APPLICATION FOR RIGHT-OF-WAY EXCAVATION PERMIT VIOLET TOWNSHIP

Similar documents
Sagamore Hills Township Valley View Rd. Sagamore Hills, OH (330) Phone (330) Fax

SPRING LAKE TOWNSHIP SCOTT COUNTY STATE OF MINNESOTA ORDINANCE NO

ORDINANCE GOVERNING PRIVATE AND PUBLIC DRIVEWAY ROAD APPROACHES TO LIVONIA TOWNSHIP ROADS

ORDINANCE GOVERNING PRIVATE AND PUBLIC DRIVEWAY ROAD APPROACHES TO BECKER TOWNSHIP ROADS

CITY OF ST. PETERS RESIDENTIAL SANITARY SEWER LATERAL REPAIR PROGRAM APPLICATION. Daytime Phone: Evening Phone: Tenant Name: Tenant Phone:

REGULATIONS OF WALLER COUNTY, TEXAS

Pocono Springs Civic Association Architectural Rules and Regulations. Adopted by Board of Directors Date: January 20, 2007

HEAVY-HAULING AGREEMENT. THIS HEAVY-HAULING AGREEMENT amended by Resolution #1, January 2010,

Upper Bern Township, Berks County, Pennsylvania Street Occupancy Permit Application

Condominium Homes Condo B Lisle, Illinois EXHIBIT A CONDITIONAL HARD FLOORING WAIVER AGREEMENT. Address:

ACCESS AND OPTION AGREEMENT TEMPLATE FOR REAL PROPERTY PARTNERSHIP PROJECTS

Legally Described as: Lot(s) - in BROOKHAVEN ESTATES PLAT 1, pursuant to the Plat thereof (the, Property ).

Prairie Township Right-of-Way Regulations and Guidelines for Excavation/Construction Permits

Explanation of Permanent Stormwater Management Facilities Maintenance Agreement

THE CORPORATION OF THE TOWNSHIP OF PERTH EAST BY-LAW NO

Town of P O Box SEWER. tion and. for. of any to a sewer. Provide the. property

VILLAGE OF PLAINFIELD

Encroachment Permit Application Instructions

MINNEHAHA COUNTY HIGHWAY DEPARTMENT HIGHWAY ACCESS APPLICATION & PERMIT

GUIDELINES to SITE MANAGEMENT PROGRAM (Effective: August 15, 2006, Revised 08/2007, 05/2014, 12/2014)

DECLARATION OF DRAINAGE EASEMENTS. Document No. Document Title. (Declarant) Recording Data Return Address

Attached is a Clinton Township Zoning Permit Application and requirements for issuance of a permit.

CITY OF BLACK JACK SEWER LATERAL REPAIR PROGRAM POLICY AND PROCEDURES

CHAPTER 154 RIGHTS OF WAY

STORMWATER BEST MANAGEMENT PRACTICES OPERATION, MAINTENANCE, AND INSPECTION PLAN AND AGREEMENT

Point Aquarius Property Owners Association Architectural Control Committee REQUEST FOR ARCHITECTURAL CONTROL COMMITTEE APPROVAL

PRINT NAMES OF BUYERS AS ARE THEY ARE TO APPEAR ON DEED (WITH MIDDLE INITIALS, ETC.)

WATER LINE & INGRESS/EGRESS EASEMENT AGREEMENT WITNESSETH:

SANILAC COUNTY ROAD COMMISSION ROAD POLICIES. A. Drainage, Base and Grade Construction (NON BITUMINOUS)

BECKER COUNTY HIGHWAY DEPARTMENT 200 EAST STATE STREET DETROIT LAKES, MN 56051

LOCAL LAW NO. 2, 1987 A LOCAL LAW REGULATING EXCAVATION AND TOPSOIL REMOVAL WITHIN THE TOWN OF CAMBRIA

Road Rights of Way And Obstructions

SOUTH BROWARD DRAINAGE DISTRICT

APPLICATION FOR CERTIFICATE OF ZONING COMPLIANCE/OCCUPANCY PERMIT. APPLICATION TYPE (check all that apply) APPLICANT INFORMATION

PARK COUNTY ROAD WORK PERMIT APPLICATION

BUY/SELL AGREEMENT. 4. Possession will be given to Buyer at closing. Exceptions: Subject to tenant s rights.

Purchasing Division Finance Department 44 E. Downer Place Aurora, Illinois (630) FAX (630)

POCONO SPRINGS CIVIC ASSOCIATION, INC.

