# TMEP KILOMETRE POST (20 KM) PROPOSED TMEP ROUTE

Similar documents
# TMEP KILOMETRE POST (1 KM) PROPOSED TMEP ROUTE

Maple Ridge. Greater Vancouver. Regional District. Fraser Valley. Regional District. Surrey M002-PM Abbotsford. Township of Langley

Chilliwack. Abbotsford SOOWAHLIE 14 KP 1098 KP 1100 KP 1102 KP 1104 KP 1106 M002-PM M002-PM M002-PM M002-PM

Greater Vancouver. Fraser Valley. Regional District Mission. Regional District KP 1135 KP 1130 KP Abbotsford KP Township of Langley

Joeyaska Indian Reserve No. 2 Lower Nicola First Nation

ATTACHMENT 2: CONSULTATION UPDATE NO. 3 PART 3 LANDOWNER ENGAGEMENT

Shoowahtlans Indian Reserve No. 4 Metlakatla

Housing Characteristics Hot Facts

City of Richmond. Report to Committee PLN - 168

Issued date between October 01, 2014 and October 31, 2014

Well Survey Requirements

THE CITY OF PORT MOODY

Date: April 15, 2016 Meeting Date: May 6, Park for Other Land to be used for Park Purposes Bylaw No. 1233, 2016 ;

SECTION 9 RESIDENTIAL R5 ZONE

Fewer home sales and listings in the first quarter of 2018

News Release FOR IMMEDIATE RELEASE

News Release FOR IMMEDIATE RELEASE

News Release FOR IMMEDIATE RELEASE

EXCEPTIONAL COMMUNITY DEVELOPMENT OPPORTUNITY

Burquitlam-Lougheed Neighbourhood Plan Market Analysis Findings and Lessons Learned

Lot area (minimum) 6,000 m 2 (64, ft. 2 ) Lot Frontage (minimum) 60 m ( ft.)

THE CITY OF PORT HOODY

Utility Corridors on Public Land PL DEFINITIONS. In this policy,

CONSENT APPLICATION FORM

News Release FOR IMMEDIATE RELEASE

FOR SALE FOR SALE SINGLE-TENANT INVESTMENT OPPORTUNITY STREET FORT ST. JOHN, BC

1024 St. Andrews Street

News Release FOR IMMEDIATE RELEASE:

Seniors Residence + Commercial White Rock, BC. Seniors Residence + Commercial. West Vancouver, BC

Mixed Income Transit-Oriented Rental Housing Study Transit Ridership

Development Variance Permit

THE CITY OF PORT MOODY

Metro Vancouver continues to experience above-average demand and below-average supply

Metro Vancouver home buyers compete for fewer home listings

Metro Vancouver home sales surpass 4,000 for third consecutive month

SECTION 10 RESIDENTIAL R6 ZONE

THE CORPORATION OF THE TOWN OF WASAGA BEACH PLANNING DEPARTMENT

VANCOUVER, BC December 2, 2016 Home buyer and seller activity remains near historical averages in the Metro Vancouver* housing market.

News Release FOR IMMEDIATE RELEASE:

Issued date between September 01, 2016 and September 30, 2016

News Release FOR IMMEDIATE RELEASE:

Housing market conditions continue to favour home buyers

Home sales remain at record levels across Metro Vancouver

News Release FOR IMMEDIATE RELEASE

Reduced demand is allowing housing supply to accumulate

LONSDALE Court 8669 Heather Street, Vancouver, BC 23-Suite Apartment Building in Marpole

Last month s sales were 28.7 per cent below the 10-year June sales average.

Metro Vancouver housing market off to a quieter start than last year

Home listings at four-year October high as sales remain below typical levels

News Release FOR IMMEDIATE RELEASE

Grand Forks Growth Fund, A Jobs Development Authority Staff Report

News Release FOR IMMEDIATE RELEASE

News Release. Property sales strengthen in current market cycle FOR IMMEDIATE RELEASE

News Release FOR IMMEDIATE RELEASE

Home sales down, listings up across Metro Vancouver

Issued date between August 01, 2010 and August 31, 2010

News Release FOR IMMEDIATE RELEASE:

News Release FOR IMMEDIATE RELEASE:

News Release FOR IMMEDIATE RELEASE

News Release FOR IMMEDIATE RELEASE

RAY TOWNSEND BEN WILLIAMS ext. 203 JAMES BLAIR Personal Real Estate

Former Happy Hour Public House Eastbury Road, Bushey WD19 4JL

Low supply continues to limit Metro Vancouver home buyers

A Bylaw to Authorize the Sale and Exchange of a Portion of Derby Reach Regional Park for Other Land to be Used for Park Purposes

News Release FOR IMMEDIATE RELEASE:

News Release FOR IMMEDIATE RELEASE:

Prospective home buyers remain on the sidelines in March

RJC Engineers rjc.ca. Vancouver Victoria Nanaimo Kelowna Calgary Edmonton Lethbridge Toronto Ottawa Kitchener Kingston

VANCOUVER, BC March 2, 2018 Metro Vancouver* home sales dipped below the longterm historical average in February.

EDITION 1 VESTING OF ROADS AND/OR RESERVES EASEMENT INFORMATION REFER TO SHEET 2 FOR EASEMENT INFORMATION SURVEYOR'S REF: 16022/01

Home sale and listing activity dip below historical averages in October

Real Estate Administration at the Vancouver Port Authority (VPA) Presentation by Ron McMillan - GIS/LIS Coordinator December 13, 2004

CITY OF TORONTO BY-LAW (LPAT)

MESQUITE POWER CENTER

Steady trends continue in the Greater Vancouver housing market

Information contained

News Release FOR IMMEDIATE RELEASE

News Release FOR IMMEDIATE RELEASE:

Condominiums and townhomes in high demand across Metro Vancouver

Brandi M. Ho

October sales were 28.5 per cent below the 10-year October sales average of 2,700.

News Release FOR IMMEDIATE RELEASE

STANDARDIZED LEGAL DESCRIPTIONS AND EXHIBITS

2495 Lancaster Rd. Minor Zoning By-law Amendment

INTERIM POSTAL CODE DIRECTORY RÉPERTOIRE DU CODE POSTAL INTÉRIMAIRE

Steady trends continue in the Greater Vancouver housing market

Subdivision of existing two lots into three lots.

