DEPARTMENT: Community Development EXTERNAL FEE NUMBER: EX 2-1*

Similar documents
APPENDIX A BUILDING PERMIT AND RELATED FEES

Permitting Fee Schedule

Planning&Development Fee Standards

Building Permit Miscellaneous Fees At time of submittal, a 15% non-refundable deposit is required.

RESOLUTION NO

City of High Point Development Fee Schedule

The City of Daytona Beach Fee Schedule

6 WHEREAS, Hernando County has established development requirement conditions for

THE BOARD OF COUNTY COMMISSIONERS

COUNTY OF FREDERICK INSPECTIONS DEPARTMENT FEE SCHEDULE Approved July 14, COMMERCIAL FEES Minimum Fee $ unless stated otherwise

Commissioners to enact, amend, and enforce technical construction and building codes; and,

Caroline County, Maryland Department of Planning & Codes FEE SCHEDULE Tel: Fax:

Fees--Commercial Development (includes Residential 3 units or more) Effective January 1, 2019

FY 2018 FEE SCHEDULE (Effective )

DESCRIPTION FEE UNIT MINIMUM BLDG FEE¹ New Building or Addition All occupancy classifications except

CITY OF PALM COAST SUMMARY OF APPLICATION AND IMPACT FEES

APPLICATION. Airport Hazard In ETJ - one- and two family dwelling $100 Airport Hazard in ETJ anything other than one- and twofamily

Fees--Commercial Development (includes Residential 3 units or more) Effective January 1, 2019

FEE SCHEDULE Construction Services and Permitting

EXHIBIT A to Ordinance No PART 1

LINCOLN COUNTY, NORTH CAROLINA PLANNING & INSPECTIONS DEPARTMENT FEE SCHEDULE ADOPTED AUGUST 15, 2016 EFFECTIVE SEPTEMBER 6, 2016

Reynoldsburg Code of Ordinances. CHAPTER 1305 Permits and Fees

Fees--Commercial Development (includes Residential 3 units or more) Effective August 1, 2017

Fee Resolution

Department of Public Works Permit Fee Schedule

RESOLUTION NO NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF SATELLITE BEACH, BREVARD COUNTY FLORIDA, as follows:

THE TOWN OF Angier N O R T H C A R O L I N A

Zoning Fee Schedule. Per Chapter Part VIII Administrative Code

APPENDIX A 2018 FEE SCHEDULE

Towamencin Township Fee Schedule

ORDINANCE NO ORDINANCE TO AMEND AN ORDINANCE CODIFIED IN THE CODE OF THE TOWNSHIP OF NUTLEY, CHAPTER 272, ENTITLED CONSTRUCTION CODES, UNIFORM

NEW BRITAIN BOROUGH SCHEDULE OF FEES (Revised April 9, 2019)

NEW BRITAIN BOROUGH SCHEDULE OF FEES (Revised December 15, 2017)

Town of Angier Rate and Fee Schedule Fiscal Year Effective July 1, 2011

CHAPTER 1321 Permit and Inspection Fees

BUILDING PERMIT INSTRUCTIONS CONTRACTOR

Fees--Residential Development (1 or 2 units) Effective August 1, 2017

Community Development Department Fee Schedule

Fees--Residential Development (1 or 2 units) Effective January 1, 2014

LIMERICK TOWNSHIP 646 WEST RIDGE PIKE LIMERICK, PENNSYLVANIA 19468

TOWN OF WOODWAY FEE SCHEDULE EFFECTIVE JANUARY 8, 2019

2017 TOWN OF RISING SUN FEE SCHEDULE ADOPTED

Building Division Fee Schedule January 2018

THE CITY OF SPRUCE GROVE BYLAW C DEVELOPMENT FEES AND FINES BYLAW

CITY OF JOHNSTOWN SCHEDULE OF PERMIT FEES

1. Areas within perimeter boundary of city No fee. 2. Annexation agreements $100.00

Highlands County, Florida Special Exception Application

SCHEDULE A TO BY-LAW NUMBER (Amended by By-law ) CLASSES OF PERMITS AND PERMIT FEES

City of Sand Springs, Oklahoma Planning and Development Department Neighborhood Services Office

