STEPS TO OBTAIN A PERMIT TO BUILD A FENCE OR REPLACE A FENCE OR WALL FLOW CHART

Similar documents
Building or replacing a fence or wall

CITY OF WEST PARK FENCE PERMIT REQUIREMENTS

FENCE PERMIT REQUIREMENT

CITY OF WEST PARK FENCE PERMIT REQUIREMENTS

FENCE PERMIT REQUIREMENT

Community & Economic Development Department 2200 Civic Center Place Miramar, Florida Tel: Fax:

BUILDING PERMIT INSTRUCTIONS CONTRACTOR

Community & Economic Development Department 2200 Civic Center Place Miramar, Florida Tel: Fax:

Marion County Board of County Commissioners

Septic Tank / Drainfield / Holding Tank Permit Application

Septic Tank / Drainfield / Holding Tank Permit Application

CITY OF BELLE GLADE. 110 Dr. Martin Luther King Jr. Blvd., West Belle Glade, FL Telephone (561) Fax (561)

Boundary Line Adjustments and Lot Line Vacations Minor Subdivision Application Packet

REQUEST FOR ALTERATION REVIEW VERANDA GARDENS HOMEOWNERS ASSOCIATION, INC.

City of East Orange. Department of Policy, Planning and Development LAND USE APPLICATION & SITE PLAN REVIEW CHECKLIST

Town of Jamestown Single/Two-family Residential. Building Permit Application Packet

~ Please Detach and Save This Page ~

ADDITION/REMODEL APPLICATION CHECKLIST 2017 FBC. Please make sure you have ALL required copies before submitting permit application

PERMIT AND SUBMITTAL REQUIREMENTS (PR)

Fence Application Package

MACOMB TOWNSHIP BUILDING DEPT TEL: (586) BROUGHTON ROAD FAX: (586) MACOMB MI 48042

Application for a Deminimus Development

SWIMMING POOL PERMIT APPLICATION PACKET

PETITION TO VACATE A STREET, ALLEY, OR EASEMENT APPLICATION

Lake County Planning, Building and Development Department

Site Development Review for

City of Mascotte. 100 East Myers Blvd. * Mascotte, Florida * Phone (352) * Fax (352) FENCE CHECKLIST

Unified Development Code Temporary Use Permit Application and Checklist

SITE DEVELOPMENT PLAN APPLICATION PAHRUMP REGIONAL PLANNING DISTRICT

Fence Checklist. Permit application and supporting documents. 2. Notarized, Owner/Builder Affidavit (if applicable).

RESCINDING A BINDING LOT AGREEMENT

City of Port St. Lucie PLANNING & ZONING DEPARTMENT

Application for a Public Hearing for PUD Rezone, Amendment to PUD or PUD to PUD Rezone

FILING INSTRUCTIONS FOR LOT LINE ADJUSTMENT APPLICATION

MINOR SUBDIVISION FINAL PLAT APPLICATION Town of Apex, North Carolina

Guide to Combined Preliminary and Final Plats

FINAL SITE PLAN PLAT APPLICATION Town of Apex, North Carolina

Demolition Application Package

FENCE and or POOL BARRIER CHECKLIST

PLANNING BOARD CITY OF CONCORD, NH MINOR SUBDIVISION CHECKLIST

C. Florida Power & Light (FPL): FPL Distribution Supervisor at (386) Or Pattie Hersch at (386)

Planning & Development Department AGRICULTURAL EXEMPTION SUBMITTAL FORMS INDEX

City of Margate DEVELOPMENT REVIEW COMMITTEE Application for SPECIAL EXCEPTION

CITY OF NORTH PORT Neighborhood Development Services Planning Division Relocation of Easement Packet

AFFIDAVIT FENCE OFFICE OF THE JACKSON TOWNSHIP ZONING DEPARTMENT P. O. BOX 517 GROVE CITY, OH 43123

Community & Economic Development Department 2200 Civic Center Place Miramar, Florida Tel: Fax:

INSTRUCTIONS FOR FILING A PLANNING/ZONING BOARD APPLICATION

SOUTH BROWARD DRAINAGE DISTRICT

PLANNING CLEARANCE. Planning Clearance is required prior to the submittal of most building and development permit applications.

GENERAL PLAN, DEVELOPMENT CODE AND ZONING MAP AMENDMENT APPLICATION INFORMATION SHEET

WRIGHT TOWNSHIP Ottawa County 1565 Jackson Street, P.O. Box 255, Marne, Michigan 49435

MASTER SUBDIVISION FINAL PLAT APPLICATION Town of Apex, North Carolina

WRIGHT TOWNSHIP Ottawa County 1565 Jackson Street, P.O. Box 255, Marne, Michigan 49435

CITY OF HOLLYWOOD. Technical Advisory Committee Submittal Checklist. Guide to TAC Submittal Checklist. General Requirements:

TOWN OF EASTCHESTER BUILDING AND PLANNING DEPARTMENT PLANNING BOARD APPLICATION PACKAGE SUBDIVISIONS

BUILDING PERMIT APPLICATION

COMMERCIAL BUILDING PERMIT APPLICATION

NASSAU COUNTY BUILDING DEPARTMENT SWIMMING POOL & POOL SCREEN ENCLOSURES CHECKLIST

Guide to Minor Developments

Family Subdivision Application Packet. Revised April 2018

VARIANCE APPLICATION PACKET

Number of LOT MERGER

DENTON Developer's Handbook

Applying for a Conditional Use Permit

SHEDS. You must submit the following items:**

Doors & Windows Package

RESIDENTIAL DEVELOPMENT ORDER APPLICATION Application Fee $ PLEASE READ THE FOLLOWING INFORMATION CAREFULLY

INFORMATION & PROCEDURES FOR CHANGE OF ZONING REQUESTS AND CONDITIONAL USE PERMITS

BUILDING PERMIT APPLICATION

NEW SINGLE FAMILY RESIDENTIAL

PLANNING BOARD APPLICATION

Larimer County Planning & Building Dept. Procedural Guide for NON-RESIDENTIAL DISTRICT SIGNAGE Information and Requirements

APPLICATION FOR CERTIFICATE OF PARCEL MERGER

WILTON MANORS, Island City 2020 WILTON DRIVE, WILTON MANORS, FLORIDA 33305

Guide to Preliminary Plans

Incorporated Village of Lattingtown 299 Lattingtown Road P.O. Box 488 Locust Valley, New York

Packet Contents: Page #

Marion County Board of County Commissioners

ZONING COMMISSION 125 EAST AVENUE P.O. BOX 5125 NORWALK, CONNECTICUT Revised January 1, 2018

ZONING COMMISSION 125 EAST AVENUE - CITY HALL P.O. BOX 5125 NORWALK, CONNECTICUT Revised Januar y 1, 2018

COUNTY OF WELLINGTON AND MUNICIPALITY OF Application for Part Lot Control Exemption By-law GUIDELINES AND EXPLANATORY NOTES

BYRON TOWNSHIP ZONING APPLICATION

Environmental Health Technician: (303) ; Environmental Health Manager: (303) ;

COMMITTEE OF ADJUSTMENT APPLICATION FOR CONSENT SUBMISSION CHECKLIST

APPLICATION FOR A BUILDING PERMIT

Collin County Development Services OSSF CONSTRUCTION INFORMATION SHEET

TOWN OF EASTCHESTER BUILDING AND PLANNING DEPARTMENT

DEPARTMENT. A Current Contractor Listing: If the contractor is pulling the permit, they must be listed with the County

BUILDING CODE SERVICES PERMIT SUBMITTAL REQUIREMENTS (2017 Florida Building Code in Effect)

CITY OF SARALAND PRELIMINARY SUBDIVISION PLAT REVIEW

PLANNING & ZONING DEPARTMENT 401 South Rogers Street Waxahachie, Texas (469)

Gates County Planning and Zoning

SHORT PLAT Information

NEW RENTAL APARTMENT DEVELOPMENT ACTIVITY REPORT 1 st Quarter, 1998 April, 1998

MOUNT OLIVE TOWNSHIP ZONING BOARD OF ADJUSTMENT VARIANCE APPLICATION INSTRUCTIONS

WALLS: PERIMETER / RETAINING

DALLAS WATER UTILITIES WATER/WASTEWATER COVENANT

Borough of Roselle Planning Board and Board of Adjustment Notice to Applicant

ACCESSORY STRUCTURE DEVELOPMENT ORDER APPLICATION (WITH RESTROOM PLUMBING)

