WELD COUNTY BUILDING PERMIT & INSPECTION FEE SCHEDULE JANUARY 2018

Similar documents
Commercial Fee estimate The Building department will provide the actual fees at the time the permit is issued.

BUILDING PERMIT FEE SCHEDULE

BUILDING PERMITS Table Total Valuation. $1.00 to $ $26.00

AN ORDINANCE FOR ADOPTION OF FEES IN CONJUNCTION WITH THE FAMILY OF INTERNATIONAL BUILDING CODES FOR PEARL RIVER COUNTY

City of Georgetown. Inspection Services

APPLICATION. Airport Hazard In ETJ - one- and two family dwelling $100 Airport Hazard in ETJ anything other than one- and twofamily

LANE COUNTY BUILDING & ELECTRICAL PROGRAMS PERMIT FEE GUIDE

BUILDING PERMIT APPLICATION. Commercial Building Permit Application Checklist

City of Georgetown. Inspection Services

LANE COUNTY BUILDING & ELECTRICAL PROGRAMS PERMIT FEE GUIDE

TOWN OF CASTLE ROCK. Fee Schedules. Development Services MAY 2018

TOWNSHIP OF O HARA ALLEGHENY COUNTY, PENNSYLVANIA

MILLCREEK. Planning & Development Services APPROVED FEE SCHEDULE. for Submitted for review and approval in 2016

PLANNING AND DEVELOPMENT DIVISION OF BUILDING AND INFRASTRUCTURE HAMILTON COUNTY, OHIO SCHEDULE OF FEES JANUARY, 2014, EDITION

Resolution Fee Schedule

Residential Permits R-2, R-3, R-4, and U Occupancies 2019 Building Permit Valuation/Fee Schedule

REPORT TO COUNCIL City of Sacramento

City of Wausau Building, Housing and Zoning Fee Schedule

BUILDINGS AND BUILDING REGULATIONS: (1) Building permit fees ( 6-3(108.2 of the Florida Building Code, 2004 ed.)): See subsection (6) for all new

NOTICE. Valuations for determining the building permit fee shall be set by the Building Official per International Building Code Section

3. COMMUNITY DEVELOPMENT Approved FY 18 19

REQUEST FOR COUNCIL ACTION

Zoning Fee Schedule. Per Chapter Part VIII Administrative Code

CHAPTER 6: ALCOHOLIC BEVERAGES

Prepared by: Office of Management and Budget

Rules and Regulations. for. Building Control Fees. Revised January 2, 2018

BUILDING PERMIT SUBMITTAL REQUIREMENTS

NEW BRITAIN BOROUGH SCHEDULE OF FEES (Revised April 9, 2019)

City of Wausau Building, Housing and Zoning Fee Schedule 2019

BUILDING & ZONING SCHEDULE OF FEES Effective March 15, 2015

Commissioners to enact, amend, and enforce technical construction and building codes; and,

SCHEDULE A TO BY-LAW NUMBER (Amended by By-law ) CLASSES OF PERMITS AND PERMIT FEES

ZONING and PA UNIFORM CONSTRUCTION CODE (UCC) PERMIT APPLICATION. I. Zoning Permit Section Date Received Ins. Addendum Y N

MASTER SCHEDULE OF FEES, CHARGES, AND RECOVERED COSTS SECTION DEVELOPMENT SERVICES

MUDDY CREEK TOWNSHIP 2018 FEE SCHEDULE RESOUTION #

FEE SCHEDULE ADMINISTRATION FEES OF 35% ARE CHARGED TO THE PROPERTY OWNER IN ADDITION TO ALL OTHER APPLICABLE FEES AND COSTS. SEE NO. 13.

Appendix B PENALTY, SALARY, BONDS and FEES

FEE SCHEDULE SAFETY CODE PERMIT FEES EFFECTIVE JANUARY 1, 2018 PART 1 - DEFINITIONS

NEW BRITAIN BOROUGH SCHEDULE OF FEES (Revised December 15, 2017)

10% of Building Permit in addition to the full Building Permit Fee

THE BOARD OF COUNTY COMMISSIONERS

Building Permit Miscellaneous Fees At time of submittal, a 15% non-refundable deposit is required.

