SCHEDULE OF FEES AND CHARGES LAND USE PLANNING AND DEVELOPMENT APPROVALS

Similar documents
SCHEDULE OF FEES AND CHARGES LAND USE PLANNING AND DEVELOPMENT APPROVALS

Hinchinbrook Shire Adopted Infrastructure Charges Resolution CR1-2018

Division 8 General Urban (T4) Zone: Assessment Criteria and Assessment Tables

Division 5 Residential Low Density Zone: Assessment Criteria and Assessment Tables

Division 4 Large Lot Residential Zone: Assessment Criteria and Assessment Tables

Development assessment and compliance fees 2010/11

The City is divided into zones as described in Table 2.1:-

South East Queensland Regional Plan State planning regulatory provisions Current as at May 2014

Division 16 Bundamba Racecourse Stables Area Zone: Assessment Criteria and Assessment Tables

Strathfield Local Environmental Plan 2012

Division 6 Residential Medium Density Zone: Assessment Criteria and Assessment Tables

Warringah Local Environmental Plan 2011

FOR PL A N N ERS. Michael Forwood. Tuesday 11 July 2017

Botany Bay Local Environmental Plan 2013

Bankstown Local Environmental Plan 2015

Great Lakes Local Environmental Plan 2014

State Environmental Planning Policy (Major Development) Amendment (Huntlee New Town Site) 2015

The Hills Local Environmental Plan 2012

Bega Valley Local Environmental Plan 2013

Blacktown Local Environmental Plan 2015

Wollongong Local Environmental Plan 2009

Moree Plains Local Environmental Plan 2011

Liverpool Local Environmental Plan 2008

Lithgow Local Environmental Plan 2014

Coffs Harbour Local Environmental Plan 2013

Canterbury Local Environmental Plan 2012

IDAS form 1 Application details

Fees and charges. Consenting and property information fees and charges. Effective from 1 July 2018

Richmond Valley Local Environmental Plan 2012

Environmental Planning and Assessment Act 1979

LAND USE PROCEDURES (LUP) BYLAW NO. 1235, 2007

Shellharbour Local Environmental Plan 2013

Gwydir Local Environmental Plan 2013

CITY OF CLAREMONT DEVELOPMENT REVIEW FEE SCHEDULE

Zoning Fee Schedule. Per Chapter Part VIII Administrative Code

Dungog Local Environmental Plan 2014

Kiama Local Environmental Plan 2011

This document uses the base official legal draft version of the Plan and therefore is in the same format.

Application details IDAS form 1

PART 9 TOWNSHIP AREAS

Harden Local Environmental Plan 2011

Deniliquin Local Environmental Plan 2013

SAI Global Property. This Certificate contains important information about the land described above.

Snowy River Local Environmental Plan 2013

Woollahra Local Environmental Plan 2014

Greater Hume Local Environmental Plan 2012

Hawkesbury Local Environmental Plan 2012

Wingecarribee Local Environmental Plan 2010

CITY OF JOHNSTOWN SCHEDULE OF PERMIT FEES

WEST NOTTINGHAM TOWNSHIP FEE SCHEDULE

Manly Local Environmental Plan 2013

Kogarah Local Environmental Plan 2012

PERMIT FEES DOUBLED FOR CONSTRUCTION WITHOUT THE BENEFIT OF A PERMIT

Greater Taree Local Environmental Plan 2010

The City of Daytona Beach Fee Schedule

STELLENBOSCH ZONING SCHEME SUMMARY Information document (Summary Draft 10.3a) 17 November 2016 (Rev1 Erratum)

GUIDANCE INFORMATION Building Consent and Inspection fees

THE CORPORATION OF THE CITY OF MISSISSAUGA GENERAL FEES AND CHARGES BY-LAW

Ryde Local Environmental Plan 2010

TARIFF OF FEES FOR PROCESSING OF PLANNING APPLICATIONS GENERAL TERMS

ZONING & BUILDING PERMIT AND SUBDIVISION & LAND DEVELOPMENT PLAN MASTER FEE SCHEDULE PER RESOLUTION No

Dwelling house guide

MASTER PLAN. March (As Amended February 2017) Western Australian Land Authority (LandCorp)

CHAPTER COMMERCIAL ZONING DISTRICTS

Kiama Local Environmental Plan 2011

Sydney Local Environmental Plan 2012 (Amendment No 17)

Commercial and Manufacturing Districts TABLE ALLOWED USES AND PERMIT REQUIREMENTS FOR COMMERCIAL AND MANUFACTURING DISTRICTS

EXHIBIT A to Ordinance No PART 1

SECTION 94 CONTRIBUTIONS PLAN CAR PARKING

El Paso County Development Review System Adopted Fee Schedule (2005)

