FIRST AMENDMENT TO THE AMENDED AND RESTATED DEVELOPMENT PLAN FOR THE OFFICE BUILDINGS / SPORTS PROJECT WITHIN PLANNED DEVELOPMENT AREA NO.

Similar documents
DEVELOPMENT PLAN FOR THE RESIDENTIAL PROJECT AT 125 GUEST STREET WITHIN PLANNED DEVELOPMENT AREA NO. 87 BOSTON LANDING

AMENDED AND RESTATED DEVELOPMENT PLAN FOR THE OFFICE BUILDINGS / SPORTS PROJECT (FORMERLY THE OFFICE BUILDINGS PROJECT) WITHIN

tofdj? ~iji! to/;j/&-

FACT SHEET DEVELOPMENT PLAN FOR PLANNED DEVELOPMENT AREA NO. 91 UNIVERSITY PLACE RESIDENCES DEVELOPMENT

Boston East. Fort Point Associates, Inc. Urban Planning Environmental Consulting Project Permitting. May 31, 2013

Planning Justification Report

170 West Broadway. South Boston, MA Application for Article 80 Small Project Review Boston Redevelopment Authority April 28, 2014

40 Malvern Street Allston, MA.

FIRST AMENDMENT TO DEVELOPMENT PLAN For PLANNED DEVELOPMENT AREA NO. 56. Dated: February 12, 2004

;ARTICLE 27N. SOUTH BOSTON SEAPORT BUFFER ZONE INTERIM PLANNING OVERLAY DISTRICT (;Article inserted on December 6, 1997*, rescinded on July 22, 1999)

70 Parker Hill Avenue Development. 70 Parker Hill Avenue Mission Hill. Application for Small Project Review Submitted to the

Architect: Lucio Trabucco Nunes Trabucco Architects 109 Highland Avenue Needham, MA Tel: Fax:

MEADOWBROOK FLATS SPECIAL USE PERMIT APPLICATION

Downtown Development Focus Area: I. Existing Conditions

ORDINANCE NO (As Amended)

OVERVIEW OF BOSTON ZONING. Presented by: David R. Jackowitz, Esq.

EXHIBIT 1 PROJECT DESCRIPTION AND DESCRIPTION OF REQUESTED AREA VARIANCES REDEVELOPMENT OF 201 ELLICOTT STREET

DRAFT FOR DISCUSSION PURPOSES ONLY. Port Credit Local Area Plan Built Form Guidelines and Standards DRAFT For Discussion Purposes

Poughkeepsie City Center Revitalization Plan

20 Edward Street Zoning Amendment Application - Preliminary Report

UPDATE Board of Selectmen June 20, 2017

Requested Information for 6701 W Sunset 2 messages

3.0 Project Description

Architect: Lucio Trabucco Nunes Trabucco Architects 109 Highland Avenue Needham, MA Tel: Fax:

Preliminary Report Zoning By-law Amendment and Site Plan Control Applications Yonge Street

Director, Community Planning, Toronto and East York District

LAND USE AMENDMENT ITEM NO: 05

MassDOT Parcel 25/26 Community Questions and Comments sorted by major theme:

Richardson s TOD Experience From ULI Panel Report to Breaking Ground. September 8, 2011

PUD-7 Zoning Petition Suggested Changes Following 10/17/2017 Ordinance Committee

Adaptive Reuse Ordinance Effective 12/20/01

COLDSTREAM (PC-1) INCLUSIONARY HOUSING PLAN

Sherwood Forest (Trinity) Housing Corporation. Urban Design Brief

Bunker Hill Part II Urban Design. Specific Plan. Case No. CPC SP TABLE OF CONTENTS

Proposed Development. The first phase of development will include the construction of an as-of-right tower, which will avail itself of the permitted d

The Forecaster Building Notice of Project Change

2.0 LAND USE FRAMEWORK

International Village By-law No (Being a By-law to Amend By-law 3575, being the Zoning and Development By-law)

a. To insure compatible relationships between land use activities;

Village of Port Jefferson Urban Renewal Plan

ARLINGTON COUNTY, VIRGINIA

PLANNING REPORT Gordon Street City of Guelph. Prepared on behalf of Ontario Inc. March 17, Project No. 1507

PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: July 20, 2017

5 to 25 Wellesley Street West and 14 to 26 Breadalbane Street - Zoning Amendment Application - Preliminary Report