Public Meeting Information Report Development Approval and Planning Policy Department

Home buyer demand depends on property type

Greater Vancouver residential property sale and listing activity below 10-year averages in November

Part 9 Commercial, Mixed Use and Industrial Sign District

RECENT APARTMENT TRANSACTIONS. LANCE COULSON PERSONAL REAL ESTATE CORPORATION Executive Vice President

City of Surrey PLANNING & DEVELOPMENT REPORT File:

LRS USE ONLY EDITION COUNCIL NAME: THIS IS A SPEAR PLAN. TOTAL ROAD AREA IS 8969m² EASEMENT INFORMATION

Recommendation: 1. That Council give fourth and final reading to City of Coquitlam Zoning Amendment Bylaw No. 3826, 2007;

THE CITY OF PORT MOODY

R-11. REPORT ON SUBDIVISION WITHIN THE AGRICULTURAL LANDRESERVE FILE NO. 212/2017 (Simpson) PEACE RIVER REGIONAL DISTRICT DEVELOPMENT SERVICES

City of Richmond. Report to Committee Planning and Development Division

FOR SALE EXCELLENT ESTATE BUILDING SITE Ave., Surrey, BC Acres

COMMONWEALTH OF PENNSYLVANIA DEPARTMENT OF TRANSPORTATION

Transcription:

M2-PM328-9 ± 3.4 # M2-PM328-8 Port Moody M2-PM328-7 M2-PM328-6 M2-PM328-5 118.6 # Burnaby M2-PM328-4 M2-PM328-3 M2-PM328-2 Coquitlam M2-PM328-1 # 1175 New Westminster SIZE: 11 x 17 LEGEND # TMEP KILOMETRE POST (2 KM) PROPOSED TMEP ROUTE PLAN AND PROFILE MAP WINDOW SCALE: 1:35, COORDINATE SYSTEM: NAD 1983 UTM ZONE 1N MUNICIPAL BOUNDARY THIS DOCUMENT WAS PREPARED BY UPI PROJECTS CANADA LTD. ON BEHALF OF TRANS MOUNTAIN PIPELINE ULC FOR THE REGULATORY REVIEW OF THE TRANS MOUNTAIN EXPANSION PROJECT (PURPOSE). THIS DOCUMENT IS OWNED BY TRANS MOUNTAIN PIPELINE ULC AND MAY BE REPRODUCED FOR THE INTENDED PURPOSE ONLY AND SHALL NOT BE UTILIZED FOR ANY OTHER PURPOSE WITHOUT THE PRIOR WRITTEN APPROVAL OF TRANS MOUNTAIN PIPELINE ULC..75 1.5 Kilometers REV DESCRIPTION DATE DRN CKD APP ISSUED FOR INFORMATION 217/3/3 KBW LPT DMM TRANS MOUNTAIN EXPANSION PROJECT PLAN AND PROFILE OF TMEP EASEMENT INDEX OVERVIEW BURNABY SEGMENT 7.7 DRAWING SHT. NO. REV. M2-PM3128 1

BOOK OF REFERENCE - TRANS MOUNTAIN EXPANSION PROJECT BURNABY SEGMENT 7.7 SHEET: 1 1174+668 TO 1175+872 PID OWNER(S) LANDOWNER/OCCUPANT OCCUPANT(S) PROPOSED NEW EASEMENT WIDTH LENGTH (ha) (Ac.) PC 892.1 24-44-51 BNSF Railway Company c/o Jones Lang Lasalle Brokerage, Inc. Attention: Ed Darter Occupant City of Burnaby Attention: Lou Pelletier, Director, Planning and Building 1 76.48.76 1.88 PC 899 24-44-132 BNSF Railway Company c/o Jones Lang Lasalle Brokerage, Inc. Attention: Ed Darter City of Burnaby Attention: Lou Pelletier, Director, Planning and Building 1 226.81.227.56 PC 899.2 24-44-94 BNSF Railway Company c/o Jones Lang Lasalle Brokerage, Inc. Attention: Ed Darter City of Burnaby Attention: Lou Pelletier, Director, Planning and Building 1 113.62.113.28 NOTES: 1. Easement lengths are the length of centre line at the easement location. Areas noted represent actual areas, not necessarily length times width. 2. Areas and lengths are calculated in UTM coordinates. 3. Owner/Occupant information is as of 217/3/1. 4. Unit Conversions: 117473.78 1 Hectare (ha) = 2.471 Acres (Ac.). 1 Metre = 3.281 Feet (ft). 1 Kilometre (km) =.621 Miles (mi). DOCUMENT PAGE REV. DESCRIPTION DATE BY M2-PI328 1 ISSUED FOR INFORMATION 217/3/3 DWY

EDGAR AVE FOR CONTINUATION SEE: M2-PM328-2 92G7D HORNE S T = HALSTON CRT 1176 WILTSHIRE PL GOVERNMENT ST CRES SANDLEWOOD GILDWOOD DR PC 899.2 PLAN 8583 CARDSTON CRT PC 899 MANCHESTER DR 92G2L PLAN 8583 BELFRIAR DR DGEWATER CRES DISTRICT OF BURNABY PLAN 3567 PLAN 1817 PC 892.1 ROC H ESTER ST = TRANS-CANADA HWY 1175 NORTH RD PC 892.1 PC 892.1 PC 892.1 DELESTRE AVE LORING ST EUCLID CRT ARROWLANE ± SUNSET AVE DUNLOP ST GRAYSON AVE ALDERSON AVE FOR CONTINUATION SEE: 1m (New) Easement Detail CITY OF BURNABY TURNING LANE STORMONT AVE 9 9 8 8 COLBY ST 7 7 E COLUMBIA ST EMERGENCY LANE GAGLARDI WAY ONRAMP 6 6 5 5 CARIBOO DR CARIBOO RD 4 4 3 3 KLENNER DR MONA AVE CRAIG AVE HOLMES ST 2 2 1 1 1175+872 1175+8 1175+7 1175+6 1175+5 1175+4 1175+3 1175+2 1175+1 1175+ 1174+9 1174+8 1174+7 1174+668 PROFILE SCALE: HORIZONTAL 1:5,. VERTICAL 1:1,. DATA SOURCE: LIDAR PROVIDED BY MCELHANNEY, 212. = SIZE: 11 x 17 LEGEND TMEP KILOMETRE POST (1KM) PROPOSED TMEP EASEMENT PROPOSED TMEP LAND RIGHTS ACQUIRED THROUGH UTILITY CROSSING OR OTHER NON-EASEMENT AGREEMENT SCALE: 1:5, COORDINATE SYSTEM: NAD 1983 UTM ZONE 1N OTHER EXISTING EASEMENTS LAND PARCEL / BLOCK (NATIONAL TOPOGRAPHIC SYSTEM) NOTES 1. ALL DIMENSIONS ARE IN METRES UNLESS SHOWN OTHERWISE. 2. PARCEL BOUNDARIES ARE AS OF 217/3/1. 3. BOUNDARIES SHOWN IN THE BAND ACROSS THE TOP OF THE MAP ARE PROJECTIONS UPWARDS OF THE LOCATIONS WHERE THE PIPELINE CROSSES THE PARCEL BOUNDARIES. 4. UNIT CONVERSIONS: 1 HECTARE (ha) = 2.471 ACRES (Ac.). 1 METRE = 3.281 FEET (ft). 1 KILOMETRE (km) =.621 MILES (mi). THIS DOCUMENT WAS PREPARED BY UPI PROJECTS CANADA LTD. ON BEHALF OF TRANS MOUNTAIN PIPELINE ULC FOR THE REGULATORY REVIEW OF THE TRANS MOUNTAIN EXPANSION PROJECT (PURPOSE). THIS DOCUMENT IS OWNED BY TRANS MOUNTAIN PIPELINE ULC AND MAY BE REPRODUCED FOR THE INTENDED PURPOSE ONLY AND SHALL NOT BE UTILIZED FOR ANY OTHER PURPOSE WITHOUT THE PRIOR WRITTEN APPROVAL OF TRANS MOUNTAIN PIPELINE ULC. 1 2 METRES REV DESCRIPTION DATE DRN CKD APP ISSUED FOR INFORMATION 217/3/3 LPT KBW DMM TRANS MOUNTAIN EXPANSION PROJECT PLAN AND PROFILE OF TMEP EASEMENT 1174+668 TO 1175+872 92G2L DRAWING SHT. NO. M2-PM328 1 REV.

