Develop a GIS-based Electronic Mark Plant Circulation System in a collaborative and end-user computing approach

Similar documents
Shatin to Central Link. Transport Advisory Committee 4 May 2011

Progress Update on Shatin to Central Link (SCL) 2 May 2013

MTR to work closely and align with the Government on announcement mechanism in relation to Railway Protection Area

Collection Point Address

Appendix: List of CLP Power s EV charging stations (14 December 2018)

Project Summary Major Property Development Projects in Hong Kong. Project Summary Major Property Development Projects in Hong Kong.

BUILDING FOR THE BETTER CHINA. Hong Kong

Gross Floor Area of HOS Flat by Phase / Estate

CLP Power Extends Electric Vehicle Charging Network as Popularity of Green Motoring Accelerates

FOR VIBRANT LIFESTYLES THE REACH, YUEN LONG, HONG KONG

Government Vaccination Programme 2018/19 List of HA GOPCs for GVP Vaccination

BIM in Current MTR Railway Projects. SDI Conference Presented by Andrew Lee Manager Land Surveying 9 Aug Harry Wu Manager CADD

Monthly update of MTR facilities for passengers with disabilities December 2017

Delia Memorial School (Hip Wo) Guidance notes on filling Student s Particulars Record

Railway Developments and Highlights of the Construction Features of Recent Railway Projects

Self Service Terminal Service Hour Hong Kong District Branch

Parallel Lines : Railway Infrastructure Development and its interaction with Urban Growth in Hong Kong

MTR Kwun Tong Line Extends to Ho Man Tin and Whampoa Stations From 23 October 2016

S.F. Express Circle K Convenience Store Self-pickup Service Service Coverage: Kowloon

Selection Method for Shaw College Student Hostel Places 2017/2018 (First Draft)

Property Development. 1. YOHO Town, Yuen Long 2. Park Island, Ma Wan 3. Severn 8, The Peak 4. The Arch, Kowloon Station. Park Island, Ma Wan

18 D Shop D & Portion of Shop B, G/F, B. 16 B Shop B, G/F and Shop A2 & A3, Upper G/F, A2

Property Development 26 SUN HUNG KAI PROPERTIES LIMITED. Manhattan Hill, West Kowloon

MTR Transformation of CBDs in Hong Kong

Selection Method for Shaw College Student Hostel Places 2014/2015 (Second draft)

Selection Method for Shaw College Student Hostel Places 2017/2018 (Second Draft)

/ 2736 BOULEVARD, NATHAN ROAD, TSIM SHA TSUI

MEGA CUBE. Kowloon Bay, Hong Kong

Shaw College Selection Method for Student Hostel Places 2018/2019 (1st Draft)

Selection Method for Shaw College Student Hostel Places 2016/2017 (Final Version)

HKBN Mass Deploys Fiber-To-The-Home Making the Future Today in Hong Kong

S.F. Service Points Update Notice

HK Island Central. Central / Admiralty / Sheung Wan Admiralty Centre ifc (International Finance Centre) (One & Two) Shanghai Commercial Bank Building

Property Investment. 1. Two IFC, Central 2. International Commerce Centre, Kowloon Station 3. East Point City, Tseung Kwan O 4.

HONG KONG EXAMINATIONS AND ASSESSMENT AUTHORITY 2019 HONG KONG DIPLOMA OF SECONDARY EDUCATION EXAMINATION ENGLISH LANGUAGE

香港物業管理公司協會有限公司 The Hong Kong Association of Property Management Companies Limited

Shaw College Selection Method for Student Hostel Places 2019/2020

Business in Hong Kong Property Development

Shatin to Central Link. 5 August 2009

Job Reference for "LH" Cable Trunking, Cable Trays & Cable Ladders

A Dissertation On Hang Hau Town And Ap Chai Wan By Kwok-shing Pun READ ONLINE

HONG KONG HOUSING AUTHORITY HOME OWNERSHIP SCHEME AND PRIVATE SECTOR PARTICIPATION SCHEME AND TENANTS PURCHASE SCHEME INFORMATION FOR APPLICANTS ON

NOTIFIER JOB REFERENCE IN HONG KONG

SUN HUNG KAI PROPERTIES LIMITED ANNUAL REPORT 2001/02

Job Reference for "LH" Cable Trunking, Cable Trays & Cable Ladders

Provisional District Council Constituency Areas

From Western District to Airport

Kiosk SHW 8 at Unpaid Concourse, MTR Sheung Wan Station Kiosk No. HOK 31, MTR Hong Kong Station, HK (Paid Concourse) Kiosk No.

