PRE CONSTRUCTION CHECK LIST FOR BUILDING PERMITS

Similar documents
GALLATIN COUNTY Land Use Permit Information & Application

Septic Tank / Drainfield / Holding Tank Permit Application

Septic Tank / Drainfield / Holding Tank Permit Application

Zoning Permit Application Cover Page

NEW SINGLE FAMILY RESIDENTIAL

BAY COUNTY BUILDERS SERVICES DIVISION RESIDENTIAL. MANUFACTURER/MOBILE HOME PLAN REVIEW SUBMITTAL FORM (For HUD approved structures only)

~ Please Detach and Save This Page ~

Lot Split Application

APPLICATION FOR MAJOR SUBDIVISION APPROVAL (PRELIMINARY PLAT)

Charter Township of Garfield Grand Traverse County

COLUMBIA COUNTY LAND DEVELOPMENT SERVICES COURTHOUSE 230 STRAND ST. HELENS, OREGON (503) APPLICANT: Name:

PROCEDURE GUIDE AND APPLICATION FOR A DEVELOPMENT PERMIT TO CLEAR AND GRADE A PARCEL OF LAND

City of McMinnville Community Development Department

PLANNING CLEARANCE. Planning Clearance is required prior to the submittal of most building and development permit applications.

NELSON TOWNSHIP APPLICATION FOR BUILDING PERMIT

Umatilla County Department of Land Use Planning

ALEXANDRIA TOWNSHIP Land Use/Building Permit Application

PLANNING & DEVELOPMENT SERVICES 1800 Continental Place Mount Vernon, WA Inspections Office Fax 360.

MCPC MONONGALIA COUNTY PLANNING COMMISSION 243 High Street, Rm 110, Morgantown, WV Phone Fax

ELMORE COUNTY LAND USE & BUILDING DEPARTMENT 520 E 2 nd South Mountain Home, ID (208) Preliminary Plat Application

SHORT PLAT Information

For Office Use Only. Permit No. Fee: $ $ per proposed lot (AN ADDITIONAL 10% CODE COMPLIANCE FEE WILL BE CHARGED)

COMMERCIAL SITE PLAN & CONDITIONAL USE PERMIT REVIEW PROCESS & CHECKLIST

DEPARTMENT. A Current Contractor Listing: If the contractor is pulling the permit, they must be listed with the County

Make checks payable to Columbia County Treasurer. We do not issue refunds. Credit Cards accepted.

Instructions for Residential Building Permit Application

CHAPTER 3 PRELIMINARY PLAT

BUILDING PERMIT APPLICATION

ARTICLE 9 SPECIFICATIONS FOR DOCUMENTS TO BE SUBMITTED

MINOR SUBDIVISION INFORMATION

Commercial Requirements Packet Sheridan, Indiana Hamilton County

MUDDY CREEK TOWNSHIP PO BOX 239 PORTERSVILLE, PA SUBDIVISION AND LAND DEVELOPMENT APPLICATION

Planned Residential Development ( PRD ) Application

PLYMOUTH PLANNING BOARD APPLICATION FOR A MINOR SUBDIVISION OR MAJOR SUBDIVISION

Zoning Permit Application

LOT SUBDIVISION LOT BLOCK SIZE

MANUFACTURED HOME SUBMITTAL REQUIREMENTS

PARK COUNTY DEVELOPMENT PERMIT APPLICATION

Waseca County Planning and Zoning Office

INSTRUCTIONS FOR APPLICATION IMPORTANT NOTICES

REGULAR FINAL PLAT SUBDIVISION APPLICATION

Zoning/Building Permit Application

EAST COCALICO TOWNSHIP BUILDING / ZONING PERMIT PROCEDURE AND GENERAL NOTES Revised 6/12/2012

Individual Well Individual Septic. Community Well 19. What is the proposed method of sewage disposal? Public. None

City of Leavenworth DEPARTMENT OF DEVELOPMENT SERVICES MAJOR SUBDIVISION APPLICATION 1

PRELIMINARY PLAT Checklist

SWIMMING POOL PERMIT APPLICATION PACKET

Conditional Use Sketch Plan Application Non-Residential Zone

SUBMITTAL REQUIREMENTS: The number indicates the number of copies for submittal (if applicable).

