Contribution of Manufacturing to GDP and Stock of Industrial Premises

Similar documents
INDUSTRIAL 2.0: MORE THAN A FACE LIFT

Property Development 26 SUN HUNG KAI PROPERTIES LIMITED. Manhattan Hill, West Kowloon

BUILDING FOR THE BETTER CHINA. Hong Kong

MTR to work closely and align with the Government on announcement mechanism in relation to Railway Protection Area

Survey on the Current Status of Industrial Buildings for Arts Activities and Future Demand Report Summary

FOR VIBRANT LIFESTYLES THE REACH, YUEN LONG, HONG KONG

Delia Memorial School (Hip Wo) Guidance notes on filling Student s Particulars Record

Property Development. 1. YOHO Town, Yuen Long 2. Park Island, Ma Wan 3. Severn 8, The Peak 4. The Arch, Kowloon Station. Park Island, Ma Wan

Project Summary Major Property Development Projects in Hong Kong. Project Summary Major Property Development Projects in Hong Kong.

Property Investment. 1. Two IFC, Central 2. International Commerce Centre, Kowloon Station 3. East Point City, Tseung Kwan O 4.

Gross Floor Area of HOS Flat by Phase / Estate

Industrial rents shrug off retail market slowdown to reach new high

SUN HUNG KAI PROPERTIES LIMITED ANNUAL REPORT 2001/02

Unopened Space: Mapping Equitable Availability of Open Space in Hong Kong Press Conference Report by Carine Lai

FY2013 Annual Results. 26 September New World One Step Forward We Create New Living Experience

Property Investment. International Commerce Centre, Kowloon Station 38 SUN HUNG KAI PROPERTIES LIMITED

Collection Point Address

THE HONG KONG HOUSING AUTHORITY. Memorandum for the Commercial Properties Committee. Shopping Centres Scheduled for Completion in 2000/2001

Task Force on Kai Tak Harbourfront Development. Residential Development at 1-5 Kai Hing Road, Kai Tak South (Kowloon Godown Site)

Proposed Residential Development at 1-5 Kai Hing Road, Kai Tak South

Monthly update of MTR facilities for passengers with disabilities December 2017

HK Island Central. Central / Admiralty / Sheung Wan Admiralty Centre ifc (International Finance Centre) (One & Two) Shanghai Commercial Bank Building

CLP Power Extends Electric Vehicle Charging Network as Popularity of Green Motoring Accelerates

Causeway Bay ( Sec. ) A of Marine Lot No. 269; RP of Sec. A of Marine Lot No. 269; and RP of Sec. E of Marine Lot No. 201

Appendix: List of CLP Power s EV charging stations (14 December 2018)

Government Vaccination Programme 2018/19 List of HA GOPCs for GVP Vaccination

Memorandum for the Subsidised Housing Committee of the Hong Kong Housing Authority. Public Rental Housing Allocation Plan for 2010/11

Selection Method for Shaw College Student Hostel Places 2017/2018 (First Draft)

18 D Shop D & Portion of Shop B, G/F, B. 16 B Shop B, G/F and Shop A2 & A3, Upper G/F, A2

NOTIFIER JOB REFERENCE IN HONG KONG

Selection Method for Shaw College Student Hostel Places 2017/2018 (Second Draft)

A Dissertation On Hang Hau Town And Ap Chai Wan By Kwok-shing Pun READ ONLINE

Selection Method for Shaw College Student Hostel Places 2014/2015 (Second draft)

S.F. Service Points Update Notice

Redeveloping/Upgrading old and dilapidate districts as a form of improving the urban quality of Hong Kong

MEGA CUBE. Kowloon Bay, Hong Kong

Hong Kong Property Business

Selection Method for Shaw College Student Hostel Places 2016/2017 (Final Version)

High Park Grand Mong Kok, Hong Kong

Booth no: 1E-F12. Booth no: 1E-F15. Booth no: 1E-F25 ALFALFA ATELIER AMEBA DESIGN LIMITED ARTECH GRAPHICS LIMITED

For the Hong Kong Housing Society, 1998/1999 has been a year of. facing challenges and finding solutions

Kowloon Region. Unit No. District Meeting Venue & Contact Tel. Meeting Time. The Salvation Army Chuk Yuen Children and Youth Centre

