Contract Renegotiation of Transport PPP Projects An overview of the Latin American Experience

Similar documents
RENEGOTIATION OF PPP CONTRACTS: Evidence, Typology and Tendencies Gypsy Curse?

International Seminar on Strengthening Public Investment and Managing Fiscal Risks from Public-Private Partnerships

The Renegotiation of PPP Contracts: An Overview of its Recent Evolution in Latin America

The Renegotiation of PPP Contracts: An overview of its recent evolution in Latin America

Toolkit for PPP in roads & highways

A Diagnostic Checklist for Business Inspection

Republika e Kosovës Republika Kosovo - Republic of Kosovo Kuvendi - Skupština - Assembly

Case Study 2: Risk Allocation and Mitigation in a Road Toll Project. Thursday, 10:45 to 12:00

Implementation of a PPP Transaction in the Rural Water Sector in Uganda. IFC - PPP Transaction Advisory Dakar, June 4, 2012

Revised translation by legal affairs Department CIB/CDC

Institutional Analysis of Condominium Management System in Amhara Region: the Case of Bahir Dar City

PPP Project Realization Roadmap for Public Entities. based on the PPP Act and the Act on Concessions for Construction Work or Services

Designing for transparency and participation in the Hellenic Cadastral Project

Land Administration Projects Currently there are more than 70 land administration projects being implemented Many donors involved, including NGOs Thes

Real Estate and Construction Law investing in Saudi Arabia

Public-private Partnerships in the Road Sector. Caroline Visser International Road Federation 18 April 2008

Self-Regulation in Colombian Securities Markets

Implementing GASB s Lease Guidance

18 Sale and Other Disposition of Regional Lands Policy

Establishment of a land market in Ukraine: current state and prospects

Future Canadian Embassy, Current state 130 rue du Faubourg Saint-Honoré, Paris

Government Emergency Ordinance No. 54/2006 on the regime of the concession contracts for public assets ( GEO No. 54/2006 );

INVENTORY POLICY For Real Property

APPENDIX B1 EXECUTION OF PROJECT AGREEMENTS

Identifying brownfield land suitable for new housing

ROLE OF SOUTH AFRICAN GOVERNMENT IN SOCIAL HOUSING. Section 26 of the Constitution enshrines the right to housing as follows:

Proposal to Restructure

Core Element 6 Appropriate Regulation

ONTARIO S CONDOMINIUM ACT REVIEW ONCONDO Submissions. Summary

In light of this objective, Global Witness is providing feedback on key sections of the 6 th draft of the national land policy:

ISSUES OF EFFICIENCY IN PUBLIC REAL ESTATE RESOURCES MANAGEMENT

The Social Housing Regulator & Housing Co-operatives. Blase Lambert CCH Conference 2016

RENEGOTIATION OF PUBLIC PRIVATE PARTNERSHIP ROAD CONTRACTS: ISSUES AND OUTCOMES

OUR GLOBAL FOOTPRINT INDEPENDENT, INTERNATIONAL, COMMERCIAL, RESIDENTIAL. Locally expert, globally connected.

National Technical University of Athens School of Rural and Surveying Engineering

PROJECT INITIATION DOCUMENT

Welsh Government Housing Policy Regulation

City of Brandon Brownfield Strategy

License award process for 3G and 2G

Superintendent of Real Estate Ministry of Finance Vancouver

Referral Partnership Program

Housing in African Cities: why it matters and what is going wrong

GASB 87: Leases. Hosted By: Ben Lindekugel, Executive Director Association of Washington Public Hospital Districts

Suburban Sprawl: Exposing Hidden Costs, Identifying Innovations. Summary

CAPITAL IMPROVEMENT PLAN POLICY/PROCEDURE Approved by the Town Council at the Town Council Meeting

Monetization/ disposal of Public Land: Framework and action plan for the ULBs. Mohd Taquiddin 1 Ramakrishna Nallathiga 2

