Surveyor s. Time Machine. The. Product Review Triumph-LS software. Polaris Shows the Way Leveraging workflow

Similar documents
THE PURPOSE OF MEASUREMENTS IN BOUNDARY SURVEYS. (THE ETERNAL SUVRVEY QUESTION: HOW CLOSE IS CLOSE ENGOUGH?) By. Norman Bowers, P.S. & P.E.

Legal Descriptions INTRODUCTION: WARNING: Writing Legal Descriptions NYSAPLS Conf January Scott Reeser, P.L.S. NYSAPLS 2018 Conference

Preparation of Deed Descriptions

Preparation of Deed Descriptions

Preparing Property descriptions D A V I D T. BUTCHER, PLS

The Hennepin County platting process and common platting problems

New Jersey Administrative Code Title 13, Chapter 40 State Board of Professional Engineers and Land Surveyors

TRANSFER AND CONVEYANCE STANDARDS OF THE PICKAWAY COUNTY AUDITOR AND THE PICKAWAY COUNTY ENGINEER

CONFLICTING ELEMENTS

www. Allenbrand-Drews.com

BOUNDARY SURVEYS RE-SURVEYS

For operating a community association, the general hierarchy of authority among governing documents consists of:

APPROVAL REQUIREMENTS

LISA ANDERSON-OGILVIE, AICP DEPUTY COMMUNITY DEVELOPMENT DIRECTOR AND PLANNING ADMINISTRATOR

Final Subdivision Plat

BOUNDARIES & SQUATTER S RIGHTS

STANDARDS GOVERNING CONVEYANCES OF REAL PROPERTY


Minimum Requirements. In Carroll County, Ohio

RULES OF THE GEORGIA STATE BOARD OF REGISTRATION FOR PROFESSIONAL ENGINEERS AND LAND SURVEYORS CHAPTER APPLICATIONS TABLE OF CONTENTS

Requirements for All Instruments of Conveyance in Logan County, Ohio

WYANDOT COUNTY BASIC STANDARDS FOR THE APPROVAL OF REAL ESTATE DEED TRANSFERS & LAND CONTRACT AGREEMENTS

Notice of Public Hearings (effective July 14, 2003) Transfer and Conveyance Standards New Information on Proposed Transfer and Conveyance Standards

INTRODUCTION...2 THE CALLS...3 INFORMATION REQUIRED TO PROVIDE PROPER PROTECTION...3 TWO KEY PROPERTY QUESTIONS...4

U.S. Public Land Survey - Special Instructions A Case Study

REQUIREMENTS FOR ALL INSTRUMENTS OF CONVEYANCE IN GREENE COUNTY

(10) The Board has the powers and duties of an arbitrator under sections 29(3) and 43 of the Arbitration Act.

REQUIREMENTS FOR ALL INSTRUMENTS OF CONVEYANCE IN HARDIN COUNTY, OHIO

Easements, Establishments, Abandonments and Vacations

ARIZONA LAND SURVEYORS STATE SPECIFIC EXAM

WASTEWATER BACKFLOW RELEASE PROCEDURES

OTTAWA COUNTY LEGAL DESCRIPTION REVIEW GUIDELINES

Enforcement of Minimum Survey Standards

Delaware County Transfer Standards

Standards for All Instruments of Conveyance

Oahu Real Estate December 2014 Year End Report

STANDARDS GOVERNING CONVEYANCES OF REAL PROPERTY IN DARKE COUNTY, OHIO

Agency Duties. Objectives. Upon completion of this section the student should be able to:

DALLAS WATER UTILITIES WATER/WASTEWATER COVENANT

Data Verification. Professional Excellence Bulletin [PP-14-E] February 1995

Sell Your House in DAYS Instead of Months

Conveyance Standards. Boundary Survey Requirements. Adams County, Ohio

RAILS- TO- TRAILS PROGRAM IN MICHIGAN. in implementing so- called rails- to- trails programs, which seek to convert unused

ALTA/NSPS Land Title Survey Standards: What Real Estate Counsel Need to Know

Finding and Prioritizing Boundary Evidence

DIVISION 2 - CONSTRUCTION PLAN AND MISCELLANEOUS REQUIREMENTS

Lake County, Ohio USA

Requirements For All Instruments of Conveyance In Monroe County, Ohio. Transfer and Conveyance Standards of the Monroe County Auditor & Engineer