WATAB TOWNSHIP, BENTON COUNTY, STATE OF MINNESOTA. ORDINANCE #4 (Amended November 2014) AN ORDINANCE REGULATING TOWN ROAD RIGHTS-OF-WAY

RNB PROPERTY MANAGEMENT

STORMWATER MANAGEMENT AGREEMENT AND DECLARATION OF EASEMENT

ESCROW AGREEMENT. by and among HARBOR DEPARTMENT OF THE CITY OF LOS ANGELES. and. U.S. BANK NATIONAL ASSOCIATION, as Trustee and as Escrow Agent

CHAPTER 17 STREETS AND SIDEWALKS ARTICLE I TOWNSHIP ROAD OCCUPANCY PERMITS

ORDINANCE NO. 782 AN ORDINANCE REGULATING THE USE AND OCCUPANCY OF THE RIGHT-OF-WAY OF THE CITY OF WASHINGTON, KANSAS.

CHAPTER 3: TOWN ROADS AND RIGHT-OF-WAY 3.01 HIGHWAY EXCAVATION

CYPRESS RIDGE SUBDIVISION PHASE I & III PROTECTIVE COVENANTS AND RESTRICTIONS

STANDARD FORM Proposal to Purchase and Agreement for Transfer of Ownership of Distribution Systems Form No

BEAR CREEK TOWNSHIP EMMET COUNTY, MICHIGAN. PRIVATE ROAD ORDINANCE Ordinance No. 11A-99. (to replace prior Private Road Ordinance No.

PROTECTIVE COVENANTS DEED RESTRICTIONS SPENCER BUSINESS/INDUSTRIAL PARK August 11, 1999 Amended, March 3, 2014

CONSTRUCTION PACKAGE HOUSE

Chapter 46 STREETS, SIDEWALKS AND OTHER PUBLIC PLACES*

TOWNSHIP OF WANTAGE ORDINANCE #

CITY OF WEATHERFORD DEVELOPER AGREEMENT WITH CITY PARTICIPATION

SUBDIVISION BACKBONE COVER LETTER

EASEMENT AGREEMENT. hereinafter called Grantor, (whether grammatically singular or plural) and the:

UTILITY EASEMENT AGREEMENT

LIONSGATE COMMUNITY ASSOCIATION, INC. RESOLUTION

HAMILTON COUNTY SECONDARY ROAD DEPARTMENT DRIVEWAY AND ENTRANCE POLICY EFFECTIVE NOVEMBER 28, 2017

BID DOCUMENTS FOR DEMOLITION OF STRUCTURE AND DETACHED SHED AT 111 SOUTH LANSING STREET

Ohio Township Association

ASSUMPTION OF HOUSING CHOICE RENTAL ASSISTANCE AGREEMENT

STORM DRAINAGE EASEMENT FOR PUBLIC STORMWATER RUNOFF (DISCHARGE) TO

ORANGE TOWNSHIP SIDEWALK CONSTRUCTION, REPAIR AND MAINTENANCE POLICY

CHAPTER 14: DRIVEWAYS, TOWN HIGHWAYS, AND PRIVATE ROADS

OFFER TO PURCHASE AND CONTRACT

AMENDED DECLARATION OF COVENANTS FOR COUNTRY CREEK SUBDIVISION

DEED OF AGRICULTURAL CONSERVATION EASEMENT TO THE COMMONWEALTH OF PENNSYLVANIA IN PERPETUITY

SPRING BROOK TOWNSHIP 966 STATE ROUTE 307 SPRING BROOK TOWNSHIP, PA PHONE (570) FAX (570)

PERMANENT EASEMENT AGREEMENT

STORMWATER BEST MANAGEMENT PRACTICES OPERATIONS AND MAINTENANCE AGREEMENT

Chapter 6 - BUILDINGS

City of Mosier Site Development Permit Information

Storm Water Management BMP Maintenance Agreement City of St. George, Utah

ESCROW AGREEMENT - MAINTENANCE

FALCON FIELD AIRPORT AIRCRAFT TIEDOWN STORAGE AGREEMENT

City of Melissa, Texas Plat Dedication Language

SIMPLIFIED APPROACH PERMIT PROCEDURES

T E M P O R A R Y B A N N E R P E R M I T P R O C E D U R E

RESIDENTIAL ACCESS AGREEMENT. ( Owner ) and Butte-Silver Bow County ( BSB ) enter into this Residential Access Agreement ( Agreement ) this day of.