Development Related Fee Schedule Effective May 1, Plan Reviews. Remodeling, Alterations, Additions Residential and Commercial

SECTION 1. That Section 20-3 of Chapter 20 entitled Fees be and is hereby amended to read as follows: *Plan review fees are not refundable*

Development and Other Services Fee Schedule"

RESIDENTIAL BUILDING/GENERAL PERMIT FEE SCHEDULE

RESIDENTIAL BUILDING PERMIT FEES. New Construction and Multi-Residential Construction* Including living, habitable space, basement, & garages

Land Use Application Fees

PERMIT FEES DOUBLED FOR CONSTRUCTION WITHOUT THE BENEFIT OF A PERMIT

Amendment to the City s Master Schedule of Fees, Charges & Application Fees

City of Oregon City. Community Development Building Division Fee Schedule Effective April 1, 2016 BUILDING DIVISION

CITY OF MASCOTTE SERVICE FEES. One or Two Sided Copy not more than 8 ½ x 11 per page.15. One Sided Copy or Two sided 8 ½ x 14 per page.

BUILDING & ZONING SCHEDULE OF FEES Effective March 15, 2015

Development Related Fee Schedule Effective May 1, Plan Reviews. Remodeling, Alterations, Additions Residential and Commercial

ORDINANCE NO. WHEREAS, the last update to the Chapter 6 Buildings and Building Regulations fees schedule was over a decade ago; and,

RESOLUTION NO

Development Related Fee Schedule Effective May 1, Plan Reviews. Remodeling, Alterations, Additions Residential and Commercial

Appendix G Fee Schedule

Planning, Zoning and Building Fee Schedule

Location in Code Subject Fees

Meeting Date: February 26, 2018 Agenda Item No:

Town of Chino Valley Consolidated Fee Schedule Resolution No , Adopted October 23, 2012 Effective January 1, 2013

5755 Country Club Road * Shorewood, MN * / City of Shorewood MASTER FEE SCHEDULE

Highlands County, Florida Variance Application

RESOLUTION NO

Fees for construction of all buildings except single family dwellings, shall be calculated using Table 2.

City of Lake Dallas Master Fee Schedule Fiscal Year 2019 Fee Fee Amount Code Reference

Springfield Township Bucks County SCHEDULE OF FEES AND CHARGES RESOLUTION #

MASTER FEE SCHEDULE ATTACHMENT TO CITY ORDINANCE 102. Alcoholic Beverages:

SCHEDULE OF BUILDING PERMIT FEES

NOW, THEREFORE, BE IT ORDAINED, by the Council of the City of Maple Heights, County of Cuyahoga, State of Ohio that:

Town of Palm Beach Building Division CONSTRUCTION PERMIT APPLICATION

Meeting Date: December 3, 2018 Agenda Item No:

City of Wausau Building, Housing and Zoning Fee Schedule 2019

Violet Township requires Zoning and Plans Examination and Building Permits for all new construction.

Permit Fees for The City of Monroe **Effective July 2, 2018** Table of Contents

County of Fresno / Public Works and Planning Master Schedule of Fees for Development Services, Effective January 3, 2008

REZONING REQUESTS. Rezoning to: Site Area 25,000 sq. ft. or less Site Area More than 25,000 sq. ft.

REZONING REQUESTS. Rezoning to: Site Area 25,000 sq. ft or less Site Area More than 25,000 sq ft

City of Lake Dallas Master Fee Schedule Fiscal Year 2017

Application fee (Non-refundable) $20.00 Public Passenger Vehicle Chauffeur's License

City of Pleasant Hill. Master Fee Schedule

Village of Glen Ellyn Fee & Deposit Schedule Per Village Code 4-1-4

El Paso County Development Review System Adopted Fee Schedule (2005)