I. RESIDENTIAL AND COMMERCIAL ON-LOT SEWAGE DISPOSAL SYSTEMS

MIXED-USE DEVELOPMENTS AND DEVELOPMENTS COMPRISING DIFFERENT TYPES OF STRATA LOTS

CAMDEN COUNTY PLANNING BOARD APPLICATION SUBMISSION REQUIREMENTS

SPECIAL USE PERMIT APPLICATION CITY PLAN COMMISSION AND BOARD OF ZONING ADJUSTMENT

CHAPTER XVIII SITE PLAN REVIEW

PEEL WATER NETWORKS LIMITED WHOLESALE SEWERAGE CHARGES SCHEME 2017/18

How To Prepare an Infrastructure Agreement. Scott Turner - Manager Planning Scenic Rim Regional Council June 2013

PORT PHILLIP PLANNING SCHEME. Condition

Disability Access Regulations

Ontario Municipal Board Decision issued July 28, 2014 and Orders issued December 4 and 17, 2015 in Board File No. PL CITY OF TORONTO

Development Application Type

9.3.5 Dual occupancy code

Sign Regulations Recommendations

CITY OF GALION OHIO CONSOLIDATED FEE SCHEDULE

PLACEMENT OF SECURITY HUTS ON CITY OWNED LAND

WEST WOOLGOOLGA. Developer Contributions Plan 2016

Farming & Livestock related activities Y Y Y Y Y Y. Commercial Type Animal Facility Y Y Y

Appendix G Fee Schedule

APPLICATION. Airport Hazard In ETJ - one- and two family dwelling $100 Airport Hazard in ETJ anything other than one- and twofamily

These charges apply to all actions of the Council for which a charge may be levied pursuant to section 219 of the Building 2004

32.08 GENERAL RESIDENTIAL ZONE. Shown on the planning scheme map as GRZ, R1Z, R2Z or R3Z with a number (if shown). Purpose

City of High Point Development Fee Schedule

Planning&Development Fee Standards

Condition. The gross floor area of all buildings must not exceed 250 square metres.

SCHEDULE 12 TO THE URBAN GROWTH ZONE. Shown on the planning scheme map as UGZ12. Kororoit Precinct Structure Plan

CHAPTER COMMERCIAL AND INDUSTRIAL ZONING DISTRICTS

New Hanover Township

THE TOWN OF Angier N O R T H C A R O L I N A

THE CITY OF SPRUCE GROVE BYLAW C DEVELOPMENT FEES AND FINES BYLAW

Town of Angier Rate and Fee Schedule Fiscal Year Effective July 1, 2011

Transcription:

1.0 Schedule of Fees & Charges Note: for applications involving multiple land uses or types of development, the fee shall be the combined total of all applicable fees. applications that are not properly made in accordance with Section 261 of the Sustainable Planning Act 2009 (SPA), will incur a further of 25% of the prescribed fee. where a use is not defined in the LUP, the fee will be set as the use deemed most similar by the Chief Executive Officer. 1.1 Material Change of Use Lodgement of a Code Assessable Development Application Where inconsistent with the LUP minor $832.00 $832.00 medium $5,544.00 $5,544.00 major $8,870.00 $8,870.00 Application for relaxation or modification of a provision of the LUP Where consistent with the LUP, but where made assessable development in accordance with Schedule 3 of SPA Where Ports North requires the submission of a technical report for review by an external appropriately qualified external consultant, in order to facilitate the assessment of a development application or consideration of a land use proposal. $832.00 or 25% of the original fee, whichever is greater $832.00 or 25% of the original fee, whichever is greater $1,584.00 $1,584.00 Minor technical $ 3,881.00/report Minor technical $ 3,881.00/report Where Far North Queensland Ports Corporation (FNQPC) has undertaken a compliance check of a proposed development against the LUP, it is at the discretion of FNQPC to waiver the application lodgement fee. Determination as to whether a technical assessment matter is minor or major in nature is at the discretion of FNQPC. 1.2 Operational Work Lodgement of a Code Assessable Development Application Where assessable development in accordance with Schedule 3 of SPA $1,584.00 $1,584.00 Far North Queensland Ports Corporation 1

Engineering Plans Assessment of operational works plans and/or engineering drawings $1,267.00 $1,267.00 Assessment of environmental management plan $528.00 $528.00 Application for approval of substantially amended engineering plans (for amendments other than required by FNQPC) Re-assessment of an application as a result of substantial FNQPC requirement for further information or a requirement for substantial amendments to drawings and/or design Water & Sewer Reticulation Flat charge $665.00/connection $665.00/connection External works, pump station & other infrastructure $665.00 $665.00 Rain checking/reinspection Subsequent checking of road and drainage plans which have been resubmitted as a result of previous nonapproval $665.00 $665.00 Subsequent road works or drainage inspection (e.g. sub grade, pre-seal, on maintenance, off maintenance and clearance inspections 1.3 Building Work $665.00 $665.00 Building approval filing fee $222.00 $222.00 1.4 Advertising Devices & Outdoor Dining Permits Advertising Devices Registration of portable advertising device (sandwich boards) registration $138.00 $138.00 Annual renewal of registration $95.00 $95.00 Return of confiscated advertising device $33.00 $33.00 Advertising device (excluding billboard) $194.00 + $16.00 Billboard $470.00 + $16.00 $194.00 + $16.00 $470.00 + $16.00 Far North Queensland Ports Corporation 2