High Park Grand Mong Kok, Hong Kong

Railway Development in Hong Kong

Hong Kong Property Business

THE HONG KONG MORTGAGE CORPORATION LIMITED ISSUANCE OF RETAIL BONDS. Press Release

Recommended District Council Constituency Areas

The Past, Present and Future Land-forming in Hong Kong

(1) Building Services Installation

Foreseeable Problems of Redevelopment of. Public Housing Estates a case study of Tsui. Ping (North) Estate

Raymond Wong, Wai Man. Prof. Tam, Chi Ming

Major SmarTone Authorised Resellers

THE HONG KONG HOUSING AUTHORITY. Memorandum for the Commercial Properties Committee. Shopping Centres Scheduled for Completion in 2000/2001

HONG KONG HOUSING AUTHORITY

Merchants Offers Details and Merchant's Additional Terms and Conditions Contact Details

BANK OF CHINA LIMITED (A joint stock company incorporated in the People s Republic of China with limited liability) Stock Code: 3988

Centre and the Hong Kong Sectio

Property Investment. International Commerce Centre, Kowloon Station 38 SUN HUNG KAI PROPERTIES LIMITED

Major Project/Studies Areas undertaken by Raymond Wong since 1993

7-Eleven Store List DHL Pick Up Service

Hong Kong Out-patient Direct Settlement Network - April 2015

The highly distinctive Manulife Financial Centre sets a precedent for the regeneration of the older districts of Hong Kong, providing over one

New Asia College Student Hostel Selection Criteria, Rules and Regulations

New Asia College Student Hostel Selection Criteria, Rules and Regulations

(1) Gas Pipe Installation

S.F. Express Circle K Convenience Store Self-pickup Service Service Coverage: New Territories

Gross Rental Income* Gross Rental Income* by Sector

New Asia College Student Hostel Selection Criteria, Rules and Regulations For Local Student (Revised in March 2018)

Enriching Living. Quality. homes. We build. for Hong Kong people which connect to our network

New Asia College Student Hostel Selection Criteria, Rules and Regulations

More than 170 Restaurants Serve up Free Breakfasts from today in CLP Power Elderly Yum Cha Programme

1

DEVELOPMENT PROJECTS COMPLETED

Appendix. Office and Unit Lists. HKFYG Website: hkfyg.org.hk M21 Multimedia Web: M21.hk

Recommended District Council Constituency Areas

Offers Details and Merchant's Additional Terms and Conditions. 10% off on regular-priced items

Store # Area Region in Eng Address in Eng 0001 HK Happy Valley G/F., Winner House,15 Wong Nei Chung Road, Happy Valley, HK 0009 HK Quarry Bay Shop

BRANCH NETWORK & CORPORATE BANKING CENTRES

Offers Details and Merchant's Additional Terms and Conditions

Occupational Safety and Health Council Construction Safety Promotional Campaign 2017 Competition Winners List

Development Projects Completed

S.F. Service Points Update Notice

Merchants Offers Details and Merchant's Additional Terms and Conditions Contact Details

Recommended District Council Constituency Areas

(sq.ft.)!!"!!!" HONG KONG 1. No. 1 Chatham Path % 7,800 R Completed Existing Mid-levels, Hong Kong!"#$1

HOUSING MATTERS DISCUSSED AT DISTRICT BOARDS AND THEIR COMMITTEES (1 MARCH 1998 to 31 MAY 1998) Abbreviations : PDB Provisional District Board

JOB REFERENCE FOR "ITO" BAR SCREEN

(sq.ft.)!!"!!!" HONG KONG 1. No. 1 Chatham Path % 4,017 R Completed Existing Mid-levels, Hong Kong!"#$1

This announcement is for information purposes only and does not constitute an invitation or offer to acquire, purchase or subscribe for securities.

S.F. Service Points Update Notice

SHOP NAME ADDRESS Tel No. Fax No. SHOP G2, AON CHINA BUILDING, 29 QUEEN'S ROAD CENTRAL, CENTRAL, H.K.

Kowloon Region. Unit No. District Meeting Venue & Contact Tel. Meeting Time. The Salvation Army Chuk Yuen Children and Youth Centre

Access to Quality Living

項目名稱應用完工年份建築師承辦商 1. 2 nos of Plant Room at Yau Oi Roof Sport Cladding Centre WIP ASD Shui On Bldg Co Ltd

Transcription:

Develop a GIS-based Electronic Mark Plant Circulation System in a collaborative and end-user computing approach Presented by Spencer Li, Howard Cheng 24 Nov 2010

Electronic Mark Plant Circulation (EMPC) Joint project among 12 participants (CLP, HKE, Towngas, Hutchison, PCCW, HyD, DSD & WSD) Provide an automated case creation, routing and response system to handle the used to be paper based workflow of the mark plant process for road excavation System integration with Email, GIS system, PKI/e cert and Internet

Automated Work Flow

Hardware and Network Structure

How It Works. Handling of Incoming Request

How It Works. Handling of Outgoing Request

Incoming & Outgoing Request

Benefits of EMPC Use Single Sign On (SSO) for all users Automated workflow for operations Menu driven Ease of Use Automatically checking with MTR maps according to other UU s request Significant manpower saving Implementation of HK Post e Cert

Incoming Request Simple to use

Incoming Request

Incoming Request

Reply Letter

Incoming Request Record Plan is automatically generated

Outgoing Request Common User Interface

Outgoing Request Ease to use

Outgoing Request Draw trench line

Outgoing Request Historical information is available

Common User Interface Standard icon

What Problems We face With Complex Site Boundary Data Conversion and Validation Multi department Involvement Lack of Document for EMPC standards Lack of GIS Expert in the beginning