MEMORANDUM. First Read: Permanent Easement Agreement for Palisades Venture, LLC

T E M P O R A R Y U S E A N D O C C U P A N C Y P E R M I T P R O C E D U R E

CHAPTER 58 DRIVEWAYS

UMATILLA COUNTY DEPARTMENT OF PUBLIC WORKS 3920 WESTGATE PENDLETON, OREGON 97801

BOONE COUNTY, MISSOURI RESOURCE MANAGEMENT DEPARTMENT (573)

RIGHT-OF-WAY MAINTENANCE AGREEMENT

THIS IS A LEGALLY BINDING CONTRACT PLEASE READ CAREFULLY. Clearfield City Good Landlord Program Agreement

This document was prepared by: Albemarle County Attorney County of Albemarle 401 McIntire Road Charlottesville, Virginia 22902

MILLE LACS COUNTY DRAINAGE AUTHORITY DRAINAGE POLICY

EASEMENT AGREEMENT. hereinafter called Grantor, (whether grammatically singular or plural) and the:

THE CORPORATION OF THE MUNICIPALITY OF THAMES CENTRE BY-LAW NO

MANAGEMENT AGREEMENT

SANITARY BACKWATER VALVE REBATE APPLICATION. Applicant No. Date Received

BYRON TOWNSHIP ZONING APPLICATION

ROAD USE AGREEMENT RELATING TO THE DEVELOPMENT OF (WIND FARM NAME) WIND FARM

AGREEMENT. Private Stormwater Management Facilities Operation and Maintenance And Right of Entry

RIGHT-OF-WAY USE APPLICATION

ARTICLE XXIV MORRISON TOWNSHIP CULVERT AND DRIVEWAY ACCESS ORDINANCE Revised Sept 2003, Revised April 2015

Practice Continuation Agreements:

AGREEMENT FOR TEMPORARY CONSTRUCTION EASEMENT AND PERMANENT SEWER UTILITY EASEMENT

City of Coral Springs Community Redevelopment Agency (CRA) Commercial Enhancement Grant Program Application Form

Transcription:

Permit No. APPLICATION FOR RIGHT-OF-WAY EXCAVATION PERMIT VIOLET TOWNSHIP Applicant: (property owner or authorized agent) Phone No. Mailing Address: Contact Name and Phone Number: (must include 24-hour emergency number) Location of excavation/construction site Nature of excavation and work to be undertaken Construction dates: Estimated start date: Completion date: For any new construction within the Township (Pursuant to Resolution Number 2002-0904-02) applicant shall: 1. Any property owner and/or builder shall establish a single access point to a property prior to the start of any construction on that property; 2. Any property owner and/or builder shall use only the improved access point for deliveries and all ingress/egress to and from the property during the construction period; 3. Such access shall be improved with culverts where needed, and large gravel shall be placed within the access in order to prevent the creation of dust and mud in the access drive and in the adjoining right-of-way. Applicant has read the Violet Township Right-of-Way Excavation Permit Regulations agrees to or is providing the following: 1. Applicant agrees to provide and place such warning devices as are necessary to protect travelers on the road and to ensure their safety. 2. Applicant agrees to complete all work to be performed under this Application as soon as reasonably possible and to completely restore the entire road right-of-way to the condition that existed before such work was undertaken, in accordance with the Violet Township Right-of-Way Excavation Regulations. 3. Applicant agrees to notify the Violet Township Road Department and all applicable utility providers of the right-of-way excavation and to obtain all required permits prior to the commencement of any work or excavation in the road right-of-way.

