FACTSHEET LOCATION At the right bank of The Sava River, in proximity of Kalemegdan Fortress and with direct access to Sava Promenada and BW Galerija DEVELOPER EAGLE HILLS DEVELOPER LEGAL ENTITY BW KULA DOO INTERNATIONAL CONSULTANT SOM AECOM LOCAL CONSULTANCY SUPPORT Energoprojekt Urbanizam & Arhitektura DNEC PROJECT BANK ACCOUNT Local purchaser: RSD Account No. 205-249453-84 Komercijalna banka AD Beograd Svetog Save 14,11000 Belgrade Foreign purchaser: Komercijalna banka AD Beograd Svetog Save 14,11000 Belgrade IBAN: RS35205007010049061513 SWIFT/BIC KOBBRSBG *Intermediary: Deutsche bank AG, Frankfurt Am Main, Germany *SWIFT/BIC for Intermediary: DEUTDEFF
Kula Belgrade is the city s new landmark and the highest building in the region. This 168-metre high mixed-use tower will host The St. Regis Belgrade and The Residences at The St. Regis Belgrade. 119 hotel apartments are spread from 3 rd to 11 th level, while 220 branded residences occupy levels from 14 th to 39 th. The ballroom is situated in the ground level, extending to landscaped public plaza which is new city venue for cultural and entertainment events. Kula Belgrade will add a must-see attraction to the city: an observation deck at the top of the tower, providing 360 view to the capital. Kula Belgrade will welcome residents and guests with elegant residential lobbies on ground level and underground garage entry level, both independent from hotel entrances. The building offers an array of amenities for its residents, such as swimming pool, spa, gym and relaxation lounge. Interior public spaces also include Salon, Long Gallery, St. Regis bar and restaurants.
TOTAL SITE AREA 12,157 sqm NUMBER OF LEVELS 42 levels ARCHITECTURAL HIGHLIGHTS The unique rotated shape of the building, inspired by fluidity of rivers Sava and Danube Landscaped plaza CONSTRUCTION GROUND DATE 2018 ESTIMATION COMPLETION DAY 2020 TOTAL NUMBER OF UNITS 220 residential units NUMBER OF UNITS PER LEVELS From 6 to 10 per level TOTAL NUMBER OF PARKING LOTS 245 for residents and 60 for hotel guests TECHNICAL INFORMATION Designed by the prestigious international companies: Architecture and landscape by Skidmore, Owings & Merrill Structural and MEP design developed by AECOM Interior design by HOK 1 to 3 bedroom apartments; 2 and 3 bedroom apartments as simplex or duplex World-class design and materials Wooden floors Podium with F&B facilities Landscaped plaza Elegant lobbies Open-plan kitchen area Multiple air-con controls Modular lighting Underground parking
FACILITIES & NEARBY AMENITIES The St. Regis Belgrade and the Residences at the St. Regis Belgrade are located to create an energetic synergy with the shopping district to its south and to maximize the public plaza to its north. The plaza will be a gateway between the new urban development and the waterfront recreation areas. The St. Regis Belgrade and the Residences at the St. Regis Belgrade will be a destination day and night, with a multitude of activities, including retail, restaurants, bars and an observation deck. TRAVEL TIMES at Sava Promenada 2 minutes walk to W Belgrade 5 minutes walk to the park 2 min walk to BW Galerija 7 min walk to Savamala Urban District 3-5 min drive to New Belgrade Business HQ 7 min drive to Slavija Square 15 min drive to Nikola Tesla Airport LEISURE Green spaces at landscaped plaza Sava Promenada with activities throughout the year DINING & SHOPPING Fine dining The biggest shopping and lifestyle district in the region
PAPERWORK REQUIRED FOR OWNERSHIP CONTRACT In case the purchase is under individual s name, you must provide: Signed Reservation Agreement Client identification information Reservation Fee Signed Floor Plan In case you are purchasing the property in a company s name, the company must provide: Signed Reservation Agreement Trade license or Commercial license Certificate of Incorporation Share Certificate / Board Resolution / MOA Power of Attorney for the authorized signatory Reservation Fee Signed Floor Plan ERMS / DOCUMENTATION INSTALLMENTS DUE* INSTALMENT DUE TO COLLECT Within 10 days as of the SPA notarization 1 st Installment 10% 15-June-2018 2 nd Installment 10% 15-Nov-2018 Completion of substructure beneath the Tower 3 rd Installment 15% 15-June-2019 Completion of superstructure up to level 19 4 th Installment 15% 15-Nov-2019 Completion of superstructure - 5 th Installment 15% 15-Apr-2020 Building watertight- 6 th Installment 15% 15-Dec-2020 Technical acceptance - 7 th Installment 20%