Foreseeable Problems of Redevelopment of. Public Housing Estates a case study of Tsui. Ping (North) Estate

Shaw College Selection Method for Student Hostel Places 2018/2019 (1st Draft)

Road to regaining Balance? Hong Kong office market in 2020

The highly distinctive Manulife Financial Centre sets a precedent for the regeneration of the older districts of Hong Kong, providing over one

HKBN Mass Deploys Fiber-To-The-Home Making the Future Today in Hong Kong

香港物業管理公司協會有限公司 The Hong Kong Association of Property Management Companies Limited

S.F. Service Points Update Notice

MTR Kwun Tong Line Extends to Ho Man Tin and Whampoa Stations From 23 October 2016

S.F. Express Circle K Convenience Store Self-pickup Service Service Coverage: Kowloon

Parallel Lines : Railway Infrastructure Development and its interaction with Urban Growth in Hong Kong

Appendix. Office and Unit Lists. HKFYG Website: hkfyg.org.hk M21 Multimedia Web: M21.hk

MTR Transformation of CBDs in Hong Kong

Develop a GIS-based Electronic Mark Plant Circulation System in a collaborative and end-user computing approach

The Past, Present and Future Land-forming in Hong Kong

Shaw College Selection Method for Student Hostel Places 2019/2020

HONG KONG EXAMINATIONS AND ASSESSMENT AUTHORITY 2019 HONG KONG DIPLOMA OF SECONDARY EDUCATION EXAMINATION ENGLISH LANGUAGE

New Business Districts Why Success or Failure

Gross Rental Income* Gross Rental Income* by Sector

Major Project/Studies Areas undertaken by Raymond Wong since 1993

Self Service Terminal Service Hour Hong Kong District Branch

Booth no: 1E-F12. Booth no: 1E-F15. Booth no: 1E-F19 ALFALFA ATELIER AMEBA DESIGN LIMITED AP CREATIVE LIMITED

Progress Update on Shatin to Central Link (SCL) 2 May 2013

Hong Kong Industrial MarketView

HOUSING MATTERS DISCUSSED AT DISTRICT BOARDS AND THEIR COMMITTEES (1 JUNE 1998 to 31 AUGUST 1998) Abbreviations : PDB Provisional District Board

APPROVED URBAN RENEWAL AUTHORITY PRINCE EDWARD ROAD WEST / YUEN NGAI STREET DEVELOPMENT SCHEME PLAN NO. S/K3/URA2/2

A MAJOR PROPERTIES UNDER DEVELOPMENT

/ 2736 BOULEVARD, NATHAN ROAD, TSIM SHA TSUI

HONG KONG PRIME OFFICE Monthly Report

DEVELOPMENT PROJECTS COMPLETED

Redevelopment. The vertical green wall featured in URA redevelopment project One Wanchai Redevelopment Eng (5)a.indd 22

Business in Hong Kong Property Development

PROPERTY ANNUAL REPORT

BANK OF CHINA LIMITED (A joint stock company incorporated in the People s Republic of China with limited liability) Stock Code: 3988

HONG KONG MONTHLY RESEARCH DECEMBER 2017 REVIEW AND COMMENTARY ON HONG KONG'S PROPERTY MARKET

Shatin to Central Link. Transport Advisory Committee 4 May 2011

Amendments to the Approved South West Kowloon Outline Zoning Plan No. S/K20/24

HONG KONG HOUSING AUTHORITY HOME OWNERSHIP SCHEME AND PRIVATE SECTOR PARTICIPATION SCHEME AND TENANTS PURCHASE SCHEME INFORMATION FOR APPLICANTS ON

Award presentation ceremony. Green Building Award 2012

New World One Step Forward. We Create New Living Experience. FY2014 Annual Results 24 Sep 2014

HOUSING MATTERS DISCUSSED AT DISTRICT BOARDS AND THEIR COMMITTEES (1 JULY 1999 to 30 SEPTEMBER 1999) Abbreviations : PDB Provisional District Board

Hong Kong Industrial MarketView

Highlights of the Year

Hong Kong Out-patient Direct Settlement Network - April 2015

Hong Kong Property Transaction Analysis Report

HONG KONG MONTHLY RESEARCH MAY 2018 REVIEW AND COMMENTARY ON HONG KONG'S PROPERTY MARKET. Office More consolidation activity in Kowloon East

Centre and the Hong Kong Sectio

HONG KONG PRIME OFFICE Monthly Report

S.F. Service Points Update Notice

S.F. Service Points Update Notice

Booth no: 1E-F12. Booth no: 1E-F15. Booth no: 1E-F19 ALFALFA ATELIER AMEBA DESIGN LIMITED AP CREATIVE LIMITED

BRANCH NETWORK & CORPORATE BANKING CENTRES

Content. Mission. Objectives. For the People. People First, a District-based and Public Participatory Approach. Redevelopment.