APPENDIX C CITY OF OVERTON - SCHEDULE OF FEES

City of East Bethel 2019 Fee Schedule

ALPINE TOWNSHIP ZONING ORDINANCE TABLE OF CONTENTS

Annexation Procedure

BUILDING SERVICES ~ FEE SCHEDULE

RESOLUTION # WHEREAS, The Board of Supervisors of Upper Southampton Township has established a fee schedule, and

BUILDING PERMITS Table Total Valuation. $1.00 to $ $26.00

1. Permit Fees for new single family dwellings, duplexes, and multifamily dwellings with eight units or less are as follows:

WHEREAS, it is necessary that an appropriate Fee Schedule be established sufficient to

Transcription:

DEPARTMENT: Community Development EXTERNAL FEE NUMBER: EX 2-1* Development Services Zoning Fees BASIS FOR FEE: Charge for service rendered; Reso 03-05-27; 03-09-105; 07-06-13; 10-06-35 DATE APPROVED: 09-19-91, Effective 10-01-91; 10-01-92; 01-27-93; 12-22-93; 02-01-95, Effective 03-01- 95; 03-06-96; 09-05-2000; 04-23-02; 05-13-03; 09-30-03 (03-09-105 Effective 11-17- 03); 06-19-07; 6-22-10; 7-11-11; 6-25-13 NOTE: *May Not Be Changed Without BOCC Approval ZONING FEES ADMINISTRATIVE ACTIONS Commercial Lot Split $850 Community Gardens $100 Consumption on Premises (COP) Administrative COP $650 Pine Island ACoastal Rural@ Administrative Review $4,000 Special Ordinance and Other Reviews $500 Variance $550 Wireless Communication Facility (Tower) $1,000 BONUS DENSITY $2,100 COUNTY COMMISSION Appeal to Hearing Examiner (refunded if successfully appealed) $700 Continuance $160 Deferral After Advertising $160 Before Advertising n/c New Hearing $350 Rehearing Request $265 DCI/PLANNED DEVELOPMENT PD Base Fee $8,000 Plus per acre $40 Each added district $1,500 Minor PD Base Fee $5,000 Each added district $800 Mining/Excavation PD Base Fee $8,000 Plus per acre $12 PD Administrative Amendments and Changes $1,500 PD Administrative Minor Amendments and Changes $1,000 PD Amendments $5,000 PD Final Plan Approval $1,000 PD Reinstatement $2,500 (Page 1 of 3)

EX 2-1 Continued DEVELOPMENT OF REGIONAL IMPACT (DRI) Abandonment $1,500 DRI/AMDA Base Fee $7,800 Plus per acre $15 DRI/AMDA Increments Base Fee $6,500 Plus per acre $15 DRI/Area Master Plan Base Fee $6,500 Plus per acre $15 DRI Essentially Built Out Process $1,500 DRI/FQD Base Fee (DRI fees in addition to Rezoning fee) $9,100 Plus per acre $12 DRI Notice of Proposed Change (Non-Substantial Deviation) $4,000 DRI/PUD Ordinance Review $2,600 DRI Changes pursuant to LDC34-145(d)(1)c $600 DRI Substantial Deviation Determination/Changes $6,000 Plus per acre $10 DRI Time Extension (Non-Substantial Deviation) $600 HEARING EXAMINER Appeal (refunded if successfully appealed) $700 Continuance (Scheduled and Advertised) $160 Deferral After Advertising $160 Before Advertising n/c Withdrawal n/c HISTORIC DISTRICT Administrative Relief $500 Appeal to Hearing Examiner (refunded if successfully appealed) $135 HOME OCCUPATION $20 MINIMUM USE/SINGLE FAMILY DETERMINATION $135 Appeal of Determination $75 REMODELING/CHANGE OF USE $200 RESEARCH (per hour) $25 REZONING (Conventional) All Districts $2,500 SPECIAL EXCEPTION Accessory Apartment $500 Excavation Base Fee $2,600 Plus per acre $20 Wireless Communication Facility (Tower) $1,500 Other $1,000 (Page 2 of 3)