WOODLAND BOUNDARY LINES PRESENTED BY: ANDREW SUTHERLAND, NSLS, BSC.ENG. CENTRAL WOODLAND CONFERENCE, SATURDAY, APRIL 2, 2016 OXFORD, NOVA SCOTIA

MINNESOTA ASSOCIATION OF COUNTYSURVEYORS MANUAL OF MINIMUM GUIDELINES FOR THE PREPARATION OF COUNTY HIGHWAY RIGHT-OF-WAY PLATS

Exploring the 2016 ALTA/ACSM NSPS Land Title Survey Standards

REQUIREMENTS For Subdivision Plats, Administrative Subdivision Plats, Deposit Surveys and Deeds December 2016

Introduction. Request to modify the restaurant use restriction.

Certified Federal Surveyor Program Standards of Practice Handbook (Modified February 19, 2013 and November 18, 2014) "Trained to Make a Difference"

Department of Natural Resources

Transfer and Conveyance Standards of the Athens County Auditor and the Athens County Engineer. Table of Contents

STATE OF LOUISIANA COURT OF APPEAL, THIRD CIRCUIT ADMINISTRATORS OF VACANT SUCC. OF ISAAC J. CELESTINE, ET AL. **********

Department of Development Services Engineering; Survey Plat Review Group SPRG

(5) Multiple Transfer Fees collectively paid with one check will not be accepted.

Methods of Perpetuation of Indiana s Section Corners J o h n G. M ce ntyre

Auditor's Office Tuscarawas County

APPLICATION FOR EXEMPT SUBDIVISION: NON-LOT SPLIT

HISTORICAL CREATION OF INDIANA ROADS (How To Determine Existing Right of Way) January 19, 2017 Jason McCort, P.S.

PLATS: OLD AND NEW. Minnesota Recorder s Summer Conference June 14, 2007 Lisa M. Hanni, PLS

201 KAR 18:150. Standards of practice.

Plats and subdivisions; mapping requirements. (a) Size Requirements. All land plats presented to the register of deeds for recording in the

Easements, Establishments, Abandonments and Vacations

Secret and Forgotten Elements of Rule 12

If you re on the fence about buying your first investment, let us share advice on what to look for and what to avoid.

Property, Servitudes/Easements- pp November 6, 2006 Crusto s Socratic Dialogue. 1. Please provide an Analytical Overview of the Topic.

Chapter Five Drainage 2017 final Law.docx 1

STANDARDIZED LEGAL DESCRIPTIONS AND EXHIBITS

A Surveyor s Responsibility and Possession Boundaries by Knud E. Hermansen P.L.S., P.E., Ph.D., Esq.

Hello Plat Review, I have a question.

CHAPTER 8 - LAND DESCRIPTIONS

Digital Track Notebook

Use of Possession/Occupation Lines 3. Surveyor s Responsibility Options for the Surveyor: Ownership Boundary Changed by Occupation: 1.

STANDARDS GOVERNING CONVEYANCES OF REAL PROPERTY IN SENECA COUNTY OHIO

DAWSON COUNTY MINOR PLAT REVIEW CHECKLIST $50.00 FEE PER PLAT REVIEW, $5.00 FEE FOR SCAN & CD FOR RECORDING

Certified Survey Review Instructions

IN THE COMMONWEALTH COURT OF PENNSYLVANIA. Appellants :

Senior Title by Knud E. Hermansen P.L.S., P.E., Ph.D., Esq.

HENRY COUNTY CONVEYANCE STANDARDS AND LAND TRANSFER POLICY

CODE OF PRACTICE FOR LAND SURVEYORS

ISSUE 1 Fourth Quarter, REALTORS Commercial Alliance Series HOT TOPICS ANSWERS TO CURRENT BUSINESS ISSUES TENANTS-IN-COMMON INTERESTS

OHIO ADMINISTRATIVE CODE CHAPTER Minimum Standards for Boundary Surveys in the State of Ohio

Article 6: Planned Unit Developments

Oakland County Michigan Register of Deeds Plat Engineering, GIS, & Remonumentation Dept. Ph: (248) Fax (248)

Subdivision FAQ s. Prepared by the Sitka Planning Office, Sara Russell, Planning Assistant Wells Williams, Planning Director