Bylaw No , being "Official Community Plan Bylaw, 2016" Schedule "A" DRAFT

MEMORANDUM. I1 District Industrial Living Overlay District 110,703 square feet / 2.54 acres

LeBreton Flats Redevelopment Development Summary Chart (First Subdivision)

AMENDED AND RESTATED DEVELOPMENT PLAN. and DEVELOPMENT IMPACT PROJECT PLAN. for PLANNED DEVELOPMENT AREA NO. 33 MILLENNIUM PLACE

2.35 BVT G Bow Valley Trail General Commercial District [ ]

The Maryland-National Capital Park and Planning Commission Prince George s County Planning Department Development Review Division

RODE. Article 80 Small Project Review Application. 232 Old Colony Avenue Mixed Use Development 232 Old Colony Avenue South Boston, MA 02127

A THRIVING NEIGHBORHOOD

85-93 WILLOW COURT RESIDENTIAL PROJECT

Allele Building: Phase II Dorchester Avenue South Boston, Massachusetts

Site & Architectural Design Study for the Conversion of Parking Lots

GENERAL PLAN UPDATE SPECIFIC AREAS OF THE CITY

CITY OF MARLBOROUGH OFFICE OF THE CITY CLERK MARLBOROUGH, MASSACHUSETTS LEGAL NOTICE. Public Hearing Proposed Zoning Amendment, Section

R E S O L U T I O N. B. Development Data Summary

^ARTICLE 68. SOUTH BOSTON NEIGHBORHOOD DISTRICT (^Article inserted on Month Day, Year*) TABLE OF CONTENTS

The Philadelphia Code. Table : Commercial and Commercial Mixed-Use Districts {For a printable PDF version, click HERE}

RETAIL SPACE FOR LEASE

FOR SALE > MULTIFAMILY/COMMERCIAL REDEVELOPMENT OPPORTUNITY

WORLD TRADE CENTER GARAGE 1245 Fifth Avenue

TASK 2 INITIAL REVIEW AND ANALYSIS U.S. 301/GALL BOULEVARD CORRIDOR FORM-BASED CODE

DRAFT. Amendment to the Master Plan Land Use Element for Block 5002, Lot Township of Teaneck, Bergen County, New Jersey.

BOARD OF ZONING ADJUSTMENT STAFF REPORT Date: April 1, 2019

Truax Park Apartments

45 L STREET MIXED - USE DEVELOPMENT. Boston Redevelopment Authority

Urban Design Brief Dundas Street. London Affordable Housing Foundation. November Zelinka Priamo Ltd.

APPROVED LONG-RANGE PROPERTY MANAGEMENT PLAN MAJOR APPROVED DEVELOPMENT PROJECT MISSION BAY


PLANNING AND ZONING DEPARTMENT

CITY OF PORTSMOUTH. CITY COUNCIL POLICY No HOUSING POLICY

DOWNTOWN BEAUMONT CENTRE-VILLE: PARKING MANAGEMENT REPORT

Parking Challenges and Trade-Offs

SERVICE & IMPROVEMENT PLAN AND ASSESSMENT PLAN:

Boston Children s Hospital Submission to Boston Civic Design Commission PROPOSED IMP PROJECTS BOSTON CHILDREN S CLINICAL BUILDING 819 BEACON STREET

8 OVERLAY DISTRICTS 8.1 BOYNTON YARDS (BY)...405

CUDAHY MUNICIPAL CODE

Yonge Street and 3 Gerrard Street East - Zoning Amendment Application - Preliminary Report

Ashcroft Homes Trim Road Development Planning Rationale

Northern Branch Corridor DEIS December Appendix D: Local Tax Base

FILE OF THE CITY CLERK ADMINISTRATION ORDINANCE NO ADMINISTRATION BILL NO INTRODUCED NOVEMBER 24, 2009

8.5.1 R1, Single Detached Residential District

ARTICLE 887. PD 887. Valley View - Galleria Area Special Purpose District

RESOLUTION NO. FILE NO. T15-058

TOTTENHAM SECONDARY PLAN

Planning Justification Report

From Policy to Reality

this page left intentionally blank DENVER ZONING CODE

DRAFT Plan Incentives. Part A: Basic Discount

TRANSIT-ORIENTED DEVELOPMENT PLAN EXISTING CONDITIONS REPORT LAWRENCE TO BRYN MAWR MODERNIZATION

770 BROOKFIELD ROAD Site Plan Control Atlantis Investments November 2017

Cambridge Ordinance Committee Zoning Submission Overview 8/2/2017

PIN , Part 1, Plan SR-713 in Lot 2, Concession 5, Township of McKim (1096 Dublin Street, Sudbury)