Land Tools for Tenure Security for All

MULTIPLE CHALLENGES REAL ESTATE APPRAISAL INDUSTRY FACES QUALITY CONTROL. Issues. Solution. By, James Molloy MAI, FRICS, CRE

WHEREAS, the Board passed Resolution approving the aforementioned Guidelines; and

INTERNATIONAL SALE CONTRACT MODEL INTERNATION SALE CONTRACT

Contract Management Body of Knowledge, Acquisition Planning and Strategy, and Post- Award Competencies

SOCIAL HOUSING THE WAY FORWARD

Community Occupancy Guidelines

IPSASB Consultation Paper (CP): Financial Reporting for Heritage in the Public Sector Proposed comments from the FOCAL i working group

Broadstone Asset Management, LLC

JOINT VENTURES (EMPRESAS MIXTAS) CHECKLIST OF ISSUES

New Developments in Real Estate Law. Tuesday, June 26, 2018

Award of the Housing Responsive Repairs and Void Refurbishment Contracts

Ind AS 115 Impact on the real estate sector and construction companies

Real Estate Services Division Real Estate Department Anchorage: Performance. Value. Results.

Student Property Global Contacts. Connecting people & property, perfectly.

Contact Person Applicants are encouraged to direct questions regarding this NOFA to:

NEW CHALLENGES IN URBAN GOVERNANCE AND FINANCE

OFFICIAL GAZETTE OF THE REPUBLIC OF KOSOVA / No. 33 / 23 NOVEMBER 2012, PRISTINA

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA Project Name. Region Country Sector(s) Theme(s)

Intent: To establish a policy and guidelines for all procurement activities in the city. SECTION I: Purpose of Purchasing Policies...

Going global. Trouble ahead. Ongoing major projects. Where next?

A Joint UN-Habitat GLTN and FIG session CoFLAS: Progress Report

THE LEGAL AND FINANCIAL FRAMEWORK OF AN EFFICIENT PRIVATE RENTAL SECTOR: THE GERMAN EXPERIENCE

Tenant s Scrutiny Panel and Designated Persons and Tenant s Complaints Panel

Oil & Gas Lease Auctions: An Economic Perspective

Public Housing Plan Glossary of Terms. A Additional places. B Base. C Case Management

HELLENIC REPUBLIC ASSET DEVELOPMENT FUND SA. 1 Kolokotroni & Stadiou Str., , Athens, Greece. Athens, May 13th, 2013

Republika e Kosovës Republika Kosovo - Republic of Kosovo Kuvendi - Skupština - Assembly

Multifamily Housing Revenue Bond Rules

NSW Affordable Housing Guidelines. August 2012

Real Estate Economics

The means to identify trends and policy innovations for strengthening Land Governance

South African Council for Town and Regional Planners

The Ministry of Defence s arrangement with Annington Property Limited

Council Policy. Council policy title: Lease and Licence Policy 2018

Council Policy Name: Policy Statement and Rationale: Scope: Council Policy No.: C205 CAO 044. Date Approved by Council: May 26, 2015

MTR Corporation Interim Results. 7 August 2007

EY s Spotlight on Telecommunications Accounting

How to Read a Real Estate Appraisal Report

This article is relevant to the Diploma in International Financial Reporting and ACCA Qualification Papers F7 and P2

GUIDING QUESTIONNAIRE FOR COUNTRY ASSESSMENTS

Real Estate Acquisitions Audit (Green Line LRT Stage 1)

Material adverse change clauses

BUILDING CONTRACT AGREEMENT TEMPLATE BUILDING CONTRACT FOR HOME OWNER

Housing the World: Leveraging Private Sector Resources for the Public Good

SCHOOL SECTOR PROGRAM (SSP) FRAMEWORK FOR LAND ACQUISITION THROUGH VOLUNTARY DONATION OR WILLING SELLER WILLING BUYER PROCESS

Presentation: Urban planning law reform in Latin America

JOB DESCRIPTION MANAGEMENT EXCLUSION

PUBLIC PROCUREMENT BASICS

R esearch Highlights LIFE LEASE HOUSING IN CANADA: A PRELIMINARY EXPLORATION OF SOME CONSUMER PROTECTION ISSUES. Findings. Introduction.

