Street

OFFICIAL COMMUNITY PLAN. PART B.8 Core Area Neighbourhood Plan

Indicates Council-recommended changes Introduced by: Mr. Tackett Date of introduction: June 14, 2016 SUBSTITUTE NO. 1 TO ORDINANCE NO.

STAFF REPORT. Community Development Director PO Box 4755 Beaverton, OR 97076

178R Ossington Avenue Official Plan and Zoning By-law Amendment Application Preliminary Report

Master Plan Review WESTBARD

CITY OF FARMERSVILLE CITIZEN ADVISORY COMMITTEE AGENDA November 17, :30 P.M. 1, COUNCIL CHAMBERS, CITY HALL

Land Use. Land Use Categories. Chart 5.1. Nepeuskun Existing Land Use Inventory. Overview

and King Street West Part Lot Control Exemption Application Final Report

N o v e m b e r 9, Concept Alternatives. J o i n t C i t y C o u n c i l a n d P l a n n i n g C o m m i s s i o n W o r k s h o p

A real estate investment company.

Implementation. Approved Master Plan and SMA for Henson Creek-South Potomac 103

GETTING IT BUILT: OVERCOMING THE IMPLEMENTATION BARRIERS TO SMART GROWTH

Jasper 115 Street DC2 Urban Design Brief

CITY COUNCIL STAFF REPORT

RESOLUTION NO. A RESOLUTION OF THE COUNCIL OF THE CITY OF SAN JOSE APPROVING A NEW COUNCIL POLICY No ENTITLED SURPLUS SALES

FLAG LOT PILOT

836 St Clair Ave W - Zoning Amendment Application - Preliminary Report

STAFF REPORT PLN December 9, 2013

2201 S Townsend Avenue, Unit #2

Oak Cliff Gateway District PD 468

Palmerton Area Comprehensive Plan

shortfall of housing land compared to the Core Strategy requirement of 1000 dwellings per 1 Background

PLANNING COMMISSION STAFF REPORT

PLANNING REPORT Gordon Street City of Guelph. Prepared on behalf of Ontario Inc. March 17, Project No. 1507

TOWN OF HEMPSTEAD BUILDING ZONE ORDINANCE Proposed Zoning Amendments to Create an Hempstead Turnpike Elmont Zoning District

Kitsap County Department of Community Development

Provide a diversity of housing types, responsive to household size, income and age needs.

City of Terrace. Request for Proposals Update of Downtown Plan & Downtown Design Guidelines. Issue Date: November 3, 2017

Executive Summary Planning Code Text & Zoning Map Amendment HEARING DATE: APRIL 2, 2015

CHAPTER 21.01: GENERAL PROVISIONS

Transcription:

ITEM # 40C Staff Report REZONING BOUNDARY OPTIONS FOR NEW DOWNTOWN GATEWAY COMMERCIAL ZONING BACKGROUND: April 24, 2018 The area generally described as properties along Lincoln Way and between Grand Avenue and Duff Avenue as well as south of the railroad are identified as part of the Downtown Gateway Focus Area within the Lincoln Way Corridor Plan. The first step of implementation of the Corridor Plan is to create a new commercial zoning district with standards that encourage redevelopment for targeted commercial uses and to allow for mixed use residential development. The City has prepared draft Downtown Gateway Commercial (DGC) zoning district standards to implement the vision of the Lincoln Way Corridor Plan for the Downtown Gateway Focus Area. The draft standards are under review as a separate action item from this report. The second step in the implementation process is to initiate a rezoning of properties to the new Downtown Gateway Commercial zoning from the current Highway Oriented Commercial (HOC) and Downtown Service Center (DSC) zoning districts. City Council is asked at this time to identify the preferred area of rezoning within the Focus Area. Staff will then initiate property owner notice for public hearings with the Planning and Zoning Commission and for the City Council to adopt a rezoning map amendment for the new Downtown Gateway Commercial. As part of the discussion of new standards for the DGC zoning, there has been feedback from a variety of property owners concerned about changes in zoning due to either existing nonconformities or new nonconformities that would occur with the rezoning. The degree of nonconformities related to DGC rezoning is part of the separate report for the draft DGC standards. The primary concerns were changes to allowed uses for the area that would make uses such as gas stations, car washes, automotive repair, warehouses, and funeral homes nonconforming uses in the new zoning. Additionally, some property owners were concerned about changes to parking standards that require parking for uses along Kellogg that are currently zoned DSC and require no parking. Some property owners with HOC zoned property were concerned about nonconformities related to the configuration of parking between the building and the street as well. New drive through uses would also be limited in the proposed DGC zoning, but the current drive through establishments in the area were found to conform to the proposed standards. In general, the concerns for nonconformities under existing conditions and proposed standards apply throughout the Focus Area and are not concentrated in any one area.

OPTIONS: Part of the consideration of the rezoning boundaries is the vision for change to the area and the considerations of how specific property owners and related businesses could be impacted in the future. Staff has prepared four rezoning boundary options to help differentiate a rezoning approach that addresses priorities for either long term vision or a more concentrated immediate opportunities approach. Maps for each option are included as an attachment. Option #1. Full Extent of the Downtown Gateway Focus Area (Grand to Duff and North and south of LW)- This option would include all seventy properties in the area and extend from Grand Avenue to Duff and include properties both north and south of Lincoln Way. This is the broadest approach to rezoning for implementation of the Corridor Plan. This option would have the most nonconformities in regards to uses and site development conditions due to the greatest number of properties included in the rezoning. The broad rezoning approach would establish a long term view of evolution and redevelopment of the area. Not all of this area would be expected to redevelop in the short term as there are many viable highway oriented commercial businesses throughout the area. Option #2. Central Core Area (Centered upon Kellogg/LW intersection blocks, North and South) This option focuses the rezoning on the area between Clark Avenue and Duff Avenue for properties north and south of Lincoln Way focused on the four primary blocks that meet at the intersection of Kellogg and Lincoln Way. The Kellogg intersection is viewed as the heart of the Focus Area due to its primary connection to Downtown. This approach concentrates the rezoning on the four most critical blocks for the area and establishes a vision for redevelopment along both sides of Lincoln Way. Development on the north side would be expected to be at larger scale than redevelopment on the south side due to lot sizes and configurations. This option would leave the periphery areas out of the immediate rezoning actions, which would reduce the number of new nonconformities related to use and site development standards. Many of the periphery areas are not available for redevelopment at this time and could be reconsidered at a later time after the initial redevelopment occurs in the core blocks of the Focus Area. Option #3. Central Core Area, North Only This option would limit the rezoning to the blocks along Lincoln Way between Clark and Duff, but only on the north side. This approach maintains the two most 2

critical areas for rezoning at this time and does not change HOC zoning for the periphery area or the properties along the south side of Lincoln Way. The properties on the north side of Lincoln Way are seen as the primary redevelopment opportunities due to potential property aggregation and overall size of the development areas. Properties along the south side are shallower in depth than the north and could be redeveloped with mixed use or commercial uses at a less intense scale than is probable on the north side of Lincoln Way. Limiting rezoning to the north side of Lincoln Way would reduce many potential conflicts about nonconforming uses, with the exception of the car wash and warehouse uses that exist north of Lincoln Way. Continuing HOC zoning along the periphery and south side of Lincoln Way would allow for the current mix of uses that already exist and for the establishment of new highway oriented commercial uses. Options #4 Limited Downtown Gateway Zoning North of Lincoln Way with DSC Zoning on Kellogg The proposed DGC zoning identifies unique development standards for Kellogg recognizing its context as a connection to Main Street. The current development in the area is also similar to Main Street with buildings up to the street and limited parking on site. However, the proposed zoning has new parking requirements that are not currently the requirement for DSC zoned properties along Kellogg. This rezoning option allows for the Kellogg block to maintain its current DSC zoning, principally due to no requirement for commercial parking, and establish the DGC zoning to the east and west of Kellogg on the north side of Lincoln Way. DSC zoning is similar to the proposed DGC zoning and compatible in its basic zoning regulations and could be an accommodation for current property owners along Kellogg and create areas for redevelopment adjacent to Kellogg. STAFF COMMENTS: The extent of the rezoning boundaries is coupled with the City Council s related decisions on the proposed standards for the new DGC zoning district. Some of the concerns about nonconformities could be addressed by limiting extent of the rezoning compared to establishing more permissive DGC zoning standards to accommodate a wider range of uses and development situations. Options 1 and 2 of the rezoning boundaries fulfill the most objectives of the Corridor Plan while Options 3 and 4 are moderated approaches to implementing the Corridor Plan. While there is a strong argument to set a broad area for DGC zoning (Option 1) with clear development expectations, the periphery properties are not critical to the Plan at this time and are unlikely to have redevelopment potential in the short term. If property owners in the periphery are interested in redevelopment they could apply for a rezoning from HOC to DGC at the time of redevelopment. However, the blocks in the Central Core of the focus area (Options 2) are more critical in establishing both redevelopment 3