Director, Community Planning, North York District

Chapter URBAN VILLAGE ZONING DISTRICTS

January 7, Sarah Smith Community Development Director City of Mound 5341 Maywood Road Mound, MN Dear Ms. Smith,

ORDINANCE NO

PHASE 1 AMENDMENT TO THE STATION AREA REDEVELOPMENT PLAN BOROUGH OF NETCONG, MORRIS COUNTY, NEW JERSEY

Transcription:

FIRST AMENDMENT TO THE AMENDED AND RESTATED DEVELOPMENT PLAN FOR THE OFFICE BUILDINGS / SPORTS PROJECT WITHIN PLANNED DEVELOPMENT AREA NO. 87 BOSTON LANDING GUEST STREET, LIFE STREET AND ARTHUR STREET BRIGHTON AREA OF BOSTON DATED: TABLE OF CONTENTS 1. The Development Plan... 1 2. The Proponent... 2 3. The PDA Master Plan Area/Boston Landing... 2 4. The Third Amendment to the Master Plan... 2 5. The Amended and Restated Development Plan for the Office Buildings / Sports Project (formerly the Office Buildings Project)... 2 6. The First Amendment to the Amended and Restated Development Plan for the Office Buildings / Sports Project... 3 7. General Description of Proposed Project and Uses... 4 8. Zoning... 4 9. Planning Context/Objectives... 4 10. Proposed Location and Appearance of Structures... 5 11. Density and Dimensions of Proposed Project... 5 12. Proposed Traffic Circulation... 5 13. Parking and Loading Facilities... 6 14. Access to Public Transportation and Pedestrian Connections... 6 Page ACTIVE/85667988.6 i

15. Development Schedule... 6 16. Open Space and Landscaping... 6 17. Public Benefits... 6 18. Green Buildings... 7 19. Other Approvals... 7 20. Applicability and Compliance... 7 Exhibits Exhibit A Exhibit B Exhibit C Exhibit D Survey of Proposed Project and Legal Description - C1 Conceptual Site Plan of the Proposed Project Schematic Plans for the Proposed Project Site and Traffic Circulation Plan

FIRST AMENDMENT TO THE AMENDED AND RESTATED DEVELOPMENT PLAN FOR THE OFFICE BUILDINGS / SPORTS PROJECT WITHIN PLANNED DEVELOPMENT AREA NO. 87 BOSTON LANDING GUEST STREET, LIFE STREET AND ARTHUR STREET BRIGHTON AREA OF BOSTON DATED: 1. The Development Plan. Pursuant to Section 3-1A and Article 80C of the Zoning Code of the City of Boston, Massachusetts, as amended (as so amended, the Code ), and the Master Plan for Planned Development Area ( PDA ) No. 87, Boston Landing, Guest Street, Life Street and Arthur Street, Brighton Area of Boston, as amended, (as so amended, the PDA Master Plan ), this plan constitutes the First Amendment to the Amended and Restated Development Plan (the Development Plan ) for the Office Buildings / Sports Project (the Project ) located on the northerly side of Guest Street and westerly of the New Balance Headquarters Project and the Hotel Project. This instrument intends to implement the contemplated second phase (the Proposed Project ) of the Project at 40 Guest Street (the Site ). The Project is located within Boston Landing, which contains approximately 15.48 acres (about 674,391 square feet) of land known as and numbered 38-180 Guest Street, 77 Guest Street, 125 Guest Street and three (3) vacant lots, all located in the Brighton Section of Boston, Massachusetts (such land, the PDA Master Plan Area, also referred to herein as Boston Landing ). The survey of the Site is depicted on the plan dated April 21, 2016 entitled Exhibit C-1 40 Guest Street Brighton, MA, prepared by CHA, a copy of which is attached hereto as Exhibit A (the Survey ). The Conceptual Site Plan of the Proposed Project is depicted on Exhibit B attached hereto. This First Amendment to the Amended and Restated Development Plan (this Development Plan ) sets forth the information on the Proposed Project, including proposed location and appearance of structures, landscaping, proposed uses of the Site, densities, proposed traffic circulation, parking and loading facilities, proposed phasing, access to public transportation, and dimensions of structures proposed as part of the Proposed Project. Upon approval, this Development Plan will constitute permanent zoning for the Site in accordance with Section 3-1A and Article 80C of the Code. Under Section 80C-8 of the Code, no building, use or occupancy permit for the Proposed Project will be issued until the Boston Redevelopment Authority (the BRA ) has issued a Certification of Consistency, or a partial Certification of Consistency, as applicable, for such Proposed Project. To the extent that the ACTIVE/85667988.6

