BUILDING LOCATION PERMIT APPLICATION

Similar documents
BONNER COUNTY PLANNING DEPARTMENT

MCPC MONONGALIA COUNTY PLANNING COMMISSION 243 High Street, Rm 110, Morgantown, WV Phone Fax

DEPARTMENT. A Current Contractor Listing: If the contractor is pulling the permit, they must be listed with the County

Remember, PA One-Call before excavating. Simply dial 811 or

Septic Tank / Drainfield / Holding Tank Permit Application

Septic Tank / Drainfield / Holding Tank Permit Application

Zoning/Building Permit Application

BUILDING PERMIT / ZONING USE PERMIT APPLICATION

ST. TAMMANY PARISH PATRICIA P. BRISTER PARISH PRESIDENT

Lot Split Application

~ Please Detach and Save This Page ~

BONNER COUNTY PLANNING DEPARTMENT

Septic Tank / Drainfield / Holding Tank Permit Application

BUILDING PERMIT APPLICATION

Cassia County Accessory Dwelling Unit (ADU) Permit Application

Finnerty, Shawn & Lori Water Front Setback

MANUFACTURED HOME SUBMITTAL REQUIREMENTS

BAY COUNTY BUILDERS SERVICES DIVISION RESIDENTIAL. MANUFACTURER/MOBILE HOME PLAN REVIEW SUBMITTAL FORM (For HUD approved structures only)

PARK COUNTY DEVELOPMENT PERMIT APPLICATION

RESIDENTIAL FERRY COUNTY BUILDING PERMIT CHECKLIST

MINOR SUBDIVISION FINAL PLAT APPLICATION Town of Apex, North Carolina

RESIDENTIAL PLAN APPROVAL AND INSPECTION FEES. 2. Inspection fee $.25 per sq. ft. Minimum Inspection Fee of $25.00

Waterford Owners Association Construction Guidelines

Application for a Building/Zoning Permit

PLANNING & DEVELOPMENT SERVICES 1800 Continental Place Mount Vernon, WA Inspections Office Fax 360.

Finnerty, Shawn & Lori Water Front Setback

PRE CONSTRUCTION CHECK LIST FOR BUILDING PERMITS

MASTER SUBDIVISION FINAL PLAT APPLICATION Town of Apex, North Carolina

NELSON TOWNSHIP APPLICATION FOR BUILDING PERMIT

CITY OF BIRMINGHAM Community Development Building Department 151 Martin Street, Birmingham, MI 48009

NOTICE APPLICATION MUST BE FILLED OUT COMPLETELY.

Administrative Review Application Blair Township, Grand Traverse County. Blair Township

SIGN PERMIT APPLICATION

PROCEDURE GUIDE AND APPLICATION FOR A DEVELOPMENT PERMIT TO CLEAR AND GRADE A PARCEL OF LAND

PLANNING CLEARANCE. Planning Clearance is required prior to the submittal of most building and development permit applications.

BONNER COUNTY PLANNING DEPARTMENT PLANNING & ZONING COMMISION STAFF REPORT APRIL 19, 2018

A.3. ARTICLE 7 PLAN REQUIREMENTS FOR MINOR SUBDIVISION AND/OR LAND DEVELOPMENT

This permit application includes the land use/zoning and building inspection reviews.

NEW SINGLE FAMILY RESIDENTIAL

CITY OF SARALAND FINAL SUBDIVISION PLAT REVIEW

Land Use & Development Application

CONDITIONAL USE PEMIT

Zoning Permit Application Cover Page

Instructions for Residential Building Permit Application

Natural Resource Assessment Submittal Checklist

BOROUGH OF BANGOR ZONING PERMIT APPLICATION PACKET. Submission Checklist

TOWN OF ROME 1156 ALPINE DR. NEKOOSA, WI (715)

Instructions to the Applicant

City of Leavenworth DEPARTMENT OF DEVELOPMENT SERVICES MAJOR SUBDIVISION APPLICATION 1

Natural Resource Assessment/ Site Plan Technical Review Application

FENCE and or POOL BARRIER CHECKLIST

MINUTE ORDER. BONNER COUNTY PLANNING and ZONING COMMISSION PUBLIC HEARING MINUTES APRIL 7, 2016

MASON COUNTY DEPARTMENT OF COMMUNITY SERVICES 615 W. Alder St., Shelton, WA

Before I can issue a permit, I need the following items:

ALEXANDRIA TOWNSHIP Land Use/Building Permit Application

Zoning Permit Application

LAND USE PERMIT INFORMATION PACKET

Name: Address: City/State Phone: *Please include the Commercial/Industrial/Other Establishment Sheet with permit

APPLICATION FOR A BUILDING PERMIT

CITY OF LITTLE FALLS BUILDING PERMIT APPLICATION ALL BUILDING PERMITS ARE GOOD FOR ONE YEAR

ZONING and PA UNIFORM CONSTRUCTION CODE (UCC) PERMIT APPLICATION. I. Zoning Permit Section Date Received Ins. Addendum Y N

