NEW SINGLE FAMILY RESIDENTIAL

Similar documents
DEPARTMENT. A Current Contractor Listing: If the contractor is pulling the permit, they must be listed with the County

City of Roswell - Fee Schedule

1. STRUCTURE TYPE (CHECK ONE): METHOD FOR MEETING ENERGY CODE COMPLIANCE: RESIDENTIAL COMMERCIAL PRESCRIPTIVE REScheck COMcheck PERFORMANCE

APPLICATION PROCEDURE

Town of Aurelius 1241 West Genesee St Rd Auburn, NY Ext # (fax)

CITY OF ELSMERE 318 Garvey Avenue, Elsmere KY 41018

Remember, PA One-Call before excavating. Simply dial 811 or

PLYMOUTH PLANNING BOARD APPLICATION FOR A MINOR SUBDIVISION OR MAJOR SUBDIVISION

BUILDING PERMIT APPLICATION

WISE COUNTY DEPARTMENT OF BUILDING & ZONING PO BOX 570 / 206 EAST MAIN ST WISE, VA Applicant: Phone #:

Town of Jamestown Single/Two-family Residential. Building Permit Application Packet

FINAL PLAT CHECKLIST

RESIDENTIAL BUILDING PERMIT APPLICATION PACKET OVERVIEW PACKET CONTAINS FEE SCHEDULE INSPECTIONS EXPIRATION

LOT SUBDIVISION LOT BLOCK SIZE

APPLICATION FOR PLAN EXAMINATION / BUILDING PERMIT or ZONING PERMIT

SITE DEVELOPMENT PLAN APPLICATION PAHRUMP REGIONAL PLANNING DISTRICT

Residential Low Density Park Zone (RLP) Major Site Development Plan/Plan Amendment Application Packet

Township of Little Egg Harbor Planning Board 665 Radio Road Little Egg Harbor, New Jersey Phone: ext. 221 Fax:

CONOY TOWNSHIP 211 Falmouth Road Bainbridge, Pennsylvania Lancaster County Phone: Fax:

PRE CONSTRUCTION CHECK LIST FOR BUILDING PERMITS

COMMERCIAL SITE DEVELOPMENT GUIDE FOR UNINCORPORATED ST. CHARLES COUNTY

CONCEPT PLAN APPLICATION Meeting with Staff Commercial Projects

INTRUCTIONS FOR BUILDING/USE PERMIT APPLICATION All applicable sections of this packet must be completed.

Residential Major Subdivision Review Checklist

BUILDING PERMIT APPLICATION

Residential Minor Subdivision Review Checklist

Preliminary Subdivision Application (Minor) (Three (3) lots or less)

MINOR SUBDIVISION PLAT CHECKLIST

MASTER SUBDIVISION FINAL PLAT APPLICATION Town of Apex, North Carolina

ZONING COMPLIANCE PERMIT APPLICATION

Preliminary Subdivision Application (Major) (Four (4) lots or more)

SHORT PLAT Information

PUBLIC HEARING APPLICATION FORMS AND REQUIREMENTS

Final Plat Mapping Requirements

CITY OF SARALAND FINAL SUBDIVISION PLAT REVIEW

CITY OF SARALAND PRELIMINARY SUBDIVISION PLAT REVIEW

PRELMINARY PLAT CHECKLIST

COMMERCIAL BUILDING PERMIT APPLICATION

APPLICATION PACKET SINGLE FAMILY CLUSTER HOUSING OPTION REVIEW

Building Permit Application Instructions Please read and sign Town of Worcester (1) A land use permit is required prior to a building permit

STREAM BUFFER VARIANCE APPLICATION PACKET

BUILDING PERMIT / ZONING USE PERMIT APPLICATION

MINOR SUBDIVISION FINAL PLAT APPLICATION Town of Apex, North Carolina

BAY COUNTY BUILDERS SERVICES DIVISION RESIDENTIAL. MANUFACTURER/MOBILE HOME PLAN REVIEW SUBMITTAL FORM (For HUD approved structures only)

EAST COCALICO TOWNSHIP BUILDING / ZONING PERMIT PROCEDURE AND GENERAL NOTES Revised 6/12/2012

Conditional Use Sketch Plan Application Non-Residential Zone

MCPC MONONGALIA COUNTY PLANNING COMMISSION 243 High Street, Rm 110, Morgantown, WV Phone Fax