BOOK OF REFERENCE - TRANS MOUNTAIN EXPANSION PROJECT BURNABY SEGMENT 7.7 SHEET: 2 1175+872 TO 1177+457 PID OWNER(S) LANDOWNER/OCCUPANT OCCUPANT(S) PROPOSED NEW EASEMENT WIDTH LENGTH (ha) (Ac.) PC 811.3 PARK 9 Brunette River Conservation Area (City of Burnaby) Attention: Lou Pelletier, Director, Planning and Building 1 22.71.22.54 PC 815 24-44-18 Great Northern Railway Company c/o The Burlington Northern Inc., Jones Lang Lasalle Brokerage, Inc., Att: Ed Darter City of Burnaby Attention: Lou Pelletier, Director, Planning and Building 1 97.15.97.24 PC 772.2 1-14-75 District of Burnaby Attention: Lou Pelletier, Director, Planning and Building 1 16..16.4 PC 772.1 7-424-442 The Corporation of the District of Burnaby Attention: Lou Pelletier, Director, Planning and Building 1 97.2.97.24 PC 772 9-642-471 City of Burnaby Attention: Lou Pelletier, Director, Planning and Building 1 44.41.44.11 PC 7719 11-928-956 The Corporation of the District of Burnaby Attention: Lou Pelletier, Director, Planning and Building 1 179.43.177.44 PC 7722 9-6-26 City of Burnaby Attention: Lou Pelletier, Director, Planning and Building 1 3.47.3.8 NOTES: 1. Easement lengths are the length of centre line at the easement location. Areas noted represent actual areas, not necessarily length times width. 2. Areas and lengths are calculated in UTM coordinates. 3. Owner/Occupant information is as of 217/3/1. 4. Unit Conversions: 117569.9957 1 Hectare (ha) = 2.471 Acres (Ac.). 1 Metre = 3.281 Feet (ft). 1 Kilometre (km) =.621 Miles (mi). DOCUMENT PAGE REV. DESCRIPTION DATE BY M2-PI328 2 ISSUED FOR INFORMATION 217/3/3 DWY

FOR CONTINUATION SEE: M2-PM328-3 BAXTER PL EASTLAKE DR PRODUCTION WAY NEPTUNE CRES CORONA DR MIRA PL VEGA CRT PLAN 39987 GAGLARDI WAY CARINA PL LYRA PL PLAN 4523 ALTAIR PL BEAVERBROOK CRES 92G7D = 1177 G ANYMEDE DR ORION PL PLAN 39985 GREATER VANCOUVER REGIONAL DISTRICT PLAN 52373 TURNING LANE GANY MEDE PL NOEL DR PC 7722 CAM BELL AVE KESWICK AVE BRITISH COLUMBIA HYDRO AND POWER AUTHORITY PLAN 21314 PLAN 34628 PLAN 33799 LOUGHEED HWY GREATER VANCOUVER SEWERAGE AND DRAINAGE DISTRICT PLAN 19143 PC 7719 GREATER VANCOUVER SEWERAGE AND DRAINAGE DISTRICT PLAN 4522 CITY OF BURNABY SALISH CRT HUNTER ST PC 772 PLAN 3587 PLAN 994 PC 772.1 PC 772.2 PENTLANDCRT BRITISH COLUMBIA HYDRO AND POWER AUTHORITY PLAN 21314 PC 815 1m (New) Easement Detail HORNE ST GOVERNMENT ST WILTS H IRE PL HALSTON CRT PC 811.3 = CARRIGAN CRT 1176 92G2L CRES SAN DLEWOOD CARDSTON CRT MANCHE STER DR ± TRANS-CANADA HWY FOR CONTINUATION SEE: M2-PM328-1 COMMERCE CRT 1 1 THUNDERBIRD CRES 9 9 BONNEVILLE PL 8 8 7 7 6 6 CARIBOO PL CARIBOO RD 5 5 BRIGHTON AVE 4 4 CARIBOO DR 3 3 2 2 1177+457 1177+4 1177+3 1177+2 1177+1 1177+ 1176+9 1176+8 1176+7 1176+6 1176+5 1176+4 1176+3 1176+2 1176+1 1176+ 1175+9 1175+872 PROFILE SCALE: HORIZONTAL 1:5,. VERTICAL 1:1,. DATA SOURCE: LIDAR PROVIDED BY MCELHANNEY, 212. = SIZE: 11 x 17 LEGEND TMEP KILOMETRE POST (1KM) PROPOSED TMEP EASEMENT PROPOSED TMEP LAND RIGHTS ACQUIRED THROUGH UTILITY CROSSING OR OTHER NON-EASEMENT AGREEMENT SCALE: 1:5, COORDINATE SYSTEM: NAD 1983 UTM ZONE 1N OTHER EXISTING EASEMENTS LAND PARCEL / BLOCK (NATIONAL TOPOGRAPHIC SYSTEM) NOTES 1. ALL DIMENSIONS ARE IN METRES UNLESS SHOWN OTHERWISE. 2. PARCEL BOUNDARIES ARE AS OF 217/3/1. 3. BOUNDARIES SHOWN IN THE BAND ACROSS THE TOP OF THE MAP ARE PROJECTIONS UPWARDS OF THE LOCATIONS WHERE THE PIPELINE CROSSES THE PARCEL BOUNDARIES. 4. UNIT CONVERSIONS: 1 HECTARE (ha) = 2.471 ACRES (Ac.). 1 METRE = 3.281 FEET (ft). 1 KILOMETRE (km) =.621 MILES (mi). THIS DOCUMENT WAS PREPARED BY UPI PROJECTS CANADA LTD. ON BEHALF OF TRANS MOUNTAIN PIPELINE ULC FOR THE REGULATORY REVIEW OF THE TRANS MOUNTAIN EXPANSION PROJECT (PURPOSE). THIS DOCUMENT IS OWNED BY TRANS MOUNTAIN PIPELINE ULC AND MAY BE REPRODUCED FOR THE INTENDED PURPOSE ONLY AND SHALL NOT BE UTILIZED FOR ANY OTHER PURPOSE WITHOUT THE PRIOR WRITTEN APPROVAL OF TRANS MOUNTAIN PIPELINE ULC. 1 2 METRES REV DESCRIPTION DATE DRN CKD APP ISSUED FOR INFORMATION 217/3/3 LPT KBW DMM TRANS MOUNTAIN EXPANSION PROJECT PLAN AND PROFILE OF TMEP EASEMENT 1175+872 TO 1177+457 92G2L & 92G7D DRAWING SHT. NO. M2-PM328 2 REV.

