Flood Hazard Area Land Use Management Guidelines Sea Level Rise Amendment. Effective January 1, 2018

Similar documents
FLOOD HAZARD AREA LAND USE MANAGEMENT GUIDELINES. May Ministry of Water, Land and Air Protection. Province of British Columbia

FLOOD HAZARD AREA LAND USE MANAGEMENT

DISTRICT OF NORTH SAANICH B Y L A W N O A BYLAW TO MITIGATE COASTAL FLOODING HAZARDS

REGIONAL DISTRICT OF NANAIMO BYLAW NO. 1469

Coastal Shore Jurisdiction in British Columbia

Floodplain Regulation

City of Chilliwack. Bylaw No. 4519

Not By Government Alone Turning Partnership into Great Regional Protected Areas in the Capital Region of British Columbia

REGIONAL DISTRICT OF KITIMAT-STIKINE BYLAW NO. 656

Ministry of Forest, Lands and Natural Resource Operations

Qualified Professionals, Land Owners and Developers. FROM: Development Services. DATE: November 29, 2017

NEW HOMES REGISTRY REPORT

REPORT TO THE JUAN DE FUCA LAND USE COMMITTEE MEETING OF TUESDAY FEBRUARY 19, 2013

SENIORS HOUSING REPORT British Columbia

Current Issues in Managing Flood Protection Works in BC

DEVELOPMENT PERMIT APPLICATION REQUIREMENTS

Fraser River Escarpment Policy

Guidelines for Hazard Assessment by a Professional in the field of Geotechnical Engineering

Implementation Tools for Local Government

A Guide to the Municipal Planning Process in Saskatchewan

ALC Bylaw Reviews. A Guide for Local Governments

Peter Kenward. Profile. Matthew Southwest Bethel

May 2010 Regional Parks Land Acquisition Fund

SUBDIVISION AND DEVELOPMENT APPLICATION FORM

MEMO RECOMMENDATION REFERRAL

REQUEST FOR PROPOSALS

Our Proposal. The Proposal

Surrey Rental Premises Standards of Maintenance By-law. The Planning and Development Department recommends that Council:

NO: R172 COUNCIL DATE: SEPTEMBER 9, Locational Guidelines for Private Liquor Stores (Licensee Retail Stores)

CAPITAL REGIONAL DISTRICT BYLAW NO (As amended by Bylaw Nos. 2960, 3100, 3218, 3432, 3805, 3893, 3904, 4063, 4249)

River Road - Civil Design Report. Appendix D. Flood Hazard Map. Beca //04 August // NZ // page 38

Chapter 19. Water, Riparian, and Foreshore Rights. Key Terms. Water Rights. Riparian Rights. Chapter 19: Water, Riparian, and Foreshore Rights

Capital Regional District. Regional Parks Land Acquisition Strategy 2015 to 2017

MonthlyStatistics DECEMBER 2017

Residential Strata Title Conversion Policy, 2010

Application of tsunami modelling for escape and refuge planning in Aceh (Indonesia)

Fraser River Model Project fonds

PHASED STRATA APPLICATION FORM

Manufactured Home Study

Overview 7/6/2016. Agenda. Introduction to ParcelMap BC LGMA Annual Conference Nanaimo, BC. ParcelMap BC Primary Goal

Date: April 15, 2016 Meeting Date: May 6, Park for Other Land to be used for Park Purposes Bylaw No. 1233, 2016 ;

Mayor Darrell R. Mussatto and Members of Council ENHANCED NOTICE AND ASSISTANCE OPTIONS FOR TENANT DISPLACEMENT

VI. SAFETY ELEMENT I. INTRODUCTION A. PURPOSE B. AUTHORITY. 1. Safety

Date: May 15, 2014 Meeting Date: May 23, Corporation of Delta Proposed Amendment to Metro Vancouver 2040: Shaping our Future for Southlands

Board of Trustees Meeting Regular Minutes - Approved March 29, 2014

Sea-Level Rise and Flooding: Legal, Fiscal, & Regulatory Challenges for Local Governments, Part I

MonthlyStatistics JANUARY 2018

Interior health. Subdivision Referrals and Soils Information

MonthlyStatistics MARCH 2018

Proposed Horowhenua District Plan

Summary of Changes: June 1, 2011 BN Policy and Procedure update to reflect reorganization of resource ministries April 2011