Septic Tank / Drainfield / Holding Tank Permit Application

SUBDIVISION APPLICATION: RECOMBINATION PLAT or EXEMPT PLAT

Zoning Permit Application Cover Page

Waseca County Planning and Zoning Office

MINOR PLAT AMENDMENT APPLICATION CHECK APPLICABLE PERMIT ATTACHMENT:

TEMPORARY OUTDOOR SALES/SEASONAL EVENT PACKET

APPENDIX B. SUBMISSION REQUIREMENTS

Initial Subdivision Applications Shall Include the Following:

MAJOR RESIDENTIAL AND NONRESIDENTIAL SUBDIVISIONS

Make checks payable to Columbia County Treasurer. We do not issue refunds. Credit Cards accepted.

E L M E R B O R O U G H L A N D U S E B O A R D APPLICATION COVER SHEET (to be completed for all applications and appeals)

JOINT PLANNING BOARD APPLICATION FORM

TOWN OF LAKE LURE LAND DISTURBANCE PERMIT (LESS THAN 1 ACRE) Permit Fee Permit No. LDP- (see Fee Schedule below) Approved:

City of Prior Lake APPLICATION FOR REGISTERED LAND SURVEY

Manor Township Zoning Permit Application (Section 702) Application Number Application Date / /

REZONING APPLICATION COVER SHEET

APPLICATION PACKET LAND SPLIT OR COMBINATION REVIEW

APPLICATION PACKET ARC SIGN REVIEW. COMMUNITY DEVELOPMENT DEPARTMENT CHARTER TOWNSHIP OF PLYMOUTH 9955 N. Haggerty Road Plymouth, MI 48170

MINOR SUBDIVISION APPLICATION

FENCE BUILDING PERMIT APPLICATION

COMMERCIAL SITE PLAN & CONDITIONAL USE PERMIT REVIEW PROCESS & CHECKLIST

Waterford Owners Association Construction Guidelines

APPLICATION FOR ZONING USE AND COMPLIANCE CERTIFICATE CENTER TOWNSHIP, BEAVER COUNTY, PA

Septic Tank / Drainfield / Holding Tank Permit Application

APPLICATION PACKET SINGLE FAMILY CLUSTER HOUSING OPTION REVIEW

RESIDENTIAL PLAN APPROVAL AND INSPECTION FEES. 2. Inspection fee $.25 per sq. ft. Minimum Inspection Fee of $25.00

SPECIAL USE PERMIT FOR TEMPORARY DEPENDENT HOUSING

TOWNSHIP OF DOYLESTOWN APPLICATION FOR REVIEW OF SUBDIVISION OR LAND DEVELOPMENT PROPOSAL. Please PRINT; all information MUST be filled out completely

CITY OF PANAMA CITY BEACH Building and Planning Department

City of Prior Lake APPLICATION FOR PRELIMINARY PLAT

ACCESSORY STRUCTURE DEVELOPMENT ORDER APPLICATION (WITH RESTROOM PLUMBING)

FINAL SITE PLAN PLAT APPLICATION Town of Apex, North Carolina

City of Prior Lake APPLICATION FOR COMBINED PRELIMINARY AND FINAL PLAT

NELSON TOWNSHIP APPLICATION FOR BUILDING PERMIT

File Name: Private Provider Requirements and Information

Greenbrier County Building Code Administrative Policy Manual

ST. TAMMANY PARISH PATRICIA P. BRISTER PARISH PRESIDENT

Development Related Fee Schedule Effective May 1, Plan Reviews. Remodeling, Alterations, Additions Residential and Commercial

LAND USE APPLICATION

City of East Orange. Department of Policy, Planning and Development LAND USE APPLICATION & SITE PLAN REVIEW CHECKLIST

CONDITIONAL USE PEMIT

PROCEDURES TO SUBDIVIDE / LOT COMBINATION

SUBMITTAL REQUIREMENTS: The number indicates the number of copies for submittal (if applicable).