BOOK OF REFERENCE - TRANS MOUNTAIN EXPANSION PROJECT BURNABY SEGMENT 7.7 SHEET: 3 1177+457 TO 1178+784 PID OWNER(S) LANDOWNER/OCCUPANT OCCUPANT(S) PROPOSED NEW EASEMENT WIDTH LENGTH (ha) (Ac.) PC 7726 6-619-69 City of Burnaby Attention: Lou Pelletier, Director, Planning and Building 9.5-1 322.8.32.79 PC 8122 6-848-681 City of Burnaby Attention: Fernando Imola 1 36.4.36.89 PC 7751 6-848-63 Insurance Corporation of British Columbia Attention: Steve Harrington, Manager, Real Estate Investments 1 76.91.77.19 PC 7752 6-848-737 City of Burnaby Attention: Lou Pelletier, Director, Planning and Building 1 327.68.328.81 PC 7755 8-994-773 City of Burnaby Attention: Lou Pelletier, Director, Planning and Building 1 188.51.188.47 NOTES: 1. Easement lengths are the length of centre line at the easement location. Areas noted represent actual areas, not necessarily length times width. 2. Areas and lengths are calculated in UTM coordinates. 3. Owner/Occupant information is as of 217/3/1. 4. Unit Conversions: 1176668.136 1 Hectare (ha) = 2.471 Acres (Ac.). 1 Metre = 3.281 Feet (ft). 1 Kilometre (km) =.621 Miles (mi). DOCUMENT PAGE REV. DESCRIPTION DATE BY M2-PI328 3 ISSUED FOR INFORMATION 217/3/3 DWY

FOR CONTINUATION SEE: M2-PM328-4 GREATER VANCOUVER SEWERAGE AND DRAINAGE DISTRICT PLAN 52374 = 1179 PC 7755 PLAN 43746 BRITISH COLUMBIA HYDRO AND POWER AUTHORITY PLAN 12169 PLAN 3145 PLAN 2427 UNDERHILL AVE PC 7752 1m (New) Easement Detail 92G7D PC 7751 IMPERIAL OIL LIMITED PLAN 39486 IMPERIAL OIL LIMITED PLAN 2996 EASTLAKE DR UNKNOWN PLAN 73991 PLAN 7399 = PC 8122 1178 PRODUCTION WAY BAXTER PL PC 7726 GAGLARDI WAY PLAN 4523 PLAN 39987 PL NEPTUNE CRES MIRA ± CORON A DR CRT VEGA FOR CONTINUATION SEE: M2-PM328-2 THUNDERBIRD CRES 9.5m (New) CARIN A PL Easement Detail ENTERPRISE ST CITY OF BURNABY COMMERCE CRT BEAVERBROOK CRES 18 18 16 16 14 14 12 12 1 1 8 8 6 6 4 4 2 2 1178+784 1178+7 1178+6 1178+5 1178+4 1178+3 1178+2 1178+1 1178+ 1177+9 1177+8 1177+7 1177+6 1177+5 1177+457 PROFILE SCALE: HORIZONTAL 1:5,. VERTICAL 1:2,. DATA SOURCE: LIDAR PROVIDED BY AIRBORNE IMAGING, 212. = SIZE: 11 x 17 LEGEND TMEP KILOMETRE POST (1KM) PROPOSED TMEP EASEMENT PROPOSED TMEP LAND RIGHTS ACQUIRED THROUGH UTILITY CROSSING OR OTHER NON-EASEMENT AGREEMENT SCALE: 1:5, COORDINATE SYSTEM: NAD 1983 UTM ZONE 1N OTHER EXISTING EASEMENTS LAND PARCEL / BLOCK (NATIONAL TOPOGRAPHIC SYSTEM) NOTES 1. ALL DIMENSIONS ARE IN METRES UNLESS SHOWN OTHERWISE. 2. PARCEL BOUNDARIES ARE AS OF 217/3/1. 3. BOUNDARIES SHOWN IN THE BAND ACROSS THE TOP OF THE MAP ARE PROJECTIONS UPWARDS OF THE LOCATIONS WHERE THE PIPELINE CROSSES THE PARCEL BOUNDARIES. 4. UNIT CONVERSIONS: 1 HECTARE (ha) = 2.471 ACRES (Ac.). 1 METRE = 3.281 FEET (ft). 1 KILOMETRE (km) =.621 MILES (mi). THIS DOCUMENT WAS PREPARED BY UPI PROJECTS CANADA LTD. ON BEHALF OF TRANS MOUNTAIN PIPELINE ULC FOR THE REGULATORY REVIEW OF THE TRANS MOUNTAIN EXPANSION PROJECT (PURPOSE). THIS DOCUMENT IS OWNED BY TRANS MOUNTAIN PIPELINE ULC AND MAY BE REPRODUCED FOR THE INTENDED PURPOSE ONLY AND SHALL NOT BE UTILIZED FOR ANY OTHER PURPOSE WITHOUT THE PRIOR WRITTEN APPROVAL OF TRANS MOUNTAIN PIPELINE ULC. 1 2 METRES REV DESCRIPTION DATE DRN CKD APP ISSUED FOR INFORMATION 217/3/3 LPT KBW DMM TRANS MOUNTAIN EXPANSION PROJECT PLAN AND PROFILE OF TMEP EASEMENT 1177+457 TO 1178+784 92G7D DRAWING SHT. NO. M2-PM328 3 REV.

BOOK OF REFERENCE - TRANS MOUNTAIN EXPANSION PROJECT BURNABY SEGMENT 7.7 SHEET: 4 1178+784 TO 118+61 PID OWNER(S) LANDOWNER/OCCUPANT OCCUPANT(S) PROPOSED NEW EASEMENT WIDTH LENGTH (ha) (Ac.) PC 7754 6-554-75 Underhill Lands Ltd. Attention: Craig Fabische Business Unknown 1 171.2.17.42 PC 7761 24-378-429 Shell Canada Limited Attention: Todd McMahon 1 24.37.24.6 PC 7762 24-378-364 Shell Canada Limited Attention: Todd McMahon 1 14.2.14.35 PC 7763 3-77-446 Shell Canada Limited Attention: Todd McMahon 1 568.4.568 1.4 1 3-296-661 Trans Mountain Pipeline ULC Attention: Bob Love... NOTES: 1. Easement lengths are the length of centre line at the easement location. Areas noted represent actual areas, not necessarily length times width. 2. Areas and lengths are calculated in UTM coordinates. 3. Owner/Occupant information is as of 217/3/1. 4. Unit Conversions: 1178595.3172 1 Hectare (ha) = 2.471 Acres (Ac.). 1 Metre = 3.281 Feet (ft). 1 Kilometre (km) =.621 Miles (mi). DOCUMENT PAGE REV. DESCRIPTION DATE BY M2-PI328 4 ISSUED FOR INFORMATION 217/3/3 DWY