Location in Code Subject Fees

ZONING & BUILDING PERMIT AND SUBDIVISION & LAND DEVELOPMENT PLAN MASTER FEE SCHEDULE PER RESOLUTION No

Fee Schedule July 1, 2017

Total Cost of the Building Permit. Total Valuation*

BUILDING PERMIT APPLICATION

TOWN OF HERNDON, VIRGINIA ORDINANCE MAY 26, 2015

CITY OF SANTA ROSA CITY COUNCIL MAYOR AND CITY COUNCIL REPORT ITEM-RANGE RANCH; SETTING HOUSING ALLOCATION PLAN FEE FOR ONE YEAR COMMUNITY DEVELOPMENT

FEES ASSOCIATED WITH DEVELOPMENT

9. Public (Federal, State, or local

Town of Chino Valley Consolidated Fee Schedule Resolution No , Adopted October 23, 2012 Effective January 1, 2013

Fees for construction of all buildings except single family dwellings, shall be calculated using Table 2.

SCHEDULE OF PERMIT FEES. (Effective November 3, 2015)

SCHEDULE A. Permit fees shall be calculated based on the formula given below, unless otherwise specified in this schedule:

Class of Permits and Fees Schedule A

San Diego Area Chapter International Code Council

Information Needed for a Building Permit

Greenbrier County Building Code Administrative Policy Manual

Fee Type How Determined Rate Permit Processing Charge Flat Permit or Plan Review Submittal $32.00

PLANS MUST BE APPROVED BY THE FIRE DEPARTMENT BEFORE SUBMITTING TO OUR OFFICE FOR REVIEW.

CITY OF BRANDON BY-LAW NO ANNUAL SCHEDULE OF FEES SCHEDULE "A"

Chapter Fees (d) OFFICIAL ZONING MAP UPDATE (EXCLUDING FINAL PLATS) $10.00, PER LOT (e) HOME OFFICE PERMIT

Permit fees shall be calculated based on the formula given below, unless otherwise specified in this schedule:

BUILDING DIVISION SIMPLIFIED BUILDING PERMIT FEE SCHEDULE January 01st, 2019 to December 31st, 2019

PERMIT FEES CITY OF BATAVIA DEPARTMENT OF PUBLIC WORKS ONE BATAVIA CITY CENTRE BATAVIA, NEW YORK Revised: July 21, 2008

COMMERCIAL THIRD PARTY UCC BUILDING INSPECTOR SELECTION FORM & FEE SCHEDULE

RESOLUTION # WHEREAS, The Board of Supervisors of Upper Southampton Township has established a fee schedule, and

SCOPE All fees associated with and referenced in the 2016 Building Code of the City and County of Denver ( Code ) are as set forth in this policy.

New Hanover Township

Violet Township requires Zoning and Plans Examination and Building Permits for all new construction.

PLUMBING SYSTEMS CHAPTER 29

County of Kane CHAPTER 6, BUILDINGS AND BUILDING REGULATIONS, OF THE KANE COUNTY CODE

APPENDIX A BUILDING PERMIT AND RELATED FEES

MUDDY CREEK TOWNSHIP 2019 FEE SCHEDULE RESOUTION #

City of Roswell - Fee Schedule

RESOLUTION NO BUILDING, ZONING, AND SEWAGE ENFORCEMENT FEE SCHEDULE

SCHEDULE A. Classes of Permits and Fees (Reference By-law No ) 1.) Calculation of Permit Fees (All fees are exempted from HST)

Town of Aurelius 1241 West Genesee St Rd Auburn, NY Ext # (fax)

Regular Session. Adjournment

ORDINANCE NO (revised by Ordinance )

LIMERICK TOWNSHIP 646 WEST RIDGE PIKE LIMERICK, PENNSYLVANIA 19468

Community Development Department Fee Schedule

CITY OF JOHNSTOWN SCHEDULE OF PERMIT FEES

TOWN OF BLOOMSBURG COLUMBIA COUNTY, PENNSYLVANIA RESOLUTION NO SETTING VARIOUS FEES

Permit Application Procedures

EAST WHITELAND TOWNSHIP FEE SCHEDULE 2018

City of Humble 114 W. Higgins, Humble, Texas ( 281 ) ( 281 )

COMMERCIAL ZONING DISTRICTS (Amended 11/13/14) Part I. C-1 Restricted Commercial District

Schedule of City Fees & Charges

Village of Glen Ellyn Fee & Deposit Schedule Per Village Code 4-1-4

BUILDING SERVICES ~ FEE SCHEDULE

Appendix G Fee Schedule

Building Permit & Plan Check Fees

RESOLUTION NUMBER

BUILDING PERMIT FEE SCHEDULE

Farming & Livestock related activities Y Y Y Y Y Y. Commercial Type Animal Facility Y Y Y

ORDINANCE NO: INTRODUCED BY: ADMINISTRATION

NEW JERSEY DEPARTMENT OF COMMUNITY AFFAIRS DIVISION OF CODES AND STANDARDS OFFICE OF STATE AND LOCAL CODE INSPECTIONS ELEVATOR SAFETY UNIT

DESCRIPTION FEE UNIT MINIMUM BLDG FEE¹ New Building or Addition All occupancy classifications except

Transcription:

WELD COUNTY BUILDING PERMIT & INSPECTION FEE SCHEDULE JANUARY 2018 Building Permit Fees: Total Valuation Fee (calculated according to building valuation per sq. ft.) $1 to $500 $21 $501 to $2,000 $21 for the first $500 plus $2.75 for each additional $100 or fraction thereof, to and including $2000 $2,001 to $25,000 $62.25 for the first $2,000 plus $12.50 for each additional $1,000 or fraction thereof, to and including $25,000 $25,001 to $50,000 $349.75 for the first $25,000 plus $9.00 for each additional $1,000 or fraction thereof, to and including $50,000 $50,001 to $100,000 $574.75 for the first $50,000 plus $6.25 for each additional $1,000 or fraction thereof, to and including $100,000 $100,001 to $500,000 $887.25 for the first $100,000 plus $5.00 for each additional $1,000 or fraction thereof, to and including $500,000 $500,001 to $1,000,000 $2,887.25 for the first $500,000 plus $4.25 for each additional $1,000 or fraction thereof, to and including $1,000,000 $1,000,000 and up $5,012.25 for the first $1,000,000 plus $2.75 for each additional $1,000 or fraction thereof Manufactured Structure Permit Fees: Manufactured homes block & tied in established park (includes electric)..$400.00 Manufactured homes temporarily stored on property..$75.00 Commercial manufactured structures.. see building valuation per sq ft Manufactured home single family dwelling...see building valuation per sq ft Engineered foundations...see building valuation per sq ft (Crawlspace, basement or permanent installation) Plan Review Fee for Building/Manufactured Home Permits: Major Plan Review...65% of building valuation fee New single family dwelling & all commercial buildings New utility buildings over 3,000 sq ft Minor Plan Review..$50.00 Residential additions/alterations & utility buildings additions/alterations under 1,000 sq ft Manufactured home single family dwelling on engineered foundation New utility buildings under 3,000 sq ft

Road Impact Fee: All new single family dwellings will be assessed..$2,406.00 All commercial & industrial buildings will be assessed...see attached County Facilities Impact Fee: All new single family dwellings..$674.00 All new commercial & industrial structures.....see attached Drainage Fee: All land uses*.....$0.10 per impervious sq ft area * The impervious area of streets or driveways within the public right-of-way adjacent to the parcel shall be included up to the centerline of the street. Gravel roads and driveways shall be counted as 50% impervious. Premove Inspection Fees: Move-In Dwelling..$200.00 Move-In Utility Structure.. $200.00 Demolition Permit Fees: Dwelling/Manufactured Home/Utility Structure. 52.00 Commercial Structures...see cost of job table Electrical Permit Fees: Residential: This includes single family residences, duplexes, condominiums, townhouses and construction and extensive remodeling and additions to same (based on enclosed living area) 0 to 500 sq ft...$37.00 501 sq ft to 1,000 sq ft...$53.00 1,001 sq ft to 1,500 sq ft $72.00 1,501 sq ft to 2,000 sq ft $78.00 Per 100 sq ft in excess of 2,000 sq ft $5.00 *Example: 2,100 sq ft = $78.00 + $5.00 = $83.00 All other electrical fees except for inspections in mobile home and travel trailer parks, shall be computed on the dollar value of the electrical installations, including labor and materials (total cost to the customer), and such fees shall be computed as follows: Valuation of Work (actual cost to customer labor and materials): Not more than $300 $37.00 $301 to $2,000 $44.00 $2,001 to $3,000.$51.00 $3,001 to $50,000 $17.00 per $1,000 or fraction thereof of total valuation Example: $3,500 = $51.00 + $17.00 = $68.00 $4,700 = $51.00 + $34.00 = $85.00 More than $50,000 contact Weld County Building Department Construction Meter (Temporary).. $37.00