Housing White Paper Summary. February 2017

POLICY BRIEFING. ! Disposal of public land for new homes NAO Report

SUBJECT: Board Approval: 1/18/07

Ontario Energy Board Decision on Installation of Smart Sub-Metering Systems in Rental Residential Buildings

Transcription:

Contract Renegotiation of Transport PPP Projects An overview of the Latin American Experience José Luis Guasch, Daniel Benitez, Irene Portabales and Lincoln Flor October 28, 2014 Work in progress

1984 1985 1986 1987 1988 1989 1990 1991 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 PPPs in developing countries: an overview More than 6000 PPP contracts have been signed in developing countries in the last 25 years* Transport concentrates 25% of the total PPP contracts Three lead regions: Latin America, South Asia and East Asia and Pacific: They concentrate almost 90% of the PPP transport projects in the last 30 years Brazil, India, and China - large economies with high economic growth rates In 2012, 78% of transport investments were concentrated in Brazil and India *Source: World Bank / PPIAF database www.ppiaf.org 600 500 400 300 200 100 0 120 100 80 60 40 20 0 Number of PPP Transport Projects by Type and Region (1984-2013) East Asia and Pacific Europe and Central Asia Latin America and the Caribbean Middle East and North Africa South Asia Greenfield project Brownfield project Management and lease contract Number of PPP Transport Projects by Type and Year Greenfield project Brownfield project Management and lease contract Sub-Saharan Africa

Investments, promise, and contract renegotiations in LCR* Beyond much needed investments, another legacy is a large number of PPP contract renegotiations: 55% of the PPP contracts in transport (1980-2000) were renegotiated with and fairly quickly after the signature of contract (3.1 years). Colombia (roads) between 1993-2010 showed seven times the number of renegotiation in Chile or Peru Chile: contract renegotiations for additional investments suggesting poor project preparation studies critical to assess the real dimension/scope of the infrastructure projects and budget bypassing issues *LCR: Latin America and Caribbean Region

High frequency of contract renegotiation It also occurs in countries with large experience with private sector participation (also India, Portugal, South Africa ) Region / country Sector % of renegotiated contracts source Latin America and Caribbean Total 68% Electricity 41% Transport 78% Water 92% Guasch 2004 (2012) US Highways 40% Engel Fischer & Galetovic 2011 France Highways 50% Atthias and Saussier 2007 Parking 73% Beuve et al 2013 UK All sectors 55% NAO 2001 Source: Estache, Antonio and Stéphane Saussier, "Public-Private Partnerships and Efficiency: A Short Assessment", CESifo DICE Report 12 (3), 2014, 08-13

What do we mean by contract renegotiation? Renegotiation is when: i) a change in the risk matrix assignment and / or in the conditions of the contract, or ii) A change in compensation iii) a change in project scope (if this was not regulated in the contract). Examples Renegotiation is not when: Reduce the level of services (airports, from IATA A to B). Defer or advance investments for several years. Extension of the contract term. Reduction guarantees (financial bonds) Increase the guarantee of the government (to pay lenders). Delays in the reduction of tariffs (tolls), or levels Reduce the thresholds of the economic equilibrium of the contract, etc. Government requests new investments. Reduction of fees for the government. Ovoid bankruptcy of the operator. Changes on the contract scope, etc. Tariffs are adjusted with a formula set it in the contract or indexed by inflation. Triggers are activated and eventual investments become mandatory. Payments to operator if they are regulated in the contract, etc.