1 FOR CONTINUATION SEE: M2-PM328-5 PC 7763 PC 7762 PC 7761 PC 7754 BURNABY TERMINAL PLAN 22913 PLAN 13424 = 118.1 SHELLMONT ST SHELL CANADA LIMITED PLAN 28915 PLAN 1521 MEADOWOOD PK PLAN 24155 DISTRICT OF BURNABY PLAN 63856 92G7D UNDERHILL AVE WOODHURST DR PLAN 6363 BROADWAY BRITISH COLUMBIA HYDRO AND POWER AUTHORITY PLAN 12169 = 1179 PLAN 3145 PLAN 43746 PLAN 2427 GREATER VANCOUVER SEWERAGE AND DRAINAGE DISTRICT PLAN 52374 BRITISH COLUMBIA HYDRO AND POWER AUTHORITY PLAN 2167 ENTERPRISE ST TURNING LANE ± LOUGHEED HWY FOR CONTINUATION SEE: M2-PM328-3 PLAN 13989 MEADOWOOD DR WINDWOOD PL 1m (New) Easement Detail KNI GHTSWOOD PL CITY OF BURNABY EXPRESS ST 14 14 13 13 12 12 11 11 1 1 9 9 8 8 7 7 6 6 118+61 118+ 1179+9 1179+8 1179+7 1179+6 1179+5 1179+4 1179+3 1179+2 1179+1 1179+ 1178+9 1178+8 1178+784 PROFILE SCALE: HORIZONTAL 1:5,. VERTICAL 1:1,. DATA SOURCE: LIDAR PROVIDED BY MCELHANNEY, 212. = SIZE: 11 x 17 LEGEND TMEP KILOMETRE POST (1KM) PROPOSED TMEP EASEMENT PROPOSED TMEP LAND RIGHTS ACQUIRED THROUGH UTILITY CROSSING OR OTHER NON-EASEMENT AGREEMENT SCALE: 1:5, COORDINATE SYSTEM: NAD 1983 UTM ZONE 1N OTHER EXISTING EASEMENTS LAND PARCEL / BLOCK (NATIONAL TOPOGRAPHIC SYSTEM) NOTES 1. ALL DIMENSIONS ARE IN METRES UNLESS SHOWN OTHERWISE. 2. PARCEL BOUNDARIES ARE AS OF 217/3/1. 3. BOUNDARIES SHOWN IN THE BAND ACROSS THE TOP OF THE MAP ARE PROJECTIONS UPWARDS OF THE LOCATIONS WHERE THE PIPELINE CROSSES THE PARCEL BOUNDARIES. 4. UNIT CONVERSIONS: 1 HECTARE (ha) = 2.471 ACRES (Ac.). 1 METRE = 3.281 FEET (ft). 1 KILOMETRE (km) =.621 MILES (mi). THIS DOCUMENT WAS PREPARED BY UPI PROJECTS CANADA LTD. ON BEHALF OF TRANS MOUNTAIN PIPELINE ULC FOR THE REGULATORY REVIEW OF THE TRANS MOUNTAIN EXPANSION PROJECT (PURPOSE). THIS DOCUMENT IS OWNED BY TRANS MOUNTAIN PIPELINE ULC AND MAY BE REPRODUCED FOR THE INTENDED PURPOSE ONLY AND SHALL NOT BE UTILIZED FOR ANY OTHER PURPOSE WITHOUT THE PRIOR WRITTEN APPROVAL OF TRANS MOUNTAIN PIPELINE ULC. 1 2 METRES REV DESCRIPTION DATE DRN CKD APP ISSUED FOR INFORMATION 217/3/3 LPT KBW DMM TRANS MOUNTAIN EXPANSION PROJECT PLAN AND PROFILE OF TMEP EASEMENT 1178+784 TO 118+61 92G7D DRAWING SHT. NO. M2-PM328 4 REV.

BOOK OF REFERENCE - TRANS MOUNTAIN EXPANSION PROJECT BURNABY SEGMENT 7.7 SHEET: 5 + TO +85 PID OWNER(S) LANDOWNER/OCCUPANT OCCUPANT(S) PROPOSED NEW EASEMENT WIDTH LENGTH (ha) (Ac.) 1 3-296-661 Trans Mountain Pipeline ULC Attention: Bob Love... NOTES: 1. Easement lengths are the length of centre line at the easement location. Areas noted represent actual areas, not necessarily length times width. 2. Areas and lengths are calculated in UTM coordinates. 3. Owner/Occupant information is as of 217/3/1. 4. Unit Conversions: 1179834.7746 1 Hectare (ha) = 2.471 Acres (Ac.). 1 Metre = 3.281 Feet (ft). 1 Kilometre (km) =.621 Miles (mi). DOCUMENT PAGE REV. DESCRIPTION DATE BY M2-PI328 5 ISSUED FOR INFORMATION 217/3/3 DWY

BURNABY MOUNTAIN PKY FOR CONTINUATION SEE: M2-PM328-6 1 AUBREY ST 92G7D BURNABY TERMINAL PLAN 22913 PLAN 13424 SHELL CANADA LIMITED PLAN 28915 = = 118 ± FOR CONTINUATION SEE: M2-PM328-4 SHELLMONT ST CITY OF BURNABY PINEHURST DR 2 2 MEADOWOOD PK 19 19 18 18 17 17 16 16 15 15 WYNBROOK PL MEADOWOOD DR 14 14 13 13 12 12 +85 +8 +7 +6 +5 +4 +3 +2 +1 + PROFILE SCALE: HORIZONTAL 1:2,5. VERTICAL 1:1,. DATA SOURCE: LIDAR PROVIDED BY MCELHANNEY, 212. = SIZE: 11 x 17 LEGEND TMEP KILOMETRE POST (1KM) PROPOSED TMEP EASEMENT PROPOSED TMEP LAND RIGHTS ACQUIRED THROUGH UTILITY CROSSING OR OTHER NON-EASEMENT AGREEMENT SCALE: 1:2,5 COORDINATE SYSTEM: NAD 1983 UTM ZONE 1N OTHER EXISTING EASEMENTS LAND PARCEL / BLOCK (NATIONAL TOPOGRAPHIC SYSTEM) NOTES 1. ALL DIMENSIONS ARE IN METRES UNLESS SHOWN OTHERWISE. 2. PARCEL BOUNDARIES ARE AS OF 217/3/1. 3. BOUNDARIES SHOWN IN THE BAND ACROSS THE TOP OF THE MAP ARE PROJECTIONS UPWARDS OF THE LOCATIONS WHERE THE PIPELINE CROSSES THE PARCEL BOUNDARIES. 4. UNIT CONVERSIONS: 1 HECTARE (ha) = 2.471 ACRES (Ac.). 1 METRE = 3.281 FEET (ft). 1 KILOMETRE (km) =.621 MILES (mi). THIS DOCUMENT WAS PREPARED BY UPI PROJECTS CANADA LTD. ON BEHALF OF TRANS MOUNTAIN PIPELINE ULC FOR THE REGULATORY REVIEW OF THE TRANS MOUNTAIN EXPANSION PROJECT (PURPOSE). THIS DOCUMENT IS OWNED BY TRANS MOUNTAIN PIPELINE ULC AND MAY BE REPRODUCED FOR THE INTENDED PURPOSE ONLY AND SHALL NOT BE UTILIZED FOR ANY OTHER PURPOSE WITHOUT THE PRIOR WRITTEN APPROVAL OF TRANS MOUNTAIN PIPELINE ULC. 2 4 6 8 1 METRES REV DESCRIPTION DATE DRN CKD APP ISSUED FOR INFORMATION 217/3/3 LPT KBW DMM TRANS MOUNTAIN EXPANSION PROJECT PLAN AND PROFILE OF TMEP EASEMENT + TO +85 92G7D DRAWING SHT. NO. M2-PM328 5 REV.