INDUSTRY OVERVIEW INTRODUCTION

THE HONG KONG HOUSING AUTHORITY. Memorandum for the Housing Authority. Secretary s Report Committee Work (September November 1998)

Hong Kong Prime Office Monthly Report. September 2011 RESEARCH NON-CORE DISTRICTS LEAD THE MARKET

HONG KONG MONTHLY RESEARCH JANUARY 2018 REVIEW AND COMMENTARY ON HONG KONG'S PROPERTY MARKET

Recommended District Council Constituency Areas

Hong Kong Prime Office Monthly Report. October 2011 RESEARCH NON-CORE DISTRICTS LEAD THE MARKET

Transcription:

Hong Kong Institute of Facility Management Optimising the Use of Industrial Buildings Mrs Carrie Lam Secretary for Development 22 January 2010 1 Contribution of Manufacturing to GDP and Stock of Industrial Premises % 19 500 25 Stock of private flatted factories ('000 m²) 17 500 15 500 13 500 11 500 Stock of industrial premises Contribution to GDP 20 15 10 5 Percentage contribution of manufacturing to GDP 9 500 0 1980 1982 1984 1986 1988 1990 1992 1994 1996 1998 2000 2002 2004 2006 2008 Year 2

Existing Industrial Buildings Industrial buildings in Yau Tong & Kwun Tong Chimneys often sterilise new developments in the neighbourhood 3 Existing Industrial Buildings Former industrial area in Kwun Tong located along harbourfront good existing infrastructure undergoing urban regeneration 4

Existing Industrial Buildings Age profile of private industrial buildings in Metro and New Town Areas 45 50 years or above 7 Others 0-14 years 139 674 30-49 years 15-29 years 602 Total number: 1467 The industrial buildings in Hong Kong are relatively young 5 Existing Industrial Buildings During the past two decades, about 500 hectares of industrial land have been rezoned for non-industrial uses 70% of existing industrial buildings are now situated in non-industrial zones, mostly in Other Specified Uses (Business) zone Residential (A) Comprehensive Development Area Residential (E) 108 441 Industrial 31 2625 Commercial 18 Other zones 818 Other Specified Uses (Business) Total number: 1467 6

Existing Industrial Buildings Distribution of Private Industrial Buildings by Outline Zoning Plan Areas 300 Hong Kong Island Kowloon New Town No. of Buildings 250 200 150 100 Total number: 1467 50 0 Aberdeen/Ap Lei Chau 259 120 162 34 6 14 113 54 37 76 63 46 42 81 104 82 64 68 23 8 11 Chai Wan Kwun Tong (South) Cheung Sha Wan Mong Kok TWS/DH/SPK Ngau Tau Kok / Kowloon Bay Ma Tau Kok Kwai Chung Tsuen Wan Tuen Mun Sha Tin Fanling/Sheung Shui Other Zones Non-Industrial Zone Outline Zoning Plan Areas Industrial Zone All former industrial land in the whole of Kowloon has been rezoned for non-industrial uses, but 660 industrial buildings remain in these areas 7 Existing Industrial Buildings Planning intention of various zones : Industrial zone General industrial uses; information technology and telecommunication industries, and office related to industrial use are always permitted Flat, House or Residential institutions are not permitted uses Other Specified Uses designated Business ( OU(B) ) zone General business uses - Information technology and telecommunications industries, non-polluting industrial uses, office and other commercial uses are always permitted in new business buildings Less fire-hazard-prone office use not involving direct provision of customer services or goods to general public always permitted in existing industrial or industrial-office buildings Flat, House or Residential Institutions are not permitted uses 8