EX 2-1 Continued VARIANCE Dock $700 Commercial $700 Each additional request $150 Residential $700 Each additional request $150 Sign $1,100 ZONING LETTER OF VERIFICATION $200 ************************************************************ COPIES (per page) Letter (82 x 11) One sided $.15 One sided (color) $1.00 Two sided $.20 Legal (82 x 14) One sided $.20 One sided (color) $1.50 Two sided $.25 Large (11 x 17) One sided $.30 One sided (color) $2.00 Large (11x17) (per page from microfilm) $2.00 Plans (24 x 36) $5.00 (Page 3 of 3)

EXTERNAL FEE NUMBER: EX 2-2* DEPARTMENT: Community Development Development Services Development Review Fees DATE APPROVED: 11-09-94; 02-01-95 (effective 03-01-95); 09-30-03 (03-09-105 effective 11-17-03); 08-14- 07; Reso 07-10-31 dated 10-23-07; Reso 10-06-35 dated 6-22-10, 07-11-11; 06-25-13 NOTE: *May Not Be Changed Without BOCC Approval DEVELOPMENT REVIEW FEES ADMINISTRATIVE DEVIATIONS Base Fee $400 Each additional request $75 CONCURRENCY Extension/Renewal $40 Concurrency Renewals Extension/Renewal $40 DEVELOPMENT ORDER (DO) Amendment $775 Amendment Resubmittal $350 Applicant Request/Deferral (Hold) Action $40 Application Base Fee $3,000 Plus per acre* $60 *Minimum acreage fee is one gross acre, rounded off to nearest 1/10 acre if over 1 acre in size Extension (must be requested in the 6 months PRIOR to expiration date) $350 Minor Change $100 Resubmittal (First resubmittal free) $435 Reinspection (Initial inspection free) First and Each Additional $50 LIMITED REVIEW DEVELOPMENT ORDER (LDO) Limited Review (or Exemption) Amendment $50 Reinspection (Initial inspection free) First and Each Additional $50 Resubmittals $100 Type A $100 Type B $350 Type C $350 Type D $1,100 Type E $350 EXTRA PLANS TO BE STAMPED $50 HEARING EXAMINER APPEAL (refunded if successfully appealed) $700 PLAT REVIEW Base Fee (resubmittals free) $775 Plus Lot/Tract Fee (each) $12 (Page 1 of 2)

EX 2-2 Continued ROAD MAINTENANCE APPLICATION $645 VACATION Of Drainage Easement $600 Of Plat (no right-of-way) $600 Of ROW, Of Plat (with right-of-way) $900 Of Utility Easements $300 VARIANCE Initial Request $700 Each additional request $150 COPIES (per page) ************************************************************ Letter (8½ x 11) One sided $.15 One sided (color) $1.00 Two sided $.20 Large (8½ x 14) One sided $.20 One sided (color) $1.50 Two sided $.25 Letter (11 x 17) One sided $.30 One sided (color) $2.00 Large (11 x 17) (per page from microfilm) $2.00 Plans (24 x 36) $5.00 (Page 2 of 2)

DEPARTMENT: Community Development Development Services Building Permit Fees EXTERNAL FEE NUMBER: EX 2-3* BASIS FOR FEE: Board approved on 02-01-95 (Blue Sheet #950061) with endorsement of BIA and EROC; Resolution 02-11-05; 02-11-18; 03-09-105; 04-07-07; 09-04-13; 10-06-35 (valid only until 12/31/2010); 2-1-11 Blue Sheet #20110035 DATE APPROVED: 10-23-85; 03-18-87; 08-11-87; 09-07-88; 02-01-95 (effective 03-01-95); 11-05-02; 11-12- 02; 09-30-03 (effective 11-17-03); 07-27-04; 04-28-09 (effective 06-01-09); 6-22-10 (valid only until 12/31/2010); 2-1-11; 7-11-11 NOTE: *May Not Be Changed Without BOCC Approval BLASTING (BLS) BUILDING PERMIT FEES Permit $350 Plus Per Acre of Blast Area $275 Permit Extension $100 Inspection (each blast) $200 Inspection Surcharge (per hour over customary time for initial inspection blast) $100 COMMERCIAL (COM) Additions/Remodels Aluminum Shed $50 Aluminum Structures Glass/Vinyl/Utility Room $100 Pool Enclosure $100 Screen Room $100 Apartments 3-4 Units Apartments 5-Up Awning/Canopy (existing buildings only) $100 Carport $75 Church Concrete Restoration $200 Concrete Structure Slab/All Decks $.05/$100 Dumpster - Slab and Enclosure $150 Foundation Only (not credited toward full building permit) 20% of applicable permit cost Gas Station Fuel Island Canopy Gazebo Unenclosed $75 Interior Remodel Interior Completion Interior Non-Bearing Wall (non-tenant separation) <25lf $100 Miscellaneous Modular Buildings $.15/$300 min Motel Pole Barn $75 Radio/TV Antenna $250 Recreational Building Shed (Conventional Construction) $100 (Page 1 of 5)