Director of the BRA certifies consistency with this Development Plan, the Proposed Project will be deemed to be in compliance with the requirements of the Code under Section 80C-9, to the extent that such requirements have been addressed in this Development Plan. This Development Plan consists of 8 pages of text, plus the attachments designated as Exhibit A through Exhibit D. All references herein to this Development Plan refer to such pages and exhibits. Capitalized terms used but not defined in this Development Plan shall be as defined in Article 2A of the Code as in effect on the date hereof, and not as amended hereafter. 2. The Proponent. Courtside Realty, LLC, which is related to Boston Landing LLC (the original owner and developer of Boston Landing), is a privately held Massachusetts limited liability company with its business address at 221 North Beacon Street, Brighton, Massachusetts 02135. 3. The PDA Master Plan Area/Boston Landing. Boston Landing consists of 12 parcels of land, comprising 8 tax lots, and contains about 15.48 acres (about 674,391 square feet) of land area located on both the north and south sides of Guest Street. The portion of Boston Landing on the northerly side of Guest Street is bounded to the north by land of the Massachusetts Department of Transportation, to the south by Guest Street, to the east by a Stop & Shop Supermarket and to the west by the office complex known as Brighton Landing. The portion of Boston Landing on the southerly side of Guest Street is bounded to the north by Guest Street, to the south by numerous other property owners, to the east by Arthur Street, and to the west by Life Street. The entirety of Boston Landing is located within the Planned Development Area No. 87 overlay district governed by the PDA Master Plan. The entirety of Boston Landing is owned by Boston Landing LLC, except for (i) the Proposed Project owned by the Proponent, (ii) the New Balance Headquarters Project at 100 Guest Street owned by Railyard Realty, LLC, (iii) the portion of the Office Buildings / Sports Project at 80 Guest Street owned by Ice Box LLC, and (iv) the Residential Project at 125 Guest Street owned by Rail Spur, LLC, all Massachusetts limited liability companies, and all entities related to Boston Landing LLC. 4. The Third Amendment to the Master Plan. The Third Amendment to the Master Plan for Planned Development Area No. 87 which was approved by the BRA on August 14, 2014, adopted by the BZC on September 3, 2014, and became effective on September 5, 2014, (i) deleted reference to the Single Office Project; and (ii) permitted the construction of one or more buildings for Office Use, Clinic Use (but not to establish a Hospital or Institutional Use), Research and Development Use, including biotechnology and laboratory use building or buildings (provided, however, that no laboratory classified by the U.S. Centers for Disease Control as a Biosafety Level 3 or 4 ( BSL-3 or BSL-4 ) shall be permitted), Studio Production Use and/or a Multifamily Dwelling and/or Dwellings Use, a Sports Use that may contain venues for ice hockey and basketball, together with accessory parking, loading, Restaurant Use, Retail Use and Service Use, containing up to 720,000 square feet of Floor Area, Gross, exclusive of areas dedicated for parking and loading and exclusive of areas devoted to Retail Use, Restaurant Use and Service Use. 5. The Amended and Restated Development Plan for the Office Buildings / Sports Project (formerly the Office Buildings Project). The Amended and Restated Development Plan for the Office Buildings / Sports Project which was approved by the BRA on ACTIVE/85667988.6 2