Uses Always Permitted in Buildings in OU(B) Zone Industrial or Industrial-Office Buildings Office Uses Office (excluding those involving direct provision of customer services or goods) Commercial Uses Eating Place (canteen only) Shop and Services (motor-vehicle showroom on ground floor and service trades only) Industrial Uses Information Technology and Telecommunications Industries Non-polluting Industrial Use (excluding industrial undertakings involving use/storage of dangerous goods) Research, Design and Development Centre Warehouse (excluding dangerous goods godown) Other Buildings (including redeveloped or buildings undergone wholesale conversion) Office Uses Office Commercial Uses Eating Place Shop and Services Exhibition or Convention Hall Recreation and Leisure Uses Place of Entertainment Place of Recreation, Sports or Culture Private Club Educational and Religious Uses Educational Institution Library School (excluding free-standing purpose-designed building and kindergarten) Training Centre Religious Institution Industrial Uses Information Technology and Telecommunications Industries Non-polluting Industrial Use (excluding industrial undertakings involving use/storage of dangerous goods) Research, Design and Development Centre 9 Existing Industrial Buildings Despite large scale rezoning for non-industrial uses, not many redevelopment or wholesale conversion of industrial buildings have taken place: between 2005 and 2008, there were only 32 cases of lease modifications for change of use of industrial buildings (mostly for redevelopment) 10

Existing Industrial Buildings Redevelopment of industrial buildings in Kwun Tong for other uses Industrial Buildings Redeveloped for Commercial Uses in the past 20 years Source : Information based on Monthly Digest issued by Buildings Department 11 Existing Industrial Buildings Former industrial area in Kwun Tong (rezoned as OU(B)) Area already redeveloped into office buildings (bigger building mass) Older existing industrial buildings (good potential for conversion to non-industrial uses) 12

Existing Industrial Buildings official vacancy rate of industrial buildings was not particularly high 6.5% at end 2008 (compared with 8.4% for office buildings and 4.9% for residential buildings) a survey in 2005 revealed that around 65% of industrial premises in OU(B) zones were still engaged in industrial and related uses the other 35% were for non-industrial uses or vacant. Non-industrial uses could take up an even higher percentage at present As at March 2009, Lands Department was managing 441 temporary waivers granted for change in use of industrial buildings, covering just slightly more than 1% of the existing stock of industrial buildings against about 30% of industrial premises engaging in non-industrial uses Conclusion: non-compliant uses in existing industrial buildings are widespread 13 Non-compliant Uses in Industrial Buildings Two kinds of non-compliance - (1) Not a permitted use in the current planning zone and no planning permission has been granted (2) Not complying with the lease conditions of the lot A major reason for rejection of planning applications is the potential fire risks due to mixed industrial and commercial uses in the same building 14

Existing Mixed Uses An industrial building in an Industrial zone Mixed uses on the same floor a show room locates near two factories, posing fire risks to visitors Roast meat factory: odour, slippery floor and fire risks not an ideal neighbour for art studios 15 Non-industrial Uses Allowed in Industrial Buildings Fire Services Department generally accepts the following types of change to commercial use in industrial buildings: 1. Partial change of use on ground floor Shop and services such as motorvehicle showroom on the ground floor of an industrial building are allowed 16

Non-industrial Uses Allowed in Industrial Buildings 2. Total change of use below a buffer floor Uses that may attract a lot of customers (e.g. retail banking, restaurant) are also allowed in floors below a purpose-designed buffer floor difficult to provide after the building is completed 17 Non-industrial Uses Allowed in Industrial Buildings 3. Partial change to commercial use (without direct provision of customer services or goods) on any floor Wine making inside industrial buildings Production and storage of wine in an industrial building are allowed, but 18

Non-industrial Uses Allowed in Industrial Buildings Shop and services that may attract a large number of customers would require planning permission not easy to get in an industrial building due to fire safety concerns 19 Non-industrial Uses Allowed in Industrial Buildings 4. Total change of use for the entire building (wholesale conversion) The entire industrial building has been renovated, but the owner still has to satisfy the land lease conditions 20