EX 2-3 Continued COMMERCIAL (COM) (continued) Shell Only Shutters $75 Window Replacement/Door $75 DEMOLITION (DEM) Structure Removal $150 ELECTRICAL (ELE) Commercial Low Voltage Residential Low Voltage $.20amp/$75 min $.02sf/$75 min $.20amp/$75 min $.02sf/$75 min FENCE (FNC) (Commercial & Residential) Fence $25 Wall $.75/$100 min FIRE (FIR) Dry Hydrants $150 Fire Alarms (per initiating device) $1/$100 min Fire Pump $75 Flow Test $75 Fuel Lines $125 Fuel Tank $125 Halon/Energen $150 Hood $100 Hood Suppression $50 LP Lines $100 LP Tank $100 LP Tank & Lines $100 Monitor $50 Natural Gas $100 Paint Booth $100 Pollutant Storage Tank $125 Self-Contained Generator $125 Sprinklers (per sprinkler head) $1.25/$100 min Standpipes (per riser) $75 Underground Water $125 Water Storage Tank $100 MECHANICAL (MEC) Air Handler $75 Commercial Refrigeration (per unit) $75 Condenser Only $75 Disconnect/Reconnect $75 Duct Work Only $75 Heat Pump $75 Mobile Home & RV $75 New Construction/Addition $.03/$100 min Package Unit $75 Split System $75 EX 2-3 Continued (Page 2 of 5)

MOBILE HOME/RECREATIONAL VEHICLE (MRV) Mobile Home $150 Park Model $150 Recreational Vehicle $150 PLUMBING (PLU) Irrigation $75 New construction & additions/renovations $.03/$100 min Sewer $75 POOL (POL) (Commercial & Residential) Fountain $100 Pool - Above Ground $75 Pool - Below Ground $225 Pool w/spa - Below Ground $225 Pool Renovation $100 Spa - Above Ground $75 Spa - Below Ground $100 RESIDENTIAL (RES) - One and Two Family Dwellings Addition/Sheds (wood/cbs) $.25/$200 min Alteration/Interior Remodeling $.25/$150 min Detached Guest House $.25/$200 min Duplex $.25/$200 min Garage (detached) $.25/$200 min Garage Door $75 Gazebo (unenclosed structure) $75 Mobile Home Addition $.25/$200 min Pole Barn $75 Pool Enclosure $100 Roofover/Aluminum Shed/Aluminum Carports Carport Canopy $75 Carport w/utility Room $100 Roofover $75 All Prefab Sheds $50 RV Addition $.25/$200 min Shutters $75 Single Family $.25/$200 min Structural Slabs/All Decks (SFR Foundations) $.05/$100 min Utility, Glass, Vinyl or Screen Room/Greenhouse $100 Window Replacement/Door $75 ROOFING (ROF) Commercial $200 Residential $75 SIGNS (SGN) per sign Awning $.50/$75 min Billboards $250 Electronic Message Center $.50/$75 min Ground $.50/$75 min Interchange $.50/$75 min Tenant Panel $.50/$75 min Wall $.50/$75 min (Page 3 of 5)

EX 2-3 Continued SOLAR (SOL) Photovoltaic System $75 Pool Heater $75 Water Heater $75 STRUCTURE MOVE (MOV) $500 TEMPORARY (TMP) Balloons $35 Carnival $150 Christmas Tree Sales $150 Circus $150 Construction Trailer $150 Fireworks $250 Parking Lot $100 Parking Lot Sales $100 Road Side Stand $100 Special Occasion $35 Tent $150 Tent for Fireworks $150 Tent for Sparklers $150 USE (USE) $100/streamline $35 MISCELLANEOUS FEES Change of Contractor $50 Completions Commercial ½ original permit/$300 min Accessory Building $100 Interior Remodel ½ original permit/$150 min Residential ½ original permit/$200 min Accessory Building $100 Demolition $150 Fire $100 Sign original permit cost Temporary CO (first) $100 Temporary CO (second/final) $150 Trade original permit cost Extensions First (3 months) $100 Subsequent (3 months) $150 SB 2156 Extension (State of Emergency) $200 (Page 4 of 5)

EX 2-3 Continued Copies (per page) Letter (8½ x 11) One sided $.15 One sided (color) $1.00 Two sided $.20 Legal (8½ x 14) One sided $.20 One sided (color) $1.50 Two sided $.25 Large (11 x 17) One sided $.30 One sided (color) $2.00 Large (11 x 17) (per page from microfilm) $2.00 Plans (24 x 36) $5.00 Refunds No refund on permits of $50 or less unless issued in error by the County No refund on any permit shall be granted if work has commenced Refund on all other permits shall be at 75% of the permit fee There shall be no refund on any plan or zoning review fee GENERAL NOTE Fees calculated per square foot shall be assessed using the gross floor area. The County Building Official shall determine questions on interpretation of the method of measurement and inclusion of areas or items. (Page 5 of 5)

DEPARTMENT: Community Development EXTERNAL FEE NUMBER: EX 2-4* Development Services Plan Review Fees BASIS FOR FEE: Board approved on 02 01-95 (Blue Sheet 950061) with endorsement of BIA and EROC; 2-1-11 Blue Sheet #20110035 DATE APPROVED: 10-06-82; 09-21-83; 07-31-85, 02-02-95 (effective 03-01-95); 04-28-09 (Reso 09-04-13, effective 06-01-09); 2-1-11 NOTE: *May Not Be Changed Without BOCC Approval PLAN REVIEW FEES IMPACT FEES Roads LDC Article VI, Division 2 Regional Parks LDC Article VI, Division 3 Community Parks LDC Article VI, Division 4 Fire & EMS LDC Article VI, Division 5 PLAN REVIEW Commercial (COM) Revision (if new SF then new construction rate applies) $.10 psf/$200 min $.01 psf/$50 min Residential (RES) $50 Revision (if new SF then new construction rate applies) $25 Courtesy Review (per person, per hour) $50 Fire $25 Reinspection Fee $50 Sign $25 Trade Revision $25 RESIDENTIAL ZONING $25 COM (not associated with a Development Order) $75 RES $25 Revision $20 DEP Coast Pre-App Determination $50 (Page 1 of 1)

DEPARTMENT: Community Development EXTERNAL FEE NUMBER: EX 2-5* BASIS FOR FEE: Development Services Contractors Licensing Fees Ordinance 91-25, 93-18; Board approved on 02-01-95 (Blue Sheet #950061) with endorsement of BIA & EROC(repealed); Ord. 96-20; Ord. 00-26; Reso 03-03-35; Reso 04-07-07; 2-1-11 Blue Sheet 20110035 DATE APPROVED: 09/04/91; 07/21/93; 02/01/95 (effective 03-01-95); 10/16/96; 12/12/2000(Ord.00-26); 3/25/03 (Reso 03-03-35); 7/27/04 (Reso 04-07-07) ; 2-1-11; 10-18-16 NOTE: *May Not Be Changed Without BOCC Approval CONTRACTORS LICENSING FEES LICENSING Air Conditioning, Class A, B, C $ 90.00 Blast/User Registration $ 90.00 General, Building & Residential Contractor $100.00 Journeymen (All) $ 24.00 Master Electrician $ 90.00 Mechanical Contractor $ 90.00 Roofing Contractor $ 90.00 Sheet Metal Contractor $ 90.00 Specialty Trades (All) $ 90.00 Swimming Pool, Class A, B, C $ 90.00 Voluntary Inactive Certificate $ 18.00 Delinquency fees (assessed beginning October 1 st ) $10.00 plus percentage (rounded off). October 5% November 10% December 15% January 20% February 25% March 30% NOTE: After March 31 st, renewal may only be authorized by the Lee County Construction Board. (Page 1 of 2)