BOOK OF REFERENCE - TRANS MOUNTAIN EXPANSION PROJECT BURNABY SEGMENT 7.7 SHEET: 6 +85 TO 1+663 PID OWNER(S) LANDOWNER/OCCUPANT OCCUPANT(S) PROPOSED NEW EASEMENT WIDTH LENGTH (ha) (Ac.) PC 7887 3-211-649 City of Burnaby Attention: Lou Pelletier, Director, Planning and Building 1 84.91.84.21 PC 7888 23-189-45 City of Burnaby Attention: Lou Pelletier, Director, Planning and Building 1 61.27.6.15 PC 789.1 12-753-611 Corporation of the District of Burnaby Attention: Lou Pelletier, Director, Planning and Building 1 26.78.25.6 PC 789.2 12-8-848 Corporation of the District of Burnaby Attention: Lou Pelletier, Director, Planning and Building 1 3.47.5.1 PC 789.9 12-766-917 Corporation of the District of Burnaby Attention: Lou Pelletier, Director, Planning and Building 1 5.39.1. PC 789.11 12-8-643 Corporation of the District of Burnaby Attention: Lou Pelletier, Director, Planning and Building 1 8.87.4.1 PC 789.12 12-8-694 Corporation of the District of Burnaby Attention: Lou Pelletier, Director, Planning and Building 1 1.85.8.2 PC 789.13 12-759-767 Corporation of the District of Burnaby Attention: Lou Pelletier, Director, Planning and Building 1 1.85.11.3 PC 789.14 12-766-992 Corporation of the District of Burnaby Attention: Lou Pelletier, Director, Planning and Building 1 21.7.22.5 PC 789.15 12-8-724 Corporation of the District of Burnaby Attention: Lou Pelletier, Director, Planning and Building 1 21.7.22.5 PC 789.16 12-767-26 Corporation of the District of Burnaby Attention: Lou Pelletier, Director, Planning and Building 1 21.7.21.5 PC 789.17 12-787-68 Corporation of the District of Burnaby Attention: Lou Pelletier, Director, Planning and Building 1 7.19.8.2 PC 7891 23-188-84 City of Burnaby Attention: Lou Pelletier, Director, Planning and Building 1 396.47.396.98 NOTES: 1. Easement lengths are the length of centre line at the easement location. Areas noted represent actual areas, not necessarily length times width. 2. Areas and lengths are calculated in UTM coordinates. 3. Owner/Occupant information is as of 217/3/1. 4. Unit Conversions: 1 Hectare (ha) = 2.471 Acres (Ac.). 1 Metre = 3.281 Feet (ft). 1 Kilometre (km) =.621 Miles (mi). DOCUMENT PAGE REV. DESCRIPTION DATE BY M2-PI328 6 ISSUED FOR INFORMATION 217/3/3 DWY

PC 789.9 PC 7891 PC 789.17 PC 789.16 PC 789.15 PC 789.14 PC 789.13 PC 789.12 PC 789.11 PC 789.2 PC 789.1 PC 7888 FOR CONTINUATION SEE: M2-PM328-7 PC 7887 CENTENNIAL WAY 92G7D = 1 BURNABY MOUNTAIN PKY AUBREY ST ± FOR CONTINUATION SEE: M2-PM328-5 1m (New) Easement Detail CITY OF BURNABY 25 25 24 24 23 23 22 22 21 21 2 2 19 19 18 18 17 17 1+663 1+6 1+5 1+4 1+3 1+2 1+1 1+ +9 +85 PROFILE SCALE: HORIZONTAL 1:2,5. VERTICAL 1:1,. DATA SOURCE: LIDAR PROVIDED BY MCELHANNEY, 212. = SIZE: 11 x 17 LEGEND TMEP KILOMETRE POST (1KM) PROPOSED TMEP EASEMENT PROPOSED TMEP LAND RIGHTS ACQUIRED THROUGH UTILITY CROSSING OR OTHER NON-EASEMENT AGREEMENT SCALE: 1:2,5 COORDINATE SYSTEM: NAD 1983 UTM ZONE 1N OTHER EXISTING EASEMENTS LAND PARCEL / BLOCK (NATIONAL TOPOGRAPHIC SYSTEM) NOTES 1. ALL DIMENSIONS ARE IN METRES UNLESS SHOWN OTHERWISE. 2. PARCEL BOUNDARIES ARE AS OF 217/3/1. 3. BOUNDARIES SHOWN IN THE BAND ACROSS THE TOP OF THE MAP ARE PROJECTIONS UPWARDS OF THE LOCATIONS WHERE THE PIPELINE CROSSES THE PARCEL BOUNDARIES. 4. UNIT CONVERSIONS: 1 HECTARE (ha) = 2.471 ACRES (Ac.). 1 METRE = 3.281 FEET (ft). 1 KILOMETRE (km) =.621 MILES (mi). THIS DOCUMENT WAS PREPARED BY UPI PROJECTS CANADA LTD. ON BEHALF OF TRANS MOUNTAIN PIPELINE ULC FOR THE REGULATORY REVIEW OF THE TRANS MOUNTAIN EXPANSION PROJECT (PURPOSE). THIS DOCUMENT IS OWNED BY TRANS MOUNTAIN PIPELINE ULC AND MAY BE REPRODUCED FOR THE INTENDED PURPOSE ONLY AND SHALL NOT BE UTILIZED FOR ANY OTHER PURPOSE WITHOUT THE PRIOR WRITTEN APPROVAL OF TRANS MOUNTAIN PIPELINE ULC. 2 4 6 8 1 METRES REV DESCRIPTION DATE DRN CKD APP ISSUED FOR INFORMATION 217/3/3 LPT KBW DMM TRANS MOUNTAIN EXPANSION PROJECT PLAN AND PROFILE OF TMEP EASEMENT +85 TO 1+663 92G7D DRAWING SHT. NO. M2-PM328 6 REV.

