The redevelopment began in March 2016 and is slated to complete in phases from

Similar documents
The redevelopment began in March 2016 and is slated to complete in phases from

A complete renovation of the 5-story, 75,000 sf building. Internal demolition began in summer 2017.

A complete renovation of the 5-story, 75,000 sf building. Internal demolition began in summer 2017 with a targeted completion in 2019.

A complete renovation of the 5-story, 75,000 sf building. Internal demolition began in summer 2017 with a targeted completion in 2019.

A complete renovation and modernization of the 5-story, 75,000 sf building.

Ariel Property Advisors Presents. The Revitalization of the

PRE-DESIGN STUDY 2401 COLE PLACE. Mixed Use Development. 10 Attached Residential Units Parking Garage. and Retail Space

Midtown Detroit, Inc. Efforts in the North & South Cass Neighborhoods (updated February 2016)

PRE-DESIGN STUDY 6/26/ COLE PLACE ARSHIA ARCHITECTS 550 N LARCHMONT BLVD #100 LOS ANGELES, CA

Studio $3875 $3875 $7, bedroom single $4125 $4125 $ bedroom double $3200 $3200 $6400

DRAFT 1. GENERAL INFORMATION 2. APPLICATION INSTRUCTIONS

VISION PARK 128 VISION PARK DR. SHENANDOAH, TX

MICRO LIVING: DESIGN CONSIDERATIONS FOR SMALL SPACES

AGBH, 1 Lochside View Space planning & Atrium options

Site Modification Process for Alcova Reservoir and Pathfinder Reservoir, Natrona County, Wyoming Leaseholders Revised October 6, 2016

VeloCity An Active Community. History

DRAFT For Discussion Only

US Route 15 & Monocacy Boulevard Northeast Bypass Interchange

Downtown J Street Apartments

1309 N J St Apartments

1309 N J St Apartments

404 South M Street. 2 Units at 404 South M Street, Lake Worth FL, Martin Goldstein Russell Goldstein

Board of Regents Meeting November 30-December 1, 2006 Agenda Item #32 Arizona State University EXECTIVE SUMMARY Page 1 of 8

MOTION NO. M Beacon Hill Station TOD Property Final Transaction Agreements PROPOSED ACTION

Orion Park, Northfield Avenue, Northfields, Ealing, London W13 9SJ

HAMILTON STREET CORRIDOR

MEMORANDUM. To meet the goal established in the Amendment to the Resolution to provide 10% workforce housing, we offer the following:

City of Richmond Rent Control and Just Cause for Eviction. Fact Sheet

Beecher Neighborhood Stabilization Plan

Approval to Sell Property at Glenmont Station to Montgomery County

ACCESSORY DWELLING UNIT ORDINANCE

DES PLAINES ZONING BOARD MEETING SEPTEMBER 29, 2015 MINUTES

YEAR IN REVIEW High Street Boston, MA

RESIDENTIAL BUILDING PERMIT REQUIREMENTS

REQUEST FOR PROPOSALS

HISTORIC PRESERVATION FINANCIAL INCENTIVES

MacroHomes Design Competition - Call for Submissions. Prize: $10,000 & potential collaboration on a large scale multifamily project

I n v. e s t m e n t. i l d i n g. 3 - B u. Downtown Mixed-Use. o i. S a l. e P

PROPOSAL Architectural Services

Access Statement for Bovey Castle

Keystone Preservation Group

Sea House Apartments 601 S Ocean Drive, Hutchinson Island, FL. Martin Goldstein Russell Goldstein

Procedure for an Permit Application For a Park Model Home or Mobile Home

HISTORIC PRESERVATION FINANCIAL INCENTIVES

TOWN OF BASHAW. Bylaw A bylaw to regulate the development and use of land and buildings

Reclaimed Land A guide for developers applying for an interest in reclaimed land under the Marine and Coastal Area Act 2011

Myra / Manzanita Neighborhood Coalition 939 Manzanita Street Los Angeles, California

FY18 DCS Grant Round Announced

APPLICATION. Fee Simple Subdivision Bare Land Strata Conversion of Existing Building into Strata Units

Greenlane Staff Residence Information o

94 Crescent Road Townhouse 7

Habitat for Humanity Greater San Francisco Application Meeting: 1009 Mission Street, San Francisco

Single Drawer Accountability (SDA) (NON POS) R2 and R4 Hour Offices Conversion Guide Instructions

COUNTY OF SANTA BARBARA

27 THURLOE SQUARE KNIGHTSBRIDGE

< UJ. strong and welcome statement of federal pur pose in a place that will always figure in our

Strategic Planning for RAD Conversions. Thursday, April 6, 2017

SAMPLE SELLER PROPERTY QUESTIONNAIRE ADDENDUM

DDD Commission Meeting September 13, 2016, 8:00 a.m. St. James Episcopal, Parish Hall, 208 N. Fourth Street

TO LET. Town Centre Retail Premises. Shop Unit 10, Manchester Chambers, Oldham OL1 1LF.

SITE 03 SITE 04 SITE 02 SITE 01. City U Bentonville, Arkansas 9.08 ACRES TOTAL PROJECT MULTIFAMILY (42 UNITS/ACRE) PRD SITE ACRES MULTIFAMILY

407 Walmer Road PH me: See my website:

VILLAGE OF STURTEVANT TH STREET STURTEVANT, WI 'OWNER: LOCATION ADDRESS: 'OWNER'S PHONE CONTRACTOR CONTRACTOR ADDRESS: CONTRACTOR PHONE:

Contents. 15 Stout Street, Wellington 6011 w: Tel: PO Box 1473, Wellington 6140, New Zealand

MAP REFERENCE HANDBOOK

CITY OF NANAI MO BYLAW NO A BYLAW TO AMEND THE CITY OF NANAIMO "ZONING BYLAW 2011 NO. 4500"

MULBERRY APARTMENTS 16-UNITS

City of Surrey PLANNING & DEVELOPMENT REPORT File:

DES PLAINES PLAN COMMISSION MEETING AUGUST 31, 2015 MINUTES PLAN COMMISSION

Welcome to Riverfront Residence Hall!

Palmaire 12-Units 7602/7606 W Palmaire Ave. Glendale, AZ 85303

TO LET. Town Centre Offices Flexible Terms. First & Second Floor Offices, Manchester Chambers, Oldham OL1 1LF.

HINDU AMERICAN RELIGIOUS INSTITUTE 301 Steigerwalt Hollow Road, New Cumberland PA (717)

DEVERON APARTMENTS N. 45 th Place Phoenix, AZ PRICE: $1,890,000 COVERED RESERVED PARKING CENTRAL ARCADIA LOCATION

2018 Awards of Excellence

University of Colorado Design Review Board Meeting Notes

STAFF REPORT - SUMMATION. South Park Estates 9 th Filing Final Plat Process. CASE NUMBER(s): UDC SUBDIVISION CODE: SPKE 09

How to Make Auctions of Public Land

Staff Initiated Discretionary Review Full Analysis HEARING DATE NOVEMBER 29TH, 2012

FACT SHEET # 32 EVICTION. Introduction

Introduction. Student Comments. Welcome to Sedley Court. High quality student accommodation

Residence Hall Room Lease & Board Contract,

Culture Development Advisory Committee Minutes

48,72;9,3$1$0(5,&$1$5&+,7(&785(%,(11$/( %$4 ³)((//$7,1$0(5,&$1$5&+,7(&785( WR1RYHPEHURI

CITY COUNCIL STUDY SESSION MEMORANDUM

Barnstable Municipal Airpolt Commission. Barnstable Municipal Airport Improvements Project Barnstable Municipal Airport

Staff Report. Andrea Ouse, Director of Community and Economic Development

LEGAL BRIEF FORECLOSURE ON RENTAL PROPERTY JANUARY 2016

Room Selection FAQ s

Map Type Final Map, Parcel Map, Final /Parcel Map for Condominium purposes, or Planned Development

Module Three - Application of the Method The Seven-Step Method Detail of Measurement Key Points to Remember...

Planning Rationale in Support of an Application for:

Ben Moberg ~

Las Casitas 30-Units 801 S. 17 th Ave. Phoenix, AZ 85007

MyHome 1. MyHome 1. Location. Beylikdüzü. Floor Property Type Number of Residences USD USD. Price.

Accessory Dwelling Unit (ADU) Permanent Regulations (Revisions to TMC and 13.06)

REQUEST FOR PROPOSALS FOR ARCHITECTURAL SERVICES

Lewisham Estate Heritage Conservation Area

COMMUNITY MEETING REPORT Petitioner: Partnership INC Charlotte-Mecklenburg Housing Rezoning Petition No

Opportunity Description: Assistant Property Manager Location: Office in Menlo Park, CA

Transcription:

Dwntwn Develpment Fact Sheet Cmpiled by the Dwntwn Bstn BID Updated February 2017 Under Cnstructin: Cngress Square Develpment (54-82 Devnshire St.): A transfrmative $105 millin, 458,300 sq.-ft. redevelpment f the frmer Fidelity Investments-wned blck that includes 92,700 sq.-ft. f prpsed new develpment. The preexisting buildings t be renvated/readapted include: Residential: 15-19 Cngress Street (51,350 sq.-ft., 13 flrs, 35 units) Htel: 54-68 Devnshire Street (85,700 sq.-ft., 13 flrs, 165 rms) Office/Retail: 40 Water Street (286,400 sq.-ft., 14 flrs) The redevelpment began in March 2016 and is slated t cmplete in phases frm 2017-2018. 100 Federal Street Winter Garden: This 18,000 sq.-ft. transparent glass atrium, lcated n the Cngress Street Plaza side f 100 Federal St., is set t include 8,500 sq.-ft. f retail, 500 sq.-ft. f kisk space, and a 9,000 sq.-ft. winter garden. Cnstructin began in December 2016 and is slated t cmplete in early 2018. Develpment Prpsals/Apprved By The BPDA Bard: 171 Tremnt Street develpment: Apprved prpsal calls fr the redevelpment f a frmer ffice building int a 12- unit, 155-ft cndminium twer with each cndminium unit ccupying an entire flr. Cnstructin grundbreaking slated fr April 2017. Develpment Prpsals/Subject T Onging Cmmunity Review: One Brmfield Street Develpment (1 Brmfield St.): Prpsal calls fr a 683-ft, 59-stry mixed-use twer including 30,000 sq.-ft. f retail. The prpsed 419 residential units include 300 apartments (54 f them affrdable) and 119 cnd units. The prject is currently being redesigned fllwing the initial rund f cmmunity review. 115 Winthrp Square (Winthrp Square Garage redevelpment): Millennium Partners current prpsal calls fr a 750-ft, 58-flr, 1.2 millin sq.-ft., mixed-use twer including 477,000 sq.-ft. f ffice space, a 12,800 sq.-ft. Great Hall cultural center/pavilin, 14,600 sq.-ft. f tech/start-up incubatr space, and 300 residential units. Impact Advisry Grup (IAG) hearings have cmmenced.

Canvas (533 Washingtn St.): Current prpsal calls fr a 30-stry, 305-ft, 94-unit residential twer with the bttm 4 flrs given ver t a tech start-up/business incubatr space as well as a restaurant. Estimated pening subject t BPDA and cmmunity review. Cmpleted Prjects/Inside The Dwntwn Bstn BID: 2016: The Cnrad (6 Hamiltn Pl.): A renvatin f 17-33 Winter St. int a 27-unit, 29,000-sq.-ft. apartment building. The Cnrad includes: nine 2-bedrm apartments; six 3-bedrm apartments; and twelve 4-bedrm apartments. The Gdfrey Htel (505 Washingtn St.): An $83 millin renvatin f the frmer 59 Temple Pl. ffice twer int a 243-rm, 135,000 square-ft butique htel with grund-flr restaurant & cffee shp. Opened January 2016. Millennium Twer Develpment (1 Franklin St.): 2015: A landmark $495 millin redevelpment f the frmer Filene s int a 650-ft, 442-unit mixed-use residential twer with 95,000 sq.-ft. f retail. The twer pened fr residents in July 2016. The restaurant/retail cmpnent (including PABU sushi restaurant and Old Navy anchr department stre) is slated t pen in the fall. Burnham Building Restratin (10 Summer St.): A $120 millin restratin f the histric Burnham Building int a 285,000 sq.-ft. ffice/retail space. Building timeline: August 2014: lead ffice tenants Havas/Arnld Wrldwide and AOL mve int upper levels, ccupying apprx. 125,000 sq.-ft. May 2015: a flagship Rche Brs. supermarket pened n the Burnham Building s street level and n the Dwntwn Crssing subway cncurse, ccupying apprx. 25,000 sq.-ft. September 2015: the first Nrth American Primark department stre pened n the first fur flrs f the Burnham Building, ccupying apprx. 112,000 sq.-ft. 44 Winter Street Residences: A $3 millin residential cnversin f an ffice building int a 14-unit apartment building, cnsisting f a mix f eight 4-bedrm (1,300 sq.-ft.), three 3-bedrm (1,200 sq.-ft.), and 3 micr (400 sq.-ft.) units. Opened July 2015.

2014: Fx Residences (407 Washingtn St.): Renvatin f upper stries int 14 apartments ranging frm 700-1,000 sq. ft. Full restratin f histric façade/street-level retail space. Opened spring 2014. Lafayette City Center (2 Ave. de Lafayette): A $5 millin lbby renvatin, including new security desk, tuchdwn area, lunge seating, and elevatr area. Cnstructin began in June 2013; cmpleted spring 2014. Winter Place Residences (1-3 Winter Pl.): 2013: A $6 millin renvatin f upper stries abve frmer Lcke-Ober restaurant int six cnds, ranging in size frm 2,000-3,300 sq. ft. Opened fr residents in spring 2014. Millennium Place III (580 Washingtn St.): A $220 millin, 15-stry, 265-unit, 390,705-square-ft mixed-use residential twer with apprx. 12,000-square-feet f grund-flr retail pened fr residents in fall 2013. Fidi Dwntwn 103 Residences (103 Arch St.): A $4 millin, 5-stry, 18-unit renvatin, pened Nvember 2013. Hamiltn Crssing (8 Winter St.): A $8.5 millin renvatin f a 12-stry, 50,000-square-ft building int 48 apartments. Opened fr residents in July 2013. Hyatt Regency (1 Ave. de Lafayette): A $13 millin renvatin f htel public areas, meeting rms, lbby & bar, frnt entrance, and guest rms. Cmpleted February 2013. Old Suth Meeting Huse (310 Washingtn St.): 2010-2012: An $800,000 restratin f the histric museum s windws, exterir wdwrk, and steeple. Cmpleted December 2013. Mdern Theatre (525 Washingtn St.): A $45 millin restratin includes 190-bed drmitry, 2,400 square-ft, 185-seat black bx theater; 800-square-ft art gallery/functin space. Opened Octber 2010. Paramunt Center (559 Washingtn St.): An $80 millin, 145,000-sq. ft. renvatin including tw theaters (ne 550-seat, ther 140-seat), 180-seat screening rm, 150-seat restaurant, 262-bed drm. Opened January 2010.

29 Temple Place: A $4 millin [estimated] renvatin f building int 44 rental units, with 6,500-squarefeet f grund-flr retail. Opened in winter 2010. 25 Temple Place: A $1 millin renvatin f building int retail, ffice, and 6 apartments. Opened in summer 2010. One Bstn Place (201 Washingtn St.): A $2 millin renvatin f the grund flr fr cnversin int retail space. 37 Temple Place: 2000-2009: An $8 millin renvatin f building int 20 rental units. Cmpleted 2012. Ritz-Carltn Htel & Residences (1-10 Avery St.): The $600 millin, 1.9 millin sq.-ft. develpment includes: Ritz-Carltn Bstn; Ritz- Carltn Residences (368 cnd units); AMC Lews Bstn Cmmn. Opened in 2000. 45 Prvince Street: A $120 millin, 31-stry, 337,098-square-ft, 137-unit cnd twer with street-level retail, student center, health club, 8-level parking facility. Opened June 2009. Ames Htel (1 Curt St.): A $58 millin redevelpment/renvatin f 1 Curt St. int a 125-rm butique htel featuring Wdward at Ames restaurant/bar. Opened December 2009. Bstn Opera Huse (539 Washingtn St.): A $55 millin restratin f the 2,500-seat theater. The theater debuted in July 2004. Nine Zer Htel (90 Tremnt St.): A $59 millin develpment f an upscale/butique 189-rm htel. Opened in June 2002. Sld in 2006 fr $71 millin t Kimptn Htels grup, the current peratr. 10 West Street: A $25 millin, 274-bed drmitry with 6,500-square-ft grund-flr retail space (ccupied by Back Deck restaurant in July 2012). Opened in 2008.

Cmpleted Prjects/Adjacent T The Dwntwn Bstn BID: Archstne Bstn Cmmn (660 Washingtn St.): The $150 millin, 28-stry, 420 unit residential twer pened March 2007. AVA Theater District (45 Stuart St.): $125 millin, 29-stry, 384,000-sq.-ft., 404-unit residential twer pened March 2015. The Kensingtn (665 Washingtn St.): $170 millin, 385-unit, 27-stry, 457,000-sq. ft. residential twer pened Octber 2013. Liberty Tree Lfts (630 Washingtn St.): $15 millin, 40-unit, 5-stry, 52,000-sq. ft. residential building pened September 2015. Radian (120 Kingstn St.): A $130 millin, 26-stry, 228,865-square-ft residential twer with 240 residential units and 5,300-square-feet f grund-flr retail space, pened summer 2014.