Grading Permit Fees: 1 to 5 Acres disturbed $50.00 5 to 20 Acres disturbed $100.00 20 or more Acres disturbed..$200.00 plus $1.00 per acre for each acre over 20 No plan check fee is assessed on Grading Permits Other Inspections and Fees: Inspections outside of normal business hours (minimum charge 2 hrs) $52.00 per hour Inspections for which no fee is specifically indicated. $52.00 per hour Reinspection fee.. $52.00 per hour Additional plan review required by changes, additions or revisions to approved plans.$52.00 per hour Investigation fee per Building Official shall be 50% of the amount of the permit fee as established by the BOCC NOTE: When work for which a permit is required by the Weld County Code is started or proceeds PRIOR to obtaining a permit, an additional investigation fee shall be added to the cost of the permit. The investigation fee shall be 50% of the fee established by separate action by the Weld County Board of County Commissioners. In no event shall the investigation fee exceed the amount set by separate action by the Board of County Commissioners. The payment of such investigation fee shall not relieve any persons from fully complying with the requirements of the Weld County Code in the execution of the work, nor from any other penalties prescribed within the Weld County Code Revised 01/01/2018

Chapter 20 Impact Fees Road Impact Fee Categories Fees Single-Family Detached Dwelling... $2,406 Multi-Family Dwelling. $1,576 Mobile Home Park Pad.. $1,476 Hotel/Motel Room $1,390 Shopping Center/Commercial.. $3,336 per 1,000 sq. ft. Office. $2,220 per 1,000 sq. ft Institutional/Quasi-Public...$1,138 per 1,000 sq. ft. Manufacturing/Industrial. $2,177 per 1,000 sq. ft. Warehouse...$1,104 per 1,000 sq. ft Mini-Warehouse.. $460 per 1,000 sq. ft. Agricultural Commercial 1,000 sq. ft $704 per 1,000 sq. ft. County Facilities Categories Single-Family Detached Dwelling $674 Multi-Family Dwelling. $500 Mobile Home Park Pad.. $680 Hotel/Motel Room $308 Shopping Center/Commercial.. $645 per 1,000 sq. ft. Office. $321 per 1,000 sq. ft. Institutional/Quasi-Public......$199 per 1,000 sq. ft. Manufacturing/Industrial.....$161 per 1,000 sq. ft. Warehouse... $72 per 1,000 sq. ft. Mini-Warehouse......$58 per 1,000 sq. ft. Agricultural Commercial.....$136 per 1,000 sq. ft. Drainage Impact Fee All Land Uses Sq. Ft. of Impervious Cover*....$0.10 * The impervious area of streets or driveways within the public right-of-way adjacent to the parcel shall be included up to the centerline of the street. Gravel roads and driveways shall be counted as 50% impervious.