ARTICLE 5 MINOR SUBDIVISION/LAND DEVELOPMENT

SURVEYING BOUNDARIES FORESHORE AND PROPERTY OUTLINE DEFINITIONS JURISDICTIONAL ISSUES TENURE ISSUES PRACTICAL SURVEY ISSUES RECOMMENDATIONS

Permits and Inspections Policy

ENVIRONMENTAL ASSESSMENT / INFRASTRUCTURE PROJECTS

Monthly Statistics Package June 2015

R esearch Highlights LEVIES, FEES, CHARGES AND TAXES ON NEW HOUSING (2002) Introduction. Municipal Levies, Fees and Charges

Zoning Bylaw Amendment 1926 Vera Drive (Thomas) Lazo North (Electoral Area B) Lot C, Block 29, Comox District, Plan 32630, PID

Ministry of Environment and Climate Change Strategy and Ministry of Forests, Lands, Natural Resource Operations and Rural Development

The Permit & Licence Process at the City of Vancouver. Presented By Bob Gill July 24, 2017

DEVELOPMENT APPLICATION FORM

MonthlyStatistics NOVEMBER 2017

/THE CORPORATION OF THE CITY OF PENTICTON MEMORANDUM

REGIONAL DISTRICT OF KITIMAT-STIKINE BYLAW NO. 676

MonthlyStatistics MARCH 2017

MonthlyStatistics APRIL 2018

Crown Land Use Policy: Industrial - General APPROVED AMENDMENTS: Summary of Changes: /Approval

4.0. Residential. 4.1 Context

These can be obtained at the City s Engineering Department or on the City s website (

MonthlyStatistics AUGUST 2018

TEMPORARY USE PERMITS (TUP) A Guide to the Municipal Approvals Process in Chilliwack September 2014

Land Procedure: Land Exchange Indian Reserve Lands APPROVED AMENDMENTS: Summary of Changes: /Approval

Strengthening Community. Building Opportunity

MONTHLY STATISTICS PACKAGE

MonthlyStatistics MAY 2018

STRATA TITLE CONVERSION APPLICATION FORM

Pop Growth Rate. Population % 5.9% 8.6. Implemented No Prevention Mandatory Unique Low (< $10,000)

BC Assessment 2006 Annual Service Plan Report. Appendix C: Supplementary 2007 Assessment Roll Information - Statistics

ZONING BOARD OF APPEALS APPLICATION

MonthlyStatistics FEBRUARY 2018

APPENDIX B COMPLIANCE WITH THE GOVERNMENT CODE

DISTRICT OF CENTRAL SAANICH SOIL REMOVAL OR DEPOSIT PERMIT APPLICATION. Applicant Information (filled out by applicant)

Schedule A to Bylaw No. 477, 2013 APPLICATION FEES 1. Official Community Plan Bylaw Amendment $ Zoning Bylaw Amendment $ Simultaneous Of

The Joe Rich Rural Land Use Bylaw

Some Social and Policy Implications of Shore Erosion. James G. Titus U.S. Environmental Protection Agency

Open Space Model Ordinance

MonthlyStatistics JULY 2018

Town of Lisbon, Maine SUBDIVISION REVIEW APPLICATION

Monthly Statistics Package July 2016

Temporary Use Permit Application Form

Georgia Street W, PO Box 10123, Pacific Centre, Vancouver, BC V7Y 1C6

How to find your home s required finished floor elevation according to City s proposed new Floodplain Ordinance

STAFF REPORT. DATE: February 26, 2018 FILE: EASC. Chair and Directors, Electoral Areas Services Committee. Chief Administrative Officer

ADDENDUM A TO CONTRACT OF PURCHASE AND SALE

METHODOLOGY GUIDE VALUING LANDS IN TRANSITION IN ONTARIO. Valuation Date: January 1, 2016

CITY OF VANCOUVER ADMINISTRATIVE REPORT

City of Brandon Brownfield Strategy

GOVERNMENT CODE SECTION GOVERNMENT CODE SECTION 65302

DISTRICT OF SICAMOUS REQUEST FOR EXPRESSIONS OF INTEREST MAIN STREET REDEVELOPMENT

For Committee. Mobile Home Park Redevelopment Tenant Assistance Policy

Transcription:

Flood Hazard Area Land Use Management Guidelines Sea Level Rise Amendment Effective January 1, 2018

What are the Flood Hazard Area Land Use Guidelines used for again?

Flood Hazard Area Land Use Management Guidelines Provincial guidelines intended to minimize injury and property damage resulting from floods Intended to support land use and development decisions broadly Recommend setbacks and flood construction level (FCL) for various hazard types Local Government Act Local governments must consider guidelines when making bylaws for designated sea level rise (SLR) planning areas Linked to Compensation and Disaster Financial Assistance Regulation for determining properly flood protected properties in designated SLR areas Updated by the Ministry of Forests, Lands, Natural Resource Operations and Rural Development January 2018

Amendment to Sections 3.5 and 3.6 The provincial guidelines have been amended to define SLR planning areas and to incorporate sea level rise into the determination of building setbacks and flood construction The amendment affects communities where potential flood levels will be increased by sea level rise The amendment comes into effect on January 1, 2018 In the absence of more site-specific studies of information by a qualified Professional Engineer, the Flood Hazard Area Land Use Management Guidelines are the recommended provincial minimum requirements for land use management in flood hazard areas

Flood Hazard Assessments The management of land use in coastal flood hazards may require flood hazard assessments to be completed by a suitably qualified Professional Engineer, experienced in coastal engineering. The standards of practice that these Professionals should follow include those outlined in the most recent revision of the Professional Practice Guidelines Legislated Flood Assessments in a Changing Climate in BC, published by Engineers and Geoscientists of BC. The Professional Practice Guidelines provide for use of risk based assessment methodologies not considered by this Amendment. Those choosing to base approval decisions on risk assessments prepared by Professional Engineers, must ensure the changes in risk over time due to sea level rise are fully taken into account.

How did this amendment come about?

Timeline of Milestones

What type of engagement and consultation took place?

Engagement and Consultation Review, discussion, and input was sought and incorporated into the amendment, including from the following agencies: Fisheries & Oceans Canada Natural Resources Canada Multiple Provincial Ministries Experts from the University of BC and University of Victoria and Simon Fraser University Numerous private sector professionals Engineers and Geoscientists BC 113 coastal First Nations

Engagement and Consultation A technical working group (TWG) was formed in 2014 consisting of 20 local governments and representation from the Union of BC Municipalities. Advice and recommendations from the TWG and from written submissions were invaluable in drafting the final amendment for approval by the Province s Water Policy and Legislation Committee. The local government representation on the TWG consisted of staff from: District of West Vancouver Town of View Royal Corporation of Delta Juan de Fuca EA (CRD) District of Squamish District of Tofino City of Vancouver City of Nanaimo District of Sooke City of Surrey Strathcona Regional District Islands Trust City of Richmond City of Campbell River Town of Qualicum Beach District of North Saanich Town of Sidney City of Victoria Capital Regional District Cowichan Valley Regional District

What did the science say about expected sea level rise and how far out should we be looking?

Recommended Curve for Sea Level Rise Gray area represents the range of sea level rise projections in scientific literature and in policies adopted in other jurisdictions (e.g. US, UK, New Zealand, Netherlands) http://www2.gov.bc.ca/assets/gov/environment/air-land-water/water/integrated-flood-hazard-mgmt/ guidelines_for_mgr_coastal_flood_land_use-2012.pdf

Plan for 0.5m sea level rise by 2050, 1.0m by 2100, and 2.0m by 2200 (based on year 2000 and adjusted for regional uplift or subsidence) Buildings, subdivisions and zoning to the year 2100 Land use strategies to the year 2200 http://www2.gov.bc.ca/assets/gov/environment/air-land-water/water/integrated-flood-hazard-mgmt/ guidelines_for_mgr_coastal_flood_land_use-2012.pdf

What are the highlights of this amendment?

Amendment Highlights General In the absence of more site-specific studies or information by a qualified Professional Engineer, these guidelines are the recommended provincial minimum requirements for land use management in flood hazard areas. Current Guideline No sea level rise Flood hazard based on designated flood with a 1:200 annual exceedance probability (AEP) Amendment Sea level rise (SLR) planning encouraged SLR to 2100 for buildings, zoning, subdivisions SLR to 2200 for land use adaptation 1:200 (minimum) return period water level for combined high tide and storm surge 1:200 AEP event has a 22% probability of occurring once in a 50 year period and 39% probability of occurring once in a 100 year period.

Amendment Highlights Flood Construction Level Current Guideline Strait of Georgia: 1.5m above elevation of natural boundary Amendment Greater of FCLs calculated based on tsunami hazard (if present) or: Sea level rise to year 2100 Land uplift/subsidence to 2100 Outside Strait of Georgia: Determined by site-specific analysis of tsunami hazard (professional report) 1:200 Annual Exceedance Probability as determined by probabilistic analyse of tides and storm surge* Wave effects for design storm Freeboard * A more conservative combined method is available as an alternate method to determine FCLs.