CONOY TOWNSHIP 211 Falmouth Road Bainbridge, Pennsylvania Lancaster County Phone: Fax:

HOME ADDITION PERMIT PROCESS

Charter Township of AuSable

RESIDENTIAL DEVELOPMENT ORDER APPLICATION Application Fee $ PLEASE READ THE FOLLOWING INFORMATION CAREFULLY

ADDITION/REMODEL APPLICATION CHECKLIST 2017 FBC. Please make sure you have ALL required copies before submitting permit application

9. Public (Federal, State, or local

INSTRUCTIONS FOR APPLICATION IMPORTANT NOTICES

WISE COUNTY DEPARTMENT OF BUILDING & ZONING PO BOX 570 / 206 EAST MAIN ST WISE, VA Applicant: Phone #:

DRIVEWAY/ACCESS PERMIT APPLICATION INSTRUCTIONS Douglas County Trunk Highways

CITY OF ELSMERE 318 Garvey Avenue, Elsmere KY 41018

STEP 1: SOIL EVALUATION

CITY OF PANAMA CITY BEACH Building and Planning Department

COUNTY OF TAZEWELL DEPARTMENT OF COMMUNITY DEVELOPMENT

Sketch Plan 2018 Bargersville Plan Commission Application Kit

City of Greensburg. Step by Step Guidelines for your Project. Informational Packet for a Compliance Permit

FINAL SITE PLAN PLAT APPLICATION Town of Apex, North Carolina

Directions For Filling Out A CAMA MINOR Permit

THE CITY OF ELM SPRINGS

LOT SUBDIVISION LOT BLOCK SIZE

COLUMBIA COUNTY LAND DEVELOPMENT SERVICES COURTHOUSE 230 STRAND ST. HELENS, OREGON (503) APPLICANT: Name:

Square feet of Lot: State Parcel: Subdivision. Name: Subd. Sec:

DEMOLITION REQUIREMENTS

City of Midland Application for Site Plan Review

ELMORE COUNTY LAND USE & BUILDING DEPARTMENT 520 E 2 nd South Mountain Home, ID (208) Preliminary Plat Application

SITE DEVELOPMENT PLAN APPLICATION PAHRUMP REGIONAL PLANNING DISTRICT

APPLICATION FOR DRIVEWAY PERMIT

BOSSIER CITY PARISH METROPOLITAN PLANNING COMMISSION 620 Benton Rd. Bossier City, LA Phone: Fax: PRELIMINARY PLAT

Town of Lake George. Area Variance Review Application

MACOMB TOWNSHIP BUILDING DEPT TEL: (586) BROUGHTON ROAD FAX: (586) MACOMB MI 48042

DECK, DETACHED-GARAGE, STORAGE-BUILDING, REPLACEMENT WINDOWS, CHIMNEY, SIGNS, SOLAR PANELS, FENCES, RETAINING WALLS, AGRICULTURAL BUILDINGS

BUILDING PERMIT APPLICATION

*FOR RESIDENTIAL PROJECTS, CALL JACK CARNS AT *FOR COMMERCIAL PROJECTS, CALL BRIAN WRUBLE AT

Residential Minor Subdivision Review Checklist

ZONING COMPLIANCE PERMIT APPLICATION

Town of Aurelius 1241 West Genesee St Rd Auburn, NY Ext # (fax)

1. Name of Property Owner Phone Address. 2. Name of Surveyor. Phone Address. 3. Lots, Block, Section. Subdivision

SEPTIC PERMIT APPLICATION

1. STRUCTURE TYPE (CHECK ONE): METHOD FOR MEETING ENERGY CODE COMPLIANCE: RESIDENTIAL COMMERCIAL PRESCRIPTIVE REScheck COMcheck PERFORMANCE

Department of Planning and Development

Transcription:

BONNER COUNTY PLANNING DEPARTMENT 1500 HIGHWAY 2, SUITE 208, SANDPOINT, ID 83864 (208) 265-1458 (208) 265-1463 (FAX) planning@bonnercountyid.gov (email) www.bonnercountyid.gov (web page) BUILDING LOCATION PERMIT APPLICATION PROPERTY OWNER: PERMIT# MAILING ADDRESS: PHONE: CELL: CITY: STATE: ZIP: E-MAIL(optional): LEGAL DESCRIPTION: Tax #: Section: Township: Range: Site Acreage: Subdivision Name: Homeowner Built: Yes No If No provide Contractor Registration #: Block: Lot: Describe Use of Structure (see attached information sheet): STRUCTURAL DETAIL CLASS OF WORK IS BUILDING SITE OR ACCESS ROAD: YES NO # of units New # of stories Addition Sq footage Deck Attached garage sq. footage Type of heating Remodel Change of use Other Within 300 feet of any surface water? On or within 300 feet of a 15% or greater slope? Within a subdivision requiring Stormwater plans? Is the use commercial or industrial? If YES to any of the above, a stormwater and/or erosion control plan & fees are required Within a special flood hazard area? If YES a development permit & fees are required Does the site contain mapped wetlands? Mobile/ Manufactured Home Attach a copy of the title OR Floor Plan of New Model (Current Year) Year: Make: ID#: Size: AGENCY AUTHORIZATIONS Fire District: Local Road Jurisdiction: APPLICANT/REPRESENTATIVE SIGNATURE: I/We certify that I/We have read and examined this application and know the statements and depictions to be true and correct. I/We certify that the proposed construction will conform to the dimensions and uses shown above and that no changes will be made without first obtaining approval from Bonner County Planning Department. I/We understand that additional information may be necessary for a complete review of this application by the Planning Department, and submission of this application does not constitute approval. I/We further grant permission to Bonner County employees or officials to enter upon the subject land to make examinations or review the premises relative to this application. SIGNATURE OF OWNER(S) OR AUTHORIZED REPRESENTATIVE NOTICE: Nothing in the processing or granting of this permit shall be construed to relieve an applicant from compliance with any other requirements contained within Bonner County Revised Code, Idaho Code, state or federal regulations. EXPIRATION: This permit shall expire and become null and void if the building or work authorized by the permit is not commenced within (1) year from issuance or if the building or work is suspended or abandoned at any time after the work is commenced for a period of more than (1) year. A one-time extension of an unexpired permit, not to exceed (1) year, may be granted upon written request by the permitee, provided circumstances beyond the control of the permitee have prevented action from being taken. See 11-101 BCRC for definition of start of construction. Commencement of construction or time extension to be received prior to: Date of: Extension granted to: CONDITIONS OF APPROVAL: (For Planner Use Only) BLP: BV: EC/SW: DP: TIME EXT: DATE Address: Y / N Address/Access Road Name: Parcel # Zoning District: Receipt # s TOTAL FEES: PERMIT APPROVAL: (Permit is considered issued and approved when stamped, signed and initialed by a Planning Department official in this space.) Flood Zone: Panel # Development Permit # DATE RECEIVED: Call: or Mail: J:\Planning\Administrative\Applications\BLP\Building Location Permit Application August 8 th, 2016 Page 1 of 2

BUILDING LOCATION PERMIT PAGE 2 - SITE PLAN OWNER: PERMIT#: COMPLETE THE SITE PLAN BELOW, DEPICTING THE FOLLOWING: Property lines of the property to be developed Location of front door & dimensions of proposed structure Locations and uses of all existing and proposed structures Septic tanks, leach fields and wells, if applicable All bodies of water within 300 feet of the proposed building site and any wetlands on site. Signature of Owner/Authorized Representative Distance from property lines to architectural projections for all proposed structures All public or private roads providing access to the site; indicate primary access. Date All easements of record (utility, road, etc) Direction to site: INDICATE NORTH IN CIRCLE PARCEL HISTORY/COMMENTS: (For office use only) DATE RECEIVED:

USE THIS SHEET FOR THE DRAWING OF THE DIAGRAMMATIC FLOOR PLAN SHOWING ALL LEVELS OF THE PROPOSED STRUCTURE OR ATTACH YOUR DRAWINGS (NO LARGER THAN 11 X 17) Signature of Owner(s) or Authorized Representative Signature/Date \\7B-ADMIN1\common\Planning\Development Review\Application Forms\BLP\Diagramatic Floor Plan.doc March 2009

USE THIS SHEET FOR THE DRAWING OF THE FRONT AND SIDE ELEVATIONS OF THE PROPOSED STRUCTURE OR ATTACH YOUR DRAWINGS (NO LARGER THAN 11 X 17) Signature of Owner(s) or Authorized Representative Signature/Date \\7B-ADMIN1\common\Planning\Development Review\Application Forms\BLP\Elevation Drawings.doc October 2010

BUILDING LOCATION PERMIT SITE INPSECTION REPORT RP# BLP#: BV#: FDP#: NAME: APPLICANT PLEASE COMPLETE SITE ADDRESS: ESTIMATED CONSTRUCTION START DATE: CONTRACTOR/CONTACT PERSON: PHONE # DIRECTIONS TO SITE: OFFICIAL PLANNING USE ONLY INITIAL INSPECTION DATE: STATUS OF PROJECT: Structure staked Footer/foundation excavated Concrete footers placed Poles set Construction underway Structure completed How were property lines identified? Assisted by owner/contractor/neighbor Survey pins/stakes String line Ample distance to property line Fencing Flagging Are setbacks met as shown in site plan? Yes No Does the site plan show existing structures? Yes No N. A. Is the age/model of manufacture home shown on permit? Yes No N. A. Does construction appear to conform to application? Yes No Is the BLP posted? Yes No Comments/status/visits/corrective action: FINAL INSPECTION DATE: Does the structure conform to the permit? Yes No INSPECTED BY: