Caroline County, Maryland Department of Planning & Codes FEE SCHEDULE Tel: Fax:

Similar documents
Fee Schedule for Zoning, Building Permits, and Plan Review Services

PALMER TOWNSHIP NORTHAMPTON COUNTY, PENNSYLVANIA RESOLUTION#

BUILDING & ZONING SCHEDULE OF FEES Effective March 15, 2015

~ Please Detach and Save This Page ~

Schedule of City Fees & Charges

LINCOLN COUNTY, NORTH CAROLINA PLANNING & INSPECTIONS DEPARTMENT FEE SCHEDULE ADOPTED AUGUST 15, 2016 EFFECTIVE SEPTEMBER 6, 2016

RESOLUTION NO AMENDING RESOLUTION NO TOWN OF BEL AIR S FEE SCHEDULE

WEST NOTTINGHAM TOWNSHIP FEE SCHEDULE

SUBSEQUENT APPLICATION, INSPECTION/RENEWAL BOND, ESCROW OR FEE REQUIRED INITIAL APPLICATION BOND, ESCROW OR FEE REQUIRED PRE-APPLICATION MEETING

FEE SCHEDULE ADMINISTRATION FEES OF 35% ARE CHARGED TO THE PROPERTY OWNER IN ADDITION TO ALL OTHER APPLICABLE FEES AND COSTS. SEE NO. 13.

RESIDENTIAL BUILDING PERMIT FEES. New Construction and Multi-Residential Construction* Including living, habitable space, basement, & garages

PERMIT FEES DOUBLED FOR CONSTRUCTION WITHOUT THE BENEFIT OF A PERMIT

New Hanover Township

Appeals to the Board of County Commissioners Code standard as part of a project review Code standard without a project submittal $725.

WHEREAS, it is necessary that an appropriate Fee Schedule be established sufficient to

BUILDING SERVICES ~ FEE SCHEDULE

THE BUILDING PERMIT PROCESS FOR SINGLE-FAMILY DWELLINGS REVISED MAY 2006

Village of Glen Ellyn Fee & Deposit Schedule Per Village Code 4-1-4

Planning&Development Fee Standards

Rules and Regulations. for. Building Control Fees. Revised January 2, 2018

ZONING & BUILDING PERMIT AND SUBDIVISION & LAND DEVELOPMENT PLAN MASTER FEE SCHEDULE PER RESOLUTION No

EXHIBIT A to Ordinance No PART 1

City of High Point Development Fee Schedule

RESOLUTION # WHEREAS, The Board of Supervisors of Upper Southampton Township has established a fee schedule, and

RESOLUTION NO

RESOLUTION NO NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF SATELLITE BEACH, BREVARD COUNTY FLORIDA, as follows:

1. Areas within perimeter boundary of city No fee. 2. Annexation agreements $100.00

RESOLUTION NO. 29 OF Town of Clinton Fee Schedule

Appeals to the Board of County Commissioners Code standard as part of a project review Code standard without a project submittal $200.

Chapter YAKIMA COUNTY FEE SCHEDULE

2018 THURSTON COUNTY LAND USE APPLICATION FEE SCHEDULE

Town of Walworth Fee Schedule 2019

Permitting Fee Schedule

GENERAL FEE SCHEDULE TOWN OF LOCKPORT RESOLUTION

DECLARATION OF RESTRICTIONS OF CHESHIRE FOREST PHASE 1-A

Appendix G Fee Schedule

Town of Holly Springs Residential Development Fee Worksheet. Effective July 1, 2018 June 30, 2019

TATAMY BOROUGH 2018 FEE SCHEDULE ADOPTED 1/2/18 EFFECTIVE 1/1/18

RESOLUTION NO BUILDING, ZONING, AND SEWAGE ENFORCEMENT FEE SCHEDULE

LIMERICK TOWNSHIP 646 WEST RIDGE PIKE LIMERICK, PENNSYLVANIA 19468

Town of Angier Rate and Fee Schedule Fiscal Year Effective July 1, 2011

Grass Lake Charter Township 373 Lakeside Drive, P.O. Box 216 Grass Lake, Michigan 49240

TOWN OF ROXBURY INSTRUCTIONS FOR FILING A BUILDING PERMIT. Phone/Fax/Message(607) Phone/Fax (607) REVISED 6/2/17

Peters Township Planning Department Fee Schedule

HOMEOWNER S PROCEDURES FOR FILING A BUILDING PERMIT APPLICATION FOR WASHINGTON COUNTY, MARYLAND

Allen Township Northampton County, Pennsylvania TOWNSHIP S GENERAL FEE SCHEDULE FOR 2018

BYLAW OF LAC LA BICHE COUNTY

ST. MARY S COUNTY DEPARTMENT OF LAND USE AND GROWTH MANAGEMENT FREQUENTLY ASKED QUESTIONS

Zoning Fee Schedule. Per Chapter Part VIII Administrative Code

FEES AND COST DEPOSITS FOR SUBDIVISIONS, LAND DEVELOPMENTS AND DEVELOPMENT MATTERS SKETCH PLANS

THE TOWN OF Angier N O R T H C A R O L I N A

Town of Sylva Fee Schedule FY

Land Use Application Fees

STEP 1: SOIL EVALUATION

Springfield Township Bucks County SCHEDULE OF FEES AND CHARGES RESOLUTION #

BOROUGH OF NORTH WALES. Fee Schedule Effective: 01/01/2018

Worcester Township Fee Schedule

RESOLUTION PERMIT FEE SCHEDULE

Location in Code Subject Fees

Office of the Zoning Administrator and Planner. Saugatuck Township Planning and Zoning Applicants. Notice of Information for PC and ZBA Applicants

a. Test well for the purpose of community water supply or any other investigatory purpose per Ordinance 124 b. Monitoring Well

APPLICATION FOR SITE PLAN CONTROL

Pt. SE W4

ZONING ORDINANCE, ARTICLE 5: SITE DEVELOPMENT REGULATIONS PAGE

Reynoldsburg Code of Ordinances. CHAPTER 1305 Permits and Fees

PERMIT FEES CITY OF BATAVIA DEPARTMENT OF PUBLIC WORKS ONE BATAVIA CITY CENTRE BATAVIA, NEW YORK Revised: July 21, 2008

MENARD COUNTY ZONING PERMIT APPLICATION (PLEASE READ BEFORE PROCEEDING WITH APPLICATION)

CITY OF JOHNSTOWN SCHEDULE OF PERMIT FEES

Community Development Department Fee Schedule

TOWN OF WOODWAY FEE SCHEDULE EFFECTIVE JANUARY 8, 2019

PUTNAM TOWNSHIP. Schedule of Development Review Fees. As adopted by the Putnam Township Board August 16, 1995 Effective September 22, 1995

PRAGR Agricultural 14 PRAGR Agricultural 14

ORDINANCE NO (revised by Ordinance )

NEW BRITAIN BOROUGH SCHEDULE OF FEES (Revised December 15, 2017)

APPLICATION. Airport Hazard In ETJ - one- and two family dwelling $100 Airport Hazard in ETJ anything other than one- and twofamily

ST. MARY S COUNTY DEPARTMENT OF LAND USE AND GROWTH MANAGEMENT FREQUENTLY ASKED QUESTIONS

6808 SOUTHVIEW TERRACE

BUILDING PERMIT APPLICATION

NEW BRITAIN BOROUGH SCHEDULE OF FEES (Revised April 9, 2019)

Information Needed for a Building Permit

City of Lynden Title 19 ZONING

City of Wasco MASTER FEE SCHEDULE EXHIBIT A. City Clerk. Community Development

MUDDY CREEK TOWNSHIP 2018 FEE SCHEDULE RESOUTION #

Town of Aurelius 1241 West Genesee St Rd Auburn, NY Ext # (fax)

NOTICE. Valuations for determining the building permit fee shall be set by the Building Official per International Building Code Section

Architecture Definitions and Guidelines For All Buildings/Structures On Grandview See Additional notes on Page 6

EXHIBIT A PERMIT & GENERAL BUILDING FEES SCHEDULE

JOINT PLANNING BOARD APPLICATION FORM

SECTION 5: ACCESSORY USES

ORDINANCE NO. 5 CASE NO. ORA THIRD SET OF OMNIBUS AMENDMENTS TO THE KOOTENAI COUNTY LAND USE AND DEVELOPMENT CODE

Annexation Procedure

APPENDIX A BUILDING PERMIT AND RELATED FEES

THE CORPORATION OF THE MUNICIPALITY OF MISSISSIPPI MILLS SITE PLAN CONTROL APPLICATION FORM Procedure Guide June 12, 2017

Total Cost of the Building Permit. Total Valuation*

Zoning and Building Permit Application

CITY OF MERCED PLANNING AND DEVELOPMENT FEE SCHEDULE

WEST MANHEIM TOWNSHIP FEE SCHEDULE FOR SERVICES & PERMITS. Resolution #

$ $ $ $ $ Failed Inspection... Residential...$ must be paid prior to re-inspection Miscellaneous $ 146.

ADDENDUM B DECLARATION OF COVENANTS, CONDITIONS AND RESTRICTIONS OF FRESHWATER ESTATES. Prepared by Jeanne Dove-Taylor, Esquire.