Why Renegotiation is an important issue? Implications Eliminate the competitive effect of the auction including transparency: questioning the credibility of the model/program Voids value for money analysis Asymmetric information and lack of negotiation skills of public sector to renegotiate the contract Distortion in public tender, in that the most likely winner is not the most efficient operator but the most expert/qualified in renegotiations Decreases the benefits/advantages of PPP and the welfare of users, and usually it has a fiscal impact by increasing liabilities to the government While some can be efficient, many of them are opportunistic

Costs associated with disputes, conflicts and renegotiations are: Time and financial resources: to address and resolve the conflict. Social and Political: Since conflicts tend to be highly visible and have great coverage of the media, leading to disenchantment of citizens, the PPP model tends to lose credibility and public support, and the government can be weakened. Financial/Fiscal: Often the results of the negotiation have a fiscal cost to the government. Economic and Social: Users tend to be adversely affected by the results of conflicts, particularly renegotiations (in terms of reduced access, higher or lower prices and delays in service quality)

Overall Incidence of Renegotiated and Cancelled Contracts in LCR The increase in the complexity of PPP projects might suggest more renegotiation incidence; but on the other hand, the countries with PPP experience have improved their renegotiation regulations in their PPP legislation, which intends to reduce incentives and manage renegotiations with better structure and oversight. Sectors Percentage of Renegotiated PPP Average Time to Renegotiation All Sectors 68% 1.0 years Electricity 41 % 1.7 years Transport 78% 0.9 years Water 87% 0.8 years Social Sectors 39% 1.2 years Other Sectors 35% 1 year Infrastructure LCR: Total Number of PPP Projects 1713 By sector Transport Energy Water and Sanitation Telecom Cancelled By sector 85 39 19 22 5 Percentage of Projects 4.96 % By sector 7.01% 2.46% 8.56% 3.91% The number of cancelled contracts in Latin America is low, but increasing *LCR: Latin America and Caribbean Region

Renegotiation in Chile, Colombia and Peru Chile Colombia Peru Total 60 403 44 Bilateral Agreement 83% 98% 100% Arbitration 17% 2% 0% How Government-led 84% 40% 64% Firm-led 12% 20% 23% Jointly-led 4% 40% 13% When During construction 53% 51% 62% After construction 47% 49% 38% Complementary works 69% 39% 17% What for Change conditions 22% 55% 83% Both 9% 1% 0% Add new stretches 0% 5% 0% Present fiscal transfer 66% 42% 14% Paid when Deferred fiscal funds 55% 6% 0% Other costs realized later 36% 28% 39% No cost 14% 24% 47% Fiscal transfer 66% 48% 20% Increase concession term 12% 12% 14% Types of cost Higher toll tariffs 24% 1% 0% Other type of payment 16% 0% 0% Without direct cost 15% 45% 77% Source: Bitran et al 2012

Drivers of Renegotiations Requests The renegotiations requests can have multiple causes, external and/or internal. For example, in the first case, in regulated markets, where no prices can be adjusted, significant changes in economic circumstances frequently lead to renegotiation requests, either by the operator or the Government (even if the risk allocation is established in the contract) Occasionally, economic conditions change unexpectedly because of the macroeconomic conditions beyond of the control of the parties (e.g. financial crises worldwide, the fluctuations of currencies, election where the new administration can change the regulation and affect the operator rights, etc.) Most commonly, demands for the renegotiation relate to bidding errors, aggressive offers, and poorly written contracts One of the main causes of the renegotiation is opportunistic behavior by operators and governments (governments may decide to modify the contract in benefit of users acting unilaterally to capture "excess profits" in electoral votes, or changing priorities after elections to anticipate investments). As well as the opportunity of governments to bypass the due process to secure additional financing and authorization (by parliament) expand investments The inability of Governments to credibly commit to a policy of no renegotiations and abuse of the exception for renegotiation Operators believe the circumstances confer them considerable influence on the host Government to grant them additional benefits through the renegotiation and weak contract monitoring