BOOK OF REFERENCE - TRANS MOUNTAIN EXPANSION PROJECT BURNABY SEGMENT 7.7 SHEET: 7 1+663 TO 1+925 PID OWNER(S) LANDOWNER/OCCUPANT OCCUPANT(S) PROPOSED NEW EASEMENT WIDTH LENGTH (ha) (Ac.) PC 7891.31 12-783-544 Corporation of the District of Burnaby Attention: Lou Pelletier, Director, Planning and Building 1 6.2.1. PC 7891.28 12-796-875 Corporation of the District of Burnaby Attention: Lou Pelletier, Director, Planning and Building 1 4.1.38.9 PC 7891.32 12-759-911 Corporation of the District of Burnaby Attention: Lou Pelletier, Director, Planning and Building 1 9.9.3.1 PC 7891.4 12-783-595 Corporation of the District of Burnaby Attention: Lou Pelletier, Director, Planning and Building 1 2.43 <.1 <.1 PC 7891.35 12-782-874 Corporation of the District of Burnaby Attention: Lou Pelletier, Director, Planning and Building 1 3.2 <.1 <.1 PC 7891.36 12-782-777 Corporation of the District of Burnaby Attention: Lou Pelletier, Director, Planning and Building 1 9.54.4.1 PC 7891.37 12-751-294 Corporation of the District of Burnaby Attention: Lou Pelletier, Director, Planning and Building 1 1.82.8.2 PC 7891.38 12-782-718 Corporation of the District of Burnaby Attention: Lou Pelletier, Director, Planning and Building 1 21.65.22.5 PC 7891.39 12-782-67 Corporation of the District of Burnaby Attention: Lou Pelletier, Director, Planning and Building 1 21.65.22.5 PC 7891.41 12-782-611 Corporation of the District of Burnaby Attention: Lou Pelletier, Director, Planning and Building 1 21.65.22.5 PC 7891.411 12-789-496 Corporation of the District of Burnaby Attention: Lou Pelletier, Director, Planning and Building 1 1.82.1.3 PC 7891.412 12-796-859 Corporation of the District of Burnaby Attention: Lou Pelletier, Director, Planning and Building 1 8.33.7.2 PC 7891.413 12-796-794 Corporation of the District of Burnaby Attention: Lou Pelletier, Director, Planning and Building 1 8.23.2.1 NOTES: 1. Easement lengths are the length of centre line at the easement location. Areas noted represent actual areas, not necessarily length times width. 2. Areas and lengths are calculated in UTM coordinates. 3. Owner/Occupant information is as of 217/3/1. 4. Unit Conversions: 1266.961 1 Hectare (ha) = 2.471 Acres (Ac.). 1 Metre = 3.281 Feet (ft). 1 Kilometre (km) =.621 Miles (mi). DOCUMENT PAGE REV. DESCRIPTION DATE BY M2-PI328 ISSUED FOR INFORMATION 217/3/3 DWY

BOOK OF REFERENCE - TRANS MOUNTAIN EXPANSION PROJECT BURNABY SEGMENT 7.7 SHEET: 7 1+663 TO 1+925 PID OWNER(S) LANDOWNER/OCCUPANT OCCUPANT(S) PROPOSED NEW EASEMENT WIDTH LENGTH (ha) (Ac.) PC 7891.51 12-789-461 Corporation of the District of Burnaby Attention: Lou Pelletier, Director, Planning and Building 1.6 <.1 <.1 PC 7891.52 12-782-483 Corporation of the District of Burnaby Attention: Lou Pelletier, Director, Planning and Building 1 11.89.4.1 PC 7891.53 12-796-727 Corporation of the District of Burnaby Attention: Lou Pelletier, Director, Planning and Building 1 13.78.1.3 NOTES: 1. Easement lengths are the length of centre line at the easement location. Areas noted represent actual areas, not necessarily length times width. 2. Areas and lengths are calculated in UTM coordinates. 3. Owner/Occupant information is as of 217/3/1. 4. Unit Conversions: 1888.198 1 Hectare (ha) = 2.471 Acres (Ac.). 1 Metre = 3.281 Feet (ft). 1 Kilometre (km) =.621 Miles (mi). DOCUMENT PAGE REV. DESCRIPTION DATE BY M2-PI328 ISSUED FOR INFORMATION 217/3/3 DWY

PC 7891.28 PC 7891.31 PC 7891.32 PC 7891.36 PC 7891.37 PC 7891.38 PC 7891.35 PC 7891.4 PC 7891.39 PC 7891.41 PC 7891.411 PC 7891.412 PC 7891.52 PC 7891.53 PC 7891.413 PC 7891.51 WA Y FOR CONTINUATION SEE: M2-PM328-6 FOR CONTINUATION SEE: M2-PM328-8 1m (New) ± CE NT EN NIA L Easement Detail = 7D 2 92 G CITY OF BURNABY 27 26 26 25 25 24 24 23 23 22 22 21 21 1+663 27 1+7 28 1+8 28 1+9 29 1+925 29 PROFILE SCALE: HORIZONTAL 1:2,5. VERTICAL 1:1,. DATA SOURCE: LIDAR PROVIDED BY MCELHANNEY, 212. NOTES 1. ALL DIMENSIONS ARE IN METRES UNLESS SHOWN OTHERWISE. LEGEND = OTHER EXISTING EASEMENTS TMEP KILOMETRE POST (1KM) 2. PARCEL BOUNDARIES ARE AS OF 217/3/1. LAND PARCEL / PROPOSED TMEP EASEMENT SIZE: 11 x 17 SCALE: 1:2,5 COORDINATE SYSTEM: NAD 1983 UTM ZONE 1N PROPOSED TMEP LAND RIGHTS ACQUIRED THROUGH UTILITY CROSSING OR OTHER NON-EASEMENT AGREEMENT BLOCK (NATIONAL TOPOGRAPHIC SYSTEM) 3. BOUNDARIES SHOWN IN THE BAND ACROSS THE TOP OF THE MAP ARE PROJECTIONS UPWARDS OF THE LOCATIONS WHERE THE PIPELINE CROSSES THE PARCEL BOUNDARIES. 4. UNIT CONVERSIONS: 1 HECTARE (ha) = 2.471 ACRES (Ac.). 1 METRE = 3.281 FEET (ft). 1 KILOMETRE (km) =.621 MILES (mi). THIS DOCUMENT WAS PREPARED BY UPI PROJECTS CANADA LTD. ON BEHALF OF TRANS MOUNTAIN PIPELINE ULC FOR THE REGULATORY REVIEW OF THE TRANS MOUNTAIN EXPANSION PROJECT (PURPOSE). THIS DOCUMENT IS OWNED BY TRANS MOUNTAIN PIPELINE ULC AND MAY BE REPRODUCED FOR THE INTENDED PURPOSE ONLY AND SHALL NOT BE UTILIZED FOR ANY OTHER PURPOSE WITHOUT THE PRIOR WRITTEN APPROVAL OF TRANS MOUNTAIN PIPELINE ULC. REV 2 4 DESCRIPTION 6 8 1 METRES DATE DRN CKD APP TRANS MOUNTAIN EXPANSION PROJECT PLAN AND PROFILE OF TMEP EASEMENT 1+663 TO 1+925 92G7D ISSUED FOR INFORMATION 217/3/3 LPT KBW DMM DRAWING SHT. NO. REV. M2-PM328 7

BOOK OF REFERENCE - TRANS MOUNTAIN EXPANSION PROJECT BURNABY SEGMENT 7.7 SHEET: 8 1+925 TO 2+648 PID OWNER(S) LANDOWNER/OCCUPANT OCCUPANT(S) PROPOSED NEW EASEMENT WIDTH LENGTH (ha) (Ac.) PC 8193 24-775-436 City of Burnaby Attention: Fernando Imola 1 722.58.723 1.79 NOTES: 1. Easement lengths are the length of centre line at the easement location. Areas noted represent actual areas, not necessarily length times width. 2. Areas and lengths are calculated in UTM coordinates. 3. Owner/Occupant information is as of 217/3/1. 4. Unit Conversions: 19.6885 1 Hectare (ha) = 2.471 Acres (Ac.). 1 Metre = 3.281 Feet (ft). 1 Kilometre (km) =.621 Miles (mi). DOCUMENT PAGE REV. DESCRIPTION DATE BY M2-PI328 ISSUED FOR INFORMATION 217/3/3 DWY