Town of Chino Valley Consolidated Fee Schedule Resolution No , Adopted October 23, 2012 Effective January 1, 2013

Transcription:

Health & Public Services Bldg. 403 S. 7th St., Suite 210, Denton, MD 21629 RESIDENTIAL Caroline County, Maryland Department of Planning & Codes FEE SCHEDULE www.carolineplancode.org Tel: 410-479-8100 Fax: 410-479-4187 BUILDING PERMITS/ZONING CERTIFICATES (Building Inspection, Energy Code Inspection and Plan Review Fee Also Required) Single-family, Two-family, Multi-family & Accessory Dwellings Modular & Manufactured Dwellings Additions, Decks, Porches, Basements & Attached Garages..................... $0.17 per sq ft on the measurements of all buildings at all levels (rounded to the nearest dollar amount - minimum fee of ) Interior and Exterior Renovations & Alterations (which involve no structural changes)........................................ Replacement Foundations................................................ Fireplaces............................................................. Handicap Access Ramp (no permit required)................................. $30.00 NO FEE DETACHED ACCESSORY STRUCTURES Garages, Gazebos, Pole Buildings, Produce Stands and Storage Sheds (under 200 sq ft)............................ Garages, Gazebos, Pole Buildings, Produce Stands and Sheds ( 200 sq ft and over)............................... $0.17 per sq ft on the measurements of all buildings at all levels (rounded to the nearest dollar amount - minimum fee of ) In-ground Swimming Pools............................................... Above-ground Swimming Pools............................................ SHORELINE PROJECTS Residential Piers, Docks, Bulkheading, Rip-rap, Retaining Wall and Boatlift............................................... SIGNS On-Premise - Permitted business, commercial and industrial establishments Off-Premise - General Advertising.......................................... 30-DAY PROCEDURAL LETTERS Singlewide Manufactured Homes and Accessory Dwellings................................ $2.00 each letter, plus cost to send certified mail, return receipt Fee Schedule 1 03/20/2012

AGRICULTURAL Agricultural Buildings, Poultry Houses, Manure Storage Sheds, Barns and Greenhouses............. up to $10,000 value................. minimum $10,001 to $20,000................ $5.00 per thousand $20,001 to $100,000............... $4.00 per thousand $100,001 to $500,000.............. $3.00 per thousand $500,001 and up..................$2.00 per thousand COMMERCIAL, INDUSTRIAL & INSTITUTIONAL New Construction, Renovations & Alterations, Stores, Churches, Lagoons.......... up to $20,000 value................ minimum $20,000 to $100,000............... $5.00 per thousand $100,001 and above............... $4.00 per thousand ZONING CERTIFICATE Home Occupation, Change of Use, Land Use Only, Temporary Display Tents, (when a Building Permit is not Issued)...................................... Mineral Extraction/Borrow Pits:......up to 5 acres............ per acre of disturbed area 6 to 10 acres............$250.00 per acre of disturbed area 11 acres and above.......$500.00 per acre of disturbed area (disturbed area includes stockpiles, processing area and haul roads) MISCELLANEOUS Re-inspection Fee...................................................... Temporary Certificate of Occupancy....................................... Final Certificate of Occupancy............................................ NO FEE PLEASE NOTE: FEE(S) WILL AUTOMATICALLY BE DOUBLED IF AN APPROVED PERMIT IS NOT SECURED BEFORE WORK COMMENCES BOARD OF ZONING APPEALS Administrative Variance Application..................................... Variance Application.................................................. Critical Area Variance Application....................................... Special Use Exception Application....................................... Critical Area Special Use Exception Application............................ Appeal or Interpretation............................................... $125.00 $250.00 $500.00 $600.00 (Critical Area Variance and Special Use Exception Applications are those regulated by the State of Maryland, Department of Natural Resources, Critical Area Commission) ALL ADVERTISING FEES ASSOCIATED WITH THE APPLICATION ARE TO BE PAID BY THE APPLICANT PLEASE NOTE: FEE(S) WILL AUTOMATICALLY BE DOUBLED FOR "AFTER THE FACT" APPLICATIONS Fee Schedule 2 03/20/2012

STORMWATER MANAGEMENT Standard Plan Application............................................... Waiver............................................................... Detailed Plan Review when Structural and/or Non-Structural Measures are Required.......... Performance Bond................................ Administrative Fee................................ FOREST CONSERVATION Ordinance............................................... Manual................................................. Declaration of Intent (DOI): Agricultural, Forestry, Real Estate Transfer or Single Lot...................... Forest Conservation Plan................................................ $300.00 Simplfied Forest Stand Delineation........................................ Intermediate Forest Stand Delineation..................................... Full Forest Stand Delineation............................................ $300.00 $475.00 per acre plus Tree Planting Surety Bond.................................. 20% or approved estimate Non-Compliance Fine.............................. $0.30 per square foot of disturbed area SUBDIVISION PLATS reimbursement to the County for all costs for professional plan review and inspection amount of the cost of construction estimate plus fifteen percent (15%) one percent (1%) of the amount of the initial letter of credit or bond $12.00 plus postage, if mailed $15.00 plus postage, if mailed Minor Plat (4 lots or fewer)......................................... Minor Plat (lots within the Chesapeake Bay Critical Area)..................... Additions, Modifications, Corrections and Resubdivisions..................... $350.00 per lot $450.00 per lot Major Plat (5 lots or more)................................ Major Plat (lots within the Chesapeake Bay Critical Area).......... Construction of Improvements (Major Subdivision) Administrative Fee................................ County Road Construction Plan Review and Inspection Fee................................ MISCELLANEOUS $350.00, plus $350.00 per lot $350.00, plus $450.00 per lot $250.00 plus 1% of the amount of initial bond, escrow or letter of credit $250.00 plus $0.50 per center-line foot Critical Area Growth Allocation........................................... Water and Sewer Plan Amendment Fee..................................... $500.00 Annexation Fee........................................... $250.00 plus per acre Zoning Text Amendment Fee............................................. Manufactured Home Parks.................................. $250.00 per individual site Rezoning Applications...................................... $250.00 plus per acre Fee Schedule 3 03/20/2012

SITE PLAN REVIEW Commericial, Industrial, Institutional and other activities that are subject to site plan approval by the Zoning Ordinance up to 500 square foot of disturbance........................ 501 to 1,000 square foot of disturbance..................... 1,001 to 1,500 square foot of disturbance.................... 1,501 square foot of disturbance and above.................. $300.00 ELECTRICIAN LICENSES AND EXAMS Master (valid for 2 years)................................................ General (valid for 2 years)................................................ Limited (valid for 2 years)............................................... Shelved (valid for 2 years)................................................ Inspection Agency (valid for 2 years)....................................... Late Renewal Charge (per month)......................................... $70.00 $40.00 $150.00 Master Exam Fee....................................................... General Exam Fee...................................................... $150.00 Limited Exam Fee...................................................... Re-Examination Fee............................... same as original examination fee PLUMBER (must have a valid Maryland State License) Master (valid for 2 years)................................................ Journeyman (valid for 2 years)............................................ $40.00 SALVAGE YARD Annual Salvage Yard License............................................ $250.00 MAPS, PUBLICATIONS AND COPIES Comprehensive Plan.................................................... Comprehensive Water & Sewer Plan........................................ Groundwater Protection Plan............................................. Critical Area Plan...................................................... Zoning Ordinance and Subdivision Regulations............................... $20.00 County Zoning Maps (1" = 600').............................. $5.00 each/$300.00 set County Highway Maps................................................. $2.00 Plotter Copy Preparation.......................... $35.00 per hour after the first 1/2 hour Plotter Copies............................ 34" X 44"................... 28" X 40"................... 22" X 34"................... 17" X 22"................... 11" X 17"................... 8½ " X 11".................. $30.00 $20.00 $15.00 $3.00 Fee Schedule 4 03/20/2012

Xerox Copies - Engineering Size (18" X 24" and 24" X 36")...................... Xerox Copies - Standard (8½" X 11 to 11" x17") - 4 or more..................... $5.00 $0.25 ALL RECORDATION FEES FOR DOCUMENTS RECORDED IN THE LAND RECORDS OFFICE OF CAROLINE COUNTY ARE TO BE PAID BY THE APPLICANT AT THE CURRENT RATE ESTABLISHED BY THE CLERK OF CIRCUIT COURT including but not limited to easements, maintenance agreements, covenants, subdivision plats, right-ofway agreements, etc. associated with Forest Conservation, Stormwater Management and Subdivision) REFUNDS 1) There shall be a refund processing fee of which shall be deducted from any approved refund. 2) There will be no refunds or credits for building, zoning certificate or inspection fees after a permit or certificate is issued. 3) There will be no refunds of subdivision plat review fees. 4) No fees for rezonings or Board of Zoning Appeals applications will be refunded after the first public hearing notice is published. INSPECTIONS 1) Building, Energy Code, Plumbing and Electrical Inspection Fees are set by the County Commissioners at the time of contract approval with the Inspection Agency(s). 2) Building Inspection Fees are to be paid to the Department of Planning & Codes. ALL FEES EFFECTIVE MARCH 20, 2012 PER RESOLUTION # 2012-002 OF THE COUNTY COMMISSIONERS OF CAROLINE COUNTY Fee Schedule 5 03/20/2012