4. Applicant agrees to indemnify and hold harmless Violet Township, its Board of Trustees, and all officers and agents of the Township, for any loss or cost, liability, damage, claim, demand or cause of action arising from, under or connected with the excavations and work covered by this application, and has properly executed the attached indemnification and hold harmless agreement. 5. This application is accompanied by a $50.00 fee. 6. Plans as required by Violet Township, are attached to this application 7. A list of materials to be used is attached to this application 8. If constructing water/sewer or other utility lines a permit from the Fairfield County Utilities Department has been obtained and is attached to this application. 9. A security deposit, bond or letter of credit in the amount of $ accompanies this application permit (if required). Security Deposit, Bond/Letter of Credit amounts are: If open cutting pavement - $150.00 per square yard of pavement to be cut; minimum deposit - $500.00; if constructing new roadway or driveway to a commercial structure or subdivision $10,000. Security deposits shall be refunded to applicant upon performance of all conditions and agreements contained in this application and the Violet Township Right-of-Way Excavation Regulations. 10. Persons failing to comply with the approved permit, or failing to obtain a permit, shall be notified in writing by the Township that they have five (5) days from the date of notification to eliminate the violation and return the right-of-way to its original condition. Persons failing to come into compliance within the five (5) day period will be prosecuted in the Fairfield County Common Pleas Court pursuant to Section 5571.99 of the Ohio Revised Code. The Township Trustees will recommend to the court that violators b ordered to eliminate the violation at the violators expense; or that the Court appoint a qualified company to remove the violation, and the costs of the same be placed on the tax duplicate as a lien, to be collected with other taxes. 11. Inspection of work by the Violet Township Engineer is required before cover is applied. 12. Signature Date (Must be signed by property owner or owner s authorized agent) Permit No. Approved Approved with modifications listed below Denied Reason for denial Modifications to applicant s plan/materials list: All fees/security deposits paid (receipt no.) Signature of Official approving this permit Date of Approval 2

INDEMNIFICATION AND HOLD HARMLESS AGREEMENT Now comes the undersigned being (hereinafter the Undersigned ) and the Board of Trustees of Violet Township, Fairfield County, Ohio (hereinafter the Township ) and enter into this Agreement on this day of 20. WHEREAS, the Undersigned desires to engage in excavation or construction activities within a Township roadway, pursuant to an application for such authority submitted to the Township, and WHEREAS, the Township agrees to permit such excavation and construction but requires the execution of this Agreement pursuant to Ohio Revised Code Section 5571.16, NOW THEREFORE, the Undersigned and the Township, in consideration of the mutual covenants and agreements, hereby agree as follows: The Undersigned agrees to indemnify and hold harmless the Township and each member of the Board of Trustees of the Township and each officer of said Board (and their heirs, executors and administrators) who is made a party or is threatened to be made a party to any litigation, action, suit or proceeding, whether civil, criminal, administrative or investigative by reason of the fact that he is or was a trustee, officer, employee or agent of the Board or is or was serving at the request of the Board against expenses, attorney s fees, judgments, fines and amounts paid in settlement actually and reasonably incurred by him in connection with such action, suit or proceeding in connection with any construction or excavation related activity performed by the undersigned or his designee, employee, agent, assign, or contractor, including but not limited to, any negligent or intentional act which results in any harm or damage to another. The forgoing right of indemnification shall not be exclusive of other rights or remedies to which such Board or person, his heirs, executors and administrators may be entitled. In WITNES WHEROF, we have set our hands on the date set forth above. The Undersigned Violet Township Board of Trustees: By: Authorized Representative of the Undersigned 3

VIOLET TOWNSHIP ENGINEER 12970 Rustic Drive Pickerington Ohio 43147 Phone: 614-575-5556 Fax: 614-575-5562 www.violet.oh.us SUPPLEMENTAL SPECIFICATIONS FOR DITCH ENCLOSURES A right-of-way permit application must be completed and approved by Township personnel prior to work being performed within the right-of-way. All pipe shall be ADS N-12 or equivalent (double-walled). Pipe diameter shall be a minimum of 12 inches or the diameter of drive culvert, whichever is greater. Resident is responsible for the purchase of the pipe. Pipe within ditch line shall be perforated or slotted. Pipe under the drive shall be solid. All downspouts leading to ditch shall be located by resident prior to pipe installation by Township. Any raising of gas or water shut-off valves shall be the responsibility of the resident. A minimum of one tee connection is required. Tee shall be the same diameter as the pipe. Resident is responsible for contacting the Ohio Utilities Protection Service (OUPS) at 1-800-362-2764 to have any underground utilities located prior to pipe installation by Township. It is also the responsibility of the resident to locate any invisible fence, irrigation, or other private utility line. Township personnel will install pipe and cover with gravel. Resident is responsible for supplying dirt to cover the pipe, and placing seed and straw. Pipe shall be covered with dirt and seed and straw shall be placed within 3 weeks of Township installing pipe. (NOTE: There are occasions when Violet Township has fill dirt that it cannot use and elects not to stockpile. At the resident s request, the Township can haul dirt to the project site. Note the dirt is NOT topsoil and may contain clay tile, asphalt, gravel, tree roots, etc.) A swale shall be maintained over the pipe in accordance with the sketch contained within the Right-of-Way Permit application. Rev. 9/2011