Measures that have been taken to tackle this issue A number of countries have taken decisions to address the issue with mixed success Mexico Peru New Law and Regulations and Process Review to the Law and Regulations Chile New Law and Regulations and Conflict Resolution Framework Colombia Portugal India New Law and Regulations and Institutionality and Process Platform for renegotiations Normative package to guide the process

Measures that have been taken to tackle this issue (II) More specifically, measures that have been taken are for example: Use and implementation of "delivery unit" to high level. Use and implementation of requirements unit (licenses, permits, rights-of-way, evaluations specific-environmental archaeological). Greater role of the PPP Unit and regulatory agency (Peru, Colombia). Disuse of clause of financial equilibrium (Chile and Peru). Platforms of renegotiations and process led by the Ministries of Finance (Mexico,Chile and Peru). Platform for efficient land expropriation and securing of rights of way (Mexico) Use of regulatory accounting (Peru and Chile). Transparency of the renegotiation process. Disclosure of information since the request, analysis, negotiations and final amendment- web information. Greater use of LPVR as the award criteria to mitigate demand risk (Chile, Colombia). Control of aggressive bids by larger performance bonds (Uruguay). A Freeze period for renegotiations (Colombia and Peru) A statement in the law or regulations that the risk matrix cannot be altered (Mexico). Use and composition of panels of experts (aggressive betting, renegotiation, arbitration, regulation).

Platform for Addressing Renegotiations The principles behind the platform are as follows, Preserve the value for money of the PPP project/contract. Inviolability of the Contractual/Bid Offer. When confronted with requests for renegotiation, the sacred character of the original contract/bid must be respected. And the operator should be held responsible for its offer. The financial equation of the winning offer should always be the reference point, and if the contract would be modified in the case of the renegotiation or adjustment, the outcome should be an impact of zero net present value of the benefits and risks, and without changing the allocation matrix. Compensations to the other party have to be considered to insure any extraordinary benefit. Renegotiation must not be used to correct errors in the basis for tender or excessively risky or aggressive bids.

Some ideas I The contract should stipulate the renegotiations approach, criteria and process. Increase the political costs of accepting renegotiations demands, by implementing a Transparency Framework-Use of Web, publish the requests, decisions and arguments, and using the media to inform on request and decisions and rational. Establish a reputation of not being well disposed to renegotiate by cancelling PPP/concessions processes particularly with aggressive bids. Establish a freeze period for renegotiations; say no renegotiations will be considered for three to five year after contract award. Only few exceptions can be accepted. Establish clear jurisdiction over the decision to renegotiate, at high level, such as Interministerial Committee lead by Minister of Finance. Establish in the contract the right to evaluate and reject aggressive and reckless bids, defining the criteria and standards, including submission of financial model for those bids or additional guarantees (financial bonds). Use panel of experts to evaluate: i) aggressive bids, ii) renegotiations request, ii) and conflict resolution. Matrix of risks with detailed risks identification and allocation-establishing that modifications of the contract must not alter the risk allocation. Establish that if the contract is modified, the net present value of the modifications must be zero, and preserve value for money Impose appropriate (biting) level of performance bonds: for example, at least 15% of the investment

Some Ideas II Clarification and wording of key contractual clauses and biding documents. Platform for efficient land expropriation and for the securing of rights of way (Mexico and Chile are good practices). Contingent financing over time, not all at the beginning (viability gap funding) Establish guidelines for levels of compensation. Simmetry on effects of unilateral actions by government Request a mandatory bidding process for additional infrastructure and the interest rate for PPP financing (Chile is the best practice) Establish transparent framework of conflict resolution (panel of experts and arbitration). Impose appropriate (biting) level of performance bonds: for example, at least 15% of the investment. Use appropriately the selection of competitive factors (such as the award criteria) to increase the costs make more expensive the exit. When possible use as award criteria (for some sectors) the least present value of revenue, as it is quite robust to mitigate renegotiation requests (automatically extending the duration of the contract if economic conditions become adverse, Chile and Colombia are best practices).