LAND USE PERMIT APPLICATION

Town of Jamestown Single/Two-family Residential. Building Permit Application Packet

Septic Tank / Drainfield / Holding Tank Permit Application

ZONING COMPLIANCE PERMIT APPLICATION

Larimer County Planning Dept. Procedural Guide for 1041 PERMITS

9. Public (Federal, State, or local

SPECIAL USE PERMIT APPLICATION CHECKLIST BUCKINGHAM COUNTY OFFICE OF ZONING AND PLANNING MINUMUM SUBMISSION REQUIREMENTS

OSSF Permit Application

APPLICATION FOR PRELIMINARY PLAT CERRO GORDO COUNTY, IOWA

Name: Address: City/State Phone: *Please include the Commercial/Industrial/Other Establishment Sheet with permit

INCOMPLETE APPLICATIONS WILL BE RETURNED! GENERAL PROPERTY INFORMATION. Applicant s name Day Phone address Authorized Agent (if applicable)

MAJOR SUBDIVISION PRELIMINARY PLAT CHECKLIST

MAJOR RESIDENTIAL AND NONRESIDENTIAL SUBDIVISIONS

ACCESSORY STRUCTURE DEVELOPMENT ORDER APPLICATION (WITH RESTROOM PLUMBING)

REZONING APPLICATION CHECKLIST BUCKINGHAM COUNTY OFFICE OF ZONING AND PLANNING MINUMUM SUBMISSION REQUIREMENTS

LAND USE APPLICATION

Huntington Building Inspection

Initial Subdivision Applications Shall Include the Following:

R e z o n i n g A p p l i c a t i o n S u b m i s s i o n R e q u i r e m e n t s

APPLICATION FOR MAJOR SUBDIVISION APPROVAL (FINAL PLAT)

Attached is a Clinton Township Zoning Permit Application and requirements for issuance of a permit.

JOINT PLANNING BOARD APPLICATION FORM

Manor Township Zoning Permit Application (Section 702) Application Number Application Date / /

BONNER COUNTY PLANNING DEPARTMENT

City of Midland Application for Site Plan Review

APPLICATION PROCEDURE

LAND USE PERMIT INFORMATION PACKET

City of Leavenworth REMODELS / ADDITIONS / ROOFS / PLUMBING / MECHANICAL

STEP 1: SOIL EVALUATION

CITY OF BELLE GLADE. 110 Dr. Martin Luther King Jr. Blvd., West Belle Glade, FL Telephone (561) Fax (561)

SUBMITTAL REQUIREMENTS: The number indicates the number of copies for submittal (if applicable).

LAND DIVISION APPLICATION

City Of Attleboro Conservation Commission

NOTICE APPLICATION MUST BE FILLED OUT COMPLETELY.

6. Name, address, & daytime telephone # of developer (if different from applicant): 7. Address of subject property:

MINOR SUBDIVISION APPLICATION

Paper copies & an electronic copy (pdf) of the following drawings or plans: 1 full size scalable certified survey and 1 (11 x 17) copy

PLANNED DEVELOPMENT / CONDITIONAL USE PERMIT Application

CITY OF SARALAND PRELIMINARY SUBDIVISION PLAT REVIEW

SUBDIVISION APPLICATION CHECKLIST SKETCH PLAN PRELIMINARY PLAT FINAL PLAT

City of Prior Lake APPLICATION FOR REGISTERED LAND SURVEY

RESIDENTIAL DEVELOPMENT ORDER APPLICATION Application Fee $ PLEASE READ THE FOLLOWING INFORMATION CAREFULLY

WRIGHT TOWNSHIP Ottawa County 1565 Jackson Street, P.O. Box 255, Marne, Michigan 49435

TOWN OF FREEDOM FREEDOM, NH ZONING-BUILDING PACKET

THE BUILDING PERMIT PROCESS FOR SINGLE-FAMILY DWELLINGS REVISED MAY 2006

BRIDGETON SUBDIVISION APPLICATION CHECKLIST

MAJOR SUBDIVISION APPLICATION

INDUSTRIAL/COMMERCIAL DEVELOPMENTS

Lake of the Woods County Land Use Permit Instruction Sheet

Administrative Application Duplex Subdivisions

ARTICLE 5 MINOR SUBDIVISION/LAND DEVELOPMENT

Transcription:

PRE CONSTRUCTION CHECK LIST FOR BUILDING PERMITS PLAN AHEAD the following items must be completed, as outlined below, when submitting your building permit application. BE AWARE that if you do not live in a platted subdivision you will need to complete a Single Lot Subdivision Application. Upon approval of the Single Lot Subdivision application the approval process of your Building permit will begin. Once started it could take approximately 10 working days to review & approve your Building plans, even if you have ALL the required information. An incomplete application may cause further delay. Building permit. Building permit fees are based on square footage and the type of construction (i.e. garage, residence, shed, carport). A Deposit is due upon submittal. Two sets of detailed plans and supporting documents (Engineering Calculations) and truss designs are required before approval of permit. Plans: Call office to see if Engineering is required based on the area of the project Site Plan Review will be conducted on each and every building permit to determine if the building or construction can meet the current Fremont County Development Code requirements. A $50.00 fee will be charged for the site plan review. You must bring in documentation showing that there are NO deed restrictions on the parcel of ground. There are two different ways to comply with the Energy Code. (1) would be to complete a rescheck at www.energycodes.gov and submit to our office. (2) would be to use the Prescriptive Path and Insulate your house to the values listed below. Basement and Crawl Space Wall Unheated Slab* Climate Zone Ceiling Wood Frame wall R value Floor R value R value R value Continuous Cavity R value Depth (ft.) 6 49 20 20 or 13+5** 30 10 13 10 4 ** 13+5 means R 13 cavity insulation plus R 5 insulated sheathing. If structural sheathing covers 25% of exterior, R 5 sheathing is not required where structural sheathing is used. If structural sheathing covers more than 25% of exterior, structural sheathing shall be supplemented with insulated sheathing of at least R 2. *R 5 shall be added to the required slab edge R values for heated slabs. Insulation depth shall be the depth of the footing or 2 feet, whichever is less, in zones 1 through 3 for heated slabs. If community sewer (Island Park/ Mack s Sewer System or Last Chance / Pond s Sewer System) is available to your building in I.P. /Mack s Sewer or Last Chance/Pond s Sewer system areas, a hook up fee of $6,140 must be paid prior to building permit approval. These fees must be paid at the Fremont County Treasurer s Office. A COPY of the receipt is needed upon submittal. If you will be placing an individual septic system, you will need to complete a sewer application with Eastern Idaho Public Health District. A COPY of the receipt is needed upon submittal. If you are building in a subdivision, please check the covenants (if recorded) for any requirements such as, property setbacks. Also a letter from the architecture board may be required prior to permit approval. If a new access to a County Road or Highway is being built a Driveway Permit will be required thru the Public Works Dept. or ITD. (Just because a building Permit for new construction has been approved thru the county does not mean the county will be maintaining the roads to your property. (Signature sheet attached)). Building Height As per Fremont County Ordinance buildings are not to exceed 30 feet unless they are accessory structures then they are not allowed to exceed 25 feet. Building Permits should be posted on the construction site when the project is started, and should remain on site until final inspection and occupancy is granted.

Building Permit Application One and Two Family Dwelling Choice of Contact: Fremont County 125 N. Bridge Street, St. Anthony, ID. 83445 Phone: 208.624.4643 Fax: 208.624.1320 Internet: www.co.fremont.id.us JOB SITE INFORMATION Name: Property Address: City /Zip: Parcel #: Subdivision: Lot: Block: Section: Township: Range: TYPE OF WORK New construction Addition/alteration PROPERTY OWNER Name: Address: City/State/Zip: Phone: ( ) Cell: ( ) Email: CONTRACTOR Business Name: Contact Name: State Reg. #: Address: City/State/Zip: Phone: ( ) Cell: ( ) CONTRACTOR Commercial Residential TENANT APPLICANT APPLICANT I hereby certify that I have chosen to use the Prescriptive way of Energy Code Compliance. Authorized signature: I hereby certify that I understand the just because a building permit has been applied/approved on my property through the county does NOT mean the county will be maintaining the roads to my property. Authorized signature: I hereby certify that the information above is true and correct. All work to be performed shall be in accordance with all governing laws and rules. FOR OFFICE USE ONLY Received By/Date: Permit #: Plan Review/Date: Date Picked up: REQUIRED INFORMATION Permit fees are based on the valuation calculated using the amount of proposed constructed area. Living Area: Basement area: Garage/Shop area: Deck/Porch/Carport area: Other structure area: Building Valuation: Septic Permit Number: Site Plan Approval/Date: Dist: IMPORTANT INFORMATION ***ALL STRUCTURES BUILT IN AN AREA WITH A 70lb/ft² SNOW LOAD ARE REQUIRED TO BE DESIGNED BY AN ENGINEER OR ARCHITECT THAT IS LICENSED IN THE STATE OF IDAHO.*** ***ALL FREE STANDING POST & BEAM STRUCTURES REQUIRE ENGINEERED STAMPED PLANS. *** OFFICE USE ONLY Res check attached Prescriptive Addressing Site Plan Fees Paid Septic/Sewer Driveway permit HO (if applicable) BUILDING PERMIT FEES Date Paid: Deposit Due: Cash CC Check # Date Paid: Balance Due: Site Plan Review Fee (included if applicable) Cash CC Check # TOTAL BUILDING PERMIT FEE: *** This permit application expires if the permit is not obtained within 180 days after it has been approved. *** Authorized signature: Print name: Date:

SIMPLE SITE PLAN SHEET Show scale here >>>> 1 = feet. Place a North Arrow in this center of this space >>> CLEARLY INDICATE: all property lines, setbacks from buildings to property line on all sides, existing structures, and all surface water including floodplains, lakes, rivers, streams, canals and wetlands, and the road name and location where your driveway will access your property. Be aware of Easements on property Clearly identify on drawing *Subdivision Setbacks Must Be Met Before County Setbacks, Check With Your Homeowners Association* County setback standards from property lines to proposed construction. 75 setback on all sides from River, Streams, Lakes these may vary if the setback is from the high water mark or the stream corridor. FRONT: 50 Arterial Street 30 Other SIDES: 25 REAR: 25 *Setbacks stated in a Subdivision s Covenants may be used in some cases rather than the County s setbacks. This site plan sheet may be used for simple scaled drawings to accompany permit applications. Please use detailed architect s engineer s or builder s drawings, when available.

Zoning Questionnaire Please complete the following questions to assist providing information for the zoning review to be conducted on your building permit. 1) Will your proposed development disturb a cumulative total of more than 1 acre of land with a slope of more than 8%, or create more than 20,000 of impervious surface? yes no. If so, a professionally prepared runoff and erosion control plan is required. 2) Does your property contain wetlands or a spring? yes no If you answered yes, wetlands delineation may be required and discussion with Planning & Zoning staff is required. 3) Will your proposed structure be located in a floodplain area yes no, or next to a stream corridor (i.e. river, canal, creek, and stream)? yes no. Name of river, canal, creek. Construction near streams will be subject to minimum setbacks from the stream corridor. If Construction is allowed in a floodplain a surveyor s certificate of elevation is required. 4) Will your proposed structure be located on a slope? 15 to 30% 30%+. Development on slopes of 30% or more, or other slopes identified as unstable, will require a geotechnical engineer s certificate that the development creates no significant hazard of slope failure or accelerated soil erosion. 5) Are you keeping the native vegetation on the property? yes no 6) Does this property include or border irrigated lands or irrigation works? yes no. If so, you will be required to check with the Fremont Madison Irrigation Company, St. Anthony, Idaho (208 624 3381) to discuss water shares, canal maintenance requirements, or canal crossing. 7) Will you be conducting a home business from this structure? yes no. If so you may be required to obtain additional permits. Please indicate the type of home based business you are or will be conducting. 8) The County regulations allow a home a 30 foot building height measured at the eave, and accessory structures a 25 foot building height measured at the eave. Some areas are allowed a lesser or greater height based on fire fighting capabilities, as determined by the Fire District. What is the height of your proposed building? 9) Will you be installing an individual sewer system? yes no. Will you be connecting to a community (i.e. city or public) sewer system? yes no. If yes which one 10) Will you be providing an individual well for drinking or potable water? yes no. Will you be connecting to a community (public) water system? yes no. If yes which one 11) Can the utility company provide access for power to your building? yes no 12) Does the utility company have the capability to bring power to your property? yes no 13) Utilities provided to your property must be underground I agree