FENCE PERMIT APPLICATION

Transcription:

STEPS TO OBTAIN A PERMIT TO BUILD A FENCE OR REPLACE A FENCE OR WALL FLOW CHART STEP 1. BUILDING PLANS Town Staff available to meet with you and your construction professional prior to permit review process. (See the detailed instructions that follow) STEP 3. IF YOURE FENCE WILL ENCROACH A UTILITY EASEMENT Obtain letters of no objections from utility companies or an easement agreement (See the detailed instructions that follow) STEP 2. IF PROPERTY EAST OF 148 AVE AND ADDITION OVER 1, 000 SQ. FT. Submit plans to Central Broward Water Control District (see detail instruction that follow) STEP 2A. IF PROPERTY WEST OF 148 AVE AND ADDITION OVER 1, 000 SQ. FT. Submit plans to South Broward Drainage District (see detail instruction that follow) STEP 4. SUBMIT PLANS TO PLANNING AND ZONING (CODE SERVICES INC.) Take three stamped approved sets to Town Hall for Zoning and subsequent Engineering review and approval (See the detailed instructions that follow) 1

STEP 5. PLANS ROUTED INTERNALLY TO ENGINEERING DEPARTMENT (No action from the applicant at this time. See the detailed instructions that follow) STEP 6. SUBMIT YOUR PLANS TO THE TOWN S BUILDING DEPARMENT (C.A.P. GOVERNMENT) (See the detailed instructions that follow) 2

Building or replacing a fence or wall Obtaining a permit for your construction is a process that involves review and approval by multiple agencies. Generally, Broward County Development and Environmental Regulation Division, Broward County Health Department, South Broward Drainage District and Central Broward Water Control District (where applicable) are external agencies that review building plans prior to submitting them to the Town s Zoning, Engineering and Building Departments. The Town of Southwest Ranches is a contract community, meaning that it has no employees. Instead, plan reviews for Zoning, Landscape and Building Codes are accomplished by consultants. The Town contracts with Code Services Inc. to conduct in house Zoning and Landscape review, and contracts with C.A.P. Government, Inc. for Building Code review and the actual building permit issuance. The professionals of these agencies, whose contact information is provided in this packet, are available to assist you and to oversee your permit application throughout the approval process. Additionally, engineering review is provided in house by the Town Engineer for some types of construction and for fill permits. Each step of the permit process is outlined below. The steps must be followed in the exact order shown. Please note that it is illegal to clear or remove trees from your property, including nuisance trees, until you have the proper permit from the Town to do so. It is also illegal to bring fill onto your property until you have been issued a building permit. Filling must then be consistent with the amount and location of fill approved by the Town during the permit review process. Any other type of fill requires a separate fill permit, issued by the Town Engineer. STEP 1 BUILDING OR REPLACING A FENCE OR WALL: STEPS TO OBTAIN THE PERMIT Town staff is available to meet with you and your design and/or construction professionals to review the specifics of your application and to assist you in planning for your permit review process. If you would like to meet with Planning & Zoning staff, this must occur well in advance of application submittal. Please contact the Zoning Department at the number provided in this guide, to secure an appointment. Then, have your design professionals prepare all necessary plans for submittal consistent with the attached submittal requirements. You will need a minimum of three (3) complete sets of plans, which will need to 3

comply with the Town of Southwest Ranches Unified Land Development Code (ULDC), available online at www.municode.com, and the Florida Building Code. PLEASE NOTE: For simple chain-link fences, board-on-board wood fences, horse/rail fences, or for aluminum pool enclosures, you will only need three (3) copies of your survey in which you show the location, type/material, and height of the proposed fence, along with its standard specifications. STEP 2 If your property is located east of SW 148 th Avenue, and your fence or wall will encroach a drainage easement SUBMIT PLANS TO CENTRAL BROWARD WATER CONTROL DISTRICT (CBWCD): Submit your three (or four) plan sets and all other required materials to CBWCD, located at 8020 Stirling Road in Hollywood. Please call (954) 432-5110 for application fee and additional requirements. If your property is located west of SW 148 th Avenue, and your fence or wall will encroach a drainage easement SUBMIT PLANS TO SOUTH BROWARD DRAINAGE DISTRICT (SBDD): Submit your three (or four) signed and sealed plan sets and all other required materials to SBDD, located at 6591 SW 160 th Avenue (a.k.a. Dykes Road). The phone number is (954) 680-3337. Call for application fee and additional requirements. STEP 3 If your fence will encroach a utility easement SUBMIT AN EASEMENT AGREEMENT OR OBTAIN A LETTER OF NO OBJECTION FROM ALL UTILITIES. A standard agreement document and a list of utility providers is attached to this guide. Complete the form and fax it to each of the numbers provided. You will receive, from each utility, the same form back with an authorized signature, or a letter of no objection. STEP 4 SUBMIT PLANS TO PLANNING & ZONING (CODE SERVICES INC.): Take three (3) sets of your plans and survey, all already stamped by the County, showing the proposed improvement, along with the other items listed documents and fees as shown in the attached submission 4