Two Methods for Determining the Flood Construction Level in Non-Tsunami Areas

Two Methods for Determining the Flood Construction Level in Non-Tsunami Areas MORE CONSERVATIVE

Amendment Highlights Setbacks Current Guideline Amendment Strait of Georgia: Buildings: 15m from natural boundary Fill/dikes: 7.5m from natural boundary (non-erodible) Erosion hazards may require increased setbacks Special conditions for coastal bluffs Outside Strait of Georgia: Determined by site-specific analysis of tsunami hazard (professional report); minimum 30m Strait of Georgia: 15 m from estimated location of future natural boundary based on: Sea level rise to year 2100 Land uplift/subsidence to 2100 1:200 water level for high tide + storm surge for design storm Wave effects for design storm Freeboard Outside Strait of Georgia: Determined by site-specific analysis of tsunami hazard (professional report); minimum 30m from estimated location of future natural boundary

Areas Subject to Significant Tsunami Hazard Subdivision applications in tsunami prone areas (zones A,B,C and D as shown on the Tsunami Notifications Zones for BC map following slide) Setbacks and FCL for tsunami hazards must be determined for each proposed lot by a qualified Professional Engineer experienced in coastal engineering Setback must be sufficient to protect buildings and must be at least 30m from the 2100 estimated (future) natural boundary Reductions should only be considered where the building can be built to Tsunami FCL on bedrock

Tsunami Notification Zones for BC https://www2.gov.bc.ca/assets/gov/public-safety-and-emergency-services/emergency-preparednessresponse-recovery/embc/preparedbc/tsunami_zone_province_final.pdf

What is an estimated (future) natural boundary?

Boundaries Now and Then Natural boundary is defined in the Land Act: "natural boundary" means the visible high water mark of any lake, river, stream or other body of water where the presence and action of the water are so common and usual, and so long continued in all ordinary years, as to mark on the soil of the bed of the body of water a character distinct from that of its banks, in vegetation, as well as in the nature of the soil itself; For defining seal level rise planning areas a new approach involving estimating the future location of the natural boundary is required. The future natural boundary now includes for sea level rise (with regional uplift or subsidence), high tide, storm surge, wave effects, and minimum freeboard.

Defining the Sea Level Rise Planning Area Natural versus Estimated (Future) Natural Boundary

SLR Planning Areas Sea level rise planning areas should include areas exposed to coastal flood hazards, diked areas and inland floodplains adjacent to tidally influenced rivers. Lands within a designating SLR planning areas may be designated as flood plains under Section 524 of the Local Government Act to allow the specification of flood levels and setbacks, by bylaw, to address sea level rise.

Where can I find more information?

Resources Amendment to Sections 3.5 and 3.6 of the FHALUMG: Technical reports referenced in the amendment: Draft Policy Discussion Paper (Ausenco Sandwell) https://www2.gov.bc.ca/gov/content/environment/air-land-water/water/drought-flooding-dikesdams/integrated-flood-hazard-management/flood-hazard-land-use-management http://www2.gov.bc.ca/assets/gov/environment/air-land-water/water/integrated-flood-hazardmgmt/draft_policy_rev.pdf Sea Dike guidelines (Ausenco Sandwell) http://www2.gov.bc.ca/assets/gov/environment/air-land-water/water/integrated-flood-hazardmgmt/sea_dike_guidelines.pdf Coastal Flood Hazard Land Use (Ausenco Sandwell) http://www2.gov.bc.ca/assets/gov/environment/air-land-water/water/integrated-flood-hazardmgmt/guidelines_for_mgr_coastal_flood_land_use-2012.pdf Other sea level rise documents: Sea Level Rise Adaptation Primer http://www2.gov.bc.ca/assets/gov/environment/climate-change/adaptation/resources/slr-primer.pdf An Examination of the Factors Affecting Relative and Absolute Sea Level in Coastal British Columbia http://publications.gc.ca/collections/collection_2015/mpo-dfo/fs97-18-260-eng.pdf All links were tested at the time of posting this presentation, but this document will not be updated to reflect any changes to addresses.

Visit the Integrated Flood Hazard Management website at: https://www2.gov.bc.ca/gov/content/environment/air-land-water/water/drought-flooding-dikesdams/integrated-flood-hazard-management