opportunities now and ensuring that adjacent development is also compatible with the desired redevelopment in the area. Therefore, staff supports Option 2 because it fulfills the most immediate needs for implementing the Corridor Plan. However, if the City Council elects to allow for some of the Vehicle Service Facility uses to continue as pre-existing, then applying the DGC zoning to the broad area of Option 1 would be appropriate since the primary use concerns would be resolved. At this time staff needs direction on the proposed boundaries of the rezoning to initiate the rezoning process within the timeline described at the time the moratorium was adopted on March 27 th. With City Council s direction on a preferred area staff would initiate the rezoning public hearing process. Staff would coordinate the first public hearing with the Planning and Zoning Commission on May 16 th reflecting the Council s action of adopting the new DGC zoning standards on May 8 th. Upon receiving a recommendation from the Planning and Zoning Commission, the Council would need to hold a public hearing for first reading of the rezoning ordinance on either May 23 rd or June 12 th. City Council may need to consider combining second and third readings of the rezoning ordinance to complete the rezoning process prior to the expiration of the moratorium on July 2 nd. 4

E M AIN ST MAIN ST DUFF AVE E 5TH ST DOUGLAS AVE BURNETT AVE CLARK AVE PEARLE AVE GRAND AVE 5TH ST KELLOG G AVE 18 E 3RD ST Focus Area Boundary E 2ND ST City of A mes, Iowa makes n o wa rran tie s, expre ssed o r i mplied, includin g with out limita ti on, a ny wa rrantie s of me rchan ta bility o r fitness for a pa rticu lar pu rpose. In n o event sh all th e Ci ty of Ames be liab le for lo st profits o r a ny con seque ntial or incide ntal dama ges ca used by the u se o f this ma p. M S SHERMAN AVE S KELLOG G AVE S 2ND ST Option #1 Downtown Gateway Rezoning both sides of Lincoln Way S DUFF AVE S G RA N D AV E S WALNUT AVE WASHINGTON AVE SE 2ND ST

DUFF AVE DOUGLAS AVE KELLOGG AVE BURNETT AVE CLARK AVE PEARLE AVE GRAND AVE MAIN ST Focus Area Boundary Option #2 Central Core North and South City of A mes, Iowa makes n o wa rran tie s, expre ssed o r i mplied, includin g with out limita ti on, a ny wa rrantie s of me rchan ta bility o r fitness for a pa rticu lar pu rpose. In n o event sh all th e Ci ty of Ames be liab le for lo st profits o r a ny con seque ntial or incide ntal dama ges ca used by the u se o f this ma p. M S DUFF AVE S SHERMAN AVE S KELLOGG AVE S WALNUT AVE S G RAN D AVE S 2ND ST WASHINGTON AVE

18 E 5TH ST E M AIN ST MAIN ST E 3RD ST DUFF AVE CLARK AVE KELLOGG AVE T ST COMMERCE AVE IS GILC HR SHERMAN AVE MARKET AVE GRAND AVE Focus Area Boundary DOUGLAS AVE BURNETT AVE PEARLE AVE 5TH ST E 2ND ST Alley S 2ND ST Option #3 -Central Core North Only City of A mes, Iowa makes n o wa rran tie s, expre ssed o r i mplied, includin g with out limita ti on, a ny wa rrantie s of me rchan ta bility o r fitness for a pa rticu lar pu rpose. In n o event sh all th e Ci ty of Ames be liab le for lo st profits o r a ny con seque ntial or incide ntal dama ges ca used by the u se o f this ma p. M S SHERMAN AVE S DUFF AVE S G RA N D AV E S WALNUT AVE WASHINGTON AVE S KELLOG G AVE LINCOLN WAY SE 2ND ST

E M AIN MAIN ST ST DUFF AVE E 5TH ST DOUGLAS AVE BURNETT AVE CLARK AVE PEARLE AVE GRAND AVE 5TH ST KELLOG G AVE 18 Focus Area Boundary DES MOINES AVE E 3RD ST E 2ND ST E LINCOLN WAY M S SHERMAN AVE S KELLOGG AVE WASHINGTON AVE S WALNUT AVE D AVE S G RAN City of A mes, Iowa makes n o wa rran tie s, expre ssed o r i mplied, includin g with out limita ti on, a ny wa rrantie s of me rchan ta bility o r fitness for a pa rticu lar pu rpose. In n o event sh all th e Ci ty of Ames be liab le for lo st profits o r a ny con seque ntial or incide ntal dama ges ca used by the u se o f this ma p. S 2ND ST Option #4 Central Core North with DSC on Kellogg S DUFF AVE SE 2ND ST