Challenges in Revitalising Existing Industrial Buildings Multiple ownership in flatted industrial buildings difficult to reach consensus among owners Full market premium payable for lease modification for redevelopment and full waiver fees for conversion based on enhanced value. Owners may also encounter difficulties in raising funds for redevelopment First-mover disadvantages in redeveloping or converting existing industrial buildings 21 Policy Initiatives to Encourage Redevelopment Allow industrial buildings aged 30 years or above situated in nonindustrial zones to apply for compulsory sale of the lot for redevelopment, if the applicants own not less than 80% of the lot Adopt a pay for what you build approach in assessing land premium for the lease modification based on the proposed GFA of the redevelopment (assessment will be based on the optimal use of the site) Provide an option for owners who modify the lease for redevelopments to opt for payment of 80% of the land premium by instalments (up to 5 years) at a fixed rate of interest (at 2% p.a. above the best lending rates of the three note-issuing banks prevailing at the time), if the total premium exceeds $20 million 22

Merits of Redevelopment Certain planning gains, e.g. setback of building lines, new open spaces, can be realised only upon redevelopment Redevelopment can also help upgrade the general environment of former industrial areas by removing sources of environment concerns e.g. chimneys New development meets today s safety standards and special requirements of the new uses 23 Merits of Redevelopment Redevelopment in Kwun Tong Redevelopment provides opportunities for realisation of planning gains, e.g. building setbacks, provision of open space 24

Policy Initiative to Encourage Wholesale Conversion No waiver fee will be charged for the lifetime of the existing buildings or until the end of the existing lease, whichever is earlier 1. this is applicable to wholesale conversion of industrial buildings aged 15 years or above, situated in Industrial, Commercial or OU(B) zones, which means all owners/single owner apply for change in use 2. the new uses must be always permitted in the respective zones or approved by Town Planning Board 25 Policy Initiative to Encourage Wholesale Conversion 3. the original building frame is retained after the conversion - no increases in building height, building bulk or GFA, and no additional floors. Addition of architectural features that are GFA non-accountable, GFA disregarded, or within the permitted total GFA (e.g. partial floors) is acceptable 4. safety requirements and special needs of the new uses of the building should be met by upgrading of building services and alteration of the interior 5. planning, design and alteration should comply with today s building requirements 26

Merits of Wholesale Conversion Industrial buildings usually have high ceiling height, high floor-loading, flexible floor layouts, thus have good potential for conversion to serve other uses Compared with redevelopment, conversion will generate less construction wastes, can start and complete within a shorter time, and costs less Many industrial buildings are in former industrial areas with good public infrastructure, transport links and convenient location 27 Merits of Wholesale Conversion An OU(B) zone in Hung Hom near proposed railway extention OU(B) Zone in Hung Hom HMT Station Whampoa Station HH Station 28

Merits of Wholesale Conversion Kwun Tong Town Centre Existing industrial buildings near the Kwun Tong Town Centre Redevelopment site Existing Industrial Area Industrial buildings located near planned urban redevelopment projects have good potential to change to non-industrial uses to meet the changing social and economic needs in the neighbourhood. 29 Merits of Wholesale Conversion OU(B) zone in Wong Chuk Hang ` WCH Station OP Station Proposed South Island Line (East) An old industrial area in Aberdeen has been rezoned for OU(B) use and is close to a proposed station of the South Island Line 30

Wholesale Conversion (Overseas) OXO Tower in London The building was originally constructed as a power station for the Post Office It was subsequently acquired by a manufacturer and converted into a cold storage 31 Wholesale Conversion (Overseas) Art Gallery in OXO Tower The building has been converted for restaurant, shops, art gallery and exhibition uses 32

Wholesale Conversion (Overseas) Big Peg in Birmingham Originally named the Hockley Centre, the building was an eightstorey factory completed in 1971 Today it is a thriving hub for jewellers, designers, media, arts and other creative businesses 33 Wholesale Conversion (Mainland) Wholesale Conversion (Mainland) 798 Art Zone in Beijing Formerly 718 Joint Factory, a Beijing North China wireless joint equipment factory 718 Joint Factory was rendered obsolete in early 1990s Now an artist community with galleries, artists private studios and cultural companies 34

Wholesale Conversion (Hong Kong) A former factory building in Ap Lei Chau Planning approval obtained for wholesale conversion to commercial uses in 2003 Lease modification executed in April 2007 to allow commercial use Building plans approved in February 2008 35 Wholesale Conversion (Hong Kong) Shop and Services are allowed in the converted building 36