Project: Sunset Primary School Property Minor Partition Application Date: October 26, 2015 To:

EXTENDED COVERAGE. Extended Coverage 7/2000

Kansas Minimum Standards For Boundary Surveys and Mortgagee Title Inspections Standards of Practice

Survey Reports Compiled by

VICINITY MAP SCALE 1'' = 2000'

PRELIMINARY PLAT CHECK LIST

R/W PREQUALIFICATION ODOT, 3/14/2018 PROPERTY MAP SHEET

MINOR LAND DIVISIONS APPLICATION

STARTING WITH OURSELVES

BUREAU OF LAND MANAGEMENT. Fractional Sections. With John Farnsworth and Belle Craig C A D A S T R A L S U R V E Y

LeaseCalcs: How to ruin EBITDA results: Renew your lease.

Transcription:

SEPTEMBER 2017 The Surveyor s Time Machine Product Review Triumph-LS software Polaris Shows the Way Leveraging workflow Revitalizing a Business With laser scanning

Writing a Good Narrative The Land Surveyor s Time Machine» CARL CLINTON, PS

O n many occasions I have wished for a crystal ball or a time machine to go back and visit an original surveyor to find out why he made a particular decision on a corner or a boundary. How many of us at one time or another has had occasion to take a hard look at one of our old surveys and wondered what did I do, and how or why did I do that? Could we even follow our own footsteps without leaving adequate markers along the trail? This article is about leaving tracks for those that follow us. It is also about leaving a project history, and a personal legacy that we are proud of. Most importantly, we should aid others in understanding the decisions of our surveys, and allow our successors to honor and respect our decisions. Preparing a good narrative for a survey is an art that needs to be developed by each individual Land Surveyor. When I have followed the work of a fellow surveyor, and the map explicitly tells me what was done, how it was done, and why it was done that way, it gives me confidence that the surveyor thought through the project and probably did it well. If there is little information and little support in the narrative and on the map, I begin to get suspicious that maybe the surveyor may not have done a complete job. The work of the first case allows me to trust it. In the second case, my initial trust level is low and the work would have to prove itself. Have you ever felt that way about another surveyor s work? How do we put our work in the first category rather than the second? The answer (besides good research, good fieldwork, and competent evaluation) is a good map with an excellent narrative. The narrative is the essential trail of footprints to be left by the surveyor preparing the record map. A narrative as defined by Webster s New World Dictionary and Thesaurus: narrative adj. in story form n 1 a story; account 2 the art of or practice of narrating; a story-like, historical, sequential; A historical and sequential story is exactly what our narratives should be. The requirements of a narrative in Oregon Revised Statutes (ORS) Chapter 209 and the Oregon Administrative Rules only give basic guidelines that allow us to be creative in telling our story. It has been our experience that many times the survey narrative is an after-thought in the final preparation of a survey map. I say our experience because of the many conversations that I have had with other professional surveyors and coworkers on this topic. The best narratives are those that are included in the process of the boundary resolution from the very beginning. The process begins with a good understanding of the goal for the final product of your survey, and understanding how you are going to go about achieving that goal. The narrative is not just about giving statistics of your results or the type of equipment used, but is rather about leaving an understandable story (history) of your project so that others can easily follow the trail of your footsteps. Remember that this survey will be looked at and used (perhaps 100 years or more) after the map is filed. When reviewing some old surveys and public land corner records, I have often wished for a crystal ball or time machine to try and figure out what some surveyor did and why he did it. Your narrative should act as that time machine. After reviewing and preparing many surveys in private and public capacities, I have found that the real proof of a survey is being able to write that story simply and clearly. If the narrative becomes a struggle to prepare you may have a problem with the resolution of that survey boundary, and may need to re-think parts of it. A good narrative will independently describe the basics of when, where, how, and why, for each boundary line of your survey. Think of it as describing each separate side of a polygon.