October 16, 2014, adopted by the BZC on November 19, 2014, and became effective on November 21, 2014, allowed one building (the First Building or First Phase ) with two components for the construction of (i) an Office Component up to 190,000 square feet of Floor Area, Gross, which will be up to 165 feet in Building Height and which may contain Office Use, Clinic Use (but not to establish a Hospital or Institutional Use), Research and Development Use, including a Biotechnical and Laboratory Use (provided that no laboratory classified as a BSL-3 or BSL-4 shall be permitted) and Studio Production Use; and (ii) a Sports Component up to 75,000 square feet of Floor Area, Gross, will be up to 75 feet in Building Height and may contain an ice skating rink together with locker rooms and associated office space, concession areas, and skate rentals, along with seating areas for approximately 650 spectators. The street address for this site is 80-82 Guest Street. 6. The First Amendment to the Amended and Restated Development Plan for the Office Buildings / Sports Project. This Development Plan for the Proposed Project is located at the Site and consists of approximately 1.26 acres (approximately 54,759 square feet). The Site, is bound by Life Street Extension to the east, the Massachusetts Turnpike to the north, the office building with an address of 20 Guest Street to the west and Guest Street to the south. The Proposed Project contains one building (the Second Building or Second Phase ) with the following components (the Components ): (a) The Office Component. The Office Component will be up to 135,000 square feet of Floor Area, Gross, will be up to 99 feet in Building Height and may contain Office Use, Clinic Use (but not to establish a Hospital or Institutional Use), Research and Development Use, including a Biotechnical and Laboratory Use (provided that no laboratory classified as a BSL-3 or BSL-4 shall be permitted), an athletic use dedicated to private athlete training purposes that may include locker rooms, treatment areas, fitness uses, basketball uses, private food service, Studio Production Uses, and other Uses typical of a professional sports organization and their guests (which may include the hosting of private media, sponsorship and community activities) and that may include seating areas for up to 195 spectators. (b) The Restaurant, Retail and Service Component. The Restaurant, Retail and Service Component will be up to 7,000 square feet of Floor Area, Gross, and may contain Restaurant Uses, Retail Uses and/or Service Uses, including, without limitation, Local Retail Business Uses, Take-out Restaurant Uses, Banking and Postal Uses, Bank Uses, Automatic Teller Machine Uses, Bar Uses, Barber Shop Uses, Beauty Shop Uses, yoga studio uses, and Entertainment Uses. (c) The Parking and Loading Component. The Parking and Loading Component will be up to 84,000 square feet of Floor Area, Gross, containing up to 190 parking spaces at Grade and two levels above Grade. Access to both the Parking and Loading Component will be by means of Life Street Extension at the western terminus of the Service Road. The previously existing improvements on the Site within the PDA Master Plan Area, where the Proposed Project will be situated, have been razed in order to allow construction of the Proposed Project to proceed. ACTIVE/85667988.6 3

The Second Building is located in the area as shown on Exhibit B and contains about 1.26 acres or 54,759 square feet of land. One future proposed project (the Third Building or Phase Three ) is anticipated within the Office Buildings / Sports Project which will be detailed in a future filing that will be referred to as the Second Amendment to the Amended and Restated Development Plan for the Office Buildings / Sports Project. The street address of this future proposed project could be 60 Guest Street. 7. General Description of Proposed Project and Uses. This Development Plan for the Proposed Project proposes the construction of one building of up to 135,000 square feet of Floor Area, Gross, and up to 99 feet in Building Height and may contain Office Use, Clinic Use (but not to establish a Hospital or Institutional Use), Research and Development Use, including a Biotechnical and Laboratory Use (provided that no laboratory classified as a BSL-3 or BSL-4 shall be permitted), an athletic use dedicated to private athlete training purposes that may include locker rooms, treatment areas, fitness uses, basketball uses, private food service, Studio Production Uses, and other Uses typical of a professional sports organization and their guests (which may include the hosting of private media, sponsorship and community activities) and that may include seating areas for up to 195 spectators, exclusive of parking and loading, Retail Use, Restaurant use and Service Use. Up to 7,000 square feet of Floor Area, Gross may be used for Restaurant Uses, Retail Uses and/or Service Uses, including, without limitation, Local Retail Business Uses, Take-out Restaurant Uses, Banking and Postal Uses, Bank Uses, Automatic Teller Machine Uses, Bar Uses, Barber Shop Uses, Beauty Shop Uses, yoga studio uses, and Entertainment Uses, and up to 190 parking spaces at grade and above grade. Parking and loading will be accessed by means of the Life Street Extension at the western terminus of the Service Road. 8. Zoning. The underlying zoning for Boston Landing is governed by the Allston- Brighton Neighborhood District Article 51 of the Code. Boston Landing is located within the Guest Street Industrial Subdistrict of the underlying zoning. Upon approval of each, the PDA Master Plan and this Development Plan will provide the zoning for the Site and the Proposed Project. The Proposed Project will comply with Article 37, Green Buildings, of the Code. 9. Planning Context/Objectives. The Proposed Project is part of a mixed-use development on a portion of the approximately 15.48 acres of land adjacent to 20 Guest Street and along the Massachusetts Turnpike in the City of Boston s Brighton neighborhood. The PDA Master Plan calls for the revitalization of a former industrial area that once served as the region s largest Stockyard, into a vibrant 20 th century destination for companies with a shared vision to create a district where the focus will be on health and wellness. Boston Landing LLC s mission (and the mission of its related development entities) is to create a state-of-the-art development that compliments the existing neighborhood fabric and introduces mixed uses, including, without limitation, new office space, retail stores, restaurants, service establishments, residential uses and sports related uses. The property in the area previously consisted of outdated and in some cases vacant, industrial buildings with total of less than 1% of landscaped open space. With guidance from the Brighton Guest Street Planning Study, Boston Landing LLC has laid a new foundation for the vision of the Guest Street, Life Street and Arthur Street corridors, with well-designed and a well-coordinated mix of buildings, uses and facilities, and with a generous supply of ACTIVE/85667988.6 4