EX 2-5 Continued CONTRACTORS LICENSING FEES LICENSING EXAMS All Exams $35.00 Note: A trade exam and the business & law exam may be taken under one (1) $ 35.00 fee. Misc. Fees Letter of Reciprocity $25.00 Process Change of Business Name on Certificate of Competency $25.00 (Page 2 of 2)

DEPARTMENT: Community Development EXTERNAL FEE NUMBER: EX 2-6* Development Services Board of Adjustment and Appeals BASIS FOR FEE: Ordinance 94-01 DATE APPROVED: 01-19-94 NOTE: *May Not Be Changed Without BOCC Approval BOARD OF ADJUSTMENTS AND APPEALS FEES Construction Board of Appeals Plumbing Board of Appeals Mechanical Board of Appeals $100.00 each $100.00 each $100.00 each (Page 1 of 1)

DEPARTMENT: Community Development EXTERNAL FEE NUMBER: EX 2-7* BASIS FOR FEE: Development Services Building Re-Inspection Fees Board approved on 02-01-95 (Blue Sheet #950061) with endorsement of BIA and EROC;2-1-11 Blue Sheet 20110035 DATE APPROVED: 02-01-95 (effective 03-01-95); 2-1-11 NOTE: *May Not Be Changed Without BOCC Approval BUILDING RE-INSPECTION FEES INSPECTION OF OUTSIDE Reimbursement to County for cost of inspection by outside Consultant if determination is made, based on Consultant's findings, that materials or construction methods are not in compliance with codes or nationally approved techniques. REINSPECTION FEE $50.00 For extra inspections necessary due to any of the following reasons: (1) Wrong Address. (2) Re-Inspection of work not complying with code. (3) Repairs or corrections not made when inspection is called. (4) Work not ready for inspection when called. (Page 1 of 1)

DEPARTMENT: Community Development EXTERNAL FEE NUMBER: EX 2-8* Development Services Lot Mowing Fees BASIS FOR FEE: Ordinance 86-5, 88-42; Resolution 83-3-17; 93-23; 2-1-11 Blue Sheet 20110035 DATE APPROVED: 03-16-83, 08-17-88, and 09-15-93; 2-1-11 NOTE: *May Not Be Changed Without BOCC Approval LOT MOWING FEE Fee charged is based on County's cost to provide the service, twelve percent (12%) per annum interest, an enforcement cost administrative fee of $150.00, and cost for certified mailing for those specific parcels which are rendered lot mowing services by Lee County. (Page 1 of 1)

DEPARTMENT: Community Development EXTERNAL FEE NUMBER: EX 2-9* Development Services Code Enforcement Hearing Examiner Cases BASIS FOR FEE: Charge for service rendered; Ord. 94-26; 2-1-11 Blue Sheet 20110035 DATE APPROVED: 09/21/1994; 2-1-11 NOTE: *May Not Be Changed Without BOCC Approval CODE ENFORCEMENT HEARING EXAMINER CASES FEES Day of Hearing Costs of Prosecution in a Hearing Examiner Case $100.00* where there is an agreement to violation by the Respondent Day of Hearing Costs of Prosecution in a Hearing Examiner Case $285.00* where the case is disputed by the Respondent Partial Release of Code Enforcement Lien $285.00 (Does not preclude requirement for additional paydown of outstanding or accrued unpaid fine.) Full or Partial Release of Foreclosed Code Enforcement Lien $285.00 *Actual costs of prosecution may be assessed and sought in cases where an unpaid fine/lien is submitted for lien mitigation. (Page 1 of 1)

DEPARTMENT: Community Development EXTERNAL FEE NUMBER: EX 3-1* BASIS FOR FEE: Planning Planning Fees Charge for service rendered DATE APPROVED: 10-12-88, (Effective 11-01-88); 09-25-01; 9-30-03 (03-09-105 Effective 11-17-03); 03-11-08 (Reso 08-03-05); 6-25-13; NOTE: *May Not Be Changed Without BOCC Approval PLANNING FEES COMPREHENSIVE PLAN AMENDMENTS: Map Amendment < 20 acres Flat Fee $2,000.00 Map Amendment > 20 acres $2,000.00 Plus $20 per 10 acres if larger than 20 acres $20.00 Small Scale Amendments (10 acres or less) $1,500.00 Text Amendment Flat Fee $2,500.00 LEE PLAN DOCUMENTS Lee Plan Codification $35.00 Future Land Use Map $15.00 MAPS (Color or Black & White) 8-1/2 x 11 $ 3.00 8-1/2 x 14 $ 4.00 11 x 17 $ 5.00 Larger than 11x17 $ 15.00 Customized (includes one map, additional copies at above cost) $ 25.00 Electronic Maps (Various) same as charged by Property Appraiser (Page 1 of 1)

DEPARTMENT: Community Development EXTERNAL FEE NUMBER: EX 3-2* Planning Vegetation Removal Permit Fees BASIS FOR FEE: Ordinance 93-03; LDC CH 14 DATE APPROVED: 01-06-93, 02-10-93 NOTE: *May Not Be Changed Without BOCC Approval VEGETATION REMOVAL PERMIT FEES VEGETATION PERMIT Tree Removal $30.00 (Add $1/tree, not to exceed $25/acre) Tree Permit Reinspection $60.00 Tree Permit After Removal $60.00 (Add $2/tree, not to exceed $50/acre) (Page 1 of 1)

DEPARTMENT: Community Development EXTERNAL FEE NUMBER: EX 3-3* BASIS FOR FEE: Zoning Development Agreement Fees Allows County to Recuperate Cost of Review DATE APPROVED: 07-24-01 NOTE: *May Not Be Changed Without BOCC Approval DEVELOPMENT AGREEMENT FEES Development Agreement Amendment to Development Agreement $3,000.00 (Plus advertising costs) $1,500.00 (Plus advertising costs) (Page 1 of 1)

DEPARTMENT: Community Development EXTERNAL FEE NUMBER: EX 3-4* BASIS FOR FEE: Planning (Environmental Sciences) Dock and Shoreline Fees originated in EX2-3; separating them since they are not part of the FBC and fees are collected by Environmental Sciences; 2-1-11 Blue Sheet 20110035 DATE APPROVED: See EX2-3 (as of 06-22-2010); 2-1-11 NOTE: *May Not Be Changed Without BOCC Approval DOCK AND SHORELINE FEES PLAN REVIEW FEES Residential - One and Two Family $25 Commercial, Industrial, and Multi-Family Residential 40% of permit fee/ $50 min Completion Residential $100 Commercial $100 Local Letter of Approval $50 Revision $25 PERMIT FEES Boat Davit(s) $25 Boatlift, hoist $50 Boathouse/Boat shelter $50 Boat ramp $50 Dock, walkway, platform, pier $.50sf/$50 min Repair ½ applicable fee Dredging $50 Permit Extension First (3 months) $100 Subsequent (3 months) $150 Pilings Only $50 Reinspection $25 Rip Rap/Revetment $.50plf/$50 min Seawall/Retaining Wall $1.00plf/$50 min Repair ½ applicable fee min NOTE: For Electrical, Roofing, & Plumbing fees, see Building Permit Fees (EX2-3) (Page 1 of 1)