Oregon Revised Statutes Chapter 209.250 spells out time lines to follow when filing a survey and what other information is required, but the most important information is in Section (2), Such permanent map shall have a written narrative that may be on the face of the map. The narrative must (shall) explain: (must is a word that means: have to; be required to; requirement; need; obligation) (shall is a word that means: must; mandatory) 1. the purpose of the survey 2. how the boundary lines or other lines were established or reestablished 3. and must (shall) state which: deed records, deed elements, survey records, found survey monuments, plat records, road records or (any) other pertinent data, were controlling when establishing or reestablishing the lines. Following is a breakdown of each of the required elements that make up the complete narrative: 1. The purpose of the survey: (asks the questions) Why is this work being done? (This helps establish a motive for the survey.) Is it for construction of a new fence or a building on the line? Is it because of a lawsuit by a neighbor? Are the owners intending to ultimately divide the property? Is there some other special purpose for having this survey done? Who is this survey being done for? The owner, a buyer, a developer or other party. Always have a clear discussion with your client about the above issues. If you probe you might find that there is a dispute with a neighbor, or something else going on in the background other than just find my boundaries please. Very few times will you find a potential client that just wants you to find his deed lines; what they really want to know is where their property is on the ground. As we all know, the property line on the ground can be significantly different than their deed. (See POB Magazine Traversing the Law, February 2006 The Boundary Surveyor s Liability by Jeffery N. Lucas, PLS, Esq.) The narrative (answer) that we usually see is that the purpose is to identify a recorders document number. Many times the document referred to is a mortgage or finance document and not a conveying deed. What it should say as the purpose, is to identify the property ownership and boundary as indicated in a vesting deed recorded in document number xyz. 2. How the boundary lines or other lines were established (or reestablished). This question asks that you explain for each line (that makes the common connected polygon) of the boundary (and for other important lines that connect to that boundary), how you determined the location for those lines? Again, each line should be treated more or less separately. You will almost always have different deed records on different sides of the property, you will also have different surveys, plats and found monuments, and a road will almost always affect one or more lines. It is extremely important that you do not assume that everyone that picks up the map will easily and clearly understand it. 3. Must (shall) state which of the following were controlling when establishing or reestablishing the lines: deed records deed elements, survey records found survey monuments plat records road records, or any other pertinent data, This asks you to be very specific and detailed. You need to recite more than the deed document number; you need to cite the specific element or part of the deed. Was a monument called? What about occupation and unwritten title? Do you have a junior or senior deed along that specific line? Are there calls to adjoining properties in the deed? One side of a property may be junior to the adjoining property where the opposite side may be senior. Often overlooked are scrivener s changes that have been made in the description of the property since it was originally created? Where in the chain of title did those scrivener s changes occur? Was there a prior survey that established the property being surveyed or the adjoining property? Is there occupation that matches the prior survey or deed lines? Were the previous surveys, an original survey, a first survey, or a resurvey? Is this property in a plat or adjacent to platted property? Are you finding gaps or overlaps, or are you just winning the measuring contest? It is also important to remember there were bonafide legal surveys conducted in this state prior to the filing act requirement. In summary, the bottom line to a good narrative (story) are clear details of the history of the property, and what specific parts of the deed(s) and surveys were used, and how were they used. We have been told many times that one of the best ways to test your narrative is to have someone else read it for understanding, barring that put it down for several days and then pick it up and try to read and understand it as if you had never seen the project previously. Remember, it is only your reputation on the line with each survey that you undertake. Note: This article originally appeared in The Oregon Surveyor, Vol 40 No 3, and is reprinted with permission. Carl Clinton is a Licensed Land Surveyor in Oregon and Washington. He attended OTI (predecessor to Oregon Institute of Technology), graduating in 1967. Carl served as Clackamas County Surveyor (2011-2016) and was Deputy County Surveyor (1993-2011). From 1968 until 1993 he was a crew member, project surveyor and Survey manager at several firms in the greater Portland area. Carl began reviewing other surveyors work as Survey Manager and as a contract City Surveyor (1983-1993), and contract Deputy (1985-1993) for Clackamas County.