landscaped open space. The Proposed Project is part of a new mixed-use development within an established neighborhood that will compliment and expand upon existing amenities. 10. Proposed Location and Appearance of Structures. The location of the Proposed Project will be consistent with the Conceptual Site Plan as shown on Exhibit B attached hereto. Schematic Plans for the Proposed Project are attached hereto as Exhibit C, and they will continue to evolve during the course of further design development, subject to the design review process by the BRA pursuant to Article 80B of the Code. The Proposed Project will also be subject to Boston Civic Design Commission review pursuant to Article 28 of the Code, to the extent applicable. Final architectural plans and specifications for the Proposed Project will be submitted to the BRA for approval. The issuance of a building permit for the Proposed Project will occur after the issuance of a Certification of Consistency, or Partial Certification of Consistency, as applicable, in connection with this Development Plan pursuant to Section 80C-8 of the Code, and a Certification of Compliance or partial Certification of Compliance pursuant to Article 80B of the Code. 11. Density and Dimensions of Proposed Project. The Proposed Project proposes the construction of one building of up to 135,000 square feet of Floor Area, Gross, and up to 99 feet in Building Height, and may contain Office Use, Clinic Use (but not to establish a Hospital or Institutional Use), Research and Development Use, including a Biotechnical and Laboratory Use (provided that no laboratory classified as a BSL-3 or BSL-4 shall be permitted), an athletic use dedicated to private athlete training purposes that may include locker rooms, treatment areas, fitness uses, basketball uses, private food service, Studio Production Uses, and other Uses typical of a professional sports organization and their guests (which may include the hosting of private media, sponsorship and community activities) and that may include seating areas for up to 195 spectators, exclusive of parking and loading, Retail Use, Restaurant use and Service Use. Up to 7,000 square feet of Floor Area, Gross may be used for Restaurant Uses, Retail Uses and/or Service Uses, including, without limitation, Local Retail Business Uses, Take-out Restaurant Uses, Banking and Postal Uses, Bank Uses, Automatic Teller Machine Uses, Bar Uses, Barber Shop Uses, Beauty Shop Uses, yoga studio uses, and Entertainment Uses, and up to 190 parking spaces at grade and above grade. Parking and Loading are both accessed by means of Life Street Extension at the western terminus of the Service Road. 12. Proposed Traffic Circulation. Boston Landing is bounded on the north and south by Guest Street, on the west by Life Street and on the east by Arthur Street. It is also in close proximity to Market Street and North Beacon Street. Most are public streets under the jurisdiction of the City of Boston. Guest Street and Life Street underwent full depth reconstruction and are in compliance with the guidelines of the City of Boston s Complete Streets Guidelines. Boston Landing allows Life Street to be extended to the north, across Guest Street to the Service Road that runs parallel with the Turnpike. The northern terminus of what is currently being referred to as the Hichborn Street Extension has been constructed north of Guest Street and runs beneath the New Balance Headquarters Building to the Service Road. Arthur Street has been extended across the eastern end of Guest Street to the eastern terminus of the Service Road and the pick-up and drop-off location for the Boston Landing at Allston Brighton Commuter Rail Station. ACTIVE/85667988.6 5