checklist, to the Town s Zoning Department, located at, Southwest Ranches, Florida 33330. If you have any questions related to Zoning regulations and permit process or requirements you can call (954) 343-7440. At this point your plans will undergo review for compliance with Zoning requirements, as well as Landscape Code in the event that the new driveway is in conflict with existing vegetation. The person listed as applicant on the application will be notified when the plan review is complete. Corrections should then be made and the plans subsequently resubmitted. (Please refer to the attached Town s fee schedule for Planning & Zoning applications). STEP 5 ZONING DEPARTMENT WILL ROUTE PLANS TO THE ENGINEERING DEPARTMENT: Zoning will route three (3) set of plans, with Zoning s approval stamp, along with the original application for Development Order signed-off by the Zoning Department to the Engineering Department. The applicable review fee to the Town s Engineering Department shall be provided at this time. The Engineering Department will contact if corrections to your plans are necessary. Once you obtain Engineering s approval, you will have two (2) final sets of plans which are required by the Building Department, along with the original Development Order with the signatures from both the Zoning reviewer and the Town Engineer or his assistant. Please note that Engineering also performs the process and issuance of fill permits that are not related to construction, which do not require a building permit. STEP 6 SUBMIT YOUR PLANS TO THE TOWN S BUILDING DEPARTMENT (C.A.P. Government, Inc.): Take the two (2) sets of signed and sealed plans, stamped by all previously listed agencies, and the original application for Development Order (signed-off by Zoning and Engineering), along with all applicable product specifications, to the Building Department, located at 3265 Meridian Parkway, Suite 100, Weston, FL 33331. You can call (954) 888-9882 to obtain an application package and inquire about additional submission requirements and fees. The Building Department will review the structural features of your plans, and will issue the actual building permit. They also coordinate periodic and final inspections, and will issue a Certificate of Completion for the new fence, upon request. 5

CHECKLIST for submittal to Code Services Inc. and Town of Southwest Ranches Engineering Department (This is the Town s first review agencies) Three (3) sets of plans signed and sealed by a Florida registered architect or engineer in the event the permit is for a block wall or a fence that includes concrete columns. All plans must comply with the Florida Building Code, current Broward Edition, and the Town of Southwest Ranches Unified Land Development Code (ULDC) available online at www.municode.com All required agency approvals (see previous pages) must be stamped on the plans. The plans must contain the following information, at a minimum: A site plan. This can be a copy of your survey, showing exact location, height, type and material of the proposed fence. Specifically, the site plan will show: Compliance with the minimum setbacks from property lines, if applicable, and ingress/egress easements as required by the Town Code. All major features shown on the survey. Location of septic tanks, drainfields and wells. Scale, with north arrow. Site distance triangle at all gated entries, if applicable. Surveys. Three (3) surveys, signed and sealed by a registered land surveyor, dated within one year of the application date, and containing the following information: All easements and abutting rights-of-way and reservations of record with dimensions and book/page recordation references (survey must be abstracted for all easements, reservations & rights-of-way of record). All existing structures, if applicable. Existing roadway pavement location, with dimensions. The net and gross size of the property in both square feet and acres. Survey cannot say more or less. 6

Tree survey. The tree survey must show the following (this can be incorporated into the lot survey). Please note: the removal of trees requires a tree removal permit. Location of existing trees. Caliper, size of crown, and botanical name of each tree on the property. Warranty deed. A copy of your property ownership document, which is usually your warranty deed, is required to verify ownership. Permit applications. An application for Development Order, for Zoning and Engineering sign-off, is required. It is very simple and not required to be notarized or signed by the owner (in case the applicant is an architect, a contractor, or even a permit runner). The application for structural review will be required when plans are ready for the Building Department. The structural application must contain the value of the construction for the entire job. Permit fees for Town contracted agencies. Keep in mind, there are separate fees for all the different agencies involved in your permit process. Zoning review fees will be due in the form of a check, cashier's check, or money order payable to the Town of Southwest Ranches. Cash is not accepted. The application fee covers an initial review and cost of complete application processing by professional staff. Each additional plan resubmission will have a fee which will be collected each time plans are resubmitted with corrections. Please refer to fee schedule approved by Town Council on 09/15/2014. Applicable fee for Engineering plan review will be due in the form of a check, cashier's check, or money order payable to the Town of Southwest Ranches, once plans are processed by the town Engineer. Applicable building permit fees will be due in the form of a separate check, cashier s check or money order payable to the Town of Southwest Ranches once you submit your application to the Building Department. 7

PERMIT ISSUANCE AND INSPECTIONS Once your building plans are approved and the permit fees are paid, a building permit will be issued at the offices of C.A.P. Government, Inc. This permit will authorize the construction of your new fence or wall. Building permit: Be sure to post your approved permit copy in a visible spot at the construction site. The permit copy needs to be visible at all times from adjacent right of ways during the duration of the construction. Interim inspections: C.A.P. Government, Inc. will be responsible for coordinating inspections during your building s construction phase. Final inspections: Once the new building is complete, you need to order your final inspections. An inspection request form is included in the building permit package. This form has to be faxed to the Building Department, which will oversee all final inspections. The Zoning Department will also perform the final Zoning and Landscape inspection, and will coordinate with the Town Engineer if his review was part of the permit. Certificate of Completion: Once you have passed the final inspections of all agencies, the Building Department will confirm that your permit is complete and will issue a Certificate of Completion upon request, or will simply close your permit. IMPORTANT Below is a summary of phone numbers for guidance through the permitting process: Planning and Zoning: Code Services Inc. (954) 434-0008 Robert C. Solera Engineering: Clete Saunier (954) 434-0008 (by appointment ONLY) Structural, Mechanical, Electrical, Plumbing: C.A.P. Government, Inc. (954) 888-9882 Lisa Reices-Nicasio Drainage Districts: South Broward Drainage District (for areas west of SW 148 Ave) (954) 680-3337 Central Broward Water Control District (for areas east of SW 148 Ave) (954) 432-5110 8

EASEMENT AGREEMENT Date _ I, _, have applied for a building permit to construct in the utility easement on my property located at in the Town of Southwest Ranches, which is also described as follows: (legal description) A brief description of the location and type of construction of the proposed improvement is as follows: I understand that your company/agency is not responsible for repairs to, or replacement of any portion of this structure; and that any removal or replacement of the structure necessary for your use of the easement will be done at my expense. I further understand that I will assume full responsibility for any damage incurred to the utility facilities during construction. This is to certify that I am the owner of the subject property and I fully understand and agree to the terms and conditions of the proposed construction as described above. _ Date: _ Signature of Owner _ Date: _ Signature of Owner Address Company/Agency 9

Signed Date UTILITY PROVIDER CONTACT LIST CITY OF SUNRISE (water) Address: 10770 W. Oakland Park Blvd., Sunrise, FL. 33351 Contact: Judy Mufale Phone: (954) 746-3284 BELL SOUTH Address: 8601 W. Sunrise Blvd., Plantation, FL. 33322 Contact: Kay Welsh Phone: (954) 723-2426 Fax: (954) 423-6108 COMCAST Address: 2601 SW 145 th Avenue, Suite 100, Miramar, FL. 33027 Contact: Leonard Maxwell-Newbold Phone: (954) 447-8405 Fax: (954) 534-7083 FPL Building and Planning Division Phone: (954) 442-6352 Fax: (954) 442-6336 TECO/PEOPLES GAS Address: 5101 NW 21 st Avenue, Suite 460, Ft. Lauderdale, FL. 33309 Contact: Yolanda Phone: (305) 957-3857 ext 77247 Fax: (305) 945-0171 10