PC 8193 ± 1m (New) FOR CONTINUATION SEE: M2-PM328-9 BARNET HWY Easement Detail = 2 92G7D FOR CONTINUATION SEE: M2-PM328-7 INLET DR CITY OF BURNABY 22 22 2 2 18 18 16 16 14 14 12 12 1 1 8 8 6 6 2+648 2+6 2+5 2+4 2+3 2+2 2+1 2+ 1+925 PROFILE SCALE: HORIZONTAL 1:2,5. VERTICAL 1:2,. DATA SOURCE: LIDAR PROVIDED BY MCELHANNEY, 212. = SIZE: 11 x 17 LEGEND TMEP KILOMETRE POST (1KM) PROPOSED TMEP EASEMENT PROPOSED TMEP LAND RIGHTS ACQUIRED THROUGH UTILITY CROSSING OR OTHER NON-EASEMENT AGREEMENT SCALE: 1:2,5 COORDINATE SYSTEM: NAD 1983 UTM ZONE 1N OTHER EXISTING EASEMENTS LAND PARCEL / BLOCK (NATIONAL TOPOGRAPHIC SYSTEM) NOTES 1. ALL DIMENSIONS ARE IN METRES UNLESS SHOWN OTHERWISE. 2. PARCEL BOUNDARIES ARE AS OF 217/3/1. 3. BOUNDARIES SHOWN IN THE BAND ACROSS THE TOP OF THE MAP ARE PROJECTIONS UPWARDS OF THE LOCATIONS WHERE THE PIPELINE CROSSES THE PARCEL BOUNDARIES. 4. UNIT CONVERSIONS: 1 HECTARE (ha) = 2.471 ACRES (Ac.). 1 METRE = 3.281 FEET (ft). 1 KILOMETRE (km) =.621 MILES (mi). THIS DOCUMENT WAS PREPARED BY UPI PROJECTS CANADA LTD. ON BEHALF OF TRANS MOUNTAIN PIPELINE ULC FOR THE REGULATORY REVIEW OF THE TRANS MOUNTAIN EXPANSION PROJECT (PURPOSE). THIS DOCUMENT IS OWNED BY TRANS MOUNTAIN PIPELINE ULC AND MAY BE REPRODUCED FOR THE INTENDED PURPOSE ONLY AND SHALL NOT BE UTILIZED FOR ANY OTHER PURPOSE WITHOUT THE PRIOR WRITTEN APPROVAL OF TRANS MOUNTAIN PIPELINE ULC. 2 4 6 8 1 METRES REV DESCRIPTION DATE DRN CKD APP ISSUED FOR INFORMATION 217/3/3 LPT KBW DMM TRANS MOUNTAIN EXPANSION PROJECT PLAN AND PROFILE OF TMEP EASEMENT 1+925 TO 2+648 92G7D DRAWING SHT. NO. M2-PM328 8 REV.

BOOK OF REFERENCE - TRANS MOUNTAIN EXPANSION PROJECT BURNABY SEGMENT 7.7 SHEET: 9 2+648 TO 3+396 PID OWNER(S) LANDOWNER/OCCUPANT OCCUPANT(S) PROPOSED NEW EASEMENT WIDTH LENGTH (ha) (Ac.) PC 8196 17-847-745 The Corporation of the District of Burnaby Attention: Fernando Imola 1 8.74.11.3 PC 8195 1-844-848 The Corporation of the District of Burnaby Attention: Fernando Imola 1 12.36.14.26 PC 798 24-378-437 Corporation of the District of Burnaby Attention: Lou Pelletier, Director, Planning and Building 1 158.58.159.39 5 8-448-922 Trans Mountain Pipeline ULC Attention: Bob Love... NOTES: 1. Easement lengths are the length of centre line at the easement location. Areas noted represent actual areas, not necessarily length times width. 2. Areas and lengths are calculated in UTM coordinates. 3. Owner/Occupant information is as of 217/3/1. 4. Unit Conversions: 1925.82 1 Hectare (ha) = 2.471 Acres (Ac.). 1 Metre = 3.281 Feet (ft). 1 Kilometre (km) =.621 Miles (mi). DOCUMENT PAGE REV. DESCRIPTION DATE BY M2-PI328 ISSUED FOR INFORMATION 217/3/3 DWY

5 PC 798 PC 8195 PC 8196 ± FOR CONTINUATION SEE: = 3 INLET DR BARNET HWY FOR CONTINUATION SEE: M2-PM328-8 92G7D BARNET RD 1m (New) Easement Detail CITY OF BURNABY B 1 1 9 9 8 8 7 7 6 6 5 5 4 4 3 3 2 2 3+396 3+3 3+2 3+1 3+ 2+9 2+8 2+7 2+648 PROFILE SCALE: HORIZONTAL 1:2,5. VERTICAL 1:1,. DATA SOURCE: LIDAR PROVIDED BY MCELHANNEY, 212. = SIZE: 11 x 17 LEGEND TMEP KILOMETRE POST (1KM) PROPOSED TMEP EASEMENT PROPOSED TMEP LAND RIGHTS ACQUIRED THROUGH UTILITY CROSSING OR OTHER NON-EASEMENT AGREEMENT SCALE: 1:2,5 COORDINATE SYSTEM: NAD 1983 UTM ZONE 1N OTHER EXISTING EASEMENTS LAND PARCEL / BLOCK (NATIONAL TOPOGRAPHIC SYSTEM) NOTES 1. ALL DIMENSIONS ARE IN METRES UNLESS SHOWN OTHERWISE. 2. PARCEL BOUNDARIES ARE AS OF 217/3/1. 3. BOUNDARIES SHOWN IN THE BAND ACROSS THE TOP OF THE MAP ARE PROJECTIONS UPWARDS OF THE LOCATIONS WHERE THE PIPELINE CROSSES THE PARCEL BOUNDARIES. 4. UNIT CONVERSIONS: 1 HECTARE (ha) = 2.471 ACRES (Ac.). 1 METRE = 3.281 FEET (ft). 1 KILOMETRE (km) =.621 MILES (mi). THIS DOCUMENT WAS PREPARED BY UPI PROJECTS CANADA LTD. ON BEHALF OF TRANS MOUNTAIN PIPELINE ULC FOR THE REGULATORY REVIEW OF THE TRANS MOUNTAIN EXPANSION PROJECT (PURPOSE). THIS DOCUMENT IS OWNED BY TRANS MOUNTAIN PIPELINE ULC AND MAY BE REPRODUCED FOR THE INTENDED PURPOSE ONLY AND SHALL NOT BE UTILIZED FOR ANY OTHER PURPOSE WITHOUT THE PRIOR WRITTEN APPROVAL OF TRANS MOUNTAIN PIPELINE ULC. 2 4 6 8 1 METRES REV DESCRIPTION DATE DRN CKD APP ISSUED FOR INFORMATION 217/3/3 LPT KBW DMM TRANS MOUNTAIN EXPANSION PROJECT PLAN AND PROFILE OF TMEP EASEMENT 2+648 TO 3+396 92G7D DRAWING SHT. NO. M2-PM328 9 REV.