The proposed vehicular and pedestrian circulation patterns are shown on the Site and Traffic Circulation Plan attached hereto as Exhibit D. Sidewalks along Guest Street and Life Street have been expanded to provide more comfortable pedestrian circulation. 13. Parking and Loading Facilities. While it is anticipated that there will be up to 1,900 parking spaces to serve the Proposed Project and the Other Future Proposed Projects, and adequate loading facilities will be provided, the number and location of the parking and loading components will be determined as part of the Article 80 review process. The Proposed Project will be built along with up to 190 parking spaces. The parking spaces will be located at and above grade. The PDA Master Plan allows for up to 851,000 square feet of Floor Area, Gross of parking and loading areas in the aggregate for all of the Future Proposed Projects, including the Proposed Project, of which approximately 479,500 square feet of parking and loading areas will be located at or above grade. Of the approximately 80,000 square feet of parking associated with the Proposed Project, all spaces will be located at grade and above grade concealed behind retail and façade treatments. Areas dedicated to loading for the Proposed Project will be approximately 4,000 square feet, at grade. 14. Access to Public Transportation and Pedestrian Connections. Boston Landing is served by MBTA Bus #64 and #68. It is anticipated that in the spring of 2017, Boston Landing LLC will complete construction on the Boston Landing at Allston Brighton Commuter Rail Station. In addition, the regular shuttle service to and from Kenmore Square and Harvard Square will be provided. 15. Development Schedule. The Proponent expects to commence construction of the Proposed Project not later than October of 2016. 16. Open Space and Landscaping. As is shown on Exhibit B, Boston Landing will be enhanced and beautified by well-designed, landscaped open space and streetscape. Open space and streetscape will continue to transform the Site from what was a sea of asphalt and former warehouses into areas where the community can gather and enjoy the available amenities. 17. Public Benefits. The Proposed Project will provide the following benefits, at a minimum: (a) The Proposed Project will have a design that responds favorably to each of the completed projects and the Other Future Proposed Projects, as well as being sensitive and responsive to its surrounding context; (b) The Proposed Project will minimize environmental impacts; (c) The Proposed Project will provide considerably more real estate tax revenue for the City of Boston; (d) The Proposed Project will generate housing linkage funds and jobs linkage funds for the City of Boston; (e) The Proposed Project establishes an anchor for renewed activity along the Guest Street and Life Street corridors; ACTIVE/85667988.6 6

(f) The Proposed Project will create another LEED certifiable building along the spine of the Massachusetts Turnpike; (g) The Proposed Project will expand the diversity of uses in the Boston Landing area to insure long-term activity and vitality; and (h) The Proposed Project will enhance a new pedestrian realm with the addition of Life Street Extension, the continuation of the Service Road, and with sidewalks and streetscape improvements throughout. 18. Green Buildings. Article 37 of the Code was promulgated to promote sustainable development in the City of Boston, and requires certain Proposed Projects to be LEED Certifiable (as defined in Section 37-2 of the Code). Accordingly, the Proposed Project will be planned, designed, and constructed to achieve the level certifiable using the most current applicable LEED building rating system promulgated by the U.S. Green Building Council, in compliance with Article 37 of the Code. The Proponent is committed to a sustainable design for of the Proposed Project, and it will be LEED Certifiable. As the design of the Proposed Project progresses, the Proponent will file with the BRA such additional LEED information as is required under Article 37 and in conjunction with the review and compliance requirements of Article 80B of the Code, as applicable. 19. Other Approvals. The design of the Proposed Project will be subject to further review by the Boston Civic Design Commission, and to further review by the BRA of the schematic design, design development and construction drawings, pursuant to the BRA s Development Review Guidelines and Article 80B of the Code. Aspects of the Proposed Project may also require approvals of other governmental agencies, such as the City of Boston s Public Improvement Commission, and Boston Zoning Commission. 20. Applicability and Compliance. In accordance with Section 80C-8 of the Zoning Code, the consistency of the Proposed Project with this Development Plan, as evidenced by the issuance by the BRA of one or more Certifications of Consistency or Partial Certifications of Consistency therefor, constitutes compliance with the dimensional, density, use, parking, loading, green building and other requirements of the Code, to the extent that such requirements have been addressed in the PDA Master Plan and this Development Plan. Where any conflict exists between the provisions of the PDA Master Plan or this Development Plan and any provisions of the underlying zoning for the PDA Master Plan Area, the provisions of the PDA Master Plan and this Development Plan shall be dispositive. For the purposes of the PDA Master Plan and this Development Plan, the compliance of the Proposed Project with this Plan shall not affect the compliance of any Other Future Proposed Project with the PDA Master Plan or this Development Plan. In the future, the parcels comprising Boston Landing may be consolidated and/or subdivided into one or more separate parcels. The PDA Master Plan and this Development Plan seek approval for any zoning nonconformity created or increased by the separation of ownership of the Boston Landing area, or by the consolidation, subdivision, or resubdivision of such parcels, provided that the appropriate use, dimensional/density, parking and loading requirements of the PDA Master Plan and this Development Plan are met by the resulting parcel or parcels. ACTIVE/85667988.6 7