Outdoor Dining Permits Outdoor dining permit application $359.00 $359.00 *Note: pro-rata fee applies for new registration 01 October 75% 75% 01 January 50% 50% 01 April 25% 25% Annual renewal of permit $166.50 $166.50 Transfer of permit $166.50 $166.50 1.5 Other Development For all other applications $832.00 $832.00 1.6 Preliminary Planning Advice and LUP Compliance An applicant may approach FNQPC to undertake a preliminary assessment of the application in order to provide preliminary planning advice. An applicant may also request FNQPC undertake a compliance check against the LUP to confirm whether the proposed use is an MCU consistent with the LUP and does not require lodgement of an application; an MCU consistent with the LUP but does require lodgement of an application due to a component(s) of the applicable being assessable development in accordance with Schedule 3 of the SPA; an MCU inconsistent with the LUP; or for all other development, where the development is exempt development or assessable development on strategic port land. Note: for applications involving multiple land uses or types of development, the fee shall be the combined total of all applicable fees. where a use is not defined in the LUP, the fee will be set as the use deemed most similar by the Chief Executive Officer. Prelodgement meeting Request for preliminary planning assessment (excludes compliance check) $694.00 $694.00 Request for compliance check against LUP (to determine if a consistent or inconsistent use) minor $832.00 $832.00 medium $5,544.00 $5,544.00 major $8,870.00 $8,870.00 Where Ports North requires the submission of a Minor technical Minor technical technical report for review by an external appropriately qualified external consultant, in order to facilitate the $3,881.00/report $3,881.00/report assessment of a development application or consideration of a land use proposal. For all other development $832.00 $832.00 Where FNQPC has undertaken a compliance check of a proposed development against the LUP, it is at the discretion of FNQPC to waiver the application lodgement fee. Far North Queensland Ports Corporation 3

Determination as to whether a technical assessment matter is minor or major in nature is at the discretion of FNQPC. 1.7 Miscellaneous Planning & Development Certificate Limited in accordance with Section 738 of the $194.00 $194.00 SPA Standard in accordance with Section 739 of the $655.00 $655.00 SPA Full in accordance with Section 740 of the SPA $1,331.00 $1,331.00 Request for changes to application or conditions pursuant to Section 351 and/or Section 369 of the SPA Request to cancel a development approval pursuant to Section 379 of the SPA Extension of a relevant period pursuant to Section 383 of the SPA Modification of a development application (prior to FNQPC decision) where not in response to an information request issued by FNQPC, pursuant to Section 351 of the SPA Reconsideration of a lapsed approval (minimum (minimum $1,331.00) $1,331.00) Refund of s when application is withdrawn at application stage 90% 90% at information request & referral stage (prelodgement 50% 50% of applicant s response to information request) at information request & referral stage (postlodgement 25% 25% of applicant s response to information request) decision stage 10% 10% Note: the above refunds refer only to a percentage of s 1.8 Publications Land Use Plan (hardcopy including plans) $444.00 $444.00 Land Use Plan (CD including plans) $55.50 $55.50 1.9 Miscellaneous Photocopying of documents available for purchase in accordance with Section 724 and Section 729 of the SPA $5.00 + $0.50 per page (minimum $5.50) $5.00 + $0.50 per page (minimum $5.50) Far North Queensland Ports Corporation 4

2.0 Scales of Development Table 1 defines what types of development are minor, medium or major to assist in determining the appropriate assessment fee for an application. The following uses are defined by the Cairns Port Authority Land Use Plan. Use Accommodation Units Minor Development Medium Development Major Development where <20 dwelling units where 20 dwelling units Aquaculture Business/Technology/Industrial Park Car Park Car Rental Support Facility Caretaker s Residence Child Care Centre Commercial Premises where not involving building work where <500m 2 of GFA and involving building work where 500m 2 GFA and involving building work Convention Centre Detached Bottle Shop Education Establishment Fast Food Outlet where not involving building work where involving building work Freight Depot Function Centre Ground Transportation Business Storage & Operational Facilities Heavy Vehicle Parking Holiday Apartments where <20 dwelling units where 20 dwelling units Hospital Far North Queensland Ports Corporation 5

Use Minor Development Medium Development Major Development Hotel Illuminated Tennis Court Indoor Sport & Entertainment where <4,000m 2 where 4,000m 2 Industrial Retail Premises Industry Junk Yard Local Utility Low-key Nature Based Recreation & Tourism Facilities Marina Market Nightclub Outdoor Sales Premises Outdoor Sport & Entertainment Park Passenger Terminal Place of Assembly Public Purpose Public Utility Restaurant Restricted Premises Scientific Research Activity Service Station Far North Queensland Ports Corporation 6

Use Shop Minor Development Medium Development Major Development where not involving building work where <500m 2 of GFA and involving building work where 500m 2 GFA and involving building work Shopping Centre where >5,000m 2 where 5,000m 2 Showroom Sport & Recreation Telecommunication Facility Tourist Attraction Transport & Equipment Depot Vehicle Hire Premises Vehicle Repair Station Warehouse Use which is not a preferred use within the relevant precinct or planning area Use which is not defined by the LUP Far North Queensland Ports Corporation 7