Building Valuation Per Square Foot The unit costs are intended to comply with the valuation data released in August 2016 by ICC and thus include architectural, structural, electrical, plumbing and mechanical work, except as specifically listed below. The unit costs also include the contractor s profit, which should not be omitted. Group (2012 International Building Code) IA IB IIA IIB IIIA IIIB IV VA VB A-1 Assembly, theaters, with stage 226.92 219.10 213.80 205.04 192.95 187.36 198.56 176.18 169.73 A-1 Assembly, theaters, without stage 207.97 200.15 194.85 186.09 174.15 168.55 179.61 157.38 150.92 A-2 Assembly, nightclubs 177.49 172.34 167.98 161.18 151.95 147.76 155.52 137.58 132.93 A-2 Assembly, restaurants, bars, banquet halls 176.49 171.34 165.98 160.18 149.95 146.76 154.52 135.58 131.93 A-3 Assembly, churches 209.94 202.13 196.83 188.07 176.32 170.72 181.59 159.54 153.09 A-3 Assembly, general, community halls, libraries, museums 175.12 167.31 161.01 153.25 140.50 135.90 146.77 123.72 118.27 A-4 Assembly, arenas 206.97 199.15 192.85 185.09 172.15 167.55 178.61 155.38 149.92 B Business 181.12 174.43 168.67 160.26 146.18 140.70 153.97 128.34 122.72 E Educational 192.29 185.47 180.15 172.12 160.72 152.55 166.18 140.46 136.18 F-1 Factory and industrial, moderate hazard F-2 Factory and industrial, low hazard 108.53 103.54 97.56 93.81 84.17 80.36 89.86 70.57 66.08 107.53 102.54 97.56 92.81 84.17 79.36 88.86 70.57 65.08 H-1 High Hazard, explosives 101.60 96.60 91.63 86.88 78.44 73.62 82.93 64.84 NP H234 High Hazard 101.60 96.60 91.63 86.88 78.44 73.62 82.93 64.84 59.35 H-5 HPM 181.12 174.43 168.67 160.26 146.18 140.70 153.97 128.34 122.72 I-1 Institutional, supervised environment 180.72 174.14 169.28 161.12 149.06 145.04 161.12 133.69 129.43 I-2 Institutional, hospitals 304.80 298.11 292.36 283.95 268.92 NP 277.65 251.09 NP I-2 Institutional, nursing homes 211.20 204.51 198.75 190.34 177.26 NP 184.05 159.42 NP I-3 Institutional, restrained 206.08 199.38 193.63 185.22 172.62 166.14 178.93 154.78 147.16 I-4 Institutional, day care facilities 180.72 174.14 169.28 161.12 149.06 145.04 161.12 133.69 129.43 M Mercantile 132.23 127.09 121.73 115.92 106.18 102.99 110.26 91.82 88.16 Oil and gas sites* 1000.00 1000.00 1000.00 1000.00 1000.00 1000.00 1000.00 1000.00 1000.00 R-1 Residential, hotels 182.28 175.70 170.83 162.68 150.87 146.84 162.68 135.49 131.23 R-2 Residential, multiple family 152.86 146.27 141.41 133.25 122.04 118.01 133.25 106.66 102.41 R-3 Residential, one- and two-family 143.93 139.97 136.51 132.83 127.95 124.61 130.57 119.73 112.65 R-4 Residential, care/assisted living facilities 180.72 174.14 169.28 161.12 149.06 145.04 161.12 133.69 129.43 S-1 Storage, moderate hazard 100.60 95.60 89.63 85.88 76.44 72.62 81.93 62.84 58.35 S-2 Storage, low hazard 99.60 94.60 89.63 84.88 76.44 71.62 80.93 62.84 57.35 U Utility, miscellaneous 77.82 73.48 69.04 65.52 59.23 55.31 62.58 46.83 44.63 Pre-Fab Structure U Utility, misc 54.48 51.43 48.33 45.87 41.46 38.72 43.81 32.78 31.24 Pre-Fab Structure B Business 126.78 122.10 118.07 112.19 102.33 98.49 107.78 89.84 85.90 Pre-Fab Structure E Educational 134.61 129.83 126.10 120.48 112.50 106.79 116.33 98.32 95.33 *Note: Electrical and Building Fees apply on Oil and Gas Sites a. Private Garages/Storage Wood Frame $25.50 /sq ft Masonry $31.52 /sq ft Structural Steel $37.34 /sq ft b. Unfinished Basement (All Groups) $18.59 /sq ft c. Finished Basement (All Groups) $24.37 /sq ft d. NP Not Permited e. Manufactured Homes/Pre-Fab Structures deduct 30% of Value per Table f. Move-in Dwelling deduct 60% of Value per Table g. Crawlspace 50% of Unfinished Basement Fee h. Breezeway/Enclosed Porch/Patio/Covered Deck/Uncovered Deck $13.83 /sq ft i. Greenhouse $10.37 /sq ft j. Carports $17.34 /sq ft

Building, Plumbing & Mechanical Permit Fees Per Cost of Job $1.00-500.00 = 21.00 25001.00-26000.00 = 358.75 64001.00-65000.00 = 668.50 501.00-600.00 = 23.75 26001.00-27000.00 = 367.75 65001.00-66000.00 = 675.75 601.00-700.00 = 26.50 27001.00-28000.00 = 376.75 66001.00-67000.00 = 681.00 701.00-800.00 = 29.25 28001.00-29000.00 = 385.75 67001.00-68000.00 = 687.25 801.00-900.00 = 32.00 29001.00-30000.00 = 394.75 68001.00-69000.00 = 693.50 901.00-1000.00 = 34.75 30001.00-31000.00 = 403.75 69001.00-70000.00 = 699.75 1001.00-1100.00 = 37.50 31001.00-32000.00 = 412.75 70001.00-71000.00 = 706.00 1101.00-1200.00 = 40.25 32001.00-33000.00 = 421.75 71001.00-72000.00 = 712.25 1201.00-1300.00 = 43.00 33001.00-34000.00 = 430.75 72001.00-73000.00 = 718.50 1301.00-1400.00 = 45.75 34001.00-35000.00 = 439.75 73001.00-74000.00 = 724.75 1401.00-1500.00 = 48.50 35001.00-36000.00 = 448.75 74001.00-75000.00 = 731.00 1501.00-1600.00 = 51.25 36001.00-37000.00 = 457.75 75001.00-76000.00 = 737.25 1601.00-1700.00 = 54.00 37001.00-38000.00 = 466.75 76001.00-77000.00 = 743.50 1701.00-1800.00 = 56.75 38001.00-39000.00 = 475.75 77001.00-78000.00 = 749.75 1801.00-1900.00 = 59.50 39001.00-40000.00 = 484.75 78001.00-79000.00 = 756.00 1901.00-2000.00 = 62.25 40001.00-41000.00 = 493.75 79001.00-80000.00 = 762.25 2001.00-3000.00 = 74.75 41001.00-42000.00 = 502.75 80001.00-81000.00 = 768.50 3001.00-4000.00 = 87.25 42001.00-43000.00 = 511.75 81001.00-82000.00 = 774.75 4001.00-5000.00 = 99.75 43001.00-44000.00 = 520.75 82001.00-83000.00 = 781.00 5001.00-6000.00 = 112.25 44001.00-45000.00 = 529.75 83001.00-84000.00 = 787.25 6001.00-7000.00 = 124.75 45001.00-46000.00 = 538.75 84001.00-85000.00 = 793.50 7001.00-8000.00 = 137.25 46001.00-47000.00 = 547.75 85001.00-86000.00 = 799.75 8001.00-9000.00 = 149.75 47001.00-48000.00 = 556.75 86001.00-87000.00 = 806.00 9001.00-10000.00 = 162.25 48001.00-49000.00 = 565.75 87001.00-88000.00 = 812.25 10001.00-11000.00 = 174.75 49001.00-50000.00 = 574.75 88001.00-89000.00 = 818.50 11001.00-12000.00 = 187.25 50001.00-51000.00 = 581.00 89001.00-90000.00 = 824.75 12001.00-13000.00 = 199.75 51001.00-52000.00 = 587.25 90001.00-91000.00 = 831.00 13001.00-14000.00 = 212.25 52001.00-53000.00 = 593.50 91001.00-92000.00 = 837.25 14001.00-15000.00 = 224.75 53001.00-54000.00 = 599.75 92001.00-93000.00 = 843.50 15001.00-16000.00 = 237.25 54001.00-55000.00 = 606.00 93001.00-94000.00 = 849.75 16001.00-17000.00 = 249.75 55001.00-56000.00 = 612.25 94001.00-95000.00 = 856.00 17001.00-18000.00 = 262.25 56001.00-57000.00 = 618.50 95001.00-96000.00 = 862.25 18001.00-19000.00 = 274.75 57001.00-58000.00 = 624.75 96001.00-97000.00 = 868.50 19001.00-20000.00 = 287.25 58001.00-59000.00 = 631.00 97001.00-98000.00 = 874.75 20001.00-21000.00 = 299.75 59001.00-60000.00 = 637.25 98001.00-99000.00 = 881.00 21001.00-22000.00 = 312.25 60001.00-61000.00 = 643.50 99001.00-100000.00 = 887.25 22001.00-23000.00 = 324.75 61001.00-62000.00 = 649.75 23001.00-24000.00 = 337.25 62001.00-63000.00 = 656.00 24001.00-25000.00 = 349.75 63001.00-64000.00 = 662.25