Exhibit A Survey of Proposed Project and Legal Description - C1 ACTIVE/85667988.6

Legal Description C1 A certain parcel of land with all buildings, facilities and improvements thereon situated in the Brighton District of Boston, Massachusetts, the same being known as and numbered 40 Guest Street, and the same being shown as Building C-1 on a plan entitled Exhibit C-1, 40 Guest Street Brighton, MA (Suffolk County), dated April 21, 2016, prepared by CHA, bounded and described according to said plan, as follows: NORTHERLY EASTERLY SOUTHERLY WESTERLY NORTHERLY WESTERLY SOUTHERLY WESTERLY NORTHERLY EASTERLY by the Future Service Road, 218.30 feet; by Life Street Extension, 271.40 feet; by Guest Street, 205.92 feet; by land now or formerly of Brighton Landing Condominium, 55.66 feet; by the same, 27.79 feet; by the same, 201.48 feet; by the same, 11 feet; by the same, 16 feet; by the same, 11 feet; and by said Future Service Road, 6.81 feet. Containing 54,759 square feet or 1.257 acres of land, according to said plan. ACTIVE/85731418.2

Exhibit B Conceptual Site Plan of the Proposed Project ACTIVE/85667988.6

n 0 50 100 BOSTON LANDING 40 GUEST STREET APRIL 2016 SITE PLAN N B D E V E L O P M E N T G R O U P // E L K U S M A N F R E D I A R C H I T E C T S //

Exhibit C Schematic Plans for the Proposed Project ACTIVE/85667988.6

BOSTON LANDING 40 GUEST STREET n 0 20 40 APRIL 2016 GROUND FLOOR PLAN N B D E V E L O P M E N T G R O U P // E L K U S M A N F R E D I A R C H I T E C T S //

BOSTON LANDING 40 GUEST STREET n 0 20 40 APRIL 2016 MID-LEVEL PARKING PLAN N B D E V E L O P M E N T G R O U P // E L K U S M A N F R E D I A R C H I T E C T S //

BOSTON LANDING 40 GUEST STREET n 0 20 40 APRIL 2016 UPPER LEVEL PARKING PLAN N B D E V E L O P M E N T G R O U P // E L K U S M A N F R E D I A R C H I T E C T S //

BOSTON LANDING 40 GUEST STREET n 0 20 40 APRIL 2016 TYPICAL LAB/OFFICE PLAN (LEVELS 3+4) N B D E V E L O P M E N T G R O U P // E L K U S M A N F R E D I A R C H I T E C T S //

n 0 20 40 BOSTON LANDING 40 GUEST STREET APRIL 2016 OFFICE/SPORTS LOWER PLAN (LEVEL 5) N B D E V E L O P M E N T G R O U P // E L K U S M A N F R E D I A R C H I T E C T S //

n 0 20 40 BOSTON LANDING 40 GUEST STREET APRIL 2016 OFFICE/SPORTS UPPER PLAN (LEVEL 6) N B D E V E L O P M E N T G R O U P // E L K U S M A N F R E D I A R C H I T E C T S //

n 0 20 40 BOSTON LANDING 40 GUEST STREET APRIL 2016 PENTHOUSE LEVEL PLAN N B D E V E L O P M E N T G R O U P // E L K U S M A N F R E D I A R C H I T E C T S //

Exhibit D Site and Traffic Circulation Plan ACTIVE/85667988.6

PROJECT SITE LEGEND PARKING ACCESS LOADING FACILITY VEHICLE CIRCULATION n 0 50 100 BOSTON LANDING 40 GUEST STREET APRIL 2016 PARKING AND LOADING ACCESS N B D E V E L O P M E N T G R O U P // E L K U S M A N F R E D I A R C H I T E C T S //

PROJECT SITE LEGEND PARKING ACCESS LOADING FACILITY VEHICLE CIRCULATION BOSTON LANDING 40 GUEST STREET VEHICLE CIRCULATION n 0 50 100 APRIL 2016 N B D E V E L O P M E N T G R O U P // E L K U S M A N F R E D I A R C H I T E C T S //