ARTICLE 900 PLAT AND PLAN REQUIREMENTS

DAUPHIN CREEK ESTATES SUBDIVISION

DETAILED GRADING PLAN CHECKLIST (TEARDOWN/REDEVELOPMENT) Updated: 12/12/2017

Zoning Permit Application

CONDITIONAL USE APPLICATION

COUNTY OF DUPLIN BUILDING INSPECTIONS DEPARTMENT PO BOX 950, 209 SEMINARY STREET, KENANSVILLE, NC (910) FAX: (910)

PLANNING COMMISSION SUBDIVISION PLAT APPLICATION

Township of Collier 2418 Hilltop Road Presto, PA 15142

Note to the Owner, Applicant & Agent:

COMMUNITY DEVELOPMENT DEPARTMENT

Transcription:

Community Development Building & Permitting Development 38 Hill Street, Suite G-30 Roswell, GA 30075 770-641-3780 www.roswellgov.com NEW SINGLE FAMILY RESIDENTIAL BUILDING PERMIT APPLICATION This packet contains information required to prepare and submit for a City of Roswell building permit for all projects. You must have an approved permit prior to beginning construction. If construction begins before the permit is issued, you may be subject to enforcement action and a double permit fee. Inspections e-mailed in before 4:00 p.m. will be inspected the next day. Inspections e-mailed in on Friday before 4:00 p.m. will be inspected on Monday. The e-mail for inspections is: buildinginspection@roswellgov.com. Please submit Business License and State Card with each application. Application No.: Taken In By: Office use only All applicable sub-contractor affidavits must be filed before issuance of permits. PACKET CONTENT Page Number 1. Application....2 2. Single Family Building Permit Checklist......3 3. Building Permit Site Plan Checklist..... 4-5 4. Fee Schedule........6 5. Sub- Contractor Affidavit.....7 6. Property Owner Affidavit - General Contractor........8 7. Homeowner Affidavit- Trade Contractor 9 PERMITTING TEAM CONTACT Chief Building Official.. 770-594-6279 Plans Examiner/Inspector. 770-594-6115 Permit Technician.... 770-594-6195 Fire Marshall...... 770-594-6223 Water (Roswell Only)... 770-639-7565 OTHER HELPFUL TELEPHONE NUMBERS Fulton County Environmental Health Services...404-332-1801 Fulton County Water/Sever....404-612-6830 Georgia Power, Comcast, Charter EXPIRATION NOTICE In accordance with Section, 5.4.5 of the City of Roswell Code of Ordinances, an application for a permit for any proposed work shall be deemed to have been abandoned six (6) months after the date of filing for the permit, unless before then a permit has been issued. The chief building official may allow one (1) or more extension of time for periods of not more than ninety (90) days each provided the extension is requested in writing and justifiable cause is demonstrated. Page 1 of 8

Community Development Building & Permitting Development 38 Hill Street, Suite G-30 Roswell, GA 30075 770-641-3780 www.roswellgov.com NEW ALTERATION BUILDING PERMIT APPLICATION Single-Family Multi-Family Commercial Trades to add: Electrical Plumbing Mechanical Will you need to add: Temporary Pole Electric Meter Release Gas Meter Release PROJECT DESCRIPTION Job Site Address: Suite: Project Description: Estimate Value (Labor and Materials): Building Height: Ft. Total Area: Sq. Ft. # of Floors: # of Bedrooms: Subdivision: Lot Number: CONTACTS Property Owner Name: Address: City: State: Zip: Contractor Exemption Claimed (attach affidavit) DE TA Plan Review Contact Name: License No: Company: License No: Address: City: State: Zip: Phone: E-mail: Name: Phone: E-mail: Applicant Name: Phone: E-mail: Notice: No changes shall be made from that which is stated in this application, or in attached plans and specifications, except by submitting a revised application, plans and/or specifications and receiving approval of the Chief Building Official for such change. Granting of a permit shall not be construed as a permit for or an approval of any violation of the Building Code or any other state or local law regulating construction or the performance of construction. I hereby certify that I have read and examined this application and the information provided herein is true and correct. I further certify that all construction will comply with the building codes in effect at the time of permit issuance. Signature of Applicant Date Page 2 of 8

City of Roswell SINGLE FAMILY BUILDING PERMIT CHECKLIST Provide all items listed below. If not applicable, applicant shall indicate N/A on this check list, and shall explain by notation on the plan. An incomplete application will not be accepted into the review process. The building permit card must be posted on the permitted job site at the right of way, weather protected and a copy of the permitted plans must be readily available to the Inspectors at all times. Minimum Requirements 1. Complete Building Permit Application 2. A Georgia Energy Code Compliance Report (www.energycodes.gov) or a copy of the ResCheck calculations Residential plans require two (2) copies of clearly drawn architectural plans showing the following: Address of the proposed residence Heated and unheated area calculations Foundation plans, drawn clearly and to scale Footing and foundation wall details, showing reinforcement Floor plans, showing proposed electrical and plumbing fixtures Typical wall sections, showing proposed building materials Truss plans, in accordance with the R502.11.4(2006 IRC) Four-sided elevations, with building dimensions Structural/engineered plans, where required 3. A PDF of plans must be submitted by CD/DVD/USB if drawings are larger than 11 x 17. 4. A copy of the approved County water and sewer tap-in permit/receipt (or a copy of the County Health Dept. Septic Permit) 5. For attached dwellings or dwellings less than five feet from any property line, submit details for fire walls Page 3 of 8

City of Roswell BUILDING PERMIT SITE PLAN CHECKLIST Provide all items listed below. If not applicable, applicant shall indicate N/A on this check list, and shall explain by notation on the plan. An incomplete application will not be accepted into the review process. The building permit card must be posted on the permitted job site at the right of way, weather protected and a copy of the permitted plans must be readily available to the Inspectors at all times. Minimum Requirements The following documents, if applicable, are required in order to obtain approval of the site plan for a building permit. 1. Complete house location plans per the following checklist 2. Plans stamped by Professional Engineer (if applicable) 3. Fulton County Water & Sewer Tap-in permit (if applicable). 4. Fulton County Health Department Septic and Well Permits (if applicable). 5. Contractors Business License and State Card (if applicable) 6. Completed Building Permit application and submittal fee 7. Pool Permit (if applicable) Residential plans require two (2) copies of clearly drawn site plans showing the following: General Plan Requirements 1. Maximum sheet size shall be 24 X 36. A PDF is required for sheets larger than 11 x 17. 2. Project name and address, subdivision name and lot number (if applicable, land lot, district, and zoning 3. Owner s name and complete address including zip code 4. Name and telephone of a 24-hour contact 5. Design Firm name/address/phone, point of contact and contact phone number 6. North arrow, site acreage, and scale of drawing (1 =10 to 1 =50 ) 7. Boundary information including bearings and distances along all property lines 8. Street name 9. Lot building setback lines (per City of Roswell Zoning Ordinance and/or conditions of zoning) labeled with dimensions to lot lines 10. Locations of all existing structures (including houses, barns, sheds, landscape and retaining walls, sanitary and storm drainage lines and structures, detention ponds and structures, septic tanks and lines, pools, fences, etc.) with distance to lot lines for all above structures. Page 4 of 8

11. Location of all proposed structures (including houses, walls sanitary and storm drainage lines and structures, septic tanks and lines, pools, fences, etc.). Size and type of construction should be called out on the plan with distance to lot lines for all above ground structures. 12. Height of proposed buildings and square footage of existing and proposed dwelling (the dwelling must meet the minimum requirements for the parcel s zoning district). 13. Location of zoning buffers, state water buffers, floodplain access easements, sewer easements, and drainage easements, property lines, etc. 14. Location of driveway (existing and proposed) and the proposed construction entrance. Dimensions from any improvements or the property corner. Proposed driveway apron(s) must be a minimum of 10 feet from a catch basin or fire hydrant, and a minimum of 5 feet from the lot line. Driveway apron (s) must also be a minimum of 25 feet from the radius return on corner lots. 15. Flood plain notes and Flood Insurance Rate Map (F.I.R.M) panel number and effective date. Note should be in the following form: This site [is/is not] located with a zone [A, AE, shaded zone X] as defined by F.I.R.M Community Panel Number(s) 135160 for unincorporated Fulton County, Georgia. (Used June 22, 1998 map). 16. If property is located in a flood zone as determined by FEMA, a Certificate of Elevation will be required. Plan must state existing and minimum proposed finished floor elevation s for the main floor, basement, and garage. Elevations must be at least 3 feet above the 100-year elevation. The house must be at least 10 feet (horizontally) away from the 100-year limit. 17. If the site included a stormwater detention pond or a normally wet pond or lake, submittal of a Certificate of Elevation will be required. Trees 1. Location of any specimen trees as defined in Article 15, Tree Protection, of the Zoning Ordinance 2. Location of all landscape strips and tree save areas. Erosion & Sedimentation Control/Stormwater 1. A delineation of the limits of disturbance and a statement of the estimated square feet of the area being disturbed 2. Existing and proposed topographic contours with adequate spot grades to define drainage 3. Location and type of temporary or permanent soil erosion control measures including, but not limited to silt fences, construction exits, level spreaders, rip-rap, mulching, temporary and permanent seeding, etc. 4. Direction of existing and proposed storm water or drainage flow by use of arrows 5. Proper design, installation & maintenance of BMPs Page 5 of 8

City of Roswell - Building Permit Fees-ALL FEES PAID AT TIME OF SUBMITTAL Application $25 - a non-refundable application fee is in addition to the applicable fees below Plan Review Building, plumbing, mechanical, electrical and permanent sign permit fees will be collected in addition to fees that are based on Building Valuation Tables 50% of the permit fee for commercial projects. 25% of the permit fee for residential projects. Building Valuation Permit Fees Based on Valuations ALL FEES ARE PAID AT TIME OF SUBMITTAL. ALL FEES ARE NON- REFUNDABLE UNLESS AN ERROR HAS BEEN MADE INTERNALLY. Certificate of Occupancy or Completion (C/O or C/C) Residential One & Two Family and Non-Residential & Multi- Family Use ICC Building Valuation Data Table, latest publication edition The following valuation shall be used for all building permit fees including electrical, mechanical, plumbing, fire related and building permits in which square footage is not an applicable determination to calculate building fees TOTAL VALUATION FEES $0 to $2,000 $25 $2,001 to $5,000 $5,001 to $50,000 $50,001 to $100,000 $25 for the first $2,000; plus $7 for each additional $250 or thereof, to and including $5,000 $109 for the first $5,000; plus $6 for each additional $1,000 or fraction thereof, to and including $50,000 $379 for the first $50,000; plus $5 for each additional $1,000 or fraction thereof, to and including $100,000 $100,0001 and $750,000 $629 for the first $100,000; plus $4 for each additional $1,000 or fraction thereof, including $750,000 $750,000 and above $3,229 for the first $750,000; plus $2 for each additional $1,000 or fraction thereof Temporary, conditional and partial certificate of occupancy AND for each $200 30-day extension Replacement of permits, CO s, etc. $25 Re-Inspections Re-inspection fee $50 first time $75 second time $100.00 third time and each subsequent time Sign Permits (incl. elec.) Wall $50 + $25 app fee & $25 review fee Free Standing $100 + $25 app fee & $50 review fee Others Transfer of Permit/change of contractor $200 Temporary Power Letter $50 Temporary Power Pole $25 Demolition $100 Erosion Fee $20 House Moving Permit $100 Roofing per valuation Inspections outside of normal business $75 per hour ($150 minimum) hours Minor (50% or less) Plan Revision $75 per hour ($150 minimum) Reviews Revision on change to plans after approval Fee for work done without a permit 200% of original permit fee Temporary Construction Trailer (not $100 including electric Preliminary/Code compliance/safety $100 inspections Page 6 of 8

CITY OF ROSWELL COMMUNITY DEVELOPMENT DEPARTMENT Building & Inspection Division SUBCONTRACTOR AFFIDAVIT Notice: Subcontractors (trades for Electrical, Plumbing or Mechanical only) must submit this form before work begins or a building permit is issued. A copy of your current Business License, State License and Driver s License must accompany this affidavit. All information requested on this form is mandatory. You may e-mail this form with the required licenses (copies of license) to buildingpermits@roswellgov.com Permit Application #: Site Address: Subdivision: Lot/Bldg./St: General Contractor Name: This is to certify that I am responsible for: (check all that apply) Electrical Mechanical Plumbing I certify that I have and will comply with all codes and ordinances adopted by the City of Roswell that pertain to the construction of this structure. In the event of any change in my status on this installation, I understand that I will be held responsible for all indicated work at this job until Building Inspections has been notified, in writing, or any change. I further agree to indemnify the City of Roswell and its operator from any liability for damages and loss of property if the work performed under my authority has not been installed in accordance with these codes and ordinances. State card holder: (Print) Signature: Date: State License #: Business License#: Jurisdiction: Contractor Business Name: Address: Telephone: Cell: E-Mail: Page 7 of 8

CITY OF ROSWELL COMMUNITY DEVELOPMENT DEPARTMENT Building & Inspection Division Application No.: Taken In By: Office use only PROPERTY OWNER AFFIDAVIT-GENERAL CONTRACTOR Notice: This form must be completed and submitted to the Community Development Department before a permit is issued to a Property Owner to act as the General Contractor in lieu of a State of Georgia licensed Residential/General Contractor. All information requested on this form is mandatory and shall be submitted in person by the listed property owner of record. Property Address: Phone #: Subdivision: Lot/Bldg./Ste: The undersigned hereby applies for special consideration as owner of the property listed above, desiring to perform construction and serve as general contractor for the subject property. In making this request for a Property Owner building permit, the undersigned hereby states the following to be true: 1) The building or structure is located on real property owned by the undersigned and is intended for occupancy by the undersigned upon completion and will not be used by or open to the general public. 2) The undersigned has not sold a building or structure that they constructed and acted as a property owner contractor within the prior 24 months in the State of Georgia. 3) The subject property is not to be offered for sale or lease as provided in O.C.G.A. 43-41-17. 4) The undersigned shall serve as the contractor of record and accept all inherent responsibilities and liabilities for the work authorized by the approved building permit. 5) The undersigned may not hire or assign another individual or firm to hire sub-contractors without that individual or firm being duly licensed by the State of Georgia per O.C.G.A. Title 43, Chapter 41 and further securing required permits or affidavits from the City of Roswell. 6) The undersigned agrees to build in strict accordance with all applicable codes and strictly adhere to the inspection requirements of the City of Roswell AND acknowledges that inspections must be performed in an established sequence as required by the City of Roswell and that work done in violation of the building codes must be corrected or shall be ordered removed. 7) The undersigned acknowledges and is aware that a permit issued under the provisions of the City of Roswell s codes may be revoked for false statements or misrepresentation as to the material fact in the building permit application on which the permit was issued. 8) The undersigned acknowledges that knowingly making false statements in order to obtain a building permit will subject the undersigned t0 possible prosecution and/or fine per Georgia Criminal Code Section 16-10-20 (False Swearing) with fines of not more than $1,000.00 and imprisonment for not less than one (1) nor more than five (5) years or both. 9) The undersigned further agrees to indemnify, hold harmless and defend the City of Roswell, its operator, agents and contractors from any and all liabilities and actions that may arise from any actions or inactions associated with the issuance of this building permit. Signed: (Property Owner acting as general contractor of record) Print Name: Page 8 of 8 Notary Public: State of Georgia County of Sworn and subscribed before me this day of 20

CITY OF ROSWELL COMMUNITY DEVELOPMENT DEPARTMENT Building & Inspection Division Application No.: Taken In By: Office use only HOMEOWNER AFFIDAVIT TRADE CONTRACTOR Notice: This form must be completed and submitted to the Community Development Department before a permit is issued to a Homeowner to act as a Trade Contractor in lieu of a State of Georgia licensed Trade Contractor. All information requested on this form is mandatory and shall be submitted in person by the listed homeowner of record. Property Address: Phone #: Subdivision: Lot/Bldg./Ste: This is to certify that I am the homeowner of the property listed above and desire to serve as trade contractor of record and shall be responsible for: (check all that apply) Electrical Plumbing Mechanical Low Voltage In making this request for a Homeowner trade permit, the undersigned hereby states the following to be true: 10) The building or structure is located on real property owned by the undersigned. 11) The undersigned shall serve as the trade contractor(s) of record as allowed by the State of Georgia per O.C.G.A. Title 43, Chapter 14 and shall accept all inherent responsibilities and liabilities for the work authorized by the approved building permit. 12) The undersigned may not hire or assign another individual or firm to perform the specific trade work per the State of Georgia O.C.G.A. Section 43-14-13. All work intended to be performed under this affidavit must be done personally by the Property Owner. 13) The undersigned agrees to build in strict accordance with all applicable codes and strictly adhere to the inspection requirements of the City of Roswell AND acknowledges that inspections must be performed in an established sequence as required by the City of Roswell and that work done in violation of the building codes must be corrected or shall be ordered removed. 14) The undersigned acknowledges and is aware that a permit issued under the provisions of the City of Roswell s codes may be revoked for false statements or misrepresentation as to the material fact in the building permit application on which the permit was issued. 15) The undersigned acknowledges that knowingly making false statements in order to obtain a building permit will subject the undersigned t0 possible prosecution and/or fine per Georgia Criminal Code Section 16-10-20 (False Swearing) with fines of not more than $1,000.00 and imprisonment for not less than one (1) nor more than five (5) years or both. 16) The undersigned further agrees to indemnify, hold harmless and defend the City of Roswell, its operator, agents and contractors from any and all liabilities and actions that may arise from any actions or inactions associated with the issuance of this building permit. Signed: (Property Owner acting as trade contractor of record) Print Name: Notary Public: State of Georgia County of Sworn and subscribed before me this day of 20 Page 9 of 8