How Collaboration We have Project Management A close project team was formed from MTR and UtilityINFO User input is well recognized and fulfilled A temporary working office was set up in MTR headquarter Bi weekly meeting from Jun to Dec 2009

How Collaboration We have Complex Site Boundary MTR helps to provide record boundary including new project site areas A lot of technical training on MTR standards were received Joint project investigation for site boundary alignment problems Highly involvement from user testing and acceptance

How Collaboration We have Data Conversion and Validation Huge volume of record plans from MTR Data Conversion takes long time to complete MTR IT department fully support on the data conversion MTR Drawing department plays a consultancy and quality assurance roles Due to different formats of record plan and GIS, there is no direct method to validate the converted files

How Collaboration We have Multi Department Involvement Train the trainer approach was taken User training was conducted by MTR ISO and IT audit were well implemented Change Management was adopted Hotline for post implementation A lot of testings with other UUs were carried out

How Collaboration We have Lack of Document for EMPC standards Insufficient document about EMPC only a standard flow diagram, and file layout No document on e Cert details We arranged jointly visit to Highway Department to have EMPC demo A lot of integration testing with other UUs Practical experience sharing with other UUs MTR IT department also participated on preparation of technical standards like Single Sign On, ecert, etc

How Collaboration We have Lack of GIS Expert in the beginning Lack of GIS Expect in the market Lack of EMPC experienced people On the job training was offered by ESRI Attitude is important

Major MTR Project

MTR Corporation s New Railway Projects 1. West Island Line (WIL) 2. Express Rail Link (XRL) 3. South lsland Line East (SIL)(E) 4. Kwun Tong Line Extension (KTE) 5. Shatin to Central Link (SCL)

Status of Projects WIL XRL SIL KTE SCL Railway Ordinance Gazette 2007 2009 2009 2009 2010 Detailed Design Commencement 2008 2009 2009 2009 2010 Construction Commencement 2009 2010 2011 2011 2012 Opening 2014 2015 2015 2015 EWL -2018 NSL -2020

West Island Line (WIL)

West Island Line N Tung Chung Line Sheung Wan Airport Express University Sai Ying Pun Kennedy Town West Island Line South Island Line (West) Island Line Route Length: Station: 3 Journey Time: (SHW to KET) 3 km 8 mins South Island Line (East) Tunnel Section

Express Rail Link (XRL)

Express Rail Link (XRL)

Express Rail Link (XRL) Mai Po V.B. Ngau Tam Mei V.B. Emergency Rescue Station and Shek Kong Depot Tai Kong Po V.B. Pat Heung V.B. There are also 8 Vent Buildings (V.B.) located along the alignment MTR Corporation Kwai Chung V.B. Nam Cheong V.B. Mongkok West V.B. 12/28/2010 Shing Mun V.B. XRL Terminus at West Kowloon

South Island Line (SIL)

N Route Length : Station : 5 nos. Journey Time : (SOH to ADM) 7 km 11 mins Tunnel Section Viaduct Section South Island Line (East) West Island Line South Horizons Hong Kong Admiralty South Island Line (East) Lei Tung Tamar Shatin Central Link Exhibition Island Line Wong Chuk Hang Ocean Park Features: Medium capacity railway 3 car Urban Line (U type trains A direct linkage fro the Southern Distr CBD Interchange with U SCL at Admiralty Weekday patronag (2016) 166,000 MTR Corporation 12/28/2010

Kwun Tong Line Extension (KTE)

2.6 km tunnel Kwun Tong Line Extension 2 underground stations - Ho Man Tin Station -Whampoa Station Journey Time: 5 mins (YMT to WHA) Interchange with KTE/ SCL at Ho Man Tin MTR Corporation 12/28/2010

Location Plan of Ho Man Tin Station Ho Man Tin Station (HOM)

Location Plan of Whampoa Station West Concourse constructed by cut and cover method Platform tunnel constructed by mining method East Concourse constructed by cut and cover method Hung Hom Road Tak On Street

Shatin to Central Link (SCL) - East West Line (EWL) - North South Line (NSL)

Lok Ma Chau Lo Wu North South Line (NSL) Extension of East Rail Line across the harbour to Admiralty Provide direct cross-boundary train service to Hong Kong island NSL Wu Kai Sha Tuen Mun EWL Tai Wai East West Line (EWL) Extension of Ma On Shan Line Through running to Wu Kai Sha by connecting to West Rail Admiralty Hung Hom Serve Hin Keng, Kai Tak, Kowloon City, Ma Tau Wai, To Kwa Wan & Ho Man Tin 12/28/2010 areas MTR Corporation

East Rail Line Ma On Shan Line Wu Kai Sha Shatin to Central Link East West Line (EWL) Tai Wai Hin Keng Diamond Hill Kai Tak To Kwan Wan Ma Tau Wai Ho Man Tin Hung Hom North South Line (NSL) Exhibition Admiralty

Thanks! Q & A UtilityINFO 24 Nov 2010