Wholesale Conversion (Hong Kong) Jockey Club Creative Arts Centre in Shek Kei Mei (JCCAC) Opened on 26 Sept 2008, the JCCAC is converted from a decommissioned flatted factory building Over 150 artists and art groups are working inside 37 Wholesale Conversion (Hong Kong) JCCAC Painting and pottery workshops being organised in art studios in the building 38

Applicability of the New Measures Redevelopment measures Wholesale conversion measures Type of building Industrial Industrial Age of building 30 years for application of compulsory sale for redevelopment; no age requirement for other measures 15 years Zoning of land Prior planning approval upon application Prior LandsD approval Premium/waiver fee Any zoning other than Industrial (e.g. OU(B), Commercial, CDA, Residential, etc.) No, unless for rezoning, CDA and R(E) zones, or Column 2 uses Yes, lease modification Yes, full market premium assessed on pay for what you build basis and option to pay by instalments Industrial, Commercial and OU(B) No, unless for rezoning or Column 2 uses Yes, waiver for lifetime of the building or until expiry of lease, whichever is earlier No 39 Possible Uses Supporting The Six Economic Areas Most land uses related to the six economic areas are always permitted in converted buildings in OU(B) and Commercial zones, for example: Testing and certification (OU(B) zone) Laboratory, inspection and testing centre Medical services (OU(B) or Commercial zones) Clinical laboratory and medical consulting room Innovation and technology (OU(B) zone) Research, design and development centre related to industrial, information technology and telecommunication uses Workshop of high technology products 40

Possible Uses Supporting The Six Economic Areas Cultural and creative industries (OU(B) or Commercial zones) Office/ creative workshops and rehearsal room for performance Exhibition or convention hall, art gallery/ retail shop and showroom School (non-free-standing purpose-designed building) Audio-visual recording studio IT and telecommunications industries Research, design and development centre Non-polluting industrial use Environmental industry (OU(B) or Commercial zones) Recyclable collection centre Office/ retail shop and showroom Non-polluting industrial uses (in OU(B) zone) Education services (OU(B) or Commercial zones) - Educational institution 41 Potential Uses Supporting The Four Economic Pillars Financial Services Office Shops and services IT and telecommunications Training centre Trading and Logistics Office Exhibition or convention hall Training centre Producer and Professional Services Office Shop and services Training centre Tourism Hotel (subject to planning approval upon application) Eating place Shopping outlets Exhibition or convention hall Place of entertainment Place of recreation, sports or culture 42

Implementation Schedule Lower application threshold for compulsory sale of industrial buildings for redevelopment will be implemented through subsidiary legislation under the LCSRO (first quarter 2010) The pay for what you build and pay premium by instalments arrangements in respect of lease modification for redevelopment will be implemented through a three-year scheme starting 1 April 2010 Nil waiver fee for wholesale conversion of industrial buildings for the lifetime of the buildings or expiry of the leases will be implemented through a three-year scheme starting 1 April 2010 Current holders of temporary waivers with fees payable annually or periodically may also apply for the new waivers, if they meet the eligibility criteria for wholesale conversion 43 Implementation Schedule Lands Department will set up a dedicated team to process applications for redevelopment or wholesale conversion under the 3-year scheme Projects which meet the eligibility criteria for one-stop service by the Development Opportunities Office may also approach the DOO for assistance 44

Challenges in Wholesale Conversion Time and efforts to develop consensus among owners in industrial buildings with multiple ownership Creative solutions required to facilitate wholesale conversion, e.g. swapping of tenants between industrial buildings to resolve incompatible uses Decanting arrangements for existing tenants during conversion works 45 How Facility Management Surveyors May Contribute to Wholesale Conversion Assess the existing condition of industrial building and advise clients on the opportunity for converting the buildings for other uses of an enhanced value Help gather consent of individual owners for wholesale conversion in the case of fragmented ownership Assist clients in applying for wholesale conversion under the new policy initiatives 46

How Facility Management Surveyors May Contribute to Wholesale Conversion Advise clients on the new facility management requirements for the converted buildings With professional knowledge and information about the market, facility management surveyors are well-equipped to explore possible decanting arrangements for existing tenants to facilitate conversion Assist clients on sales and letting of converted premises 47 Thank you 48