Following is an actual narrative taken from Clackamas County Survey Records - Survey Number (SN) 26443 by Don Devlaeminck, PLS #1634. This narrative together with the notes on the map pages (2) of the survey, comprise an excellent model for a narrative and map. In the case of the map, the monument notes and fallings are adjacent to each found monument and are not in a separate table. This provides a preferable format that is much easier to read and understand. Narrative and Notes 1. Client: Sunset View Associates LLC. 425 N. W. 18th Avenue, Suite 3 Portland, Oregon 97209 2. Basis of bearings: the line between the found 2 inch iron pipe with brass cap stamped Chula Vista Heights No. 11, Initial Point D.E.A. Inc. 1987 at the southwest corner of lot 1, Westview and the found 5/8 inch iron rod with yellow plastic cap stamped DEA Inc. at the most southerly corner of lot 29, Westvlew, shown as n. 89 33 48 w. on the plat of Westvlew, was used as the basis of bearings for this map. 3. The purpose of this survey is to define the boundaries of the proposed plat of Sunset View P.U.D. the vesting deed for the subject property is bargain and sale deed recorded under fee number 95-28756, Clackamas County deed records. The property shown on this survey is subject to a deed reservation or exception, which reserved any portion of the above described lands which may be mineral lands, other than coal or iron. The reservation was contained in deed recorded October 10, 1891 in book 44, page 445, Clackamas County deed records. 4. The east line of this survey is the dividing line between the east half and the west half of the southwest 1/4 of the southwest 1/4 of section 27, T.1S, R.2E, W.M. To establish the position of this line, it was necessary to subdivide section 27 into quarters and to then subdivide the southwest 1/4 of section 27 into quarters as shown on the attached map. 5. The south line of this survey follows the south line of section 27, T.1S, R.2E, W.M. 6. A conflict exists along the west line of the subject property. present and past deeds for the subject property would place its west line 360 feet west of the east line of the west one-half of the southwest 1/4 of the: southwest 1/4 of section 27, T.1S., R.2E., W.M. The deeds for many of the adjoining properties to the west of the subject property would place their east lines 300 feet east of the west line of the southwest 1/4 of section 27. As can be seen, the distances called for in the various deeds for the subject property as well as the adjoining properties to the west adds up to 660 feet in the east-west direction. These figures were undoubtedly based upon the assumption that section 27 was exactly one mile square as was theoretically the case. In reality, based upon this survey, the actual ground distance between the southwest corner of section 27 and the southeast corner of the west 1/2 of the southwest 1/4 of the southwest ¼ of section 27 is 655.60 feet versus a theoretical distance as cited in the deeds of 660 feet. The parent deed for the subject property which originally established the subject parcel is Warranty Deed from M.A. Kellum to Gerhard Goetze and Eva M. Goetze recorded 3/11/41 in book 278, page 99, Clackamas County deed records. The parent deed for the adjoining properties to the west is warranty deed from M.A. Kellum to Donald S. Johnston and Vera H. Johnston recorded 3/17/41 in book 278, page 285, Clackamas County deed records. Although the parent deed for the subject property is senior to that of the property to the west, several surveys performed on said property to the west have established and monumented its east line by measuring 300 feet easterly from the west line of the southwest 1/4 of section 27. in addition, several of the current deeds for adjoining properties to the west (such as deeds recorded under fee numbers 88-39157, 93-83167, 70-24348, and 91-00414) have actually called monumentation that is referred to on one of these surveys, namely survey m-92. Furthermore, in some cases, fence lines have been placed along this monumented line. It is clear, based upon a review of the parent deed for the adjoining properties to the west that the intent was that it receive only the remainder after the east 360 feet of the west 1/2 of the southwest 1/4 of the southwest 1/4 was cut out. To resolve this conflict, quit claim deeds are presently being prepared to release any interest the grantee for the subject property may have in land to the west of the west line of this survey. The west line of this survey follows the line as monumented by prior surveys in the area (p.s. 13157, p.s. 19151, and m-92 as well as an unrecorded survey by Maris ). 7. The position and alignment of Idleman Road (County Road no. 1115) is based upon the alignment of Idleman Road as depicted upon the plat of Westview (plat no. 2914) which I previously surveyed in October 1990, using the monumentation found, as shown, as well as traverse control points in the vicinity of this project which were previously established during the initial outbounds field survey for the plat of Westvlew (plat no. 2914). 8. It should be noted that this survey makes reference to several monuments found along the perimeter of the subject property which have aluminum caps stamped Maris on top. Although some of these monuments were held by this survey and the positions of others are noted as shown, no record of their origin with regards to a survey map was found. Accordingly, it is possible that there may be additional monuments of this type in and around the subject property. 9. The location of the 50 foot wide access easement (often times referred to as Champagne Lane) as depicted on this survey, is based upon the location of the monuments found, as shown. This location does not conform to the location as cited in various deeds. By deeds, the west line of Champagne Lane is located 125.00 feet east of the west line of the southwest quarter of section 27. It is beyond the scope of this survey to address this conflict.